{{#Wiki_filter:February 15, 2023
{{#Wiki_filter:February                                           15, 2023
 
 
Bob Coffey
Bob Coffey
Executive Vice President, Nuclear Division
Executive Vice President, Nuclear Division
Line 25: Line 27:
Mail Stop: EX/JB
Mail Stop: EX/JB
Juno Beach, FL 33408
Juno Beach, FL 33408
SUBJECT:       SEABROOK STATION - INFORMATION REQUEST FOR THE CYBER
 
SUBJECT:                                         SEABROOK STATION -           INFORMATION REQUEST FOR THE CYBER
                 SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM
                 SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM
                 INSPECTION 05000443/2023401
                 INSPECTION 05000443/2023401
Dear Bob Coffey:
Dear Bob Coffey:
On July 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
On July 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated
inspection in accordance with Inspection Procedure (IP) 71130.10,                     Cyber   Security, dated
December 14, 2021, at your Seabrook Station. The inspection will be performed to evaluate and
December 14, 2021, at your                                             Seabrook Station. The inspection will be performed to evaluate and
verify your ability to meet the requirements of the NRCs Cyber Security Rule, Title 10 of the
verify your ability to meet the requirements of the NRCs Cyber Security Rule, Title                     10 of the
Code of Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and
Code of Federal Regulations (10 CFR), Part 73, Section                                           54, Protection of Digital Computer and
Communication Systems and Networks. The onsite portion of the inspection will take place
Communication Systems and Networks. The onsite portion of the inspection will take place
July 24-28, 2023.
July 24-                                                     28, 2023.
 
Experience has shown that baseline inspections are extremely resource intensive, both for the
Experience has shown that baseline inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into four groups.
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
The first group specifies information necessary to assist the inspection team in choosing the
focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be
focus areas (i.e., sample set) to be inspected                                               by IP 71130.10. This information should be
made available either on an online repository (preferred) or digital media (CD/DVD) no later
made available either on an online repository (preferred) or digital media (CD/DVD) no later
than April 14, 2023. The inspection team will review this information and, by May 19, 2023, will
than April 14, 2023.                                                                             The inspection team will review this information and, by May         19, 2023                                                                           , will
request the specific items that should be provided for review.
request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the
The second group of additional requested documents will assist the inspection team in the
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,
evaluation of the critical systems and critical digital assets (CSs/CDAs)       , defensive architecture,
and the areas of the licensees Cyber Security Program selected for the cyber security
and the areas of the licensees Cyber                                     Security Program selected for the cyber security
inspection. This information will be requested for review in the regional office prior to the
inspection. This information will be requested for review in the regional office prior to the
inspection by June 23, 2023, as identified above.
inspection by June                                                                   23, 2023, as identified above.
 
The third group of requested documents consists of those items that the inspection team will
The third group of requested documents consists of those items that the inspection team will
review, or need access to, during the inspection. Please have this information available by the
review, or need access to, during the inspection. Please have this information available by the
first day of the onsite inspection, July 24, 2023.
first day of the onsite inspection, July 24, 2023.
B. Coffey                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  2


B. Coffey                                            2
The fourth group of information is necessary to aid the inspection team in tracking issues
The fourth group of information is necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
identified as a result of the inspection. It is requested that this information be provided to the
Line 60: Line 70:
these documents are up to date and complete in order to minimize the number of additional
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Jeff Rady. We understand that our regulatory contact for
The lead inspector for this inspection is Jeff Rady. We understand that our regulatory contact for
this inspection is Joshua Greene of your organization. If there are any questions about the
this inspection is Joshua Greene of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at (610) 337-5380 or via
inspection or the material requested, please contact the lead inspector at (610)                                                                 337-53                                                                80                                              or via
email at Jeff.Rady@nrc.gov.
email at Jeff.Rady@nrc.gov         .
 
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Line 70: Line 82:
request for information or an information collection requirement unless the requesting document
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC website at
Management System (ADAMS). ADAMS is accessible from the NRC we        bsite at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
http://www.nrc.gov/reading-                                           rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
 
                                                                    Digitally signed by Glenn T.
                                                                          Sincerely,
                                                  Glenn T. Dentel Dentel
 
                                                                    Date: 2023.02.15 14:43:09
 
                                                                    -05'00'
 
                                                  Glenn T. Dentel, Chief
 
                                                  Engineering Branch 2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Glenn T. Dentel, Chief
                                                  Division of Operating Reactor Safety
                                                                          Engineering Branch 2
                                                                          Division of Operating           Reactor Safety
 
Docket Nos. 05000443
Docket Nos. 05000443
License Nos. NPF-86
License Nos.                     NPF-86
 
