f D Corrimonwealth Edison
    .            D O
) Ona F4st Nttional Plaza. Chicago. tilinois O
Corrimonwealth Edison
Address Rzply to: Postoffice BE767 v
                    ) Ona F4st Nttional Plaza. Chicago. tilinois v      Address Rzply to: Postoffice BE767
\\
              \         Chicago. Illinois 60690 September 8, 1983 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC         20555
Chicago. Illinois 60690 September 8, 1983 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555


==Subject:==
==Subject:==
Byron Generating Station Units 1 and 2 Antitrust Analysis NRC Docket Nos. 50-454 and 50-455 References (a):             {{letter dated|date=August 6, 1982|text=August 6, 1982, letter}} from A. Tealston to W. F. Naughton.
Byron Generating Station Units 1 and 2 Antitrust Analysis NRC Docket Nos. 50-454 and 50-455 References (a):
(b):       {{letter dated|date=September 2, 1983|text=September 2, 1983, letter}} from T. R.
{{letter dated|date=August 6, 1982|text=August 6, 1982, letter}} from A.
Tealston to W.
F. Naughton.
(b):
{{letter dated|date=September 2, 1983|text=September 2, 1983, letter}} from T. R.
Tramm to H. R. Denton.
Tramm to H. R. Denton.


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
This letter provides additional antitrust information for the Byron Generating Station.
This letter provides additional antitrust information for the Byron Generating Station. Enclosed is one memorandum which was inadvertently omitted in the referenge (b) responses to the reference (a)
Enclosed is one memorandum which was inadvertently omitted in the referenge (b) responses to the reference (a)
NRC questions.
NRC questions.
Exhibit 5 of reference (b) contained copies of recent correspon-dence relating to the possible sale of electricity to other utilities.               A meeting on May 10, 1983 with representatives of Wisconsin Public Power Inc. is discussed in those documents but the meeting summary is not included. The enclosed May 12, 1983 memorandum by Mr. Robert Beckwith was inadvertently omitted from Exhibit 5.
Exhibit 5 of reference (b) contained copies of recent correspon-dence relating to the possible sale of electricity to other utilities.
A meeting on May 10, 1983 with representatives of Wisconsin Public Power Inc. is discussed in those documents but the meeting summary is not included.
The enclosed May 12, 1983 memorandum by Mr. Robert Beckwith was inadvertently omitted from Exhibit 5.
Please address further questions to this office.
Please address further questions to this office.
Very truly yours,
Very truly yours,
                                                                    /[2 t     4%
/[2 t 4%
T. R. Tramm Nuclear Licensing Administrator 1m If 7273N 8309150087 830908 i     PDR ADOCK 05000454 M                   PDR
T. R.
                                                                          .~       .,    . _ -
Tramm Nuclear Licensing Administrator 1m If 7273N 8309150087 830908 i
PDR ADOCK 05000454 M
PDR
.~


May 12, 1983
May 12, 1983
Line 44: Line 53:
Meeting with Wisconsin Public Power Inc. (WPPI)
Meeting with Wisconsin Public Power Inc. (WPPI)
May 10, 1983 Attending:
May 10, 1983 Attending:
kPPT.                     CECO D. W. Penn               R. L. Bolger E. Mullins               R. Beckwith R. Philley (Atty.)       R. L. Kraatz R. G. Ferguson (IL4B) i The two parties met to discuss possible sales of power and energy ar 2
kPPT.
discussed in W. B. Behnke's letter of March 18, 1983 and Mr. Penn's letter et April 15, 1983. Following is a summary of the discussion.
CECO D. W. Penn R. L. Bolger E. Mullins R. Beckwith R. Philley (Atty.)
: 1. CECO made two Eeneral proposals that might satisfy WPPI's needs:
R. L. Kraatz R. G. Ferguson (IL4B) i The two parties met to discuss possible sales of power and energy ar 2
discussed in W. B. Behnke's letter of March 18, 1983 and Mr. Penn's letter et April 15, 1983.
Following is a summary of the discussion.
1.
CECO made two Eeneral proposals that might satisfy WPPI's needs:
(a) A 50 MW participation in Byron Station through 1996 at about
(a) A 50 MW participation in Byron Station through 1996 at about
                            $20/kW-month (firm cost to be confirmed by additional study).
$20/kW-month (firm cost to be confirmed by additional study).
WPPI would receive energy at Byron cost including fuel and pro rata O&M. Any back fitting requirements would also be shared pro rata. g/
WPPI would receive energy at Byron cost including fuel and pro rata O&M. Any back fitting requirements would also be shared pro rata.
(b) A 50       firm sale with a beginning capacity charge of about
g/
                            $5/ '-month (firm charge to be confirmed by additional study) and energy charges off system margin. A summary of Edison's expected marginal costs was provided.
(b) A 50 firm sale with a beginning capacity charge of about
$5/ '-month (firm charge to be confirmed by additional study) and energy charges off system margin. A summary of Edison's expected marginal costs was provided.
(c) In the above, or any other transactions, power and energy would be delivered at one of CECO's interconnection points. Any third party transmission would be arranged by WPPI.
(c) In the above, or any other transactions, power and energy would be delivered at one of CECO's interconnection points. Any third party transmission would be arranged by WPPI.
: 2. WPPI is not interested in participating in the Byron or Braidwood plants, but would consider LaSalle (See Item 5 following.)
2.
: 3. WPPI prefers a fixed capacity charge for any transaction that may be agreed upon.
WPPI is not interested in participating in the Byron or Braidwood plants, but would consider LaSalle (See Item 5 following.)
: 4. WPPI would be willing to consider a one-time, up-front capacity charge for any long term transaction.
3.
    .              5. WPPI requested firm proposals for the following:
WPPI prefers a fixed capacity charge for any transaction that may be agreed upon.
4.
WPPI would be willing to consider a one-time, up-front capacity charge for any long term transaction.
5.
WPPI requested firm proposals for the following:
(a) A long-term firm sale with energy of f the system margin. In addition, the capacity charge was to be stated in terms of a one-time, up-front payment rather than as a periodic amount.
(a) A long-term firm sale with energy of f the system margin. In addition, the capacity charge was to be stated in terms of a one-time, up-front payment rather than as a periodic amount.
(b) A 50 MW ownership in Powerton Station allocated evenly across both units. All normal ownership obligations and benefits j
(b) A 50 MW ownership in Powerton Station allocated evenly across both units. All normal ownership obligations and benefits would accrue to WPPI.
would accrue to WPPI.
j i
I i


                              -.                _=                     _
_=
t I
t I
(c) A 50 MW ownership in LaSalle Station allocated evenly across both units. All normal ownership obligations and benefits would accrue to WPPI.
(c) A 50 MW ownership in LaSalle Station allocated evenly across both units. All normal ownership obligations and benefits would accrue to WPPI.
6.
Ceco agreed to submit proposal in two to four weeks.
+
+
: 6. Ceco agreed to submit proposal in two to four weeks.
1 e
1 e 'd   67 R. Beckwith cc:   R. L. Bolger H. M. Dellsy R. G. Ferguson R. L. Kraatz 4
'd 67 R. Beckwith cc:
R. L. Bolger H. M. Dellsy R. G. Ferguson R. L. Kraatz 4
6 1341S
6 1341S


  . ib .
ib COMMONUEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1984 ONLY (MILLS PER KUH IN 1983 DOLL ARS)
COMMONUEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1984 ONLY (MILLS PER KUH IN 1983 DOLL ARS)
[
[
HOUR                                   PEAK (1) PERIOD HOURS l
HOUR PEAK (1) PERIOD HOURS l
ENDING:     JAt!   FEB   PAR     APR   MAY     JUNE JULY AUG     SEPT OCT   NOV DEC l
ENDING:
l           10 A.M.     49.4 45.8 46.6 52.5 45.3 44.6 46.3 39.5 55.8 56.9 54.6 43.1 l
JAt!
11           50.3 47.4 47.5 55.5 50.4 47.7 50.9 43.4 61.1 58.4 55.2 43.4 12           49.2 45.6 46.6 53.9 51.9 51.1 55.5 43.4 63.2 57.6 54.8 43.2 1 P.M.     48.8 44.4 46.3 51.4 50.2 55,2 59.9 44.5 65.1 56.9 54.3 42.9                   3 3           49.1 44.5 46.4 53.1 54.6 63.6 70.2 51.4 73.3 58.1 54.7 43.1 3           49.8 43.9 46.2 51,1 50.G 61.0 82.3 54.9 78.1 57.3 54.0 42.0 4           48 0   42.4   45.7   50.4   50.4   55.1 76.4 59.2 69.7   56.5 53.8 40.5 I
FEB PAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC l
l            5           49.3   42.0 44.9   49.3   49.2   50.1 63.0 48.6 65.5   53.3 55.3 44.1 6           55.1   44.2 44.6   47.1   43.6   45.9 55.6 44.1 53.1   52.3 61.3 48.3 ,
l 10 A.M.
7          53.5   45.7 45.9   47.9   40.9   44.0 50 1 42.4 53.1   56.0 56.6 45.7 l
49.4 45.8 46.6 52.5 45.3 44.6 46.3 39.5 55.8 56.9 54.6 43.1 l
8           50.2   44.4 46.0   49.9   39.8   41.3 47.1 39.3 56.3   56.4 55.0 43.5
11 50.3 47.4 47.5 55.5 50.4 47.7 50.9 43.4 61.1 58.4 55.2 43.4 12 49.2 45.6 46.6 53.9 51.9 51.1 55.5 43.4 63.2 57.6 54.8 43.2 1 P.M.
!            9          48.6   43.2   45.7   49.9   43.1   42.2 45.8 41.6 55.9   53.9 54.3 44.1 10           44.9   41.0   42.9   45.2   44.1   41.1 43.9 38.4 52.2   52.7 50.9 39.9 i
48.8 44.4 46.3 51.4 50.2 55,2 59.9 44.5 65.1 56.9 54.3 42.9 3
HOUR                                 OFF-PEAKC2) PERIOD HOURS ENDING:       JAN   FE8   MAR     APR   MAY     JUNE JULY AUG     SEPT OCT   NOV DEC 1 A.M.       35.3   29.2   29.6   33.1   28.1   27.9 34.3 21.5 35.6   36.5 37.2 23.3 2           35.3   29.2   29.5   32.1   25.8   25.4 31.5 21.1 35.5   36.5 37.1 23.2 3           33.5   28.0   29.1   30.8   24.2   22.9 29.1 19.1 34.4   36.4 36.5 22.6 4           31.7   27.3   28.5   30.2   23.4   21.4 27.4 17.2 32.8   36.2 35.6 21.8 5           32.3   27.5   28.7   30.4   23.3   20.8 26.4 16.3 32.7   36.3 35.4 21.8 6           34.0   28.6   29.2   32.0   24.0   21.5   26.4 17.5 34.2   36.3 36.3 22.4 I
3 49.1 44.5 46.4 53.1 54.6 63.6 70.2 51.4 73.3 58.1 54.7 43.1 3
7           36.4   32.9   32.1   32.6   27.0   25.0   30.2 20.0 35.2   37.8 39.5 25.6 8           40.5   36.3   37.5   38.6   35.1   30.7   33.7 26.5 40.2   43.4 43.4 30.4 9           43.6   39.2   41.1   44.9   38.7   35.8   37.4 31.2 43.4   47.9 48.6 36.4 10           33.4   29.0   29.6   30.4   28.9   27.6   27.8 22.9 30.4   36.9 38.4 23.1 11           35.0   29.6   30.6   31.6   30.1   29.6   30.4 25.9 33.1   39.0 39.4 25.2 12           35.7   29.3   30.1   31.1   30.7   30.8 33.0 28.2 34.6   38.5 40.0 24.9 1 P.M.       35.8   29.0   29.6   30.9   31.6   32.5   33.9 28.6 34.9   37.4 39.6 24.1 2           34.9   28.3   29.2   30.4   31.3   33.5   34.6 30.5 34.9   36.4 39.1 23.6 3           33.4   27.4   27.9   28.9   30.8   33.6   34.2 30.6 34.3   35.0 37.8 22.8 4           33.4   26.6   27.1   28.4   28.4   33.6   34.4 30.2 34.0   34.6 37.9 23.4 5           36.6   28.1   27.3   28.4   28.2   34.3   34.4 30.4 33.9 34.9 42.1 28.8 6           42.6   31.8   29.1   28.8   27.6   32.9   33.6 30.1 33.6 35.1 46.7 32.5
49.8 43.9 46.2 51,1 50.G 61.0 82.3 54.9 78.1 57.3 54.0 42.0 4
      .      7            43.3   34.2   31.6   30.0   27.6   30.8 32.6 28.4 33.7 39.6 46.1 31.9 j             8           41.2   34.2   34.1   33.0   28.4   29.6 31.9 27.6 35.3 41.3 44.9 31.4
48 0 42.4 45.7 50.4 50.4 55.1 76.4 59.2 69.7 56.5 53.8 40.5 l
!            9            39.3   32.7   33.5   34.6   31.6   31.5   32.1 29.9 36.1 39.1 43.3 29.6 10           37.6   30.8   32.3   32.9   30.6   31.8   32.9 29.6 34.6 36.9 39.9 26.9 11           40.3   34.3   38.1   37.5   37.3   34.8 39.2 32.9 42.2 43.9 44.2 32.2 12           36.6   30.9   32.0   34.2   30.2   29.5   36.0 27.0 37.6 38.8 39.0 26.2 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
5 49.3 42.0 44.9 49.3 49.2 50.1 63.0 48.6 65.5 53.3 55.3 44.1 I
6 55.1 44.2 44.6 47.1 43.6 45.9 55.6 44.1 53.1 52.3 61.3 48.3 7
53.5 45.7 45.9 47.9 40.9 44.0 50 1 42.4 53.1 56.0 56.6 45.7 l
8 50.2 44.4 46.0 49.9 39.8 41.3 47.1 39.3 56.3 56.4 55.0 43.5 9
48.6 43.2 45.7 49.9 43.1 42.2 45.8 41.6 55.9 53.9 54.3 44.1 10 44.9 41.0 42.9 45.2 44.1 41.1 43.9 38.4 52.2 52.7 50.9 39.9 i
HOUR OFF-PEAKC2) PERIOD HOURS ENDING:
JAN FE8 MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
35.3 29.2 29.6 33.1 28.1 27.9 34.3 21.5 35.6 36.5 37.2 23.3 2
35.3 29.2 29.5 32.1 25.8 25.4 31.5 21.1 35.5 36.5 37.1 23.2 3
33.5 28.0 29.1 30.8 24.2 22.9 29.1 19.1 34.4 36.4 36.5 22.6 4
31.7 27.3 28.5 30.2 23.4 21.4 27.4 17.2 32.8 36.2 35.6 21.8 5
32.3 27.5 28.7 30.4 23.3 20.8 26.4 16.3 32.7 36.3 35.4 21.8 6
34.0 28.6 29.2 32.0 24.0 21.5 26.4 17.5 34.2 36.3 36.3 22.4 I
7 36.4 32.9 32.1 32.6 27.0 25.0 30.2 20.0 35.2 37.8 39.5 25.6 8
40.5 36.3 37.5 38.6 35.1 30.7 33.7 26.5 40.2 43.4 43.4 30.4 9
43.6 39.2 41.1 44.9 38.7 35.8 37.4 31.2 43.4 47.9 48.6 36.4 10 33.4 29.0 29.6 30.4 28.9 27.6 27.8 22.9 30.4 36.9 38.4 23.1 11 35.0 29.6 30.6 31.6 30.1 29.6 30.4 25.9 33.1 39.0 39.4 25.2 12 35.7 29.3 30.1 31.1 30.7 30.8 33.0 28.2 34.6 38.5 40.0 24.9 1 P.M.
