ML23046A095: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:February 15, 2023 | {{#Wiki_filter:February 15, 2023 | ||
Bob Coffey | Bob Coffey | ||
Executive Vice President, Nuclear Division | Executive Vice President, Nuclear Division | ||
| Line 25: | Line 27: | ||
Mail Stop: EX/JB | Mail Stop: EX/JB | ||
Juno Beach, FL 33408 | Juno Beach, FL 33408 | ||
SUBJECT: | |||
SUBJECT: SEABROOK STATION - INFORMATION REQUEST FOR THE CYBER | |||
SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM | SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM | ||
INSPECTION 05000443/2023401 | INSPECTION 05000443/2023401 | ||
Dear Bob Coffey: | Dear Bob Coffey: | ||
On July 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline | On July 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline | ||
inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated | inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated | ||
December 14, 2021, at your Seabrook Station. The inspection will be performed to evaluate and | December 14, 2021, at your Seabrook Station. The inspection will be performed to evaluate and | ||
verify your ability to meet the requirements of the NRCs Cyber Security Rule, Title 10 of the | verify your ability to meet the requirements of the NRCs Cyber Security Rule, Title 10 of the | ||
Code of Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and | Code of Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and | ||
Communication Systems and Networks. The onsite portion of the inspection will take place | Communication Systems and Networks. The onsite portion of the inspection will take place | ||
July 24-28, 2023. | July 24- 28, 2023. | ||
Experience has shown that baseline inspections are extremely resource intensive, both for the | Experience has shown that baseline inspections are extremely resource intensive, both for the | ||
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site | NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site | ||
and to ensure a productive inspection for both parties, we have enclosed a request for | and to ensure a productive inspection for both parties, we have enclosed a request for | ||
documents needed for the inspection. These documents have been divided into four groups. | documents needed for the inspection. These documents have been divided into four groups. | ||
The first group specifies information necessary to assist the inspection team in choosing the | The first group specifies information necessary to assist the inspection team in choosing the | ||
focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be | focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be | ||
made available either on an online repository (preferred) or digital media (CD/DVD) no later | made available either on an online repository (preferred) or digital media (CD/DVD) no later | ||
than April 14, 2023. The inspection team will review this information and, by May 19, 2023, will | than April 14, 2023. The inspection team will review this information and, by May 19, 2023 , will | ||
request the specific items that should be provided for review. | request the specific items that should be provided for review. | ||
The second group of additional requested documents will assist the inspection team in the | The second group of additional requested documents will assist the inspection team in the | ||
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, | evaluation of the critical systems and critical digital assets (CSs/CDAs) , defensive architecture, | ||
and the areas of the licensees Cyber Security Program selected for the cyber security | and the areas of the licensees Cyber Security Program selected for the cyber security | ||
inspection. This information will be requested for review in the regional office prior to the | inspection. This information will be requested for review in the regional office prior to the | ||
inspection by June 23, 2023, as identified above. | inspection by June 23, 2023, as identified above. | ||
The third group of requested documents consists of those items that the inspection team will | The third group of requested documents consists of those items that the inspection team will | ||
review, or need access to, during the inspection. Please have this information available by the | review, or need access to, during the inspection. Please have this information available by the | ||
first day of the onsite inspection, July 24, 2023. | first day of the onsite inspection, July 24, 2023. | ||
B. Coffey 2 | |||
The fourth group of information is necessary to aid the inspection team in tracking issues | The fourth group of information is necessary to aid the inspection team in tracking issues | ||
identified as a result of the inspection. It is requested that this information be provided to the | identified as a result of the inspection. It is requested that this information be provided to the | ||
| Line 60: | Line 70: | ||
