ML13112A277: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 14: | Line 14: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:P=>ML13112A174 April 22, 2013 NOTE TO COMMISSIONERS ASSISTANTS OCM/AMM OCM/KLS OCM/GEA cc Philip Niedzielski-Eichner Jeffry Sharkey Belkys Sosa cc Heather Astwood Jessica Bielecki Roger Davis Susan Vrahoretis XPatrick Castleman X Nanette Gilles Clare Kasputys Alan Frazier Steve Baggett X John Jolicoeur Janet Lepre Kathleen Blake X Nathan Sanfilippo Nicole Riddick Carmel Savoy Marshall Kohen Michael Waters OCM/WDM OCM/WCO Mary Woollen X Jen Schwartzman Patrice Bubar John Tappert Catina Gibbs Rebecca Tadesse X Amy Cubbage Patti Pace Margaret Bupp Andrea Kock Andrea Cermeno XVictor Cusumano Kimberly Sexton Renee Taylor Linda Herr XPatti Jimenez X Sunny Bozin FROM: Reginald W. Mitchell /RA/ Assistant for Operations, OEDO | |||
==SUBJECT:== | |||
TEFLON SEALS ON CONTAINMENT ELECTRICAL PENETRATIONS AT FORT CALHOUN STATION The Commission directed the staff in Staff Requirements Memorandum (SRM) M130108, dated January 22, 2013, to provide the Commission with the background and history associated with the use of Teflon seals on containment electrical penetrations at Fort Calhoun Station. This | |||
information should include any generic actions the NRC has taken on this issue, including actions subsequent to the discovery of Teflon seals at Fort Calhoun. The requested information is provided in the Enclosure. | |||
==Enclosure:== | |||
As stated | |||
cc: R. W. Borchardt, EDO E. Leeds, NRR M. Weber, DEDMRT SECY M. Johnson, DEDR OGC D. Ash, DEDCM OCA R. Mitchell, AO OPA M. Landau, OEDO OIP K. Brock, OEDO OIS D. Merzke, OEDO CFO J. Polickoski, NRR EDO R/F (WITS 201300004) | |||
M. Markley, NRR}} |
Revision as of 22:58, 17 July 2018
ML13112A277 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 04/22/2013 |
From: | Mitchell R W NRC/EDO/AO |
To: | Bozin S, Castleman P I, Cusumano V G, Gilles N V, Sanfilippo N T, Schwartzman J K, Cubbage A E, Jimenez P J, Jolicoeur J R NRC/OCM |
D. Merzke, 415-8744 | |
Shared Package | |
ML13112A174 | List: |
References | |
Download: ML13112A277 (1) | |
Text
P=>ML13112A174 April 22, 2013 NOTE TO COMMISSIONERS ASSISTANTS OCM/AMM OCM/KLS OCM/GEA cc Philip Niedzielski-Eichner Jeffry Sharkey Belkys Sosa cc Heather Astwood Jessica Bielecki Roger Davis Susan Vrahoretis XPatrick Castleman X Nanette Gilles Clare Kasputys Alan Frazier Steve Baggett X John Jolicoeur Janet Lepre Kathleen Blake X Nathan Sanfilippo Nicole Riddick Carmel Savoy Marshall Kohen Michael Waters OCM/WDM OCM/WCO Mary Woollen X Jen Schwartzman Patrice Bubar John Tappert Catina Gibbs Rebecca Tadesse X Amy Cubbage Patti Pace Margaret Bupp Andrea Kock Andrea Cermeno XVictor Cusumano Kimberly Sexton Renee Taylor Linda Herr XPatti Jimenez X Sunny Bozin FROM: Reginald W. Mitchell /RA/ Assistant for Operations, OEDO
SUBJECT:
TEFLON SEALS ON CONTAINMENT ELECTRICAL PENETRATIONS AT FORT CALHOUN STATION The Commission directed the staff in Staff Requirements Memorandum (SRM) M130108, dated January 22, 2013, to provide the Commission with the background and history associated with the use of Teflon seals on containment electrical penetrations at Fort Calhoun Station. This
information should include any generic actions the NRC has taken on this issue, including actions subsequent to the discovery of Teflon seals at Fort Calhoun. The requested information is provided in the Enclosure.
Enclosure:
As stated
cc: R. W. Borchardt, EDO E. Leeds, NRR M. Weber, DEDMRT SECY M. Johnson, DEDR OGC D. Ash, DEDCM OCA R. Mitchell, AO OPA M. Landau, OEDO OIP K. Brock, OEDO OIS D. Merzke, OEDO CFO J. Polickoski, NRR EDO R/F (WITS 201300004)
M. Markley, NRR