Enclosure:
Enclosure:
Cyber Security Inspection Document Request
Cyber Security Inspection Document Request
cc: Distribution via ListServ
cc: Distribution via ListServ
                                      B. Coffey                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  3
                                      SUBJECT:                                                        SEABROOK                          STATION -            INFORMATION REQUEST FOR THE CYBER
                                                                                              SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM
                                                                                              INSPECTION 05000443/2023401                                                                                                                                                                                                                                                                                    DATED FEBRUARY 15, 2023
                                      DISTRIBUTION:
                                      MYoung, DORS
                                      SElkhiamy, DORS
                                      JDeBoer, DORS
                                      TDaun, DORS, SRI
                                      SFlanagan, DORS, RI
                                      ACass, DORS, AA
                                      MFerdas, RI OEDO
                                      RidsNrrPMSeabrook Resource
                                      RidsNrrDorlLpl1 Resource
                          DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared Documents/Cyber Security/_Baseline
                          Inspections - OUO_SRI/2023/Seabrook/RFI Letter/Seabrook Cyber Security RFI 1.docx
                          ADAMS ACCESSION NUMBER: ML23046A095
                                                              SUNSI Review                                                                                          n              -Sensitive                                                                                                                            Publvlle
                                                                                                                                                                      Sensitive                                                                                                                                              n              -Publiclyvlable
                                                                                                                                                                                                                                                                                                         
                              OFFICE                              RI/DO                                                                                                                                      RI/DO   
                              ME                                                        JRady                                                                                                                                              GDent
                              TE                                                          02//              23                                                                                                                          02//              23
                                                                                                                                                              OFFIAL RERD COPY
                SEABROOK STATION CYBER                            SECURITY INSPECTION DOCUMENT REQUEST
Inspection Report:                                                                                                                                                              05000443/2023401
Inspection Dates:                                                                                                                                                                                  July 24-                                                      28, 2023
Inspection Procedure:                                                                                                              IP 71130.10, Cyber  Security,  dated December 14, 2021
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  (ADAMS Accession Number: ML21271A106)
Reference:                                                                                                                                                                                                                                                                                                                                                                                                  Guidance Document for Development of the Request for
                                                                            Information (RFI) and Notification Letter for IP 71130.10, Cyber
                                                                            Security (ML21330A088)
NRC Inspectors:                                                                                                                                                                                                  Jeff Rady, Lead                                                                                                                                                                                                                                                                                                                                                                Brandon Pinson
                                                                            (610)                                                                  337-53                                                                80                                                                                                                                                                                                                                                                                                                                                                              (610)                                                                  337-5                                                                091
                                                                            Jeff.Rady@nrc.gov                                                                                                                                                                                                                                                                                                            Brandon.Pinson@nrc.gov
NRC Contractors:                                                                                                                                                                          Tim Hennessey                                                                                                                                                                                                                                                                                                                                                                          TBD
                                                                            Timothy.Hennessey@nrc.gov
I.                                                                                              Information Requested for In-Office Preparation
                  The initial request for information (i.e., first RFI) concentrates on providing the inspection
                  team with the general information necessary to select appropriate components and
                  Cyber Security Program (CSP                                                        ) elements to develop a site-specific inspection plan. The
                  first RFI is used to identify the list of critical systems and critical digital assets
                  (CSs/CDAs) plus operational and management security control portions of the CSP to
                  be chosen as the sample set required to be inspected by the cyber                                                                                security inspection
                  procedure. The first RFIs requested information is specified below in Table RFI #1. The
                  Table                      RFI #1 information is requested to be provided to the regional office by April 14,
                  2023                                                                , or sooner, to facilitate the selection of the specific items that will be reviewed
                  during the onsite inspection weeks.
                  The inspection team will examine the returned documentation from the first RFI and
                  identify/select specific systems and equipment (e.g.,                                CSs/CDAs) to provide a more
                  focused follow-up request to develop the second RFI. The inspection team will submit
                  the specific systems and equipment list to your staff by May 19, 2023                                                                                                                      , which will identify
                  the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
                  defensive architecture, and the areas of the licensees CSP selected for the cyber
                  security inspection. We request that the additional information provided from the second
                  RFI be made available to the regional office prior to the inspection by June 23, 2023.