these documents are up to date and complete in order to minimize the number of additional | these documents are up to date and complete in order to minimize the number of additional | ||
documents requested during the preparation and/or the onsite portions of the inspection. | documents requested during the preparation and/or the onsite portions of the inspection. | ||
The lead inspector for this inspection is Jeff Rady. We understand that our regulatory contact for | The lead inspector for this inspection is Jeff Rady. We understand that our regulatory contact for | ||
this inspection is Joshua Greene of your organization. If there are any questions about the | this inspection is Joshua Greene of your organization. If there are any questions about the | ||
inspection or the material requested, please contact the lead inspector at (610) 337- | inspection or the material requested, please contact the lead inspector at (610) 337-53 80 or via | ||
email at Jeff.Rady@nrc.gov. | email at Jeff.Rady@nrc.gov . | ||
This letter does not contain new or amended information collection requirements subject to the | This letter does not contain new or amended information collection requirements subject to the | ||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | ||
| Line 70: | Line 82: | ||
request for information or an information collection requirement unless the requesting document | request for information or an information collection requirement unless the requesting document | ||
displays a currently valid Office of Management and Budget control number. | displays a currently valid Office of Management and Budget control number. | ||
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, | In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, | ||
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available | of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available | ||
electronically for public inspection in the NRCs Public Document Room or from the Publicly | electronically for public inspection in the NRCs Public Document Room or from the Publicly | ||
Available Records (PARS) component of the NRC's Agencywide Documents Access and | Available Records (PARS) component of the NRC's Agencywide Documents Access and | ||
Management System (ADAMS). ADAMS is accessible from the NRC | Management System (ADAMS). ADAMS is accessible from the NRC we bsite at | ||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | http://www.nrc.gov/reading- rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
Glenn T. Dentel, Chief | |||
Engineering Branch 2 | |||
Division of Operating Reactor Safety | |||
Docket Nos. 05000443 | Docket Nos. 05000443 | ||
License Nos. NPF-86 | License Nos. NPF-86 | ||
Enclosure: | Enclosure: | ||
Cyber Security Inspection Document Request | Cyber Security Inspection Document Request | ||
cc: Distribution via ListServ | cc: Distribution via ListServ | ||
B. Coffey 3 | |||
SUBJECT: SEABROOK STATION - INFORMATION REQUEST FOR THE CYBER | |||
SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM | |||
INSPECTION 05000443/2023401 DATED FEBRUARY 15, 2023 | |||
DISTRIBUTION: | |||
MYoung, DORS | |||
SElkhiamy, DORS | |||
JDeBoer, DORS | |||
TDaun, DORS, SRI | |||
SFlanagan, DORS, RI | |||
ACass, DORS, AA | |||
MFerdas, RI OEDO | |||
RidsNrrPMSeabrook Resource | |||
RidsNrrDorlLpl1 Resource | |||
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared Documents/Cyber Security/_Baseline | |||
Inspections - OUO_SRI/2023/Seabrook/RFI Letter/Seabrook Cyber Security RFI 1.docx | |||
ADAMS ACCESSION NUMBER: ML23046A095 | |||
SUNSI Review n -Sensitive Publvlle | |||
Sensitive n -Publiclyvlable | |||
OFFICE RI/DO RI/DO | |||
ME JRady GDent | |||
TE 02// 23 02// 23 | |||
OFFIAL RERD COPY | |||
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST | |||
Inspection Report: 05000443/2023401 | |||
Inspection Dates: July 24- 28, 2023 | |||
Inspection Procedure: IP 71130.10, Cyber Security, dated December 14, 2021 | |||
(ADAMS Accession Number: ML21271A106) | |||
Reference: Guidance Document for Development of the Request for | |||
Information (RFI) and Notification Letter for IP 71130.10, Cyber | |||
Security (ML21330A088) | |||
NRC Inspectors: Jeff Rady, Lead Brandon Pinson | |||
(610) 337-53 80 (610) 337-5 091 | |||
Jeff.Rady@nrc.gov Brandon.Pinson@nrc.gov | |||
NRC Contractors: Tim Hennessey TBD | |||
Timothy.Hennessey@nrc.gov | |||
I. Information Requested for In-Office Preparation | |||
The initial request for information (i.e., first RFI) concentrates on providing the inspection | |||
team with the general information necessary to select appropriate components and | |||
Cyber Security Program (CSP ) elements to develop a site-specific inspection plan. The | |||
first RFI is used to identify the list of critical systems and critical digital assets | |||
(CSs/CDAs) plus operational and management security control portions of the CSP to | |||
be chosen as the sample set required to be inspected by the cyber security inspection | |||