35.8 29.0 29.6 30.9 31.6 32.5 33.9 28.6 34.9 37.4 39.6 24.1 2
34.9 28.3 29.2 30.4 31.3 33.5 34.6 30.5 34.9 36.4 39.1 23.6 3
33.4 27.4 27.9 28.9 30.8 33.6 34.2 30.6 34.3 35.0 37.8 22.8 4
33.4 26.6 27.1 28.4 28.4 33.6 34.4 30.2 34.0 34.6 37.9 23.4 5
36.6 28.1 27.3 28.4 28.2 34.3 34.4 30.4 33.9 34.9 42.1 28.8 6
42.6 31.8 29.1 28.8 27.6 32.9 33.6 30.1 33.6 35.1 46.7 32.5 7
43.3 34.2 31.6 30.0 27.6 30.8 32.6 28.4 33.7 39.6 46.1 31.9 j
8 41.2 34.2 34.1 33.0 28.4 29.6 31.9 27.6 35.3 41.3 44.9 31.4 9
39.3 32.7 33.5 34.6 31.6 31.5 32.1 29.9 36.1 39.1 43.3 29.6 10 37.6 30.8 32.3 32.9 30.6 31.8 32.9 29.6 34.6 36.9 39.9 26.9 11 40.3 34.3 38.1 37.5 37.3 34.8 39.2 32.9 42.2 43.9 44.2 32.2 12 36.6 30.9 32.0 34.2 30.2 29.5 36.0 27.0 37.6 38.8 39.0 26.2 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983


COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1985 ONLY J
COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1985 ONLY (MILLS PER KWH IN 1983 DOLLARS)
(MILLS PER KWH IN 1983 DOLLARS) 1 HOUR                                   PEAK (1) PERIOD HOURS ENDING:       JAN   FEB   MAR     APR   MAY     JUNE JULY AUG   SEPT OCT   NOV   DEC 10 A.M.       44.9   46.3 44.9   43.8   40.2   38.8 40.3 36.5 46.7 54.4 46.1 34.5 11           45.3   46.9 45.5   44.7   43.7   41.5 44.1 39.7 52.6 61.3 47.4 35.4 12           45.1   46.4 45.0   44.2   44.6   43.7 47.6 40.1 56.5 58.7 46.7 34.7 1 P.M.       44.7   46.0 44.3   43.6   43.4   46.5 50.6 42.3 59.0 54.6 45.6 34.0 2           45.0   46.1 44.9   43.8   49.2   52.8 58.4 49.1 67.5 59.1 46.2 34.2 3           44.6   45.8 44.8   43.5   48.4   50.7 68.6 52.7 72.5 55.7 45.4 33.2 4           44.1   44.4 44.4   43.4   43.3   46.7 63.7 56.3 63.2 53.2 45.3 31.8 5           44.9   44.1 43.9   42.7   42.6   43.4 52.8 46.3 58.2 50.3 47.6 37.1 1.
J 1
6           47.5   46.1 43.7   42.0   38.9   40.0 47.8 40.8 51.1 49.4 52.3 40.9 7           46.8   46.3 44.5   42.3   36.6   38.3 43.6 39.2 45.0 52.8 48.7 38.6 8           45.6   46.1 44.7   43.2   35.8   36.1 41.3 36.3 47.6 53.5 46.5 36.1 9           44.6   45.3 44.5   43.2   38.4   36.8 40.3 38.4 47.3 50.9 46.1 34.8 10           40.8   43.2 42.7   41.3   39.8   36.0 38.6 35.3 44.8 50.8 43.9 30.3 HOUR                                 OFF-PEAK (2) PERIOD HOURS ENDING:       JAN   FEB   MAR   APR     MAY     JUNE JULY AUG   SEPT OCT   NOV   DEC 1 A.M.       26.8   32.4 31.8   28.9   24.0   21.2 24.4 19.2 33.1 33.6 29.1 14.3 2           26.7   32.2 31.8   28.7   22.9   19.4 22.7 15.9 30.6 30.5 27.6 12.6 3           26.4   31.8 31.5   28.4   21.2   16.9 19.6 14.0 28.3 28.3 25.8 11.7 4           25.8   31.2 30.9   28.0   20.5   15.2 17.8 12.3 25.1 26.7 24.5 11.4 5           25.7   31.1 31.0   28.1   20.3   14.7 16.5 11.5 25.0 27.0 24.4 11.6 6           26.1   31.6 31.4   28.0   21.1   15.3 16.9 12.6 28.0 30.2 27.2 13.7 7           30.3   36.6 34.6   30.4   23.1   19.0 21.2 15.2 31.5 34.1 32.0 16.3 8           35.0   38.5 38.5   36.3   32.3   25.3 26.3 22.0 35.9 40.3 36.1 21.5 9           38.9   41.7 41.0   38.9   34.9   31.0 33.4 27.6 37.8 44.3 40.8 27.7
HOUR PEAK (1) PERIOD HOURS ENDING:
.              10           28.3   31.8 30.9   28.9   26.6   23.7 21.8 19.1 27.6 32.3 30.4 15.8 11           29.4   32.2 31.5   29.8   27.9   25.8 24.4 22.1 30.2 35.9 32.3 18.2 12           30.0   32.8 31.4   29.8   28.6   26.6 27.1 24.8 31.7 35.2 32.7 18.1 1 P.M.       30.4 32.6 31.1 30.1 29.5 28.4 28.6 .;24. 8 31.8 34.9 32.4 17.1 2           30.1 32.0 30.8 29.9 29.4 29.9 30.0 27.1 31.5 33.4 32.1 16.8 3           28.6 30.6 29.8 28.1 28.9 30.2 29.5 27.1 31.0 31.6 30.9 16.4 4           28.5 29.8 29.3 27.7 27.3 30,1 29.7 26.4 30.6 30.8 30.9 16.3 i               5           31.2 32.1 29.5 28.1 27.2 31.0 29.7 26.9 30.4 32.1 34.5 20.0 4
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
6            36.1 35.6 31.0 28.6 26.4 29.4 29.1 26.4 30.3 33.3 38.4 23.0
44.9 46.3 44.9 43.8 40.2 38.8 40.3 36.5 46.7 54.4 46.1 34.5 11 45.3 46.9 45.5 44.7 43.7 41.5 44.1 39.7 52.6 61.3 47.4 35.4 12 45.1 46.4 45.0 44.2 44.6 43.7 47.6 40.1 56.5 58.7 46.7 34.7 1 P.M.
:-              7           36.4 37.7 32.6 29.6 26.6 27.1 28.1 23.9 30.3 36.9 37.9 22.4 I
44.7 46.0 44.3 43.6 43.4 46.5 50.6 42.3 59.0 54.6 45.6 34.0 2
* 8            35.1 37.9 34.1 31.8 27.4 26.0 27.3 23.3 31.3 39.3 36.9 22.1 9           34.1 36.8 33.7 32.9 29.8 28.6 27.6 26.3 31.9 36.8 35.5 20.6 10           33.0 35.1 32.9 31.7 29.1 28.8 28.9 25.7 30.6 34.4 32.6 18.4 11           35.8 37.6 39.7 36.2 34.5 30.3 35.4 27.7 38.4 42.5 38.7 21.1 12           31.0 36.0 35.0 33.2 27.8 23.7 28.7 22.4 35.2 35.9 32.9 17.6 NOTER (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 e
45.0 46.1 44.9 43.8 49.2 52.8 58.4 49.1 67.5 59.1 46.2 34.2 3
44.6 45.8 44.8 43.5 48.4 50.7 68.6 52.7 72.5 55.7 45.4 33.2 4
44.1 44.4 44.4 43.4 43.3 46.7 63.7 56.3 63.2 53.2 45.3 31.8 5
44.9 44.1 43.9 42.7 42.6 43.4 52.8 46.3 58.2 50.3 47.6 37.1 1.
6 47.5 46.1 43.7 42.0 38.9 40.0 47.8 40.8 51.1 49.4 52.3 40.9 7
46.8 46.3 44.5 42.3 36.6 38.3 43.6 39.2 45.0 52.8 48.7 38.6 8
45.6 46.1 44.7 43.2 35.8 36.1 41.3 36.3 47.6 53.5 46.5 36.1 9
44.6 45.3 44.5 43.2 38.4 36.8 40.3 38.4 47.3 50.9 46.1 34.8 10 40.8 43.2 42.7 41.3 39.8 36.0 38.6 35.3 44.8 50.8 43.9 30.3 HOUR OFF-PEAK (2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
26.8 32.4 31.8 28.9 24.0 21.2 24.4 19.2 33.1 33.6 29.1 14.3 2
26.7 32.2 31.8 28.7 22.9 19.4 22.7 15.9 30.6 30.5 27.6 12.6 3
26.4 31.8 31.5 28.4 21.2 16.9 19.6 14.0 28.3 28.3 25.8 11.7 4
25.8 31.2 30.9 28.0 20.5 15.2 17.8 12.3 25.1 26.7 24.5 11.4 5
25.7 31.1 31.0 28.1 20.3 14.7 16.5 11.5 25.0 27.0 24.4 11.6 6
26.1 31.6 31.4 28.0 21.1 15.3 16.9 12.6 28.0 30.2 27.2 13.7 7
30.3 36.6 34.6 30.4 23.1 19.0 21.2 15.2 31.5 34.1 32.0 16.3 8
35.0 38.5 38.5 36.3 32.3 25.3 26.3 22.0 35.9 40.3 36.1 21.5 9
38.9 41.7 41.0 38.9 34.9 31.0 33.4 27.6 37.8 44.3 40.8 27.7 10 28.3 31.8 30.9 28.9 26.6 23.7 21.8 19.1 27.6 32.3 30.4 15.8 11 29.4 32.2 31.5 29.8 27.9 25.8 24.4 22.1 30.2 35.9 32.3 18.2 12 30.0 32.8 31.4 29.8 28.6 26.6 27.1 24.8 31.7 35.2 32.7 18.1 1 P.M.
