|
|
| Line 1: |
Line 1: |
| {{Adams
| | #REDIRECT [[NUREG-0569, Forwards NUREG-0569, Evaluation of Integrity of SEP Reactor Vessels, Completing Review of SEP Topic V-6. W/O Encl]] |
| | number = ML19309C869
| |
| | issue date = 03/05/1980
| |
| | title = Forwards NUREG-0569, Evaluation of Integrity of SEP Reactor Vessels, Completing Review of SEP Topic V-6.W/o Encl
| |
| | author name = Ziemann D
| |
| | author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| |
| | addressee name = Counsil W
| |
| | addressee affiliation = CONNECTICUT YANKEE ATOMIC POWER CO.
| |
| | docket = 05000213
| |
| | license number =
| |
| | contact person =
| |
| | case reference number = TASK-05-06, TASK-5-6, TASK-RR
| |
| | document report number = NUDOCS 8004090338
| |
| | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| |
| | page count = 2
| |
| }}
| |
| | |
| =Text=
| |
| {{#Wiki_filter:_
| |
| I Mh[$
| |
| : p. ay
| |
| 'g UNITED STATES
| |
| +
| |
| E' 3 i
| |
| NUCLEAR REGULATORY COMMISSION E
| |
| WASHING TON, D. C. 20655 k...+/
| |
| March 5, 1980
| |
| +
| |
| Docket No. 50-213 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Conpany Post Office Box 270 Hartford, Connecticut 06101
| |
| | |
| ==Dear Mr. Counsil:==
| |
| RE: COMPLETION OF SEP TOPIC V-6, REACTOR VESSEL INTEGRITY HADDAM NECK PLANT Enclosed herewith is a report entitled, " Evaluation of the Integrity of SEP i
| |
| Reactor Vessels," (NUREG-0569) for your information.
| |
| This report documents our review of the design specifications and quality assurance programs used in reactor vessel construction.
| |
| It also provides the status of material surveillance programs, pressure-temperature operating limits, inservice inspection programs and other vessel related issues for plants in the Systematic Evaluation Program (SEP).
| |
| This evaluation completed our review of SEP Topic V-6 and will be used as input to the integrated review of Haddam Neck Plant.
| |
| Sincerely, t/
| |
| qvu&
| |
| C
| |
| : g. Dennis L. Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors
| |
| | |
| ==Enclosure:==
| |
| NUREG-0569 cc w/o enclosure:
| |
| See next page 8004000 )
| |
| | |
| 4 Mr. W. G. Counsil March 5,1980 w/o enclosure:
| |
| cc Day, Berry & Howard U. S. Environmental Protection
| |
| ~
| |
| Counselors at Law Agency One Constitution Plaza Region I Office Hartford, Connecticut 06103 ATTN:
| |
| EIS COORDINATOR JFK Federal Building Superintendent Boston, Massachusetts 02203 Haddam Neck Plant RFD #1 K M C, Inc.
| |
| Post Office Box 127E ATTN:
| |
| Richard E. Schaffstall East Hampton, Connecticut 06424 1747 Pennsylvania Avenue, N. W Suite 1050 Mr. James R. Himmelwright Washington, D. C.
| |
| 20006 Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen Town Hall Haddam, Connecticut 06103 Connecticut Energy Agency ATTN:
| |
| Assistant Director Research and Policy Development Department of Planning and Energy Policy 20 Grand Street Hartford, Connecticut 06106 Director, Technical Assessment Division Office of Radiation Programs (AW-459)
| |
| U. S. Environmental Protection Agency Crysta! Mall #2 Arlington, Virginia 20460
| |
| .}}
| |