{{#Wiki_filter:N Commonwealth Edison C / One First National Plaza. Chicago, Ilknois v 7 Address Reply to: Post Offico Box 767
{{#Wiki_filter:N Commonwealth Edison C / One First National Plaza. Chicago, Ilknois v 7 Address Reply to: Post Offico Box 767 Chicago, Illinois 60690 February 24, 1983 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
* Chicago, Illinois 60690 February 24, 1983 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137


==Subject:==
==Subject:==
Byron Generating Station Units 1 and 2 I&E Inspection Report Nos.
Byron Generating Station Units 1 and 2 I&E Inspection Report Nos.
50-454/82-05 and-50-455/82-06 References (a):             {{letter dated|date=June 24, 1982|text=June 24, 1982 letter}} from C. E. Norelius to Cordell Reed.
50-454/82-05 and-50-455/82-06 References (a):
(b):       July 30, 19822 letter from W. L. Stiede to J. G. Keppler.
{{letter dated|date=June 24, 1982|text=June 24, 1982 letter}} from C. E. Norelius to Cordell Reed.
(c):       {{letter dated|date=September 22, 1982|text=September 22, 1982 letter}} from C. E. Norelius to Cordell Reed.
(b):
(d):       {{letter dated|date=November 5, 1982|text=November 5, 1982 letter}} from W. L. Stiede to J. G. Keppler.
July 30, 19822 letter from W.
L. Stiede to J. G.
Keppler.
(c):
{{letter dated|date=September 22, 1982|text=September 22, 1982 letter}} from C. E. Norelius to Cordell Reed.
(d):
{{letter dated|date=November 5, 1982|text=November 5, 1982 letter}} from W.
L. Stiede to J. G. Keppler.


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
This is to provide a revised schedule for completion of our review of cable pulling tension at Byron Generating Station.
This is to provide a revised schedule for completion of our review of cable pulling tension at Byron Generating Station.                     In reference (d) we indicated that cable pull reports would be reviewed to assure that the allowable sidwall pressure was not exceeded prior to the implementation of a new procedure on December 17, 1982.                     This work was to have been completed January 31, 1983.
In reference (d) we indicated that cable pull reports would be reviewed to assure that the allowable sidwall pressure was not exceeded prior to the implementation of a new procedure on December 17, 1982.
At present, a review of a portion of the cable pull reports has i been completed. A number of cables have been identified which appear to l
This work was to have been completed January 31, 1983.
have been pulled with tension exceeding the previously established con-servative limits associated with tensile strength and sidewall pressure.
At present, a review of a portion of the cable pull reports has been completed.
Additional analysis is required before it can be determined whether or not the recorded tensions are acceptable.                     This additional analysis is expected to be complete by July 1, 1983. A report will be provided to the NRC at that time.
A number of cables have been identified which appear to i
l have been pulled with tension exceeding the previously established con-servative limits associated with tensile strength and sidewall pressure.
Additional analysis is required before it can be determined whether or not the recorded tensions are acceptable.
This additional analysis is expected to be complete by July 1, 1983.
A report will be provided to the NRC at that time.
Please address further questions regarding this matter to this office.
Please address further questions regarding this matter to this office.
Very truly yours, W   / ACk d W. L. Stiede Assistant Vice-President TRT/lm 8303220293 830316                                               hiAR PDR ADOCK 05000454 O                       PDR                                           1 t983. MMd 6039N
Very truly yours, W
                                                                                        /t*/   ,}}
/
ACk d W.
L. Stiede Assistant Vice-President TRT/lm 8303220293 830316 hiAR 1 t983. MMd PDR ADOCK 05000454 O
PDR 6039N
/t*/
,}}

Latest revision as of 10:55, 16 December 2024

Submits Revised Schedule for Completion of Review of Cable Pulling Tension Per IE Insp Repts 50-454/82-05 & 50-455/82-06.Addl Analysis to Assure That Recorded Tensions Acceptable Should Be Completed by 830701
ML20069F072
Person / Time
Site: Byron  
Issue date: 02/24/1983
From: Stiede W
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20069F054 List:
References
0639N, 639N, NUDOCS 8303220293
Download: ML20069F072 (1)


Text

N Commonwealth Edison C / One First National Plaza. Chicago, Ilknois v 7 Address Reply to: Post Offico Box 767 Chicago, Illinois 60690 February 24, 1983 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Byron Generating Station Units 1 and 2 I&E Inspection Report Nos.

50-454/82-05 and-50-455/82-06 References (a):

June 24, 1982 letter from C. E. Norelius to Cordell Reed.

(b):

July 30, 19822 letter from W.

L. Stiede to J. G.

Keppler.

(c):

September 22, 1982 letter from C. E. Norelius to Cordell Reed.

(d):

November 5, 1982 letter from W.

L. Stiede to J. G. Keppler.

Dear Mr. Keppler:

This is to provide a revised schedule for completion of our review of cable pulling tension at Byron Generating Station.

In reference (d) we indicated that cable pull reports would be reviewed to assure that the allowable sidwall pressure was not exceeded prior to the implementation of a new procedure on December 17, 1982.

This work was to have been completed January 31, 1983.

At present, a review of a portion of the cable pull reports has been completed.

A number of cables have been identified which appear to i

l have been pulled with tension exceeding the previously established con-servative limits associated with tensile strength and sidewall pressure.

Additional analysis is required before it can be determined whether or not the recorded tensions are acceptable.

This additional analysis is expected to be complete by July 1, 1983.

A report will be provided to the NRC at that time.

Please address further questions regarding this matter to this office.

Very truly yours, W

/

ACk d W.

L. Stiede Assistant Vice-President TRT/lm 8303220293 830316 hiAR 1 t983. MMd PDR ADOCK 05000454 O