30.4 32.6 31.1 30.1 29.5 28.4 28.6.;24. 8 31.8 34.9 32.4 17.1 2
30.1 32.0 30.8 29.9 29.4 29.9 30.0 27.1 31.5 33.4 32.1 16.8 3
28.6 30.6 29.8 28.1 28.9 30.2 29.5 27.1 31.0 31.6 30.9 16.4 4
28.5 29.8 29.3 27.7 27.3 30,1 29.7 26.4 30.6 30.8 30.9 16.3 i
5 31.2 32.1 29.5 28.1 27.2 31.0 29.7 26.9 30.4 32.1 34.5 20.0 6
36.1 35.6 31.0 28.6 26.4 29.4 29.1 26.4 30.3 33.3 38.4 23.0 4
7 36.4 37.7 32.6 29.6 26.6 27.1 28.1 23.9 30.3 36.9 37.9 22.4 8
35.1 37.9 34.1 31.8 27.4 26.0 27.3 23.3 31.3 39.3 36.9 22.1 I
9 34.1 36.8 33.7 32.9 29.8 28.6 27.6 26.3 31.9 36.8 35.5 20.6 10 33.0 35.1 32.9 31.7 29.1 28.8 28.9 25.7 30.6 34.4 32.6 18.4 11 35.8 37.6 39.7 36.2 34.5 30.3 35.4 27.7 38.4 42.5 38.7 21.1 12 31.0 36.0 35.0 33.2 27.8 23.7 28.7 22.4 35.2 35.9 32.9 17.6 NOTER (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 e


l COMMONWEALTH EDISON COMPANY                                                                                                   j ESTIMATED AYERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1986 ONLY                                                                                         l (MILLS PER KWH IN 1983 DOLLARS)                                                                                                   I HOUR                                                     PE AK(1) PERIOD HOURS ENDING:           JAN   FEB   MAR         APR             MAY   JUNE JULY AUG                             SEPT OCT         NOV         DEC 10 A.M.           41.3 47.0 45.4       42.9             31.1   30.6             32.6     29.7         35.4           40.9 40.5       28.1 11                 42.8 48.1 46.4       44.6             35.9   34.5             37.4     33.3         39.4           44.6 41.7       29.2 12               41.7   46.7 45.3       43.7             36.8   37.1             41.3     35.1       41.5           43.3 41.1       28.5 1 P.M.           40.2   45.5 44.5       41.9             35.6   39.7             44.5     37.7       42.4           40.3 39.8       26.7 2               41.0   45.9 44.6       43.2             41.1   45.2           51.8       44.4       47.1           43.5 40.7       27.3 3               40.1   44.9 44.2       41.7             40.1   43.5           61.0       47.7       50.4           41.4 39.5       26.2 4               39.4   42.6 43.1       40.5             35.0   39.9           55.9       51.6       44.8           39.7 39.2       25.2 5               41.2   42.1 42.0       38.5             33.3   36.7           47.0       41.5       42.2           37.6 41.8       31.3 6               46.2   45.5 41.8       36.3             29.2   32.6           41.4       35.5       38.3           36.9 44.8       35.4 7               45.1   46.9 43.4       37.1             26.1   30.2           36.2       32.8       34.2           39.2 42.8       33.0 8               42.7   45.8 43.9       39.2             25.0   27.3           33.3       29.5       36.5           39.7 41.1       30.1 9               40.2   43.8 43.2       39.2             28.6   28.3           32.8       31.9       36.1           38.3 40.2       27.1 10               34.1   40.5 39.8       34.0             28.4   27.3           31.5       27.5       37.5           38.4 37.3       23.2 HOUR                                           OFF-PEAKC2) PERIOD HOURS ENDING:           JAN   FEB   MAR         APR             MAY     JUNE JULY AUG                             SEPT OCT           NOV         DEC 1 A.M.           19.2 23.5   24.3       17.7             11.5   11.7 14.8 11.1 18.4 16.1                                   19.3         9.7 2               16.6 22.3   23.7     15.7                 9.9   10.4 12.0                   9.7 15.4 13.5                   16.6         8.8 3               15.0 20.4   22.4     14.5                 9.3   9.5 10.7                   9.1 13.7 12.3                   15.2         8.4 4               14.1 19.5   21.3     14.0                 9.0   9.0                   9.9 8.5 11.8 11.4                   14.3         8.2 5               14.4 19.6   21.6     14.2                 9.0   8.9                   9.5 8.2 11.8 11.6                   14.3         8.3 6               16.4 22.3   23.5     15.6                 9.2   9.0                   9.6 8.5 13.8 13.4                   16.7         9.3 7               20.6 28.4   29.0       18.4             11.7   10.2 11.7                   9.5 18.2 18.8                   21.6       11.8 8               26.6 33.2   33.6       25.3             19.4   14.8 16.6 14.5 26.0 26.5                                   27.6       15.3 9               33.0 38.6   38.7       33.6             24.6   22.0 25.3 20.9 27.8 31.7                                   33.7       21.3 10               21.4 25.1   26.6       18.3             16.3   14.2 14.3 13.1 18.1 18.9                                   21.2       11.1 11               22.6 26.1   28.4       19.6             17.6   15.6 16.4 15.6 21.1 21.9                                   22.4       12.4 12               23.1 26.9   28.2       19.7             18.1   17.1 18.6 17.9 22.8 19.9                                   22.7       12.4 1 P.M.           23.4 26.6   27.8       19.1             18.4   18.3 19.8 17.2 22.6 19.2                                   22.3       12.1 2               22.9 25.9   27.3       18.9             18.1   18.9 20.2 19.6 22.5 17.9                                   21.9       11.9 3               21.6 24.5   25.8       18.1             17.8   18.9 19.8 19.4 21.6 16.9                                   20.9       11.4 4               21.3 23.6   25.1       17.7             15.1   18.8 20.1 18.2 20.8 16.2                                     20.9       11.6 5               24.1 25.9   25.6       18.1             14.9   19.3 20.1 18.1 20.6 16.6                                     24.1       13.8 6               29.9 29.6   27.3       18.1             14.4   18.3 19.1 17.6 20.4 17.6                                     27.9       15.6 7               30.3 31.9   29.6       18.5             14.4   15.7 17.4 15.9 20.3 19.6                                     27.4       15.3 8               28.6 32.3   31.9       20.4             14.8   15.1 16.8 15.5 21.9 21.9                                     26.4       15.1 9               27.4 31.1   31.3       21.4             17.8   15.7 16.9 17.3 22.9 19.4                                     25.1       14.4 10               26.2 29.1   30.2       20.1             16.6   15.9 18.1 16.6 20.9 17.1                                     22.3       12.9 11               27.5 31.9   37.1       25.1             20.8   19.8 25.4 20.3 28.7 27.6                                     29.4       14.7 12               21.7 28.2   30.3       21.0             15.6   15.1 18.7 15.4 21.7 20.2                                     22.3       12.4 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
COMMONWEALTH EDISON COMPANY j
            , - .        -.      .    -  - . - . . - . . , -,              . . - . . . - . . .        - - - ~ . - . . - , - ,         ,,- .- ,      , - - , - - - - - -
ESTIMATED AYERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1986 ONLY (MILLS PER KWH IN 1983 DOLLARS)
HOUR PE AK(1) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
41.3 47.0 45.4 42.9 31.1 30.6 32.6 29.7 35.4 40.9 40.5 28.1 11 42.8 48.1 46.4 44.6 35.9 34.5 37.4 33.3 39.4 44.6 41.7 29.2 12 41.7 46.7 45.3 43.7 36.8 37.1 41.3 35.1 41.5 43.3 41.1 28.5 1 P.M.
40.2 45.5 44.5 41.9 35.6 39.7 44.5 37.7 42.4 40.3 39.8 26.7 2
41.0 45.9 44.6 43.2 41.1 45.2 51.8 44.4 47.1 43.5 40.7 27.3 3
40.1 44.9 44.2 41.7 40.1 43.5 61.0 47.7 50.4 41.4 39.5 26.2 4
39.4 42.6 43.1 40.5 35.0 39.9 55.9 51.6 44.8 39.7 39.2 25.2 5
41.2 42.1 42.0 38.5 33.3 36.7 47.0 41.5 42.2 37.6 41.8 31.3 6
46.2 45.5 41.8 36.3 29.2 32.6 41.4 35.5 38.3 36.9 44.8 35.4 7
45.1 46.9 43.4 37.1 26.1 30.2 36.2 32.8 34.2 39.2 42.8 33.0 8
42.7 45.8 43.9 39.2 25.0 27.3 33.3 29.5 36.5 39.7 41.1 30.1 9
40.2 43.8 43.2 39.2 28.6 28.3 32.8 31.9 36.1 38.3 40.2 27.1 10 34.1 40.5 39.8 34.0 28.4 27.3 31.5 27.5 37.5 38.4 37.3 23.2 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
19.2 23.5 24.3 17.7 11.5 11.7 14.8 11.1 18.4 16.1 19.3 9.7 2
16.6 22.3 23.7 15.7 9.9 10.4 12.0 9.7 15.4 13.5 16.6 8.8 3
15.0 20.4 22.4 14.5 9.3 9.5 10.7 9.1 13.7 12.3 15.2 8.4 4
14.1 19.5 21.3 14.0 9.0 9.0 9.9 8.5 11.8 11.4 14.3 8.2 5
14.4 19.6 21.6 14.2 9.0 8.9 9.5 8.2 11.8 11.6 14.3 8.3 6
16.4 22.3 23.5 15.6 9.2 9.0 9.6 8.5 13.8 13.4 16.7 9.3 7
20.6 28.4 29.0 18.4 11.7 10.2 11.7 9.5 18.2 18.8 21.6 11.8 8
26.6 33.2 33.6 25.3 19.4 14.8 16.6 14.5 26.0 26.5 27.6 15.3 9
33.0 38.6 38.7 33.6 24.6 22.0 25.3 20.9 27.8 31.7 33.7 21.3 10 21.4 25.1 26.6 18.3 16.3 14.2 14.3 13.1 18.1 18.9 21.2 11.1 11 22.6 26.1 28.4 19.6 17.6 15.6 16.4 15.6 21.1 21.9 22.4 12.4 12 23.1 26.9 28.2 19.7 18.1 17.1 18.6 17.9 22.8 19.9 22.7 12.4 1 P.M.
23.4 26.6 27.8 19.1 18.4 18.3 19.8 17.2 22.6 19.2 22.3 12.1 2
22.9 25.9 27.3 18.9 18.1 18.9 20.2 19.6 22.5 17.9 21.9 11.9 3
21.6 24.5 25.8 18.1 17.8 18.9 19.8 19.4 21.6 16.9 20.9 11.4 4
21.3 23.6 25.1 17.7 15.1 18.8 20.1 18.2 20.8 16.2 20.9 11.6 5
24.1 25.9 25.6 18.1 14.9 19.3 20.1 18.1 20.6 16.6 24.1 13.8 6
29.9 29.6 27.3 18.1 14.4 18.3 19.1 17.6 20.4 17.6 27.9 15.6 7
30.3 31.9 29.6 18.5 14.4 15.7 17.4 15.9 20.3 19.6 27.4 15.3 8
28.6 32.3 31.9 20.4 14.8 15.1 16.8 15.5 21.9 21.9 26.4 15.1 9
27.4 31.1 31.3 21.4 17.8 15.7 16.9 17.3 22.9 19.4 25.1 14.4 10 26.2 29.1 30.2 20.1 16.6 15.9 18.1 16.6 20.9 17.1 22.3 12.9 11 27.5 31.9 37.1 25.1 20.8 19.8 25.4 20.3 28.7 27.6 29.4 14.7 12 21.7 28.2 30.3 21.0 15.6 15.1 18.7 15.4 21.7 20.2 22.3 12.4 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
- - - ~. -.. -, -,


COMMONWEALTH EDISON COMPANY l
COMMONWEALTH EDISON COMPANY l
ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1987 ONLY               l (MILLS PER KWH IN 1983 DOLLARS)                         !
ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1987 ONLY (MILLS PER KWH IN 1983 DOLLARS) i HOUR PEAKC1) PERIOD HOURS ENDING:
I i
JAN FE8 MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
HOUR                                   PEAKC1) PERIOD HOURS ENDING:       JAN   FE8   MAR   APR   MAY   JUNE JULY AUG     SEPT OCT   NOV   DEC l
36.9 41.7 56.1 49.0 36.8 19.6 26.3 25.3 40.5 44.7 40.8 25.0 11 38.4 43.0 58.5 51.1 41.7 24.4 31.0 28.4 44.7 47.1 42.1 26.2 12 37.1 40.9 56.0 50.0 42.7 26.7 35.0 31.0 47.2 46.1 41.4 25.4 1 P.M.
10 A.M.       36.9   41.7 56.1   49.0 36.8   19.6 26.3 25.3 40.5 44.7 40.8 25.0 11             38.4   43.0 58.5   51.1 41.7   24.4 31.0 28.4 44.7 47.1 42.1 26.2 12             37.1   40.9 56.0   50.0 42.7   26.7 35.0 31.0 47.2 46.1 41.4 25.4 1 P.M.       35.4   39.5 54.2   48.1 41.5   29.0 37.7 33.7 48.3 44.7 40.0 22.9 2             36.5 39.7   54.6   49.3 47.7   33.5 43.1 39.7 53.8 46.3 41.1 24.0 3             35.4 38.8   53.5   47.9 46.8   32.7 49.7 42.5 57.9 45.1 39.7 22.6 4             34.7 36.3   51.1   46.9 41.0   29.6 46.1 45.5 51.4 44.2 39.5 21.9 5             36.6 35.7   49.4   45.5 39.4   26.6 39.6 37.1 47.7 42.6 42.1 28.4 6             41.8 39.3   49.0   44.0 35.3   22.2 35.1 31.3 43.2 41.9 45.4 32.7 7             40.7 41.5   51.9   44.5 33.0   19.3 30.3 28.1 39.0 44.0 43.2 30.3 8             38.2 39.9   53.0   46.3 32.1   16.6 27.0 25.0 40.9 44.2 41.3 27.3 9             35.6 37.8   51.4   46.3 34.7   17.4 26.0 27.4 40.7 42.8 40.8 23.6 10             29.3 33.6   46.7   42.4 35.3   16.5 25.1 22.7 41.3 43.8 38.3 20.1 HOUR                                 OFF-PEAKC2) PERIOD HOURS ENDING:       JAN   FEB   MAR     APR   MAY   JUNE JULY AUG     SEPT OCT   NOV   DEC 1 A.M.       13.9 16.4 34.8 26.4 16.7           7.8 10.3     8.9 22.8 20.9 20.8   8.5 2             12.2 13.8 33.9 24.8 13.9           7.2   8.6   8.0 20.3 18.7 17.9   7.9 3             11.3 12.6 32.5 23.0 12.7           7.0   8.0   7.6 18.1 17.7 16.3   7.6 4             10.7 12.2 31.5 22.1 12.2           6.8   7.6   7.3 15.9 17.0 15.2   7.4 5             10.8 12.2 31.7 22.3 12.1           6.8   7.4   7.2 15.8 17.2 15.3   7.5 6             12.1 14.3 33.9 24.3 12.6           6.9   7.5   7.3 18.3 18.8 18.0   8.2 7             15.2 18.7 37.5 27.5 16.9           7.3   8.5   8.0 22.3 24.6 23.3 10.1 8             21.6 26.2 41.4 34.5 26.6           9.9 12.6   12.5 31.0 32.5   28.4 12.8 9             28.5 32.4 47.5 40.6 30.3 13.3 19.2           16.9 31.5 36.5   34.5 18.6 10             16.4 18.3 33.4 27.6 21.7           9.7 11.0   10.6 21.6 23.6   23.0   9.6 11             16.9 19 0 35.3 29.0 23.2 10.7 12.9           13.1 24.7 25.9   24.6 10.6 12             17.3 19.1 35.1 29.4 23.5 11.4 15.1           15.0 26.0 26.3   25.1 10.6 1 P.M.       17.2 18.9 34.6 29.9 23.9 12.4 16.1           14.6 26.4 25.6   25.0 10.3 2             16.9 18.1 34.2 29.5 23.7 13.0 16.8           16.7 26.4 24.6   24.6 10.1 3             16.1 17.1 32.6 27.9 23.4 13.1 16.4           16.6 26.1 22.7   23.6   9.7 4             16.1 16.4 31.8 27.3 20.9 12.9 16.6           15.8 25.9 22.3   23.8 10.1 5           17.6 17.9 32.2 27.8 20.5 13.6 16.6             15.9 25.9 23.1   27.1 12.1 6           ' 22.6 21.1 34.3 28.3 19.6 12.4 15.7           15.5 25.6 23.6   30.4 13.8 7           22.9 22.9 36.6 29.4 19.6 10.9 14.4             13.6 25.6 28.1   30.1 13.4 8             21.1 23.4 38.9 31.8 20.1 10.5 13.9           13.2 27.4 29.6   29.3 13.2 9           20.0 21.8 38.4 32.8 23.8 11.3 13.9             15.1 28.1 27.6   28.1 12.4 10           19.1 20.1 37.1 31.8 22.4 11.4 14.9             14.6 26.7 25.6   25.5 11.1 11           21.1 24.0 42.9 35.3 28.3 11.8 19.1             16.9 34.5 35.3   32.1 13.4   ,
35.4 39.5 54.2 48.1 41.5 29.0 37.7 33.7 48.3 44.7 40.0 22.9 2
12           15.9 19.0 38.6 31.4 21.5           9.5 13.3   12.8 26.8 26.0   24.2 10.5 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (2)0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS           l SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 l
36.5 39.7 54.6 49.3 47.7 33.5 43.1 39.7 53.8 46.3 41.1 24.0 3
35.4 38.8 53.5 47.9 46.8 32.7 49.7 42.5 57.9 45.1 39.7 22.6 4
34.7 36.3 51.1 46.9 41.0 29.6 46.1 45.5 51.4 44.2 39.5 21.9 5
36.6 35.7 49.4 45.5 39.4 26.6 39.6 37.1 47.7 42.6 42.1 28.4 6
41.8 39.3 49.0 44.0 35.3 22.2 35.1 31.3 43.2 41.9 45.4 32.7 7
40.7 41.5 51.9 44.5 33.0 19.3 30.3 28.1 39.0 44.0 43.2 30.3 8
38.2 39.9 53.0 46.3 32.1 16.6 27.0 25.0 40.9 44.2 41.3 27.3 9
35.6 37.8 51.4 46.3 34.7 17.4 26.0 27.4 40.7 42.8 40.8 23.6 10 29.3 33.6 46.7 42.4 35.3 16.5 25.1 22.7 41.3 43.8 38.3 20.1 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
13.9 16.4 34.8 26.4 16.7 7.8 10.3 8.9 22.8 20.9 20.8 8.5 2
12.2 13.8 33.9 24.8 13.9 7.2 8.6 8.0 20.3 18.7 17.9 7.9 3
11.3 12.6 32.5 23.0 12.7 7.0 8.0 7.6 18.1 17.7 16.3 7.6 4
10.7 12.2 31.5 22.1 12.2 6.8 7.6 7.3 15.9 17.0 15.2 7.4 5
10.8 12.2 31.7 22.3 12.1 6.8 7.4 7.2 15.8 17.2 15.3 7.5 6
12.1 14.3 33.9 24.3 12.6 6.9 7.5 7.3 18.3 18.8 18.0 8.2 7
15.2 18.7 37.5 27.5 16.9 7.3 8.5 8.0 22.3 24.6 23.3 10.1 8
21.6 26.2 41.4 34.5 26.6 9.9 12.6 12.5 31.0 32.5 28.4 12.8 9
28.5 32.4 47.5 40.6 30.3 13.3 19.2 16.9 31.5 36.5 34.5 18.6 10 16.4 18.3 33.4 27.6 21.7 9.7 11.0 10.6 21.6 23.6 23.0 9.6 11 16.9 19 0 35.3 29.0 23.2 10.7 12.9 13.1 24.7 25.9 24.6 10.6 12 17.3 19.1 35.1 29.4 23.5 11.4 15.1 15.0 26.0 26.3 25.1 10.6 1 P.M.
