| | #REDIRECT [[TXX-6053, Interim Deficiency Rept CP-86-52 Re Cable Tray Splices/ Connections.Initially Reported on 860725.Testing Program Initiated to Evaluate Conditions.Next Rept Will Be Submitted by 861212]] |
| | number = ML20215L961
| |
| | issue date = 10/21/1986
| |
| | title = Interim Deficiency Rept CP-86-52 Re Cable Tray Splices/ Connections.Initially Reported on 860725.Testing Program Initiated to Evaluate Conditions.Next Rept Anticipated by 861212
| |
| | author name = Counsil W, Keeley G
| |
| | author affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| |
| | addressee name = Johnson E
| |
| | addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| |
| | docket = 05000445, 05000446
| |
| | license number =
| |
| | contact person =
| |
| | document report number = CP-86-52, TXX-6053, NUDOCS 8610290394
| |
| | document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| |
| | page count = 2
| |
| }}
| |
| | |
| =Text=
| |
| {{#Wiki_filter:_ - _ _ _ _ - _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
| |
| h Log # TXX-6053 File # 10110 903.11 TEXAS UTILITIES GENERATING COMPANY BRYWAY TOWER. 4ee NORTH OLIVE STREET.1.3L 88. DALt.AS. TEXAS 75301 0ctober 21' l986 wi_tuAM. G. C.O.U.N.S.IL.
| |
| lg-g.
| |
| OCT 2 l 1986 Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
| |
| | |
| ==SUBJECT:==
| |
| COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
| |
| DOCKET NOS. 50-445 AND 50-446 CABLE TRAY SPLICES / CONNECTIONS SDAR: CP-86-52 (INTERIM REPORT)
| |
| | |
| ==Dear Mr. Johnson:==
| |
| On July 25, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving the splices / connections used for cable trays in Units 1 and 2.
| |
| This I
| |
| is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4981, dated August 22, 1986.
| |
| This issue was identified during as-built activities for the Unit 2 Cable Tray Hangers. We have established that splices / connections used for some tray types and sizes were not installed in accordance with specified splice patterns as defined by the cable tray manufacturer or approved design change documents.
| |
| Although the deviations do not appear to impair the functional capability of the trays, steps are being taken to provide a more definitive determination.
| |
| A testing program is being initiated to evaluate these conditions.
| |
| Completion of this testing is estimated for mid-November, 1986.
| |
| Evaluation of test results and identification of corrective actions, if required, will be performed at that time.
| |
| 8610290394 861021 PDR ADOCK 05000445 S
| |
| PDR a unrussox or reus cruarins vu.rcraic cmrrsw r/o
| |
| | |
| =
| |
| S i
| |
| TXX-6053 October 21, 1986 Page 2 l
| |
| Based upon this schedule we anticipate submitting our next report by December 12, 1986.
| |
| Very trul yours,
| |
| $. hs W. G. Counsil
| |
| /
| |
| By:
| |
| G.S. Keeley T-Manager, Nuclear LicWnsing i
| |
| JCH/amb c - NRC Region IV (0 + 1 copy)
| |
| Director, Inspection & Enforcement (15 copies)
| |