ML13112A277: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:P=>ML13112A174 April 22, 2013 NOTE TO COMMISSIONERS ASSISTANTS OCM/AMM  OCM/KLS  OCM/GEA cc Philip Niedzielski-Eichner  Jeffry Sharkey  Belkys Sosa cc Heather Astwood  Jessica Bielecki  Roger Davis  Susan Vrahoretis  XPatrick Castleman  X Nanette Gilles  Clare Kasputys  Alan Frazier  Steve Baggett X John Jolicoeur  Janet Lepre  Kathleen Blake X Nathan Sanfilippo  Nicole Riddick  Carmel Savoy  Marshall Kohen      Michael Waters  OCM/WDM  OCM/WCO Mary Woollen      X Jen Schwartzman  Patrice Bubar    John Tappert  Catina Gibbs  Rebecca Tadesse  X Amy Cubbage  Patti Pace  Margaret Bupp  Andrea Kock  Andrea Cermeno  XVictor Cusumano  Kimberly Sexton    Renee Taylor  Linda Herr    XPatti Jimenez  X Sunny Bozin FROM: Reginald W. Mitchell  /RA/ Assistant for Operations, OEDO
==SUBJECT:==
TEFLON SEALS ON CONTAINMENT ELECTRICAL PENETRATIONS AT FORT CALHOUN STATION The Commission directed the staff in Staff Requirements Memorandum (SRM) M130108, dated January 22, 2013, to provide the Commission with the background and history associated with the use of Teflon seals on containment electrical penetrations at Fort Calhoun Station. This
information should include any generic actions the NRC has taken on this issue, including actions subsequent to the discovery of Teflon seals at Fort Calhoun. The requested information is provided in the Enclosure.
==Enclosure:==
As stated
cc: R. W. Borchardt, EDO E. Leeds, NRR  M. Weber, DEDMRT  SECY    M. Johnson, DEDR OGC D. Ash, DEDCM OCA R. Mitchell, AO OPA M. Landau, OEDO OIP K. Brock, OEDO OIS  D. Merzke, OEDO CFO  J. Polickoski, NRR EDO R/F (WITS 201300004)
M. Markley, NRR}}

Revision as of 22:58, 17 July 2018

4/22/13 - Teflon Seals at Fort Calhoun (to: Commissioners' Assistants; from: Reginald W. Mitchell)
ML13112A277
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/22/2013
From: Mitchell R W
NRC/EDO/AO
To: Bozin S, Castleman P I, Cusumano V G, Gilles N V, Sanfilippo N T, Schwartzman J K, Cubbage A E, Jimenez P J, Jolicoeur J R
NRC/OCM
D. Merzke, 415-8744
Shared Package
ML13112A174 List:
References
Download: ML13112A277 (1)


Text

P=>ML13112A174 April 22, 2013 NOTE TO COMMISSIONERS ASSISTANTS OCM/AMM OCM/KLS OCM/GEA cc Philip Niedzielski-Eichner Jeffry Sharkey Belkys Sosa cc Heather Astwood Jessica Bielecki Roger Davis Susan Vrahoretis XPatrick Castleman X Nanette Gilles Clare Kasputys Alan Frazier Steve Baggett X John Jolicoeur Janet Lepre Kathleen Blake X Nathan Sanfilippo Nicole Riddick Carmel Savoy Marshall Kohen Michael Waters OCM/WDM OCM/WCO Mary Woollen X Jen Schwartzman Patrice Bubar John Tappert Catina Gibbs Rebecca Tadesse X Amy Cubbage Patti Pace Margaret Bupp Andrea Kock Andrea Cermeno XVictor Cusumano Kimberly Sexton Renee Taylor Linda Herr XPatti Jimenez X Sunny Bozin FROM: Reginald W. Mitchell /RA/ Assistant for Operations, OEDO

SUBJECT:

TEFLON SEALS ON CONTAINMENT ELECTRICAL PENETRATIONS AT FORT CALHOUN STATION The Commission directed the staff in Staff Requirements Memorandum (SRM) M130108, dated January 22, 2013, to provide the Commission with the background and history associated with the use of Teflon seals on containment electrical penetrations at Fort Calhoun Station. This

information should include any generic actions the NRC has taken on this issue, including actions subsequent to the discovery of Teflon seals at Fort Calhoun. The requested information is provided in the Enclosure.

Enclosure:

As stated

cc: R. W. Borchardt, EDO E. Leeds, NRR M. Weber, DEDMRT SECY M. Johnson, DEDR OGC D. Ash, DEDCM OCA R. Mitchell, AO OPA M. Landau, OEDO OIP K. Brock, OEDO OIS D. Merzke, OEDO CFO J. Polickoski, NRR EDO R/F (WITS 201300004)

M. Markley, NRR