procedure. The first RFIs requested information is specified below in Table RFI #1. The | |||
Table RFI #1 information is requested to be provided to the regional office by April 14, | |||
2023 , or sooner, to facilitate the selection of the specific items that will be reviewed | |||
during the onsite inspection weeks. | |||
The inspection team will examine the returned documentation from the first RFI and | |||
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more | |||
focused follow-up request to develop the second RFI. The inspection team will submit | |||
the specific systems and equipment list to your staff by May 19, 2023 , which will identify | |||
the specific systems and equipment that will be utilized to evaluate the CSs/CDAs, | |||
defensive architecture, and the areas of the licensees CSP selected for the cyber | |||
security inspection. We request that the additional information provided from the second | |||
RFI be made available to the regional office prior to the inspection by June 23, 2023. | |||
Enclosure | |||
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST | SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST | ||
The required Table RFI 1 information shall be provided on an online repository | |||
(preferred) or digital media (CD/DVD) to the lead inspector by April 14, 2023. The | |||
The required Table RFI 1 information shall be provided on an online repository | |||
(preferred) or digital media (CD/DVD) to the lead inspector by April 14, 2023. The | |||
preferred file format for all lists is a searchable Excel spreadsheet file. The information | preferred file format for all lists is a searchable Excel spreadsheet file. The information | ||
should be indexed and hyperlinked to facilitate ease of use. If you have any questions | should be indexed and hyperlinked to facilitate ease of use. If you have any questions | ||
regarding this information, please call the inspection team leader as soon as possible. | regarding this information, please call the inspection team leader as soon as possible. | ||
Table RFI #1 | |||
Section 3, | Section 3, | ||
Paragraph Number/Title: | Paragraph Number/Title: IP Ref | ||
A list of all Identified Critical Systems and Critical Digital Assets - | A list of all Identified Critical Systems and Critical Digital Assets - | ||
1 highlight/note any additions, deletions or reclassifications due to new Overall | |||
guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last | guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last | ||
cyber security inspection. | cyber security inspection. | ||
2 A list of emergency preparedness and Security onsite and offsite digital Overall | |||
communication systems. | communication systems. | ||
3 Network Topology Diagrams to include information and data flow for Overall | |||
critical systems in levels 2, 3 and 4 (If available). | critical systems in levels 2, 3 and 4 (If available). | ||
4 Ongoing Monitoring and Assessment program documentation. | 4 Ongoing Monitoring and Assessment program documentation. 03.01(a) | ||
5 The most recent effectiveness analysis of the Cyber Security Program. | 5 The most recent effectiveness analysis of the Cyber Security Program. 03.01(b) | ||
6 Vulnerability screening/assessment and scan program documentation. | 6 Vulnerability screening/assessment and scan program documentation. 03.01(c) | ||
Cyber Security Incident response documentation, including incident | Cyber Security Incident response documentation, including incident | ||
detection, response, and recovery documentation as well as contingency | detection, response, and recovery documentation as well as contingency 03.02(a) | ||
7 plan development and implementation, including any program and | 7 plan development and implementation, including any program and | ||
documentation that requires testing of security boundary device | documentation that requires testing of security boundary device 03.04(b) | ||
functionality. | functionality. | ||
8 Device Access and Key Control documentation. | 8 Device Access and Key Control documentation. 03.02(c) | ||
9 Password/Authenticator documentation. | 9 Password/Authenticator documentation. 03.02(c) | ||
10 User Account/Credential documentation. | 10 User Account/Credential documentation. 03.02(d) | ||
11 Portable Media and Mobile Device control documentation, including kiosk 03.02(e) | |||
security control assessment/documentation. | security control assessment/documentation. | ||
Design change/ modification program documentation and a List of all | Design change/ modification program documentation and a List of all | ||
12 design changes completed since the last cyber security inspection, including 03.03(a) | |||
either a summary of the design change or the 50.59 documentation for the | either a summary of the design change or the 50.59 documentation for the | ||
change. | change. | ||
03.03(a), | |||
13 Supply Chain Management documentation including any security impact analysis for new acquisitions. (b) and | |||
(c) | |||