17.2 18.9 34.6 29.9 23.9 12.4 16.1 14.6 26.4 25.6 25.0 10.3 2
16.9 18.1 34.2 29.5 23.7 13.0 16.8 16.7 26.4 24.6 24.6 10.1 3
16.1 17.1 32.6 27.9 23.4 13.1 16.4 16.6 26.1 22.7 23.6 9.7 4
16.1 16.4 31.8 27.3 20.9 12.9 16.6 15.8 25.9 22.3 23.8 10.1 5
17.6 17.9 32.2 27.8 20.5 13.6 16.6 15.9 25.9 23.1 27.1 12.1 6
' 22.6 21.1 34.3 28.3 19.6 12.4 15.7 15.5 25.6 23.6 30.4 13.8 7
22.9 22.9 36.6 29.4 19.6 10.9 14.4 13.6 25.6 28.1 30.1 13.4 8
21.1 23.4 38.9 31.8 20.1 10.5 13.9 13.2 27.4 29.6 29.3 13.2 9
20.0 21.8 38.4 32.8 23.8 11.3 13.9 15.1 28.1 27.6 28.1 12.4 10 19.1 20.1 37.1 31.8 22.4 11.4 14.9 14.6 26.7 25.6 25.5 11.1 11 21.1 24.0 42.9 35.3 28.3 11.8 19.1 16.9 34.5 35.3 32.1 13.4 12 15.9 19.0 38.6 31.4 21.5 9.5 13.3 12.8 26.8 26.0 24.2 10.5 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (2)0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 l


COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1988 ONLY (MILLS PER KWH IN 1983 DOLLARS)
COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1988 ONLY (MILLS PER KWH IN 1983 DOLLARS)
HOUR                                               PEAKC 1) PERIOD HOURS ENDING:         JAN         FEB   MAR         APR   MAY                 JUNE JULY AUG   SEPT OCT                             NOV DEC 10 A.M.         31.7       33.2 44.0           42.4   31.3               19.5 26.4 25.7 43.3         69.8                     50.8 38.5 11               33.4       34.8 95.1           44.1   35.6               24.4 31.1 30.2 52.3         81.3                     52.7 39.5 12               31.9       31.8   44.0       43.3   36.4               26.8 35.1 33.0 57.5       77.5                     51.7 38.8 1 P.M.         29.8       29.6   42.5       41.5   35.3               29.2 37.8 35.8 59.8         68.4                     49.6 36.2 2             31.1       30.0   43.0       42.8   40.7               33.7 43.5 43.0 71.0       78.0                     51.1 37.6 3             '9.5       28.5   42.3       41.2   39.7               32.8 50.4 46.6 76.2         71.5                     49.5 35.5 4             29.1       25.1   41.3       40.1   34.9               29.8 46.6 51.2 66.0       63.3                     49.0 33.7 5               31.3       24.2   40.2       38.0   33.5               26.7 39.9 40.0 59.0       57.4                     53.4 41.5 6             37.1       29.3   39.8       36.0   29.8               22.2 35.2 33.4 49.8       55.5                     61.7 45.8 7               36.0       33.0   41.6       36.7   27.2               19.1 30.3 29.3 41.1       61.9                     55.1 43.2 8               33.2       30.3   42.1       38.7   26.2               16.2 27.0 25.4 45.3       65.2                     51.5 40.4 9               29.9       27.0   41.3       38.7   29.3               17.1 26.0 28.1 44.6       58.1                     49.2 37.7 10               23.0       21.5   37.6       34.0   30.2               16.1 25.1 23.1 42.6       56.5                     46.5 31.9 HOUR                                             OFF-PEAKC2) PERIOD HOURS ENDING:         JAN       FEB     MAR         APR   MAY                 JUNE JULY AUG     SEPT OCT                             NOV DEC 1 A.M.         10.3         9.1   22.6       18.0   12.2                   7.6 9.8   8.2 21.0       26.1                     29.5 11.6 2               9.3         8.4   19.8       15.7   10.4                   7.1 8.3   7.5 16.8       21.7                     25.2 10.1 3               8.7         8.1   18.3       14.4     9.8                 6.8 7.7   7.1 14.4       20.3                     23.0   9.5 4               8.4         8.0   17.2       13.8     9.5                 6.7 7.4   6.9 12.5       19.4                     21.5   9.1 l             5               8.5         8.0   17.6     14.1     9.4                 6.7 7.3   6.8 12.4       19.7                     21.7   9.2 6               9.2         8.6 20.4       15.6     9.6                 6.8 7.3   7.0 14.9       22.0                     25.8 11.1 l             7               11.7       10.6   25.5       18.7   12.3                   7.1 8.2   7.6 21.5       30.9                     33.0 14.6 8               16.1       15.5   31.5       25.8   21.4                   9.6 12.2 11.7 30.4       39.9                       37.3 21.2 9               23.3       22.8   36.5 33.4 25.2                         13.0 18.9 16.9 31.4       48.3                     42.8 28.7 10               13.9       12.4   24.6 19.6 17.6                           9.6 10.7 10.2 19.7       29.7                       30.9 14.4 11               14.4       12.8   25.9 21.7 19.1                         10.4 12.6 12.6 22.9       33.1                       33.3 16.0 12               14.7       12.9   26.2 20.9 19.3                         11.2 14.8 14.6 24.4       33.6                       33.9 15.9 1 P.M.         14.9       12.6   25.9 20.3 19.3                         12.1 15.8 14.3 24.8       32.7                       33.6 14.9 2               14.6       12.4   25.4 20.0 18.8                         12.8 16.4 16.3 24.0       31.6                       33.2 14.7 3               14.0       11.6   24.3 18.6 18.6                         12.9 16.1 16.1 24.5       29.4                       31.9 14.1 4               13.8       11.1   23.6 18.4 15.9                         12.7 16.1 15.4 24.3       28.9                       32.1 14.3 5               15.3       12.2   24.1 18.3 15.5                         13.4 16.1 15.4 24.3       30.0                       36.3 17.9 6               18.8       14.1   26.0 18.8 15.1                         12.2 15.3 15.1 23.9       30.4                       40.8 21.2 l             7               18.9       15.4   27.9 19.1 14.9                         10.7 13.9 13.1 24.1       36.0                     40.1 20.5 8               17.8       15.7   29.8 21.9 14.9                         10.3 13.3 12.8 26.1       37.9                     39.1 20.0 9               16.9       14.8   29.4 23.4 17.6                         11.1 13.5 14.5 27.1       35.5                     37.4 18.4 10               16.4       13.6   28.6 21.4 16.1                         11.3   14.3 14.1 25.3       33.3                     34.1 16.0
HOUR PEAKC 1) PERIOD HOURS ENDING:
,            11               15.9       13.5   34.7 25.8 22.4                         11.4   18.8 16.9 34.7       42.6                     40.8 20.4 12               12.6       10.7   27.1 21.9 16.4                           9.2 12.9 11.5 27.3       33.0                     35.0 15.4 l             NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
31.7 33.2 44.0 42.4 31.3 19.5 26.4 25.7 43.3 69.8 50.8 38.5 11 33.4 34.8 95.1 44.1 35.6 24.4 31.1 30.2 52.3 81.3 52.7 39.5 12 31.9 31.8 44.0 43.3 36.4 26.8 35.1 33.0 57.5 77.5 51.7 38.8 1 P.M.
29.8 29.6 42.5 41.5 35.3 29.2 37.8 35.8 59.8 68.4 49.6 36.2 2
31.1 30.0 43.0 42.8 40.7 33.7 43.5 43.0 71.0 78.0 51.1 37.6 3
'9.5 28.5 42.3 41.2 39.7 32.8 50.4 46.6 76.2 71.5 49.5 35.5 4
29.1 25.1 41.3 40.1 34.9 29.8 46.6 51.2 66.0 63.3 49.0 33.7 5
31.3 24.2 40.2 38.0 33.5 26.7 39.9 40.0 59.0 57.4 53.4 41.5 6
37.1 29.3 39.8 36.0 29.8 22.2 35.2 33.4 49.8 55.5 61.7 45.8 7
36.0 33.0 41.6 36.7 27.2 19.1 30.3 29.3 41.1 61.9 55.1 43.2 8
33.2 30.3 42.1 38.7 26.2 16.2 27.0 25.4 45.3 65.2 51.5 40.4 9
29.9 27.0 41.3 38.7 29.3 17.1 26.0 28.1 44.6 58.1 49.2 37.7 10 23.0 21.5 37.6 34.0 30.2 16.1 25.1 23.1 42.6 56.5 46.5 31.9 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
10.3 9.1 22.6 18.0 12.2 7.6 9.8 8.2 21.0 26.1 29.5 11.6 2
9.3 8.4 19.8 15.7 10.4 7.1 8.3 7.5 16.8 21.7 25.2 10.1 3
8.7 8.1 18.3 14.4 9.8 6.8 7.7 7.1 14.4 20.3 23.0 9.5 4
8.4 8.0 17.2 13.8 9.5 6.7 7.4 6.9 12.5 19.4 21.5 9.1 l
5 8.5 8.0 17.6 14.1 9.4 6.7 7.3 6.8 12.4 19.7 21.7 9.2 6
9.2 8.6 20.4 15.6 9.6 6.8 7.3 7.0 14.9 22.0 25.8 11.1 l
7 11.7 10.6 25.5 18.7 12.3 7.1 8.2 7.6 21.5 30.9 33.0 14.6 8
16.1 15.5 31.5 25.8 21.4 9.6 12.2 11.7 30.4 39.9 37.3 21.2 9
23.3 22.8 36.5 33.4 25.2 13.0 18.9 16.9 31.4 48.3 42.8 28.7 10 13.9 12.4 24.6 19.6 17.6 9.6 10.7 10.2 19.7 29.7 30.9 14.4 11 14.4 12.8 25.9 21.7 19.1 10.4 12.6 12.6 22.9 33.1 33.3 16.0 12 14.7 12.9 26.2 20.9 19.3 11.2 14.8 14.6 24.4 33.6 33.9 15.9 1 P.M.