ML23046A095
                                        Non-Sensitive                            Publicly Available
        SUNSI Review
                                        Sensitive                                Non-Publicly Available
OFFICE      RI/DORS            RI/DORS
NAME        JRady              GDentel
DATE        02/14/2023          02/15/2023
                                     
      SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
Inspection Report:              05000443/2023401
Inspection Dates:              July 24-28, 2023
Inspection Procedure:          IP 71130.10, Cyber Security, dated December 14, 2021
                                (ADAMS Accession Number: ML21271A106)
Reference:                      Guidance Document for Development of the Request for
                                Information (RFI) and Notification Letter for IP 71130.10, Cyber
                                Security (ML21330A088)
NRC Inspectors:                Jeff Rady, Lead                          Brandon Pinson
                                (610) 337-5380                          (610) 337-5091
                                Jeff.Rady@nrc.gov                        Brandon.Pinson@nrc.gov
NRC Contractors:                Tim Hennessey                            TBD
                                Timothy.Hennessey@nrc.gov
I.    Information Requested for In-Office Preparation
      The initial request for information (i.e., first RFI) concentrates on providing the inspection
      team with the general information necessary to select appropriate components and
      Cyber Security Program (CSP) elements to develop a site-specific inspection plan. The
      first RFI is used to identify the list of critical systems and critical digital assets
      (CSs/CDAs) plus operational and management security control portions of the CSP to
      be chosen as the sample set required to be inspected by the cyber security inspection
      procedure. The first RFIs requested information is specified below in Table RFI #1. The
      Table RFI #1 information is requested to be provided to the regional office by April 14,
      2023, or sooner, to facilitate the selection of the specific items that will be reviewed
      during the onsite inspection weeks.
      The inspection team will examine the returned documentation from the first RFI and
      identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
      focused follow-up request to develop the second RFI. The inspection team will submit
      the specific systems and equipment list to your staff by May 19, 2023, which will identify
      the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
      defensive architecture, and the areas of the licensees CSP selected for the cyber
      security inspection. We request that the additional information provided from the second
      RFI be made available to the regional office prior to the inspection by June 23, 2023.
                                                                                              Enclosure


                                                                                                                                                                                                                                Enclosure
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
  The required Table RFI 1 information shall be provided on an online repository
 
  (preferred) or digital media (CD/DVD) to the lead inspector by April 14, 2023. The
 
  The required Table                     RFI 1 information shall be provided on                                                                           an online repository
  (preferred) or digital media (CD/DVD) to the lead inspector by April 14, 2023. The
  preferred file format for all lists is a searchable Excel spreadsheet file. The information
  preferred file format for all lists is a searchable Excel spreadsheet file. The information
  should be indexed and hyperlinked to facilitate ease of use. If you have any questions
  should be indexed and hyperlinked to facilitate ease of use. If you have any questions
  regarding this information, please call the inspection team leader as soon as possible.
  regarding this information, please call the inspection team leader as soon as possible.
                                                Table RFI #1
 