14 Configuration Management documentation including any security impact 03.03(a) | |||
analysis performed due to configuration changes since the last inspection. and (b) | |||
15 Cyber Security Plan and any 50.54(p) analysis to support changes to the 03.04(a) | |||
analysis performed due to configuration changes since the last inspection. | |||
plan since the last inspection. | plan since the last inspection. | ||
16 Cyber Security Metrics tracked (if applicable). | 16 Cyber Security Metrics tracked (if applicable). 03.06 (b) | ||
17 Provide documentation describing any cyber security changes to the access Overall | |||
authorization program since the last cyber security inspection. | authorization program since the last cyber security inspection. | ||
18 Provide a list of all procedures and policies provided to the NRC with their Overall | |||
descriptive name and associated number (if available). | descriptive name and associated number (if available). | ||
2 | |||
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST | |||
Table RFI #1 | |||
Section 3, | |||
Paragraph Number/Title: IP Ref | |||
19 Performance testing report (if applicable). 03.06 (a) | |||
In addition to the above information please provide the following: | |||
(1) Electronic copy of the U pdated F inal S afety Analysis R eport and technical | |||
specifications. | |||
(2) Name(s) and phone numbers for the regulatory and technical contacts. | |||
(3) Current management and engineering organizational charts. | |||
Based on this information, the inspection team will identify and select specific systems | |||
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and | |||
submit a list of specific systems and equipment to your staff by May 19, 202 3, for the | |||
second RFI (i.e., RFI #2). | |||
II. Additional Information Requested to be Available Prior to Inspection. | |||
As stated in Section I above, the inspection team will examine the returned | |||
documentation requested from Table RFI #1 and submit the list of specific systems and | |||
equipment to your staff by May 19, 2023, for the second RFI (i.e., RFI #2). The second | |||
RFI will request additional information required to evaluate the CSs/CDAs, defensive | |||
architecture, and the areas of the licensees CSP selected for the cyber security | |||
inspection. The additional information requested for the specific systems and equipment | |||
is identified in Table RFI #2. | |||
The Table RFI 2 information shall be provided to the lead inspector by June 23, 2023. | |||
The preferred file format for all lists is a searchable Excel spreadsheet. The information | |||
should be indexed and hyper linked to facilitate ease of use. If you have any questions | |||
regarding this information, please call the inspection team leader as soon as possible. | |||
Table RFI #2 | |||
Section 3, | |||
Paragraph Number/Title: Items | |||
For the system(s) chosen for inspection provide: | |||
1 Ongoing Monitoring and Assessment activity performed on the system(s). 03.01(a) | |||
2 All Security Control Assessments for the selected system(s). 03.01(a) | |||
All vulnerability screenings/assessments associated with or scans | |||
3 performed on the selected system(s) since the last cyber security 03.01(c) | |||
inspection. | |||
Documentation (including configuration files and rules sets) for Network- | |||
4 based Intrusion Detection/Protection Systems (NIDS/NIPS), Host- based 03.02(b) | |||
Intrusion Detection Systems (HIDS), and Security Information and Event | |||
Management (SIEM) systems for system(s) chosen for inspection). | |||
3 | |||
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST | SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST | ||
b. Original Cyber Security Safety Evaluation Report and Supplements; | |||
Table RFI #2 | |||
Section 3, | |||
Paragraph Number/Title: Items | |||
Documentation (including configuration files and rule sets) for intra- | |||
5 security level firewalls and boundary devices used to protect the selected 03.02(c) | |||
system(s). | |||
6 Copies of all periodic reviews of the access authorization list for the 03.02(d) | |||
IV. | selected systems since the last inspection. | ||
7 Baseline configuration data sheets for the selected CDAs. 03.03(a) | |||
8 Documentation on any changes, including Security Impact Analyses, 03.03(b) | |||
performed on the selected system(s) since the last inspection. | |||
9 Copies of the purchase order documentation for any new equipment 03.03(c) | |||
purchased for the selected systems since the last inspection. | |||
10 Copies of any reports/assessment for cyber security drills performed since 03.02(a) | |||
the last inspection. 03.04(b) | |||
11 Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a) | |||
documentation of the results the last time the backups were executed. 03.04(b) | |||
Corrective actions taken as a result of cyber security incidents/issues to | |||
12 include previous NRC violations and Licensee Identified Violations since 03.05 | |||