14.9 12.6 25.9 20.3 19.3 12.1 15.8 14.3 24.8 32.7 33.6 14.9 2
14.6 12.4 25.4 20.0 18.8 12.8 16.4 16.3 24.0 31.6 33.2 14.7 3
14.0 11.6 24.3 18.6 18.6 12.9 16.1 16.1 24.5 29.4 31.9 14.1 4
13.8 11.1 23.6 18.4 15.9 12.7 16.1 15.4 24.3 28.9 32.1 14.3 5
15.3 12.2 24.1 18.3 15.5 13.4 16.1 15.4 24.3 30.0 36.3 17.9 6
18.8 14.1 26.0 18.8 15.1 12.2 15.3 15.1 23.9 30.4 40.8 21.2 l
7 18.9 15.4 27.9 19.1 14.9 10.7 13.9 13.1 24.1 36.0 40.1 20.5 8
17.8 15.7 29.8 21.9 14.9 10.3 13.3 12.8 26.1 37.9 39.1 20.0 9
16.9 14.8 29.4 23.4 17.6 11.1 13.5 14.5 27.1 35.5 37.4 18.4 10 16.4 13.6 28.6 21.4 16.1 11.3 14.3 14.1 25.3 33.3 34.1 16.0 11 15.9 13.5 34.7 25.8 22.4 11.4 18.8 16.9 34.7 42.6 40.8 20.4 12 12.6 10.7 27.1 21.9 16.4 9.2 12.9 11.5 27.3 33.0 35.0 15.4 l
NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 l
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 l


COMMONWEALTH EDISON COMPANY i
COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL i
ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1989 ONLY (MILLS PER KWH IN 1983 DOLL ARS)
ENERGY COSTS FOR EACH HOUR OF THE DAY: 1989 ONLY (MILLS PER KWH IN 1983 DOLL ARS)
HOUR                                       PE AKC 1) PERIOD HOURS ENDING:         JAN   FEB   MAR     APR   MAY     JUNE JULY AUG   SEPT OCT   NOV   DEC 10 A.M.         37.3 53.8 62.9 51.9 23.3 22.8 28.5 25.3 30.9 49.4 45.7 35.6 11               39.0 56.4 66.7 56.1 29.7 27.8 34.3 31.0 35.6 54.8 47.2 36.7 12               37.5 52.2 62.8 54.0 30.8 30.7 39.1 33.9 37.8 53.0 46.5 35.9 1 P.M.       35.2 48.9 57.9 50.3 29.1 33.5 42.8 36.8 38.6 48.9 44.7 33.4 2             36.7 49.9 60.1 52.6 35.7 39.4 51.3 44.3 43.4 53.3 46.0 34.7 3             34.5 46.9 56.0 49.9 34.5 37.7 62.3 48.2 47.0 50.3 44.5 32.6 4             33.0 44.4 51.3 48.1 28.1 34.0 56.4 53.8 41.2 46.6 44.0 30.8 5             36.5 43.9 49.4 43.2 25.3 30.4 45.4 41.3 38.0 43.4 47.3 38.6 6             43.4 48.7 49.0 40.9 19.2 25.7 39.2 34.3 33.8 42.3 52.3 42.9 7             42.1 53.5 52.7 41.7 15.4 21.3 33.1 29.4 29.4 45.8 48.6 40.4 8             38.6 50.2 55.4 45.1 14.1 17.5 29.3 25.0 31.9 47.4 46.4 37.6 9             34.3 45.5 51.6 45.3 17.9 18.5 28.2 28.1 31.7 43.9 44.6 34.6 10               26.6 42.6 46.1 38.7 16.8 17.2 26.6 22.2 31.0 43.5 41.1 28.8 HOUR                                   OFF-P EAKC 2) PERIOD HOURS ENDING:         JAN   FEB   MAR     APR     MAY   JUNE JULY AUG   SEPT OCT   NOV   DEC 1 A.M.       10.0 26.8 30.1       20.5     7.0   7.3   9.2 7.9 9.4 15.8 18.5 10.8 2               8.9 22.2 26.1     17.3     6.7   6.8   7.9 7.2 8.1 12.8 14.5     9.6 3               8.4 19.8 24.3     15.5     6.6   6.7   7.3 7.0 7.6 12.0 13.3     9.1.
HOUR PE AKC 1) PERIOD HOURS ENDING:
4               8.1 18.7 23.1     14.6     6.6   6.6   7.0 6.8 7.2 11.6 12.3     8.8 5               8.1 19.2 23.6     15.0     6.6   6.5   6.9 6.7 7.2 11.8 12.5     8.9 6               8.9 23.5 27.1     17.2     6.6   6.6   7.0 6.9 7.7 13.1 15.5 10.6 7             11.7 31.3 33.4       23.1     7.2   6.9   7.7 7.3 9.9 21.0 23.4 13.5 8             18.2 35.5 38.7       29.4 10.8       9.1   11.3 10.8 17.4 30.5 29.5 19.2 9             26.1 40.5 46.6 38.8 15.8 13.5 19.9 16.3 21.9 36.3 37.0 26.6 10               14.3 27.4 31.9 24.3 10.1             9.6 10.9 10.4 11.3 22.5 23.8 14.4 11               15.1 29.1 34.2 26.0 10.9 10.7 13.0 12.9 13.4 24.5 25.6 15.4 12               15.4 30.1 34.1 26.5 11.3 11.4 15.3 14.9, 14.4 24.6 26.3 15.3 1 P.M.         15.3 29.9 33.6 27.0 11.4 12.4 16.4 14.6 14.4 23.7 26.3 14.3 2             14.9 29.3 33.0 26.7 11.1 13.1 17.2 16.8 14.4 22.6 25.9 14.0 3             14.1 27.6 31.1 25.1 10.9 13.2 16.7 16.6 13.6 20.3 25.0 13.6 4             13.9 26.6 30.3 24.6           9.7 13.1 16.7 15.8 13.1 19.7 25.1 13.8 5             15.8 29.3 30.8 25.0           9.6 13.7 16.7 15.9 13.0 20.3 28.6 17.1 6             20.9 33.4 33.2 25.6           9.3 12.6 15.9 15.4 12.9 20.6 32.1 20.4 7             21.3 36.1 35.9 26.7           9.3 10.8 14.5 13.5 12.7 25.4 31.6 19.7 8             19.3 36.3 38.7 28.9           9.4 10.4 13.8 13.1 13.9 27.1 30.9 19.3 9             18.0 35.1 38.0 29.9 11.1 11.3 13.7 14.9 14.4 24.7 29.8 17.6 10             16.8 33.0 36.6 28.9 10.4 11.4 14.9 14.4 13.3 22.1 27.3 15.3 11             18.0 35.6 41.7 31.7 11.7 11.7 19.7 16.2 20.2 32.5 33.5 18.1 12             12.6 72.4 35.8 28.2           8.3     8.6 12.4 10.7 12.3 22.6 25.3 13.6 NOTES ( 1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4. 1983 y_m .
37.3 53.8 62.9 51.9 23.3 22.8 28.5 25.3 30.9 49.4 45.7 35.6 11 39.0 56.4 66.7 56.1 29.7 27.8 34.3 31.0 35.6 54.8 47.2 36.7 12 37.5 52.2 62.8 54.0 30.8 30.7 39.1 33.9 37.8 53.0 46.5 35.9 1 P.M.
35.2 48.9 57.9 50.3 29.1 33.5 42.8 36.8 38.6 48.9 44.7 33.4 2
36.7 49.9 60.1 52.6 35.7 39.4 51.3 44.3 43.4 53.3 46.0 34.7 3
34.5 46.9 56.0 49.9 34.5 37.7 62.3 48.2 47.0 50.3 44.5 32.6 4
33.0 44.4 51.3 48.1 28.1 34.0 56.4 53.8 41.2 46.6 44.0 30.8 5
36.5 43.9 49.4 43.2 25.3 30.4 45.4 41.3 38.0 43.4 47.3 38.6 6
43.4 48.7 49.0 40.9 19.2 25.7 39.2 34.3 33.8 42.3 52.3 42.9 7
42.1 53.5 52.7 41.7 15.4 21.3 33.1 29.4 29.4 45.8 48.6 40.4 8
38.6 50.2 55.4 45.1 14.1 17.5 29.3 25.0 31.9 47.4 46.4 37.6 9
34.3 45.5 51.6 45.3 17.9 18.5 28.2 28.1 31.7 43.9 44.6 34.6 10 26.6 42.6 46.1 38.7 16.8 17.2 26.6 22.2 31.0 43.5 41.1 28.8 HOUR OFF-P EAKC 2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
10.0 26.8 30.1 20.5 7.0 7.3 9.2 7.9 9.4 15.8 18.5 10.8 2
8.9 22.2 26.1 17.3 6.7 6.8 7.9 7.2 8.1 12.8 14.5 9.6 3
8.4 19.8 24.3 15.5 6.6 6.7 7.3 7.0 7.6 12.0 13.3 9.1.
4 8.1 18.7 23.1 14.6 6.6 6.6 7.0 6.8 7.2 11.6 12.3 8.8 5
8.1 19.2 23.6 15.0 6.6 6.5 6.9 6.7 7.2 11.8 12.5 8.9 6
8.9 23.5 27.1 17.2 6.6 6.6 7.0 6.9 7.7 13.1 15.5 10.6 7
11.7 31.3 33.4 23.1 7.2 6.9 7.7 7.3 9.9 21.0 23.4 13.5 8
18.2 35.5 38.7 29.4 10.8 9.1 11.3 10.8 17.4 30.5 29.5 19.2 9
26.1 40.5 46.6 38.8 15.8 13.5 19.9 16.3 21.9 36.3 37.0 26.6 10 14.3 27.4 31.9 24.3 10.1 9.6 10.9 10.4 11.3 22.5 23.8 14.4 11 15.1 29.1 34.2 26.0 10.9 10.7 13.0 12.9 13.4 24.5 25.6 15.4 12 15.4 30.1 34.1 26.5 11.3 11.4 15.3 14.9, 14.4 24.6 26.3 15.3 1 P.M.
15.3 29.9 33.6 27.0 11.4 12.4 16.4 14.6 14.4 23.7 26.3 14.3 2
14.9 29.3 33.0 26.7 11.1 13.1 17.2 16.8 14.4 22.6 25.9 14.0 3
14.1 27.6 31.1 25.1 10.9 13.2 16.7 16.6 13.6 20.3 25.0 13.6 4
13.9 26.6 30.3 24.6 9.7 13.1 16.7 15.8 13.1 19.7 25.1 13.8 5
15.8 29.3 30.8 25.0 9.6 13.7 16.7 15.9 13.0 20.3 28.6 17.1 6
20.9 33.4 33.2 25.6 9.3 12.6 15.9 15.4 12.9 20.6 32.1 20.4 7
21.3 36.1 35.9 26.7 9.3 10.8 14.5 13.5 12.7 25.4 31.6 19.7 8
19.3 36.3 38.7 28.9 9.4 10.4 13.8 13.1 13.9 27.1 30.9 19.3 9
18.0 35.1 38.0 29.9 11.1 11.3 13.7 14.9 14.4 24.7 29.8 17.6 10 16.8 33.0 36.6 28.9 10.4 11.4 14.9 14.4 13.3 22.1 27.3 15.3 11 18.0 35.6 41.7 31.7 11.7 11.7 19.7 16.2 20.2 32.5 33.5 18.1 12 12.6 72.4 35.8 28.2 8.3 8.6 12.4 10.7 12.3 22.6 25.3 13.6 NOTES ( 1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4.
1983 y_m.


(     -
(
COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1990 ONLY (MILLS PER KWH IN 1983 DOLLARS)
COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1990 ONLY (MILLS PER KWH IN 1983 DOLLARS)
HOUR                                     PEAK (1) PERIOD HOURS ENDING:       JAN   FEB   MAR     APR   MAY     JUNE JULY AUG   SEPT OCT   NOV   DEC 10 A.M.       38.4   55.7 82.5   63.3 28.8 24.2 30.2 27.4 33.9 77.9 59.2           40.7 11             40.1 58.3   87.8   76.1 34.0 29.2 36.2 33.0 39.6 92.2 62.9 4         ~. 8 12             38.5 53.9   82.3   72.2 35.0 32.1 41.6 36.0 42.6 87.6 61.0           91.0 1 P.M.       36.2   50.6 74.5   65.4 33.8 35.1 45.8 39.2 43.8 76.3 57.0           38.2 2             37.6   51.6 78.1   69.6 40.0 41.4 55.7 48.6 50.7 88.2 59.9           39.8 3             35.5 48.6   71.1   64.7 39.0 39.4 68.0 53.6 55.7 80.2 57.1           37.3 4             33.9 45.7   62.6   61.6 33.2 35.4 61.5 59.9 47.5 69.7 55.9           35.4 5             37.6 45.2 58.8 53.8 30.9 31.6 48.9 44.8 43.2 61.4 63.8 44.0 6             44.8 50.4   58.1   50.7   25.3   27.1 41.6 36.6 37.7 58.8 76.9   49.0 7             43.4 55.4   65.2   51.8   21.5   22.8 35.0 31.5 32.2 67.6 66.8   45.9 8             39.6 52.0   70.1   56.8   20.0   18.9 31.0 27.2 35.2 72.1 60.7   42.8 9             35.2 47.0   63.1   57.2   24.3   19.9 29.9 30.2 34.8 62.4 55.9   40.0 10             27.6 43.6   53.1   48.2   24.3   18.6 28.3 24.5 34.7 59.2 50.2   34.0 HOUR                                   OFF-PEAKC 2) PERIOD HOURS ENDING:         JAN   FEB   MAR     APR   MAY     JUNE JULY AUG   SEPT OCT   NOV   DEC 1 A.M.       10.2 23.2 34.9     26.9     8.4     7.5   9.8 8.2 11.4 24.5 27.8   13.9 2             8.9 18.5 31.0     23.0     7.6     6.9   8.1 7.5   9.5 19.9 23.8   11.9 3             8.4 16.3 29.2     20.7     7.3     6.7   7.5 7.1   8.7 18.6 21.5   11.0 4             8.1 15.4 27.9     19.5     7.2     6.6   7.2 6.9   7.9 17.7 20.1   10.5 5             8.1 15.8 28.4     20.0     7.2     6.6   7.0 6.8   7.9 18.0 20.4   10.6 6             9.0 19.9 31.9     22.8     7.3     6.6   7.1 6.9   8.7 20.3 24.3   13.1 7             11.9 28.6 37.7     29.1     8.5     7.0   8.0 7.6 12.0 30.2 31.7   17.9 8             18.7 34.9 44.3     36.8 15.9         9.6 12.2 11.8 20.9 40.2 37.7   23.5 9             26.8 40.8 57.4       49.0 20.8     14.5 21.5 17.9 24.1 51.3 46.7   31.3 10             14.4 25.0 37.4     30.3 14.0         9.9 11.4 10.8 13.4 30.1 30.7   18.3 11             15.1 26.6 39.9       32.8 15.4     11.1 13.8 13.9 15.9 33.9 33.4   20.4 12             15.6 27.7 39.7       33.2 15.9     12.1 16.3 16.1 17.1 34.3 34.1   20.1 1 P.M.       15.4 27.4 39.0       33.6 16.1     12.9 17.6 15.6 17.1 33.3 33.7   19.1 2             15.1 26.8 38.4       33.1 15.8     13.9 18.3 18.1 16.8 32.1 33.3   18.6 3             14.4 25.1 36.4       30.8 15.4     13.9 17.7 17.9 15.7 29.9 31.7   17.9 4             14.5 24.1 35.4       30.1 12.8     13.8 17.9 16.9 14.9 29.3 31.9   18.1 5             15.9 26.9 35.9       30.6 12.6     14.6 18.0 16.9 14.8 30.4 36.6   23.1 6             20.5 31.2 38.4       31.4 11.9     13.2 16.9 16.4 14.6 30.9 41.9   27.3 7             20.9 33.9 41.4       32.9 11.9     11.3 15.2 14.6 14.6 36.4 41.1   26.5 8             19.0 34.2 44.6       36.3 12.3     10.8 14.6 14.0 16.1 38.5 39.9   25.9 9             17.8 32.9 43.8       37.9 14.8     11.8 14.7 16.1 17.2 35.7 37.9   23.9 10             16.7 30.9 42.3     36.1 13.6       12.1 15.9 15.5 15.1 33.6 34.3   20.8 11             18.6 34.4 46.2     39.0 17.3       12.6 21.5 17.9 24.1 42.6 41.1   24.6 12             12.9 29.5 40.2     34.5 11.3         8.9 13.5 11.6 15.4 32.1 33.6 18.7 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
HOUR PEAK (1) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
38.4 55.7 82.5 63.3 28.8 24.2 30.2 27.4 33.9 77.9 59.2 40.7 11 40.1 58.3 87.8 76.1 34.0 29.2 36.2 33.0 39.6 92.2 62.9 4 ~. 8 12 38.5 53.9 82.3 72.2 35.0 32.1 41.6 36.0 42.6 87.6 61.0 91.0 1 P.M.
