PY-CEI-NRR-0771, Forwards Reactor Internals Vibration Testing at Perry Unit 1, Preliminary Rept,Per Reg Guide 1.20: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:..
{{#Wiki_filter:..
          >    THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY PO DOX 97     e PEARY. OHIO 44081 e TELEPHONE (216) 259 3737   e ADDR E sS - 10 CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan VICE PRESIDENT NUCLEAR GROUP Janua ry 15, 1988 PY-CEI/NRR-0771 L Doc ume nt Control Desk U.S. Nuclear Regulatory Commission Washington, D. C.       20555 Perry Nuclear Power Plant Docket No. 50-440 Preliminary Vibration Analysis Report
THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY PO DOX 97 e
PEARY. OHIO 44081 e
TELEPHONE (216) 259 3737 e
ADDR E sS - 10 CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan VICE PRESIDENT NUCLEAR GROUP Janua ry 15, 1988 PY-CEI/NRR-0771 L Doc ume nt Control Desk U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Perry Nuclear Power Plant Docket No. 50-440 Preliminary Vibration Analysis Report


==Dear Sir:==
==Dear Sir:==
 
Attached is the Preliminary Vibration Analysis Report for Perry Unit 1.
Attached is the Preliminary Vibration Analysis Report for Perry Unit 1. This report is submitted in accordance with Regulatory Guide 1.20, "Comprehensive Vibration Assessment Program for Reactor Internals during Preoperational and Initial Startup Testing".
This report is submitted in accordance with Regulatory Guide 1.20, "Comprehensive Vibration Assessment Program for Reactor Internals during Preoperational and Initial Startup Testing".
Please feel free to contact me if you have any questions.
Please feel free to contact me if you have any questions.
Very truly yours ,
Very truly yours,
Al Kaplan Vice President Nuclear Group AK: c ab Attachment cc:   T. Colburn K. Connaughton USNRC Region III 8801270248 880115 PDR   ADOCK 05000440                                                                       1 P                     PDR I
Al Kaplan Vice President Nuclear Group AK: c ab Attachment cc:
lL l}}
T. Colburn K. Connaughton USNRC Region III 8801270248 880115 PDR ADOCK 05000440 1
P PDR I
lL}}

Latest revision as of 11:30, 11 December 2024

Forwards Reactor Internals Vibration Testing at Perry Unit 1, Preliminary Rept,Per Reg Guide 1.20
ML20148H536
Person / Time
Site: Perry 
Issue date: 01/15/1988
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20148H541 List:
References
RTR-REGGD-01.020, RTR-REGGD-1.020 PY-CEI-NRR-0771, PY-CEI-NRR-771, NUDOCS 8801270248
Download: ML20148H536 (1)


Text

..

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY PO DOX 97 e

PEARY. OHIO 44081 e

TELEPHONE (216) 259 3737 e

ADDR E sS - 10 CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan VICE PRESIDENT NUCLEAR GROUP Janua ry 15, 1988 PY-CEI/NRR-0771 L Doc ume nt Control Desk U.S. Nuclear Regulatory Commission Washington, D. C.

20555 Perry Nuclear Power Plant Docket No. 50-440 Preliminary Vibration Analysis Report

Dear Sir:

Attached is the Preliminary Vibration Analysis Report for Perry Unit 1.

This report is submitted in accordance with Regulatory Guide 1.20, "Comprehensive Vibration Assessment Program for Reactor Internals during Preoperational and Initial Startup Testing".

Please feel free to contact me if you have any questions.

Very truly yours,

Al Kaplan Vice President Nuclear Group AK: c ab Attachment cc:

T. Colburn K. Connaughton USNRC Region III 8801270248 880115 PDR ADOCK 05000440 1

P PDR I

lL