the last cyber security inspection. | |||
13 For the selected systems, provide design change/modification packages 03.03(a) | |||
including completed work orders since the last cyber security inspection. | |||
III. Information Requested to be Available on First Day of Inspection | |||
For the specific systems and equipment identified in Section II above, provide the | |||
following RFI (i.e., Table 1 ST Week Onsite) to the team by July 24, 2023 , the first day of | |||
the inspection. | |||
Table 1ST Week Onsite | |||
Section 3, | |||
Paragraph Number/Title: Items | |||
1 Any cyber security event reports submitted in accordance with 10 CFR 03.04(b) | |||
73.77 since the last cyber security inspection. | |||
Updated Copies of corrective actions taken as a result of cyber security | |||
2 incidents/issues, to include previous NRC violations and Licensee 03.05 | |||
Identified Violations since the last cyber security inspection, as well as | |||
vulnerability-related corrective actions. | |||
In addition to the above information please provide the following: | |||
(1) Copies of the following documents do not need to be solely available to the | |||
inspection team as long as the inspectors have easy and unrestrained access | |||
to them. | |||
a. Updated Final Safety Analysis Report, if not previously provided; | |||
4 | |||
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST | |||
b. Original Cyber Security Safety Evaluation Report and Supplements; | |||
c. Quality Assurance (QA) Plan; | |||
d. Technical specifications, if not previously provided; and | |||
e. Latest individual plant examination/p robabilistic risk assessment report. | |||
(2) Vendor Manuals, Assessment and Corrective Actions: | |||
a. The most recent Cyber Security QA audit and/or self-assessment; and | |||
b. Corrective action documents (e.g., condition reports, including status of | |||
corrective actions) generate as a result of the most recent Cyber Security QA | |||
audit and/or self-assessment. | |||
IV. Information Requested to be Provided Throughout the Inspection | |||
(1) Copies of any corrective action documents generated as a result of the | |||
inspection teams questions or queries during the inspection. | |||
(2) Copies of the list of questions submitted by the inspection team members and | |||
the status/resolution of the information requested (provided daily during the | |||
inspection to each inspection team member). | |||
If you have any questions regarding the information requested, please contact the inspection | If you have any questions regarding the information requested, please contact the inspection | ||
team leader. | team leader. | ||
5 | |||
}} | }} | ||
Revision as of 08:04, 15 November 2024
| ML23046A095 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 02/15/2023 |
| From: | Glenn Dentel Division of Operating Reactors |
| To: | Coffey B Florida Power & Light Co |
| References | |
| IR 2023401 | |
| Download: ML23046A095 (1) | |
See also: IR 05000443/2023401
Text
February 15, 2023
Bob Coffey
Executive Vice President, Nuclear Division
and Chief Nuclear Officer
Florida Power & Light Company
700 Universe Blvd.
Mail Stop: EX/JB
Juno Beach, FL 33408
SUBJECT: SEABROOK STATION - INFORMATION REQUEST FOR THE CYBER
SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM
INSPECTION 05000443/2023401
Dear Bob Coffey:
On July 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, dated
December 14, 2021, at your Seabrook Station. The inspection will be performed to evaluate and
verify your ability to meet the requirements of the NRCs Cyber Security Rule, Title 10 of the
Code of Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and
Communication Systems and Networks. The onsite portion of the inspection will take place
July 24- 28, 2023.
Experience has shown that baseline inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be
made available either on an online repository (preferred) or digital media (CD/DVD) no later
than April 14, 2023. The inspection team will review this information and, by May 19, 2023 , will
request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the
evaluation of the critical systems and critical digital assets (CSs/CDAs) , defensive architecture,
and the areas of the licensees Cyber Security Program selected for the cyber security
inspection. This information will be requested for review in the regional office prior to the
inspection by June 23, 2023, as identified above.
The third group of requested documents consists of those items that the inspection team will
review, or need access to, during the inspection. Please have this information available by the
first day of the onsite inspection, July 24, 2023.
B. Coffey 2
The fourth group of information is necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Jeff Rady. We understand that our regulatory contact for
this inspection is Joshua Greene of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at (610) 337-53 80 or via
email at Jeff.Rady@nrc.gov .