36.2 50.6 74.5 65.4 33.8 35.1 45.8 39.2 43.8 76.3 57.0 38.2 2
37.6 51.6 78.1 69.6 40.0 41.4 55.7 48.6 50.7 88.2 59.9 39.8 3
35.5 48.6 71.1 64.7 39.0 39.4 68.0 53.6 55.7 80.2 57.1 37.3 4
33.9 45.7 62.6 61.6 33.2 35.4 61.5 59.9 47.5 69.7 55.9 35.4 5
37.6 45.2 58.8 53.8 30.9 31.6 48.9 44.8 43.2 61.4 63.8 44.0 6
44.8 50.4 58.1 50.7 25.3 27.1 41.6 36.6 37.7 58.8 76.9 49.0 7
43.4 55.4 65.2 51.8 21.5 22.8 35.0 31.5 32.2 67.6 66.8 45.9 8
39.6 52.0 70.1 56.8 20.0 18.9 31.0 27.2 35.2 72.1 60.7 42.8 9
35.2 47.0 63.1 57.2 24.3 19.9 29.9 30.2 34.8 62.4 55.9 40.0 10 27.6 43.6 53.1 48.2 24.3 18.6 28.3 24.5 34.7 59.2 50.2 34.0 HOUR OFF-PEAKC 2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
10.2 23.2 34.9 26.9 8.4 7.5 9.8 8.2 11.4 24.5 27.8 13.9 2
8.9 18.5 31.0 23.0 7.6 6.9 8.1 7.5 9.5 19.9 23.8 11.9 3
8.4 16.3 29.2 20.7 7.3 6.7 7.5 7.1 8.7 18.6 21.5 11.0 4
8.1 15.4 27.9 19.5 7.2 6.6 7.2 6.9 7.9 17.7 20.1 10.5 5
8.1 15.8 28.4 20.0 7.2 6.6 7.0 6.8 7.9 18.0 20.4 10.6 6
9.0 19.9 31.9 22.8 7.3 6.6 7.1 6.9 8.7 20.3 24.3 13.1 7
11.9 28.6 37.7 29.1 8.5 7.0 8.0 7.6 12.0 30.2 31.7 17.9 8
18.7 34.9 44.3 36.8 15.9 9.6 12.2 11.8 20.9 40.2 37.7 23.5 9
26.8 40.8 57.4 49.0 20.8 14.5 21.5 17.9 24.1 51.3 46.7 31.3 10 14.4 25.0 37.4 30.3 14.0 9.9 11.4 10.8 13.4 30.1 30.7 18.3 11 15.1 26.6 39.9 32.8 15.4 11.1 13.8 13.9 15.9 33.9 33.4 20.4 12 15.6 27.7 39.7 33.2 15.9 12.1 16.3 16.1 17.1 34.3 34.1 20.1 1 P.M.
15.4 27.4 39.0 33.6 16.1 12.9 17.6 15.6 17.1 33.3 33.7 19.1 2
15.1 26.8 38.4 33.1 15.8 13.9 18.3 18.1 16.8 32.1 33.3 18.6 3
14.4 25.1 36.4 30.8 15.4 13.9 17.7 17.9 15.7 29.9 31.7 17.9 4
14.5 24.1 35.4 30.1 12.8 13.8 17.9 16.9 14.9 29.3 31.9 18.1 5
15.9 26.9 35.9 30.6 12.6 14.6 18.0 16.9 14.8 30.4 36.6 23.1 6
20.5 31.2 38.4 31.4 11.9 13.2 16.9 16.4 14.6 30.9 41.9 27.3 7
20.9 33.9 41.4 32.9 11.9 11.3 15.2 14.6 14.6 36.4 41.1 26.5 8
19.0 34.2 44.6 36.3 12.3 10.8 14.6 14.0 16.1 38.5 39.9 25.9 9
17.8 32.9 43.8 37.9 14.8 11.8 14.7 16.1 17.2 35.7 37.9 23.9 10 16.7 30.9 42.3 36.1 13.6 12.1 15.9 15.5 15.1 33.6 34.3 20.8 11 18.6 34.4 46.2 39.0 17.3 12.6 21.5 17.9 24.1 42.6 41.1 24.6 12 12.9 29.5 40.2 34.5 11.3 8.9 13.5 11.6 15.4 32.1 33.6 18.7 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983


je COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1991 ONLY (MILLS PER KWH IN 1983 DOLLARS)
je COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1991 ONLY (MILLS PER KWH IN 1983 DOLLARS)
HOUR                                     PEAK (1) PERIOD HOURS ENDING:       JAN   FEB   MAR     APR   MAY     JUNE JULY AUG   SEPT OCT   NOV   DEC
HOUR PEAK (1) PERIOD HOURS ENDING:
!        10 A.M.       42.2   55.1 57.5   48.3   23.2   26.0 31.8 29.6 36.4 ~,2 2 82.7     44.6 11             44.2   57.8 60.7   51.7   29.5   31.0 38.5 35.1 43.0 82.9 89.2       46.0 12             42.3   53.2 57.4   50.0   30.5   34.1 44.7 38.5 46.5 78.7 86.1       45.0 1 P.M.       39.7   49.5 53.1   46.9   29.0   37.6 49.8 42.2 48.2 68.8 78.6     41.8 2             41.4   50.6 55.0   48.8   35.4   44.8 61.6 53.6 56.6 79.3 84.1       43.5 3             39.0   47.1 51.4   46.6   34.3   42.3 75.3 59.8 62.2 72.3 78.5     40.9 4             37.2   44.0 47.1   45.1   28.0   37.7 68.4 66.3 52.8 63.3 76.4     38.8 5             41.3   43.4 45.3   40.7   25.3   33.5 53.5 49.1 47.5 56.6 90.0     48.7 l
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
6             49.7 49.2   44.8   38.8   19.2   28.9 44.8 39.1 41.0 54.5 107.3     55.7 7             48.0   54.7 48.5   39.5   15.5   24.6 37.0 33.6 34.7 61.6 95.3     51.3 8             43.6   50.9 50.9   42.5   14.2   20.6 32.6 29.3 37.9 65.5 85.4     47.2 9             38.7   45.4 47.4   42.7   18.0   21.7 31.5 32.3 37.3 57.4 75.9     44.0 10             30.4   41.8 41.6   36.6   17.3   20.4 29.7 26.7 37.1 55.3 63.2     37.9 l
42.2 55.1 57.5 48.3 23.2 26.0 31.8 29.6 36.4
HOUR                                 OFF-PEAKC2) PERIOD HOURS ENDING:       JAN   FEB   MAR     APR   MAY     JUNE JULY AUG   SEPT OCT   N0Y   DEC l         1 A.M.       10.9 24.1 23.0     16.4     7.1     7.7 10.4   8.6 12.3 21.5 35.1 17.7 l         2             9.5 19.5 18.8     14.0     6.8     7.1   8.6 7.7   9.9 17.1 31.1 14.5 l         3             8.8 17.2 17.2     12.6     6.6     6.8   7.8 7.3   8.9 15.9 28.9 12.9 4             8.5 16.3 16.1     11.9     6.6     6.7   7.4 7.0   8.1 15.1 27.2 12.1 5             8.5 16.6 16.6     12.2     6.6     6.6   7.2 6.9   8.1 15.4 27.4 12.4 6             9.5 20.8 19.9     13.8     6.6     6.7   7.3 7.1   9.1 17.5 31.4 15.7 i         7             12.8 29.2 128.0     19.5     7.2     7.2   8.4 7.8 13.1 27.9 38.8 22.4
~,2 2 82.7 44.6 11 44.2 57.8 60.7 51.7 29.5 31.0 38.5 35.1 43.0 82.9 89.2 46.0 12 42.3 53.2 57.4 50.0 30.5 34.1 44.7 38.5 46.5 78.7 86.1 45.0 1 P.M.
  ,      8            20.7 34.0 33.4       26.6   11.2   10.1 13.3 12.7 23.0 38.0 45.5 26.9 9             29.4 40.0 41.9       35.8   15.8   15.8 23.3 19.5 26.2 47.3 61.8 34.9 10             15.5 24.7 26.9       21.2   10.1   10.5 12.2 11.3 14.8 27.9 38.2 22.1 11             16.4 26.4 28.9       23.0   11.1   11.6 14.8 14.7 17.9 31.3 41.3 24.9 12             16.8 27.4 29.0       23.4   11.5   12.8 17.6 17.2 19.1 31.8 41.9 24.8 1 P.M.       16.6 27.2 28.6       23.8   11.7   13.9 18.6 16.7 19.4 30.9 41.4 24.6 2             16.3 26.5 27.9       23.3   11.4   14.8 19.6 19.1 19.4 29.9 40.8 24.1 3             15.4 24.9 26.2       20.9   11.1   14.9 19.1 18.9 18.6 27.8 38.9 22.9 4             15.4 23.9 25.3     20.1     9.8   14.8 19.3 18.1 18.1 27.2 39.0 23.9 5             17.1 26.6 25.8     20.5     9.6   15.4 19.3 18.4 17.8 28.4 44.6 28.9 6             22.4 30.9 28.4     21.2     9.4   14.1 18.2 17.8 17.5 28.9 51.1 31.9 7             22.8 33.5 31.4     22.9     9.3   11.8 16.6 15.3 17.4 34.1 50.1 31.3 8             20.6 33.9 34.1     26.4     9.6   11.3 15.7 14.9 19.6 36.1 48.6 30.9 9             19.1 32.6 33.4       28.3   11.2   12.4 15.8 17.3 20.7 33.6 46.1 29.6
39.7 49.5 53.1 46.9 29.0 37.6 49.8 42.2 48.2 68.8 78.6 41.8 2
,        10             17.9 30.6 32.3       26.6   10.6   12.6 17.3 16.8 18.5 31.6 41.6 27.4 l       11             20.4 33.6 38.0       28.3   12.0   13.7 23.3 19.5 26.6 40.4 49.2 31.3 l       12             14.0 30.2 30.5     24.2     8.5     9.5 14.8 12.5 17.1 29.8 40.8 24.5 l
41.4 50.6 55.0 48.8 35.4 44.8 61.6 53.6 56.6 79.3 84.1 43.5 3
l       NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY l             ( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDA'/ PLUS ALL SATURDAY 8 SUNDAY HOURS i
39.0 47.1 51.4 46.6 34.3 42.3 75.3 59.8 62.2 72.3 78.5 40.9 4
37.2 44.0 47.1 45.1 28.0 37.7 68.4 66.3 52.8 63.3 76.4 38.8 5
41.3 43.4 45.3 40.7 25.3 33.5 53.5 49.1 47.5 56.6 90.0 48.7 l
6 49.7 49.2 44.8 38.8 19.2 28.9 44.8 39.1 41.0 54.5 107.3 55.7 7
48.0 54.7 48.5 39.5 15.5 24.6 37.0 33.6 34.7 61.6 95.3 51.3 8
43.6 50.9 50.9 42.5 14.2 20.6 32.6 29.3 37.9 65.5 85.4 47.2 9
38.7 45.4 47.4 42.7 18.0 21.7 31.5 32.3 37.3 57.4 75.9 44.0 10 30.4 41.8 41.6 36.6 17.3 20.4 29.7 26.7 37.1 55.3 63.2 37.9 l
HOUR OFF-PEAKC2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT N0Y DEC l
1 A.M.
10.9 24.1 23.0 16.4 7.1 7.7 10.4 8.6 12.3 21.5 35.1 17.7 l
2 9.5 19.5 18.8 14.0 6.8 7.1 8.6 7.7 9.9 17.1 31.1 14.5 l
3 8.8 17.2 17.2 12.6 6.6 6.8 7.8 7.3 8.9 15.9 28.9 12.9 4
8.5 16.3 16.1 11.9 6.6 6.7 7.4 7.0 8.1 15.1 27.2 12.1 5
8.5 16.6 16.6 12.2 6.6 6.6 7.2 6.9 8.1 15.4 27.4 12.4 6
9.5 20.8 19.9 13.8 6.6 6.7 7.3 7.1 9.1 17.5 31.4 15.7 i
7 12.8 29.2 128.0 19.5 7.2 7.2 8.4 7.8 13.1 27.9 38.8 22.4 8
20.7 34.0 33.4 26.6 11.2 10.1 13.3 12.7 23.0 38.0 45.5 26.9 9
29.4 40.0 41.9 35.8 15.8 15.8 23.3 19.5 26.2 47.3 61.8 34.9 10 15.5 24.7 26.9 21.2 10.1 10.5 12.2 11.3 14.8 27.9 38.2 22.1 11 16.4 26.4 28.9 23.0 11.1 11.6 14.8 14.7 17.9 31.3 41.3 24.9 12 16.8 27.4 29.0 23.4 11.5 12.8 17.6 17.2 19.1 31.8 41.9 24.8 1 P.M.