                                            Table RFI #1
   Section 3,
   Section 3,
   Paragraph Number/Title:                                                               IP Ref
   Paragraph Number/Title:                                                                 IP Ref
         A list of all Identified Critical Systems and Critical Digital Assets -
         A list of all Identified Critical Systems and Critical Digital Assets -
        highlight/note any additions, deletions or reclassifications due to new
    1  highlight/note any additions, deletions or reclassifications due to new         Overall
    1                                                                                  Overall
         guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last
         guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last
         cyber security inspection.
         cyber security inspection.
        A list of emergency preparedness and Security onsite and offsite digital
    2  A list of emergency preparedness and Security onsite and offsite digital         Overall
    2                                                                                  Overall
         communication systems.
         communication systems.
        Network Topology Diagrams to include information and data flow for
    3  Network Topology Diagrams to include information and data flow for               Overall
    3                                                                                  Overall
         critical systems in levels 2, 3 and 4 (If available).
         critical systems in levels 2, 3 and 4 (If available).
     4 Ongoing Monitoring and Assessment program documentation.                       03.01(a)
     4   Ongoing Monitoring and Assessment program documentation.                         03.01(a)
     5 The most recent effectiveness analysis of the Cyber Security Program.           03.01(b)
     5   The most recent effectiveness analysis of the Cyber Security Program.           03.01(b)
     6 Vulnerability screening/assessment and scan program documentation.             03.01(c)
     6   Vulnerability screening/assessment and scan program documentation.               03.01(c)
         Cyber Security Incident response documentation, including incident
         Cyber Security Incident response documentation, including incident
         detection, response, and recovery documentation as well as contingency       03.02(a)
         detection, response, and recovery documentation as well as contingency           03.02(a)
     7 plan development and implementation, including any program                        and
     7   plan development and implementation, including any program                        and
         documentation that requires testing of security boundary device               03.04(b)
         documentation that requires testing of security boundary device                 03.04(b)
         functionality.
         functionality.
     8 Device Access and Key Control documentation.                                   03.02(c)
     8   Device Access and Key Control documentation.                                     03.02(c)
     9 Password/Authenticator documentation.                                           03.02(c)
     9   Password/Authenticator documentation.                                           03.02(c)
   10 User Account/Credential documentation.                                         03.02(d)
   10   User Account/Credential documentation.                                           03.02(d)
        Portable Media and Mobile Device control documentation, including kiosk
  11  Portable Media and Mobile Device control documentation, including kiosk         03.02(e)
  11                                                                                03.02(e)
         security control assessment/documentation.
         security control assessment/documentation.
         Design change/ modification program documentation and a List of all
         Design change/ modification program documentation and a List of all
        design changes completed since the last cyber security inspection, including
  12  design changes completed since the last cyber security inspection, including     03.03(a)
  12                                                                                03.03(a)
         either a summary of the design change or the 50.59 documentation for the
         either a summary of the design change or the 50.59 documentation for the
         change.
         change.
                                                                                      03.03(a),
                                                                                        03.03(a),
        Supply Chain Management documentation including any security impact
  13                                        Supply Chain Management documentation including any security impact analysis for new acquisitions. (b) and
  13                                                                                  (b) and
                                                                                            (c)
        analysis for new acquisitions.
  14  Configuration Management documentation including any security impact             03.03(a)
                                                                                          (c)
         analysis performed due to configuration changes since the last inspection.       and (b)
        Configuration Management documentation including any security impact         03.03(a)
  15  Cyber Security Plan and any 50.54(p) analysis to support changes to the         03.04(a)
  14
         analysis performed due to configuration changes since the last inspection.     and (b)
        Cyber Security Plan and any 50.54(p) analysis to support changes to the
  15                                                                                03.04(a)
         plan since the last inspection.
         plan since the last inspection.
   16  Cyber Security Metrics tracked (if applicable).                               03.06 (b)
   16  Cyber Security Metrics tracked (if applicable).                                 03.06 (b)
        Provide documentation describing any cyber security changes to the access
  17  Provide documentation describing any cyber security changes to the access       Overall
  17                                                                                  Overall
         authorization program since the last cyber security inspection.
         authorization program since the last cyber security inspection.
        Provide a list of all procedures and policies provided to the NRC with their
  18  Provide a list of all procedures and policies provided to the NRC with their     Overall
  18                                                                                  Overall
         descriptive name and associated number (if available).
         descriptive name and associated number (if available).
                                                2


    SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
                                                Table RFI #1
      Section 3,
      Paragraph Number/Title:                                                            IP Ref
      19 Performance testing report (if applicable).                                  03.06 (a)
    In addition to the above information please provide the following:
          (1) Electronic copy of the Updated Final Safety Analysis Report and technical
              specifications.
          (2) Name(s) and phone numbers for the regulatory and technical contacts.
          (3) Current management and engineering organizational charts.
    Based on this information, the inspection team will identify and select specific systems
    and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
    submit a list of specific systems and equipment to your staff by May 19, 2023, for the
    second RFI (i.e., RFI #2).
II.  Additional Information Requested to be Available Prior to Inspection.
    As stated in Section I above, the inspection team will examine the returned
    documentation requested from Table RFI #1 and submit the list of specific systems and
    equipment to your staff by May 19, 2023, for the second RFI (i.e., RFI #2). The second
    RFI will request additional information required to evaluate the CSs/CDAs, defensive
    architecture, and the areas of the licensees CSP selected for the cyber security
    inspection. The additional information requested for the specific systems and equipment
    is identified in Table RFI #2.
    The Table RFI 2 information shall be provided to the lead inspector by June 23, 2023.
    The preferred file format for all lists is a searchable Excel spreadsheet. The information
    should be indexed and hyperlinked to facilitate ease of use. If you have any questions
    regarding this information, please call the inspection team leader as soon as possible.
                                                Table RFI #2
      Section 3,
      Paragraph Number/Title:                                                            Items
            For the system(s) chosen for inspection provide:
        1 Ongoing Monitoring and Assessment activity performed on the system(s).      03.01(a)
        2 All Security Control Assessments for the selected system(s).                03.01(a)
            All vulnerability screenings/assessments associated with or scans
        3 performed on the selected system(s) since the last cyber security            03.01(c)
            inspection.
            Documentation (including configuration files and rules sets) for Network-
            based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based
        4                                                                              03.02(b)
            Intrusion Detection Systems (HIDS), and Security Information and Event
            Management (SIEM) systems for system(s) chosen for inspection).
                                                  3


    SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
                                            2
                                                    Table RFI #2
        SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
      Section 3,
 