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC we bsite at
http://www.nrc.gov/reading- rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Glenn T. Dentel, Chief
Engineering Branch 2
Division of Operating Reactor Safety
Docket Nos. 05000443
License Nos. NPF-86
Enclosure:
Cyber Security Inspection Document Request
cc: Distribution via ListServ
B. Coffey 3
SUBJECT: SEABROOK STATION - INFORMATION REQUEST FOR THE CYBER
SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM
INSPECTION 05000443/2023401 DATED FEBRUARY 15, 2023
DISTRIBUTION:
MYoung, DORS
SElkhiamy, DORS
JDeBoer, DORS
TDaun, DORS, SRI
SFlanagan, DORS, RI
ACass, DORS, AA
MFerdas, RI OEDO
RidsNrrPMSeabrook Resource
RidsNrrDorlLpl1 Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared Documents/Cyber Security/_Baseline
Inspections - OUO_SRI/2023/Seabrook/RFI Letter/Seabrook Cyber Security RFI 1.docx
ADAMS ACCESSION NUMBER: ML23046A095
SUNSI Review n -Sensitive Publvlle
Sensitive n -Publiclyvlable
OFFICE RI/DO RI/DO
ME JRady GDent
TE 02// 23 02// 23
OFFIAL RERD COPY
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
Inspection Report: 05000443/2023401
Inspection Dates: July 24- 28, 2023
Inspection Procedure: IP 71130.10, Cyber Security, dated December 14, 2021
(ADAMS Accession Number: ML21271A106)
Reference: Guidance Document for Development of the Request for
Information (RFI) and Notification Letter for IP 71130.10, Cyber
Security (ML21330A088)
NRC Inspectors: Jeff Rady, Lead Brandon Pinson
(610) 337-53 80 (610) 337-5 091
Jeff.Rady@nrc.gov Brandon.Pinson@nrc.gov
NRC Contractors: Tim Hennessey TBD
Timothy.Hennessey@nrc.gov
I. Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection
team with the general information necessary to select appropriate components and
Cyber Security Program (CSP ) elements to develop a site-specific inspection plan. The
first RFI is used to identify the list of critical systems and critical digital assets
(CSs/CDAs) plus operational and management security control portions of the CSP to
be chosen as the sample set required to be inspected by the cyber security inspection
procedure. The first RFIs requested information is specified below in Table RFI #1. The
Table RFI #1 information is requested to be provided to the regional office by April 14,
2023 , or sooner, to facilitate the selection of the specific items that will be reviewed
during the onsite inspection weeks.
The inspection team will examine the returned documentation from the first RFI and
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
focused follow-up request to develop the second RFI. The inspection team will submit
the specific systems and equipment list to your staff by May 19, 2023 , which will identify
the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
defensive architecture, and the areas of the licensees CSP selected for the cyber
security inspection. We request that the additional information provided from the second
RFI be made available to the regional office prior to the inspection by June 23, 2023.
Enclosure
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
The required Table RFI 1 information shall be provided on an online repository
(preferred) or digital media (CD/DVD) to the lead inspector by April 14, 2023. The
preferred file format for all lists is a searchable Excel spreadsheet file. The information
should be indexed and hyperlinked to facilitate ease of use. If you have any questions
regarding this information, please call the inspection team leader as soon as possible.
Table RFI #1
Section 3,
Paragraph Number/Title: IP Ref
A list of all Identified Critical Systems and Critical Digital Assets -
1 highlight/note any additions, deletions or reclassifications due to new Overall
guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last
cyber security inspection.
2 A list of emergency preparedness and Security onsite and offsite digital Overall
communication systems.
3 Network Topology Diagrams to include information and data flow for Overall
critical systems in levels 2, 3 and 4 (If available).
4 Ongoing Monitoring and Assessment program documentation. 03.01(a)
5 The most recent effectiveness analysis of the Cyber Security Program. 03.01(b)
6 Vulnerability screening/assessment and scan program documentation. 03.01(c)
Cyber Security Incident response documentation, including incident
detection, response, and recovery documentation as well as contingency 03.02(a)
7 plan development and implementation, including any program and
documentation that requires testing of security boundary device 03.04(b)
functionality.
8 Device Access and Key Control documentation. 03.02(c)
9 Password/Authenticator documentation. 03.02(c)
10 User Account/Credential documentation. 03.02(d)
11 Portable Media and Mobile Device control documentation, including kiosk 03.02(e)
security control assessment/documentation.
Design change/ modification program documentation and a List of all
12 design changes completed since the last cyber security inspection, including 03.03(a)
either a summary of the design change or the 50.59 documentation for the
change.
03.03(a),
13 Supply Chain Management documentation including any security impact analysis for new acquisitions. (b) and
(c)
14 Configuration Management documentation including any security impact 03.03(a)
analysis performed due to configuration changes since the last inspection. and (b)
15 Cyber Security Plan and any 50.54(p) analysis to support changes to the 03.04(a)
plan since the last inspection.
16 Cyber Security Metrics tracked (if applicable). 03.06 (b)
17 Provide documentation describing any cyber security changes to the access Overall
authorization program since the last cyber security inspection.
18 Provide a list of all procedures and policies provided to the NRC with their Overall
descriptive name and associated number (if available).