16.6 27.2 28.6 23.8 11.7 13.9 18.6 16.7 19.4 30.9 41.4 24.6 2
16.3 26.5 27.9 23.3 11.4 14.8 19.6 19.1 19.4 29.9 40.8 24.1 3
15.4 24.9 26.2 20.9 11.1 14.9 19.1 18.9 18.6 27.8 38.9 22.9 4
15.4 23.9 25.3 20.1 9.8 14.8 19.3 18.1 18.1 27.2 39.0 23.9 5
17.1 26.6 25.8 20.5 9.6 15.4 19.3 18.4 17.8 28.4 44.6 28.9 6
22.4 30.9 28.4 21.2 9.4 14.1 18.2 17.8 17.5 28.9 51.1 31.9 7
22.8 33.5 31.4 22.9 9.3 11.8 16.6 15.3 17.4 34.1 50.1 31.3 8
20.6 33.9 34.1 26.4 9.6 11.3 15.7 14.9 19.6 36.1 48.6 30.9 9
19.1 32.6 33.4 28.3 11.2 12.4 15.8 17.3 20.7 33.6 46.1 29.6 10 17.9 30.6 32.3 26.6 10.6 12.6 17.3 16.8 18.5 31.6 41.6 27.4 l
11 20.4 33.6 38.0 28.3 12.0 13.7 23.3 19.5 26.6 40.4 49.2 31.3 l
12 14.0 30.2 30.5 24.2 8.5 9.5 14.8 12.5 17.1 29.8 40.8 24.5 l
l NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY l
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDA'/ PLUS ALL SATURDAY 8 SUNDAY HOURS i
l SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 i
l SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 i
I
I
Line 133: Line 381:
~
~
COMMONWEALTH EDISOM COMPANY ESTIMATED AVERAGE FEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1992 ONLY (MILLS PER KWH IN 1983 DOLL ARS)
COMMONWEALTH EDISOM COMPANY ESTIMATED AVERAGE FEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1992 ONLY (MILLS PER KWH IN 1983 DOLL ARS)
HOUR                                     PEAK (1) PERIOD HOURS ENDING:       JAN   FEB   MAR     APR   MAY     JUNE JULY AUG     SEPT OCT   NOV   DEC 10 A.M.       55.1   78.0 97.9 66.5 24.9 27.7 33.3           31.2 36.8 63.0 52.2 42.9 11             58.4 84.4   103.9 74.5 31.9 33.1 40.9           36.4 44.1 74.5 55.1 44.3 12             54.9   73.3 97.6 70.7 33.1 36.7 48.0           39.8 48.1 70.6 53.6 43.4 1 P.M.       51.0   64.8 87.9 63.5 31.4 40.8 54.1           43.7 50.0 61.7 50.4 39.8 2             53.5   67.5 92.5 67.9 38.9 49.4 67.6           56.0 59.3 71.2 52.7 41.7 3             49.9   59.4 83.7 62.7 37.8 46.3 82.3           62.7 65.0 64.8 50.4 38.9 4             47.3   52.5 71.8 59.4 30.4 40.7 75.3           69.1 55.1 56.9 49.6 36.6 5             53.4   51.2 66.3 50.5 27.4 35.9 58.6           51.1 49.3 51.3 55.8 47.3 6             69.2   64.3 65.1 46.6 20.6 30.8 48.1           40.5 41.9 49.5 66.9 54.6 7             65.5   77.3 75.5 47.9 16.5 26.2 39.1           35.0 34.9 55.4 58.3 50.0 8             57.1   68.5 82.0 53.9 15.1 22.0 34.2           30.9 38.4 58.7 53.3 45.7 9             49.1   55.5 72.5 54.3 19.2 23.2 32.9           33.7 38.0 51.9 49.8 42.2 10             39.8   48.2 57.3 43.2 18.4 21.8 31.0           28.6 37.7 50.3 45.5 35.0 HOUR                                 OFF-PEAK (2) PERIOD HOURS ENDING:       JAN   FEB   MAR   APR     MAY   JUNE JULY AUG     SEPT OCT   NOV   DEC 1 A.M.       19.0 29.6   34.6 21.6       7.2     7.9 11.4   9.1 12.9 17.9 22.8 13.5 2             15.5 25.8   30.9 18.2       6.8     7.2   9.2   8.0 10.4 14.2 18.5 11.5 3             13.8 23.8   29.3 16.3       6.7     6.8   8.2   7.5   9.3 13.2 16.5 10.5 4             12.8 23.0   28.0 15.3       6.7     6.7   7.9   7.2   8.4 12.5 15.2 10.1 5             13.0 23.3   28.5 15.7       6.6     6.7   7.6   7.1   8.3 12.8 15.5 10.3 6             15.6 26.8   31.9 18.1       6.7     6.8   7.6   7.3   9.4 14.5 19.2 12.6 7             22.7 33.5   37.8 24.3       7.3     7.3   9.0   8.1 13.8 24.3 27.6 17.3 8             29.9 39.2   46.1 31.3     11.7   10.5 14.4 13.8 24.0 34.5 33.5 23.2 9             38.7 50.3   65.1 45.9     16.9   16.8 24.8 20.9 26.2 42.5 41.5 31.7 10             23.4 29.4   37.1 26.1     11.0   10.9 12.9 12.1 15.9 24.4 26.5 15.4 11             24.9 31.1   40.1 28.4     12.1   12.4 15.8 15.8 19.0 27.3 28.8 17.1 12             25.4 31.9   39.6 28.8     12.6   13.8 17.9 18.1 20.5 27.7 29.6 16.8 1 P.M.       25.6 31.6   38.8 29.3     12.8   14.9 19.4 17.9 20.7 27.1 29.3 15.8 2             24.9 30.9   38.1 28.8     12.4   15.9 20.2 20.4 20.6 26.1 28.8 15.4 3             23.1 29.3   35.8 26.5     12.2   16.0 19.7 20.4 19.9 23.9 27.6 14.9 4             22.7 28.6   34.5 25.8     10.4   15.8 20.0 19.4 19.4 23.4 27.8 15.1 5             26.4 30.8   35.1 26.3     10.3   16.7 20.1 19.6 19.2 24.5 32.2 19.2 6             34.8 34.6   38.0 27.1       9.9   15.2 18.9 19.0 18.8 25.0 36.8 23.3 7             35.4 37.2   41.4 28.6       9.9   12.6 16.9 16.6 18.9 30.6 36.1 22.4 8             32.9 37.4   45.3 31.9     10.2   11.9 16.1 15.8 21.1 32.4 35.1 21.9 9             31.1 36.1   44.2 33.4     11.9   13.1 16.3 18.6 22.4 30.4 33.4 19.9 10             29.3 34.0   42.4 31.8     11.4   13.4 17.6 17.8 20.0 28.1 30.1 16.9 11             31.7 37.5   48.0 33.5     12.6   14.5 25.1 21.1 27.8 36.7 37.6 24.5 12             25.1 34.3   40.1 29.4       8.7     9.8 16.1 13.5 18.1 26.2 29.8 18.2 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
HOUR PEAK (1) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
55.1 78.0 97.9 66.5 24.9 27.7 33.3 31.2 36.8 63.0 52.2 42.9 11 58.4 84.4 103.9 74.5 31.9 33.1 40.9 36.4 44.1 74.5 55.1 44.3 12 54.9 73.3 97.6 70.7 33.1 36.7 48.0 39.8 48.1 70.6 53.6 43.4 1 P.M.
51.0 64.8 87.9 63.5 31.4 40.8 54.1 43.7 50.0 61.7 50.4 39.8 2
53.5 67.5 92.5 67.9 38.9 49.4 67.6 56.0 59.3 71.2 52.7 41.7 3
49.9 59.4 83.7 62.7 37.8 46.3 82.3 62.7 65.0 64.8 50.4 38.9 4
47.3 52.5 71.8 59.4 30.4 40.7 75.3 69.1 55.1 56.9 49.6 36.6 5
53.4 51.2 66.3 50.5 27.4 35.9 58.6 51.1 49.3 51.3 55.8 47.3 6
69.2 64.3 65.1 46.6 20.6 30.8 48.1 40.5 41.9 49.5 66.9 54.6 7
65.5 77.3 75.5 47.9 16.5 26.2 39.1 35.0 34.9 55.4 58.3 50.0 8
57.1 68.5 82.0 53.9 15.1 22.0 34.2 30.9 38.4 58.7 53.3 45.7 9
49.1 55.5 72.5 54.3 19.2 23.2 32.9 33.7 38.0 51.9 49.8 42.2 10 39.8 48.2 57.3 43.2 18.4 21.8 31.0 28.6 37.7 50.3 45.5 35.0 HOUR OFF-PEAK (2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
19.0 29.6 34.6 21.6 7.2 7.9 11.4 9.1 12.9 17.9 22.8 13.5 2
15.5 25.8 30.9 18.2 6.8 7.2 9.2 8.0 10.4 14.2 18.5 11.5 3
13.8 23.8 29.3 16.3 6.7 6.8 8.2 7.5 9.3 13.2 16.5 10.5 4
12.8 23.0 28.0 15.3 6.7 6.7 7.9 7.2 8.4 12.5 15.2 10.1 5
13.0 23.3 28.5 15.7 6.6 6.7 7.6 7.1 8.3 12.8 15.5 10.3 6
15.6 26.8 31.9 18.1 6.7 6.8 7.6 7.3 9.4 14.5 19.2 12.6 7
22.7 33.5 37.8 24.3 7.3 7.3 9.0 8.1 13.8 24.3 27.6 17.3 8
29.9 39.2 46.1 31.3 11.7 10.5 14.4 13.8 24.0 34.5 33.5 23.2 9
38.7 50.3 65.1 45.9 16.9 16.8 24.8 20.9 26.2 42.5 41.5 31.7 10 23.4 29.4 37.1 26.1 11.0 10.9 12.9 12.1 15.9 24.4 26.5 15.4 11 24.9 31.1 40.1 28.4 12.1 12.4 15.8 15.8 19.0 27.3 28.8 17.1 12 25.4 31.9 39.6 28.8 12.6 13.8 17.9 18.1 20.5 27.7 29.6 16.8 1 P.M.
25.6 31.6 38.8 29.3 12.8 14.9 19.4 17.9 20.7 27.1 29.3 15.8 2
24.9 30.9 38.1 28.8 12.4 15.9 20.2 20.4 20.6 26.1 28.8 15.4 3
23.1 29.3 35.8 26.5 12.2 16.0 19.7 20.4 19.9 23.9 27.6 14.9 4
22.7 28.6 34.5 25.8 10.4 15.8 20.0 19.4 19.4 23.4 27.8 15.1 5
26.4 30.8 35.1 26.3 10.3 16.7 20.1 19.6 19.2 24.5 32.2 19.2 6
34.8 34.6 38.0 27.1 9.9 15.2 18.9 19.0 18.8 25.0 36.8 23.3 7
35.4 37.2 41.4 28.6 9.9 12.6 16.9 16.6 18.9 30.6 36.1 22.4 8
32.9 37.4 45.3 31.9 10.2 11.9 16.1 15.8 21.1 32.4 35.1 21.9 9
31.1 36.1 44.2 33.4 11.9 13.1 16.3 18.6 22.4 30.4 33.4 19.9 10 29.3 34.0 42.4 31.8 11.4 13.4 17.6 17.8 20.0 28.1 30.1 16.9 11 31.7 37.5 48.0 33.5 12.6 14.5 25.1 21.1 27.8 36.7 37.6 24.5 12 25.1 34.3 40.1 29.4 8.7 9.8 16.1 13.5 18.1 26.2 29.8 18.2 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SxTURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SxTURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983


COMMONWEALTH EDISON COMPANV ESTIMATED AVERAGE PEAK S OFF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1993 ONLY (MILLS PER KWH IN 1983 DOLLARS)
COMMONWEALTH EDISON COMPANV ESTIMATED AVERAGE PEAK S OFF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1993 ONLY (MILLS PER KWH IN 1983 DOLLARS)
HOUR                                     PEAKCl) PERIOD HOURS ENDING:         JAN   FEB   MAR   APR     MAY   JUNE JULY AUG     SEPT OCT   NOV   DEC 10 A.M.         45.8 74.6   111.9   79.5   32.4 29.2 35.1 32.3 45.1 105.0 76.3       46.6 11             48.4 79.4   117.7   89.2   39.3 34.7 43.7 39.3 57.6 121.5 82.4       48.2 12             45.9 71.0   111.5   84.6 40.9 38.7 52.2 44.2 64.6 116.5 79.4       47.1 1 P.M.       42.7 64.4   101.6   75.6 39.3 43.4 59.5 50.3 67.2 102.8 72.5       43.3 2             44.8 66.6   106.4   81.1 48.5 52.9 74.4 69.9 80.9 116.8 77.6       45.3 3             41.8 60.0 97.0 '74.6         47.1 49.5 89.5 79.9 85.0 107.5 72.4       42.3 4             39.6   53.8 83.3   70.3   38.7 43.2 32.8 82.9 74.8 93.4 70.5         39.9 5             44.6   52.6 76.4   58.5   35.9 37.6 64.8 61.7 66.1 79.9 83.4         51.7 6             55.9 64.0   74.8   53.4   28.6 32.3 52.4 45.5 54.1 75.4 100.6         60.6 7             53.5 74.1   87.5   55.0   24.4 27.8 41.7 37.2 42.0 90.2 88.5         54.9 8             47.6   67.3 95.0   63.1   22.9 23.6 36.1 32.1 47.8 96.9 78.8         49.8 9             41.4 56.6   84.0   63.6   27.5 24.8 34.6 35.6 46.7 81.8 70.2         45.3 10             31.8 49.7   64.4   49.2   28.0 23.4 32.6 29.2 43.3 74.7 58.7         38.1 HOUR                                   OFF-PEAKC2) PERIOD HOURS ENDING:         JAN   FEB   MAR   APR   MAY     JUNE JULY AUG     SEPT OCT   NOV   DEC 1 A.M.         13.4 30.6   36.6   28.0     9.1   8.2 11.9   8.8 17.3 28.1 30.9 15.1 2             11.3 26.1   32.4   24.5     8.1   7.4   9.3   7.8 13.5 23.3 26.9 12.7 3             10.3 23.5   30.7   22.3     7.7   7.0   8.2   7.3 11.6 21.7 24.6 11.5 4               9.8 22.3   29.3   21.1     7.6   6.8   7.8 7.0   10.0 20.8 23.1 10.9 5               9.9 22.8   29.9   21.6     7.5   6.8   7.5   6.9 10.0 21.1 23.3 11.1 6             11.3 27.2   33.5   24.2     7.7   6.9   7.6 7.1 11.9 23.7 27.4 13.9 7             15.9 34.7   40.7   29.7     9.3   7.4   9.2 7.9 18.1 33.4 34.8 19.4
HOUR PEAKCl) PERIOD HOURS ENDING:
.          8              22.6 40.3 50.6 36.6 18.3 11.1 15.7 13.8 28.5 46.6 41.5 25.5 9             31.8 50.7 75.0 54.4 23.5 18.0 26.3 21.1 31.0 65.4 56.9 34.7 10             17.9 31.6 41.6 31.8 15.8 11.5 13.4 12.3 18.3 34.3 34.8 18.5 11             18.9 33.8 44.6 34.4 17.5 13.1 16.5 16.6 21.6 38.9 37.7 20.8 12             19.3 34.9   44.1   34.6   18.0   14.6 19.9 19.3 23.2 39.0 38.4 20.6 1 P.M.         18.8 34.4   43.1   34.9   18.2   15.9 21.1 19.1 23.6 37.4 37.8 19.5 2             18.3 33.6   42.3   34.3   17.7   16.9 22.2 21.8 23.6 35.9 37.1 19.1 3             17.4 31.6   39.8   31.9   17.6   17.1 21.9 21.6 23.1 33.3 35.3 18.3 4             16.9 30.5   38.4   31.3   14.5   16.9 22.7. 20.9 22.9 32.6 35.4 18.5 5             19.2 33.4   39.0   31.7   14.1   17.9 22.3 21.3   22.9 33.8 40.9 23.9 6             26.5 38.5   41.9   32.4   13.4   16.1 21.1 20.6   22.4 34.3 47.1 28.4 7             27.1 41.7 45.8 33.9 13.4 13.4 19.2 17.7 22.6 40.8 46.2 27.6 8             24.6 42.1 50.1 37.3 13.4 12.6 18.1 16.9 24.9 43.6 44.5 26.9 9             22.6 40.2 48.9 39.1 16.6 14.0 18.4 20.1 25.9 39.9 42.1 24.6 10             21.1 37.6 46.8 37.1 15.3 14.3 20.0 19.5 23.9 36.9 38.0 21.3 11             23.5 39.6 53.9 30.6 19.7 15.6 27.0 21.4 32.9 49.4 45.6 27.3 12             17.6 35.9 43.3 34.8 12.8 10.4 17.5 13.4 23.8 35.6 36.9 20.7 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
45.8 74.6 111.9 79.5 32.4 29.2 35.1 32.3 45.1 105.0 76.3 46.6 11 48.4 79.4 117.7 89.2 39.3 34.7 43.7 39.3 57.6 121.5 82.4 48.2 12 45.9 71.0 111.5 84.6 40.9 38.7 52.2 44.2 64.6 116.5 79.4 47.1 1 P.M.
