{{#Wiki_filter:Attachment 6 OBDI 202  IOLE Process Rev 1 DRAFT OUTLINE COMMENTS  Facility: Comanche Peak  First Exam Date: 03/23/15  Written Exam Outline (Generated by NRC on 9/10/14; Comments Based on 11/20/14 Proposed Revisions) Comment Resolution 1 Question 53: The proposed replacement K/A, generic 2.1.14, is not one of the K/A statements approved for use in Tier 1 and 2 questions. See NUREG-1021, ES-401, Section D.1.b. The subject matter became Question 26, Tier 2, Group 1, 078 Instrument Air. The K/A statement was changed to Generic 2.1.23. 2 Question 63: When the site has to do an infrequent, planned gaseous release, as described in FSAR Section 11.3.3.1, ventilation would be controlled as part of the process. Assuming there is a procedure to conduct this discharge, it would seem that design parameters associated with the Gaseous Waste Processing System (GWPS) (example: FSAR Table 11.3-2) would be monitored to ensure that appropriate actions are taken if alarms/trends associated with them require some action. Verify that there are no parameters tied to GWPS design controls that are not monitored in this situation. This issue was discussed with the licensee. Based on review of system design, there were no ventilation components within the purview of a Reactor Operator during a gaseous discharge that would allow for writing an adequate question to this K/A statement. Therefore, this K/A statement was rejected, and replaced with Tier 2, Group 2, 035 Steam Generator, K/A Statement A1.02. 3 the Tier 3 form (Form ES-401-3). Editorial comment resolved. Administrative JPM Outline (Date) Comment Resolution 1 N/A  written RO exam only  Control Room / In-Plant System JPM Outline (Date) Comment Resolution 1 N/A  written RO exam only  Simulator Scenario Outline Comments (Date) Comment Resolution 1 N/A  written RO exam only}}

Revision as of 16:50, 12 June 2018

Comanche Peak - Draft Outline Comments
ML15084A080
Person / Time
Site: Comanche Peak  
Issue date: 03/23/2015
From: Vincent Gaddy
Operations Branch IV
To:
laura hurley
References
Download: ML15084A080 (1)


Text

Attachment 6 OBDI 202 IOLE Process Rev 1 DRAFT OUTLINE COMMENTS Facility: Comanche Peak First Exam Date: 03/23/15 Written Exam Outline (Generated by NRC on 9/10/14; Comments Based on 11/20/14 Proposed Revisions) Comment Resolution 1 Question 53: The proposed replacement K/A, generic 2.1.14, is not one of the K/A statements approved for use in Tier 1 and 2 questions. See NUREG-1021, ES-401, Section D.1.b. The subject matter became Question 26, Tier 2, Group 1, 078 Instrument Air. The K/A statement was changed to Generic 2.1.23. 2 Question 63: When the site has to do an infrequent, planned gaseous release, as described in FSAR Section 11.3.3.1, ventilation would be controlled as part of the process. Assuming there is a procedure to conduct this discharge, it would seem that design parameters associated with the Gaseous Waste Processing System (GWPS) (example: FSAR Table 11.3-2) would be monitored to ensure that appropriate actions are taken if alarms/trends associated with them require some action. Verify that there are no parameters tied to GWPS design controls that are not monitored in this situation. This issue was discussed with the licensee. Based on review of system design, there were no ventilation components within the purview of a Reactor Operator during a gaseous discharge that would allow for writing an adequate question to this K/A statement. Therefore, this K/A statement was rejected, and replaced with Tier 2, Group 2, 035 Steam Generator, K/A Statement A1.02. 3 the Tier 3 form (Form ES-401-3). Editorial comment resolved. Administrative JPM Outline (Date) Comment Resolution 1 N/A written RO exam only Control Room / In-Plant System JPM Outline (Date) Comment Resolution 1 N/A written RO exam only Simulator Scenario Outline Comments (Date) Comment Resolution 1 N/A written RO exam only