2
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
Table RFI #1
Section 3,
Paragraph Number/Title: IP Ref
19 Performance testing report (if applicable). 03.06 (a)
In addition to the above information please provide the following:
(1) Electronic copy of the U pdated F inal S afety Analysis R eport and technical
specifications.
(2) Name(s) and phone numbers for the regulatory and technical contacts.
(3) Current management and engineering organizational charts.
Based on this information, the inspection team will identify and select specific systems
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
submit a list of specific systems and equipment to your staff by May 19, 202 3, for the
II. Additional Information Requested to be Available Prior to Inspection.
As stated in Section I above, the inspection team will examine the returned
documentation requested from Table RFI #1 and submit the list of specific systems and
equipment to your staff by May 19, 2023, for the second RFI (i.e., RFI #2). The second
RFI will request additional information required to evaluate the CSs/CDAs, defensive
architecture, and the areas of the licensees CSP selected for the cyber security
inspection. The additional information requested for the specific systems and equipment
is identified in Table RFI #2.
The Table RFI 2 information shall be provided to the lead inspector by June 23, 2023.
The preferred file format for all lists is a searchable Excel spreadsheet. The information
should be indexed and hyper linked to facilitate ease of use. If you have any questions
regarding this information, please call the inspection team leader as soon as possible.
Table RFI #2
Section 3,
Paragraph Number/Title: Items
For the system(s) chosen for inspection provide:
1 Ongoing Monitoring and Assessment activity performed on the system(s). 03.01(a)
2 All Security Control Assessments for the selected system(s). 03.01(a)
All vulnerability screenings/assessments associated with or scans
3 performed on the selected system(s) since the last cyber security 03.01(c)
inspection.
Documentation (including configuration files and rules sets) for Network-
4 based Intrusion Detection/Protection Systems (NIDS/NIPS), Host- based 03.02(b)
Intrusion Detection Systems (HIDS), and Security Information and Event
Management (SIEM) systems for system(s) chosen for inspection).
3
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
Table RFI #2
Section 3,
Paragraph Number/Title: Items
Documentation (including configuration files and rule sets) for intra-
5 security level firewalls and boundary devices used to protect the selected 03.02(c)
system(s).
6 Copies of all periodic reviews of the access authorization list for the 03.02(d)
selected systems since the last inspection.
7 Baseline configuration data sheets for the selected CDAs. 03.03(a)
8 Documentation on any changes, including Security Impact Analyses, 03.03(b)
performed on the selected system(s) since the last inspection.
9 Copies of the purchase order documentation for any new equipment 03.03(c)
purchased for the selected systems since the last inspection.
10 Copies of any reports/assessment for cyber security drills performed since 03.02(a)
the last inspection. 03.04(b)
11 Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)
documentation of the results the last time the backups were executed. 03.04(b)
Corrective actions taken as a result of cyber security incidents/issues to
12 include previous NRC violations and Licensee Identified Violations since 03.05
the last cyber security inspection.
13 For the selected systems, provide design change/modification packages 03.03(a)
including completed work orders since the last cyber security inspection.
III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in Section II above, provide the
following RFI (i.e., Table 1 ST Week Onsite) to the team by July 24, 2023 , the first day of
the inspection.
Table 1ST Week Onsite
Section 3,
Paragraph Number/Title: Items
1 Any cyber security event reports submitted in accordance with 10 CFR 03.04(b)
73.77 since the last cyber security inspection.
Updated Copies of corrective actions taken as a result of cyber security
2 incidents/issues, to include previous NRC violations and Licensee 03.05
Identified Violations since the last cyber security inspection, as well as
vulnerability-related corrective actions.
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained access
to them.
a. Updated Final Safety Analysis Report, if not previously provided;
4
SEABROOK STATION CYBER SECURITY INSPECTION DOCUMENT REQUEST
b. Original Cyber Security Safety Evaluation Report and Supplements;
c. Quality Assurance (QA) Plan;
d. Technical specifications, if not previously provided; and
e. Latest individual plant examination/p robabilistic risk assessment report.
(2) Vendor Manuals, Assessment and Corrective Actions:
a. The most recent Cyber Security QA audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generate as a result of the most recent Cyber Security QA
audit and/or self-assessment.
IV. Information Requested to be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and
the status/resolution of the information requested (provided daily during the
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
5