TXX-3549, Final Deficiency Rept Re Void in Exterior Wall of Steam Generator Compartment.Deficiency Not Reportable Under 10CFR50.55e.Records Supporting Determination Available for Review at Site: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:_______________ _____ _ | {{#Wiki_filter:_______________ _____ _ | ||
TEXAS UTILITIES GENERATING COMPANY | TEXAS UTILITIES GENERATING COMPANY | ||
:4001 luti AN W)% Eat . DALI AS. TEX AM 75201 | :4001 luti AN W)% Eat. DALI AS. TEX AM 75201 | ||
"':bb5$' b"::' | "':bb5$' b"::' | ||
% $ @ $ 0 k [1 July 23, 1982 TXX-3549 i | |||
s JL 301982 1$ | |||
JL 301982 | 'l Mr. G. L. Madsen, Chief Reactor Projects Branch 3 | ||
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION UNIT #2 STEAM GENERATOR COMPARTMENT WALL FILE N0.: | |||
10110 | |||
==Dear Mr. Madsen:== | ==Dear Mr. Madsen:== | ||
On July 1,1982, we verbally informed your Mr. R. G. Taylor of a deficiency regarding a void in the exterior wall of the Unit #2 Steam Generator compart-ment wall. | On July 1,1982, we verbally informed your Mr. R. G. Taylor of a deficiency regarding a void in the exterior wall of the Unit #2 Steam Generator compart-ment wall. | ||
We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site. | We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site. | ||
| Line 31: | Line 32: | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, DC 20555 | U. S. Nuclear Regulatory Commission Washington, DC 20555 | ||
}{ | |||
8208030210 820723 PDR ADOCK 05000446 S | 8208030210 820723 PDR ADOCK 05000446 S | ||
ppg | |||
.)}} | |||
Latest revision as of 10:18, 17 December 2024
| ML20058G121 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/23/1982 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, TXX-3549, NUDOCS 8208030210 | |
| Download: ML20058G121 (1) | |
Text
_______________ _____ _
TEXAS UTILITIES GENERATING COMPANY
"':bb5$' b"::'
% $ @ $ 0 k [1 July 23, 1982 TXX-3549 i
s JL 301982 1$
'l Mr. G. L. Madsen, Chief Reactor Projects Branch 3
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION UNIT #2 STEAM GENERATOR COMPARTMENT WALL FILE N0.:
10110
Dear Mr. Madsen:
On July 1,1982, we verbally informed your Mr. R. G. Taylor of a deficiency regarding a void in the exterior wall of the Unit #2 Steam Generator compart-ment wall.
We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES site.
Very truly yours, Gary RJG:bs cc: NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, DC 20555
}{
8208030210 820723 PDR ADOCK 05000446 S
ppg
.)