{{#Wiki_filter:April 11, 2017 SVPL TR: #17-0013 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 | |||
==Subject:== | |||
Dresden Nuclear Power Station, Unit 3 Renewed Facility Operating License No. DPR-25 NRC Docket No. 50-249 Notification of Readiness for NRC 95001 Inspection | |||
==References:== | |||
Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450 1) Letter from Cynthia Pederson (NRC) to Bryan Hanson, "Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation Letter for Dresden Unit 3", dated February 27, 2017. In the referenced letter, Exelon Generation Company, LLC (EGC) was informed that based on the Unit 3 HPCI Auxiliary Oil Pump failure, the NRC determined that Dresden Nuclear Power Station (DNPS) is in the Regulatory Response Column of the Reactor Oversight Process Action Matrix. As a result of the White finding, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001. Based on discussions with the NRC staff, EGC requests that the NRC begin the inspection in June 2017. There are no regulatory commitments contained in this submittal. Should you have any questions concerning this letter, please contact Mr. Bruce Franzen, Regulatory Assurance Manager, at (815) 416-2800. __ Peter J. Karaba Site Vice President Dresden Nuclear Power Station | |||
}} | }} | ||
Revision as of 13:24, 28 April 2018
| ML17103A185 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 04/11/2017 |
| From: | Karaba P J Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 17-0013 | |
| Download: ML17103A185 (1) | |
Text
April 11, 2017 SVPL TR: #17-0013 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
Dresden Nuclear Power Station, Unit 3 Renewed Facility Operating License No. DPR-25 NRC Docket No. 50-249 Notification of Readiness for NRC 95001 Inspection
References:
Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450 1) Letter from Cynthia Pederson (NRC) to Bryan Hanson, "Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation Letter for Dresden Unit 3", dated February 27, 2017. In the referenced letter, Exelon Generation Company, LLC (EGC) was informed that based on the Unit 3 HPCI Auxiliary Oil Pump failure, the NRC determined that Dresden Nuclear Power Station (DNPS) is in the Regulatory Response Column of the Reactor Oversight Process Action Matrix. As a result of the White finding, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001. Based on discussions with the NRC staff, EGC requests that the NRC begin the inspection in June 2017. There are no regulatory commitments contained in this submittal. Should you have any questions concerning this letter, please contact Mr. Bruce Franzen, Regulatory Assurance Manager, at (815) 416-2800. __ Peter J. Karaba Site Vice President Dresden Nuclear Power Station