      Paragraph Number/Title:                                                               Items
 
               Documentation (including configuration files and rule sets) for intra-
                                                                        Table RFI #1
          5 security level firewalls and boundary devices used to protect the selected      03.02(c)
            Section 3,
              system(s).
            Paragraph Number/Title:                                                                                                       IP Ref
              Copies of all periodic reviews of the access authorization list for the
               19      Performance testing report (if applicable).                                                                        03.06 (a)
          6                                                                                03.02(d)
 
              selected systems since the last inspection.
          In addition to the above information please provide the following:
          7 Baseline configuration data sheets for the selected CDAs.                     03.03(a)
 
              Documentation on any changes, including Security Impact Analyses,
                (1)             Electronic copy of the U                                                                                                      pdated          F      inal      S        afety        Analysis R                                eport    and technical
          8                                                                                03.03(b)
                      specifications.
              performed on the selected system(s) since the last inspection.
 
              Copies of the purchase order documentation for any new equipment
                (2)            Name(s) and phone numbers for the regulatory and technical contacts.
          9                                                                                03.03(c)
 
               purchased for the selected systems since the last inspection.
                (3)             Current management and engineering organizational charts.
              Copies of any reports/assessment for cyber security drills performed since  03.02(a)
 
        10
          Based on this information, the inspection team will                                                                                      identify and select specific systems
              the last inspection.                                                         03.04(b)
          and equipment (e.g.,                                    CSs/CDAs) from the information                                                              requested by Table                                      RFI                    #1 and
              Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)
          submit a list of specific systems and equipment to your staff by                                                                                                      May 19,               202      3,      for the
        11
          second RFI (i.e.,                                                RFI                    #2).
              documentation of the results the last time the backups were executed.       03.04(b)
 
              Corrective actions taken as a result of cyber security incidents/issues to
II.                                                                                                             Additional Information Requested to be Available Prior to Inspection.
        12 include previous NRC violations and Licensee Identified Violations since          03.05
 
              the last cyber security inspection.
          As stated in Section I                                                                            above, the inspection team will examine the returned
              For the selected systems, provide design change/modification packages
          documentation requested from Table                    RFI #1 and submit the list of specific systems and
        13                                                                                03.03(a)
          equipment to your staff by May 19, 2023,                                                                            for the second RFI (i.e., RFI #2). The second
              including completed work orders since the last cyber security inspection.
          RFI will request additional information required to evaluate the CSs/CDAs, defensive
III.  Information Requested to be Available on First Day of Inspection
          architecture, and the areas of the licensees CSP selected for the cyber security
      For the specific systems and equipment identified in Section II above, provide the
          inspection. The additional information requested for the                                                               specific systems and equipment
      following RFI (i.e., Table 1ST Week Onsite) to the team by July 24, 2023, the first day of
          is identified in Table                      RFI #2.
      the inspection.
 
                                              Table 1ST Week Onsite
          The Table                     RFI 2 information shall be provided to the lead inspector by June 23, 2023.
      Section 3,
          The preferred file format for all lists is a searchable Excel spreadsheet. The information
      Paragraph Number/Title:                                                             Items
          should be indexed and hyper                                          linked to facilitate ease of use. If you have any questions
              Any cyber security event reports submitted in accordance with 10 CFR
          regarding this information, please call the inspection team leader as soon as possible.
          1                                                                               03.04(b)
 
              73.77 since the last cyber security inspection.
                                                                        Table RFI #2
              Updated Copies of corrective actions taken as a result of cyber security
            Section 3,
              incidents/issues, to include previous NRC violations and Licensee
            Paragraph Number/Title:                                                                                                       Items
          2                                                                                  03.05
                      For the system(s) chosen for inspection provide:
              Identified Violations since the last cyber security inspection, as well as
                1   Ongoing Monitoring and Assessment activity performed on the system(s).                                            03.01(a)
              vulnerability-related corrective actions.
                2    All Security Control Assessments for the selected system(s).                                                      03.01(a)
      In addition to the above information please provide the following:
                      All vulnerability screenings/assessments associated with or scans
          (1) Copies of the following documents do not need to be solely available to the
                3    performed on the selected system(s) since the last cyber security                                                   03.01(c)
              inspection team as long as the inspectors have easy and unrestrained access
                      inspection.
              to them.
                      Documentation (including configuration files and rules sets) for Network-
              a. Updated Final Safety Analysis Report, if not previously provided;
                4    based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-                based                              03.02(b)
                                                    4
                      Intrusion Detection Systems (HIDS), and Security Information and Event
                      Management (SIEM) systems for system(s) chosen for inspection).
 
 
 
 
                                                                          3


       SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
       SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
                 b. Original Cyber Security Safety Evaluation Report and Supplements;
 
                c. Quality Assurance (QA) Plan;
 
                d. Technical specifications, if not previously provided; and
                                                      Table RFI #2
                e. Latest individual plant examination/probabilistic risk assessment report.
        Section 3,
            (2) Vendor Manuals, Assessment and Corrective Actions:
        Paragraph Number/Title:                                                                      Items
                a. The most recent Cyber Security QA audit and/or self-assessment; and
                Documentation (including configuration files and rule sets) for intra-
                b. Corrective action documents (e.g., condition reports, including status of
            5  security level firewalls and boundary devices used to protect the selected            03.02(c)
                    corrective actions) generate as a result of the most recent Cyber Security QA
                system(s).
                    audit and/or self-assessment.
            6  Copies of all periodic reviews of the access authorization list for the              03.02(d)
IV.     Information Requested to be Provided Throughout the Inspection
                selected systems since the last inspection.
            (1) Copies of any corrective action documents generated as a result of the
            7  Baseline configuration data sheets for the selected CDAs.                            03.03(a)
                inspection teams questions or queries during the inspection.
            8  Documentation on any changes, including Security Impact Analyses,                    03.03(b)
            (2) Copies of the list of questions submitted by the inspection team members and
                performed on the selected system(s) since the last inspection.
                the status/resolution of the information requested (provided daily during the
            9  Copies of the purchase order documentation for any new equipment                      03.03(c)
                inspection to each inspection team member).
                purchased for the selected systems since the last inspection.
          10  Copies of any reports/assessment for cyber security drills performed since            03.02(a)
                the last inspection.                                                                  03.04(b)
          11  Copy of the individual recovery plan(s) for the selected system(s) including          03.02(a)
                documentation of the results the last time the backups were executed.                03.04(b)
                Corrective actions taken as a result of cyber security incidents/issues to
          12  include previous NRC violations and Licensee Identified Violations since                03.05
                the last cyber security inspection.
          13  For the selected systems, provide design change/modification packages                03.03(a)
                including completed work orders since the last cyber security inspection.
 
 
III.                                                                          Information Requested to be Available on First Day of Inspection
 
        For the specific systems and equipment identified in          Section                                            II above, provide                                            the
        following RFI (i.e.,          Table 1                    ST Week Onsite) to the team by                    July 24, 2023                                                                , the first day of
        the inspection.
                                                Table 1ST Week Onsite
        Section 3,
        Paragraph Number/Title:                                                                      Items
            1  Any cyber security event reports submitted in accordance with 10 CFR                  03.04(b)
                73.77 since the last cyber security inspection.
                Updated Copies of corrective actions taken as a result of cyber security
            2  incidents/issues, to include previous NRC violations and Licensee                      03.05
                Identified Violations since the last cyber security inspection, as well as
                 vulnerability-related corrective actions.
 
        In addition to the above information please provide the following:
 
            (1)      Copies of the following documents do not need to be solely available to the
                inspection team as long as the inspectors have easy and unrestrained access
                to them.
 
                a.                    Updated Final Safety Analysis Report, if not previously provided;
 
 
 
                                                        4
 
      SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
 
 
                b.                     Original Cyber Security Safety Evaluation Report and Supplements;
 
                c.                       Quality Assurance (QA)             Plan;
 
                d.                     Technical specifications, if not previously provided;                   and
 
                e.                     Latest individual plant examination/p                                          robabilistic risk assessment report.
 
            (2)     Vendor Manuals, Assessment and Corrective Actions:
 
                a.                     The most recent Cyber Security QA audit and/or self-assessment; and
 
                b.                     Corrective action documents (e.g., condition reports, including status of
                      corrective actions) generate as a result of the most recent Cyber Security QA
                      audit and/or self-assessment.
 
IV.                                                                     Information Requested to         be Provided Throughout the Inspection
 
            (1)     Copies of any corrective action documents generated as a result of the
                inspection teams questions or queries during the inspection.
 
            (2)     Copies of the list of questions submitted by the inspection team members and
                the status/resolution of the information requested (provided daily during the
                inspection to each inspection team member).
 
If you have any questions regarding the information requested, please contact the inspection
If you have any questions regarding the information requested, please contact the inspection
team leader.
team leader.
                                                  5
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                        5
}}
}}

Revision as of 08:04, 15 November 2024

Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000443/2023401
ML23046A095
Person / Time
Site: Seabrook 
Issue date: 02/15/2023
From: Glenn Dentel
Division of Operating Reactors
To: Coffey B
Florida Power & Light Co
References
IR 2023401
Download: ML23046A095 (1)


See also: IR 05000443/2023401

Text

February 15, 2023

Bob Coffey

Executive Vice President, Nuclear Division

and Chief Nuclear Officer

Florida Power & Light Company

700 Universe Blvd.

Mail Stop: EX/JB

Juno Beach, FL 33408

SUBJECT: SEABROOK STATION - INFORMATION REQUEST FOR THE CYBER

SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000443/2023401

Dear Bob Coffey:

On July 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated

December 14, 2021, at your Seabrook Station. The inspection will be performed to evaluate and

verify your ability to meet the requirements of the NRCs Cyber Security Rule, Title 10 of the

Code of Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and

Communication Systems and Networks. The onsite portion of the inspection will take place

July 24- 28, 2023.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be

made available either on an online repository (preferred) or digital media (CD/DVD) no later

than April 14, 2023. The inspection team will review this information and, by May 19, 2023 , will

request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs) , defensive architecture,

and the areas of the licensees Cyber Security Program selected for the cyber security

inspection. This information will be requested for review in the regional office prior to the

inspection by June 23, 2023, as identified above.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, July 24, 2023.

B. Coffey 2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Jeff Rady. We understand that our regulatory contact for

this inspection is Joshua Greene of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at (610) 337-53 80 or via

email at Jeff.Rady@nrc.gov .

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC we bsite at

http://www.nrc.gov/reading- rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Operating Reactor Safety

Docket Nos. 05000443

License Nos. NPF-86

Enclosure:

Cyber Security Inspection Document Request

cc: Distribution via ListServ

B. Coffey 3

SUBJECT: SEABROOK STATION - INFORMATION REQUEST FOR THE CYBER

SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000443/2023401 DATED FEBRUARY 15, 2023

DISTRIBUTION:

MYoung, DORS

SElkhiamy, DORS

JDeBoer, DORS

TDaun, DORS, SRI

SFlanagan, DORS, RI

ACass, DORS, AA

MFerdas, RI OEDO

RidsNrrPMSeabrook Resource

RidsNrrDorlLpl1 Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared Documents/Cyber Security/_Baseline

Inspections - OUO_SRI/2023/Seabrook/RFI Letter/Seabrook Cyber Security RFI 1.docx

ADAMS ACCESSION NUMBER: ML23046A095

SUNSI Review n -Sensitive Publvlle

Sensitive n -Publiclyvlable

OFFICE RI/DO RI/DO

ME JRady GDent

TE 02// 23 02// 23

OFFIAL RERD COPY

SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000443/2023401

Inspection Dates: July 24- 28, 2023

Inspection Procedure: IP 71130.10, Cyber Security, dated December 14, 2021

(ADAMS Accession Number: ML21271A106)

Reference: Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for IP 71130.10, Cyber

Security (ML21330A088)

NRC Inspectors: Jeff Rady, Lead Brandon Pinson

(610) 337-53 80 (610) 337-5 091

Jeff.Rady@nrc.gov Brandon.Pinson@nrc.gov

NRC Contractors: Tim Hennessey TBD

Timothy.Hennessey@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and

Cyber Security Program (CSP ) elements to develop a site-specific inspection plan. The

first RFI is used to identify the list of critical systems and critical digital assets

(CSs/CDAs) plus operational and management security control portions of the CSP to

be chosen as the sample set required to be inspected by the cyber security inspection

procedure. The first RFIs requested information is specified below in Table RFI #1. The

Table RFI #1 information is requested to be provided to the regional office by April 14,

2023 , or sooner, to facilitate the selection of the specific items that will be reviewed

during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by May 19, 2023 , which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber

security inspection. We request that the additional information provided from the second

RFI be made available to the regional office prior to the inspection by June 23, 2023.

Enclosure

SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST

The required Table RFI 1 information shall be provided on an online repository

(preferred) or digital media (CD/DVD) to the lead inspector by April 14, 2023. The

preferred file format for all lists is a searchable Excel spreadsheet file. The information

should be indexed and hyperlinked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1

Section 3,

Paragraph Number/Title: IP Ref

A list of all Identified Critical Systems and Critical Digital Assets -

1 highlight/note any additions, deletions or reclassifications due to new Overall

guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last

cyber security inspection.

2 A list of emergency preparedness and Security onsite and offsite digital Overall

communication systems.

3 Network Topology Diagrams to include information and data flow for Overall

critical systems in levels 2, 3 and 4 (If available).

4 Ongoing Monitoring and Assessment program documentation. 03.01(a)

5 The most recent effectiveness analysis of the Cyber Security Program. 03.01(b)

6 Vulnerability screening/assessment and scan program documentation. 03.01(c)

Cyber Security Incident response documentation, including incident

detection, response, and recovery documentation as well as contingency 03.02(a)

7 plan development and implementation, including any program and

documentation that requires testing of security boundary device 03.04(b)

functionality.

8 Device Access and Key Control documentation. 03.02(c)

9 Password/Authenticator documentation. 03.02(c)

10 User Account/Credential documentation. 03.02(d)

11 Portable Media and Mobile Device control documentation, including kiosk 03.02(e)

security control assessment/documentation.

Design change/ modification program documentation and a List of all

12 design changes completed since the last cyber security inspection, including 03.03(a)

either a summary of the design change or the 50.59 documentation for the

change.

03.03(a),

13 Supply Chain Management documentation including any security impact analysis for new acquisitions. (b) and

(c)

14 Configuration Management documentation including any security impact 03.03(a)

analysis performed due to configuration changes since the last inspection. and (b)

15 Cyber Security Plan and any 50.54(p) analysis to support changes to the 03.04(a)

plan since the last inspection.

16 Cyber Security Metrics tracked (if applicable). 03.06 (b)

17 Provide documentation describing any cyber security changes to the access Overall

authorization program since the last cyber security inspection.

18 Provide a list of all procedures and policies provided to the NRC with their Overall

descriptive name and associated number (if available).

2

SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #1

Section 3,

Paragraph Number/Title: IP Ref

19 Performance testing report (if applicable). 03.06 (a)

In addition to the above information please provide the following:

(1) Electronic copy of the U pdated F inal S afety Analysis R eport and technical

specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by May 19, 202 3, for the

second RFI (i.e., RFI #2).

II. Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by May 19, 2023, for the second RFI (i.e., RFI #2). The second

RFI will request additional information required to evaluate the CSs/CDAs, defensive

architecture, and the areas of the licensees CSP selected for the cyber security

inspection. The additional information requested for the specific systems and equipment

is identified in Table RFI #2.

The Table RFI 2 information shall be provided to the lead inspector by June 23, 2023.

The preferred file format for all lists is a searchable Excel spreadsheet. The information

should be indexed and hyper linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI #2

Section 3,

Paragraph Number/Title: Items

For the system(s) chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s). 03.01(a)

2 All Security Control Assessments for the selected system(s). 03.01(a)

All vulnerability screenings/assessments associated with or scans

3 performed on the selected system(s) since the last cyber security 03.01(c)

inspection.

Documentation (including configuration files and rules sets) for Network-

4 based Intrusion Detection/Protection Systems (NIDS/NIPS), Host- based 03.02(b)

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection).

3

SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2

Section 3,

Paragraph Number/Title: Items

Documentation (including configuration files and rule sets) for intra-

5 security level firewalls and boundary devices used to protect the selected 03.02(c)

system(s).

6 Copies of all periodic reviews of the access authorization list for the 03.02(d)

selected systems since the last inspection.

7 Baseline configuration data sheets for the selected CDAs. 03.03(a)

8 Documentation on any changes, including Security Impact Analyses, 03.03(b)

performed on the selected system(s) since the last inspection.

9 Copies of the purchase order documentation for any new equipment 03.03(c)

purchased for the selected systems since the last inspection.

10 Copies of any reports/assessment for cyber security drills performed since 03.02(a)

the last inspection. 03.04(b)

11 Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)

documentation of the results the last time the backups were executed. 03.04(b)

Corrective actions taken as a result of cyber security incidents/issues to

12 include previous NRC violations and Licensee Identified Violations since 03.05

the last cyber security inspection.

13 For the selected systems, provide design change/modification packages 03.03(a)

including completed work orders since the last cyber security inspection.

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1 ST Week Onsite) to the team by July 24, 2023 , the first day of

the inspection.

Table 1ST Week Onsite

Section 3,

Paragraph Number/Title: Items

1 Any cyber security event reports submitted in accordance with 10 CFR 03.04(b)

73.77 since the last cyber security inspection.

Updated Copies of corrective actions taken as a result of cyber security

2 incidents/issues, to include previous NRC violations and Licensee 03.05

Identified Violations since the last cyber security inspection, as well as

vulnerability-related corrective actions.

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. Updated Final Safety Analysis Report, if not previously provided;

4

SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST

b. Original Cyber Security Safety Evaluation Report and Supplements;

c. Quality Assurance (QA) Plan;

d. Technical specifications, if not previously provided; and

e. Latest individual plant examination/p robabilistic risk assessment report.

(2) Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cyber Security QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber Security QA

audit and/or self-assessment.

IV. Information Requested to be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

5