42.7 64.4 101.6 75.6 39.3 43.4 59.5 50.3 67.2 102.8 72.5 43.3 2
44.8 66.6 106.4 81.1 48.5 52.9 74.4 69.9 80.9 116.8 77.6 45.3 3
41.8 60.0 97.0 '74.6 47.1 49.5 89.5 79.9 85.0 107.5 72.4 42.3 4
39.6 53.8 83.3 70.3 38.7 43.2 32.8 82.9 74.8 93.4 70.5 39.9 5
44.6 52.6 76.4 58.5 35.9 37.6 64.8 61.7 66.1 79.9 83.4 51.7 6
55.9 64.0 74.8 53.4 28.6 32.3 52.4 45.5 54.1 75.4 100.6 60.6 7
53.5 74.1 87.5 55.0 24.4 27.8 41.7 37.2 42.0 90.2 88.5 54.9 8
47.6 67.3 95.0 63.1 22.9 23.6 36.1 32.1 47.8 96.9 78.8 49.8 9
41.4 56.6 84.0 63.6 27.5 24.8 34.6 35.6 46.7 81.8 70.2 45.3 10 31.8 49.7 64.4 49.2 28.0 23.4 32.6 29.2 43.3 74.7 58.7 38.1 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
13.4 30.6 36.6 28.0 9.1 8.2 11.9 8.8 17.3 28.1 30.9 15.1 2
11.3 26.1 32.4 24.5 8.1 7.4 9.3 7.8 13.5 23.3 26.9 12.7 3
10.3 23.5 30.7 22.3 7.7 7.0 8.2 7.3 11.6 21.7 24.6 11.5 4
9.8 22.3 29.3 21.1 7.6 6.8 7.8 7.0 10.0 20.8 23.1 10.9 5
9.9 22.8 29.9 21.6 7.5 6.8 7.5 6.9 10.0 21.1 23.3 11.1 6
11.3 27.2 33.5 24.2 7.7 6.9 7.6 7.1 11.9 23.7 27.4 13.9 7
15.9 34.7 40.7 29.7 9.3 7.4 9.2 7.9 18.1 33.4 34.8 19.4 8
22.6 40.3 50.6 36.6 18.3 11.1 15.7 13.8 28.5 46.6 41.5 25.5 9
31.8 50.7 75.0 54.4 23.5 18.0 26.3 21.1 31.0 65.4 56.9 34.7 10 17.9 31.6 41.6 31.8 15.8 11.5 13.4 12.3 18.3 34.3 34.8 18.5 11 18.9 33.8 44.6 34.4 17.5 13.1 16.5 16.6 21.6 38.9 37.7 20.8 12 19.3 34.9 44.1 34.6 18.0 14.6 19.9 19.3 23.2 39.0 38.4 20.6 1 P.M.
18.8 34.4 43.1 34.9 18.2 15.9 21.1 19.1 23.6 37.4 37.8 19.5 2
18.3 33.6 42.3 34.3 17.7 16.9 22.2 21.8 23.6 35.9 37.1 19.1 3
17.4 31.6 39.8 31.9 17.6 17.1 21.9 21.6 23.1 33.3 35.3 18.3 4
16.9 30.5 38.4 31.3 14.5 16.9 22.7.
20.9 22.9 32.6 35.4 18.5 5
19.2 33.4 39.0 31.7 14.1 17.9 22.3 21.3 22.9 33.8 40.9 23.9 6
26.5 38.5 41.9 32.4 13.4 16.1 21.1 20.6 22.4 34.3 47.1 28.4 7
27.1 41.7 45.8 33.9 13.4 13.4 19.2 17.7 22.6 40.8 46.2 27.6 8
24.6 42.1 50.1 37.3 13.4 12.6 18.1 16.9 24.9 43.6 44.5 26.9 9
22.6 40.2 48.9 39.1 16.6 14.0 18.4 20.1 25.9 39.9 42.1 24.6 10 21.1 37.6 46.8 37.1 15.3 14.3 20.0 19.5 23.9 36.9 38.0 21.3 11 23.5 39.6 53.9 30.6 19.7 15.6 27.0 21.4 32.9 49.4 45.6 27.3 12 17.6 35.9 43.3 34.8 12.8 10.4 17.5 13.4 23.8 35.6 36.9 20.7 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983


    .      o COMMONUEALTH EDISOM COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL
o COMMONUEALTH EDISOM COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1994 ONLY (MILLS PER KWH IN 1983 DOLLARS)
,                                                    ENERGY COSTS FOR EACH HOUR OF THE DAY: 1994 ONLY (MILLS PER KWH IN 1983 DOLLARS)
HOUR PEAK (1) PERIOD HOURS ENDING:
HOUR                                           PEAK (1) PERIOD HOURS ENDING:         JAN         FEB     MAR   APR   MAY             JUNE JULY AUG         SEPT OCT       NOV DEC 10 A.M.         52.8         79.1   76.5 57.3 26.8 31.0 36.7 33.6 48.5 94.9 102.3                           53.5 11             56.0       84.1   82.0 63.3 33.0 36.8 46.8 40.2 62.8 111.9 109.9                         55.5 12             52.9       75.0   76.2 60.6 34.2 41.3 56.7 44.7 70.6 106.7 106.5                         54.1 1 P.M.         49.0         67.6   68.2 55.1 32.7 46.7 65.0 50.1 73.3 92.7 97.4                           49.0 2             51.4       70.2   71.9 58.4 39.8 57.2 81.0 67.5 87.6 107.1 104.2                         51.7 3             47.9         62.7   64.8 54.4 38.6 53.7 96.0 76.8 90.8 97.4 97.0                           48.1 .
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
4              45.4         55.8   56.4 51.8 31.9 46.4 89.7 80.8 81.2 83.6 94.4                           45.3 5             51.4       54.4   52.8 44.7 29.1 40.1 71.1 60.4 72.0 71.5 109.9                           60.2 6             65.7         67.3   52.2 41.1 22.6 34.1 56.9 45.7 58.8 67.5 125.9                           72.4 7             62.6         78.5   59.0 42.3 18.4 29.7 44.4 38.3 45.0 80.7 116.0                           64.8 8             54.9       70.9   63.8 47.4 16.9 25.5 37.8 33.4 51.6 87.0 105.8                           57.8 9             47.3         58.9   56.9 47.7 21.3 26.7 36.1 36.8 50.4 73.1 94.7                           51.4 10             36.5         51.1   47.5 37.8 20.3 25.3 33.7 30.8 45.6 66.7 77.5                           43.0 HOUR                                         OFF-PEAK (2) PERIOD HOURS ENDING:         JAN         FEB     MAR   APR   MAY             JUNE JULY AUG         SEPT OCT       NOV DEC 1 A.M.         13.9       30.4   27.6   17.5       7.3           8.5 12.3       9.4 19.2     23.9 35.4 18.7 2             11.6       25.6   23.0   14.7       6.9           7.5 9.5       8.1 15.0     19.1 30.3 15.2 3             10.5       23.0   21.2   13.2       6.7           7.1 8.4       7.5 12.8     17.8 27.7 13.5 4             10.0       21.8   19.9   12.4       6.7           6.9 7.9       7.2 11.0     16.9 25.9 12.6 5             10.1       22.3   20.4   12.7       6.7           6.9 7.6       7.0 11.0     17.2 26.1 13.0 6             11.7       26.9   24.2   14.6       6.8           7.0 7.7       7.3 13.2     19.5 30.9 16.6 7             17.1       34.8   31.8   20.2       7.5           7.7 9.4       8.2 20.0     30.1 41.0 23.7 8             25.3         40.9   38.5   26.7 12.6             12.0 16.3     14.9   30.0     42.2 50.8 29.5
52.8 79.1 76.5 57.3 26.8 31.0 36.7 33.6 48.5 94.9 102.3 53.5 11 56.0 84.1 82.0 63.3 33.0 36.8 46.8 40.2 62.8 111.9 109.9 55.5 12 52.9 75.0 76.2 60.6 34.2 41.3 56.7 44.7 70.6 106.7 106.5 54.1 1 P.M.
  .                9              35.9         52.5   51.0   40.1 18.3             19.5 27.4     22.3   32.7     58.4 75.1 39.6 10             19.6         31.8   30.4   23.6 11.3             12.3 14.3     13.3   18.5     30.3 42.3 23.4 11             21.0         34.1   32.9   25.4 12.4             14.1 17.7     17.6   21.9     34.6 45.9 26.4 12             21.1         35.2   32.9   25.8 12.9             15.6 21.1     20.4   23.4     34.9 46.6 26.4 1 P.M.         21.2         34.8   32.1   26.5 13.1             16.9 22.6     20.4   23.9     33.6 45.4 26.1 2             20.4         33.9   31.6   26.0 12.6             18.1 23.7     23.0   24.1     32.3 44.7 25.4 3             18.7         31.7   29.6   24.2 12.4             18.3 23.4     23.1   23.5     29.8 42.3 24.1 4             18.3         30.5   28.6   23.6 10.6             18.1 23.7     22.4   23.3     29.1 42.4 25.3 5             22.1         33.8   29.1   24.1 10.4             18.9 23.9     22.6   23.1     30.4 49.5 30.9 6             30.9         39.3   31.9   24.7 10.1             17.3 22.8     22.0   22.8     30.9 58.5 34.6 7             31.6         42.8   34.9   26.0 10.1             14.1 20.6     19.2   22.9     37.1 57.1 33.9 4                  8             28.9         43.1   37.9   28.4 10.3             13.4 19.6     18.3   25.3     39.6 54.6 33.5 9             26.8         41.2   37.2   29.6 12.1             14.8 19.8     21.6   26.4     36.3 51.3 31.8 10             24.8         38.4   35.8   28.6 11.4             15.1 21.6     20.9   24.4     33.8 45.4 29.0 11             26.0         40.2   42.0   29.0 13.6             17.1 28.2     22.9   34.6     44.6 57.2 33.2 12             18.5       36.1   34.5   25.2     9.2           11.1 18.2     14.6   25.9     32.2 43.6 25.9 NOTE Cl) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
49.0 67.6 68.2 55.1 32.7 46.7 65.0 50.1 73.3 92.7 97.4 49.0 2
51.4 70.2 71.9 58.4 39.8 57.2 81.0 67.5 87.6 107.1 104.2 51.7 3
47.9 62.7 64.8 54.4 38.6 53.7 96.0 76.8 90.8 97.4 97.0 48.1 4
45.4 55.8 56.4 51.8 31.9 46.4 89.7 80.8 81.2 83.6 94.4 45.3 5
51.4 54.4 52.8 44.7 29.1 40.1 71.1 60.4 72.0 71.5 109.9 60.2 6
65.7 67.3 52.2 41.1 22.6 34.1 56.9 45.7 58.8 67.5 125.9 72.4 7
62.6 78.5 59.0 42.3 18.4 29.7 44.4 38.3 45.0 80.7 116.0 64.8 8
54.9 70.9 63.8 47.4 16.9 25.5 37.8 33.4 51.6 87.0 105.8 57.8 9
47.3 58.9 56.9 47.7 21.3 26.7 36.1 36.8 50.4 73.1 94.7 51.4 10 36.5 51.1 47.5 37.8 20.3 25.3 33.7 30.8 45.6 66.7 77.5 43.0 HOUR OFF-PEAK (2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
13.9 30.4 27.6 17.5 7.3 8.5 12.3 9.4 19.2 23.9 35.4 18.7 2
11.6 25.6 23.0 14.7 6.9 7.5 9.5 8.1 15.0 19.1 30.3 15.2 3
10.5 23.0 21.2 13.2 6.7 7.1 8.4 7.5 12.8 17.8 27.7 13.5 4
10.0 21.8 19.9 12.4 6.7 6.9 7.9 7.2 11.0 16.9 25.9 12.6 5
10.1 22.3 20.4 12.7 6.7 6.9 7.6 7.0 11.0 17.2 26.1 13.0 6
11.7 26.9 24.2 14.6 6.8 7.0 7.7 7.3 13.2 19.5 30.9 16.6 7
17.1 34.8 31.8 20.2 7.5 7.7 9.4 8.2 20.0 30.1 41.0 23.7 8
25.3 40.9 38.5 26.7 12.6 12.0 16.3 14.9 30.0 42.2 50.8 29.5 9
35.9 52.5 51.0 40.1 18.3 19.5 27.4 22.3 32.7 58.4 75.1 39.6 10 19.6 31.8 30.4 23.6 11.3 12.3 14.3 13.3 18.5 30.3 42.3 23.4 11 21.0 34.1 32.9 25.4 12.4 14.1 17.7 17.6 21.9 34.6 45.9 26.4 12 21.1 35.2 32.9 25.8 12.9 15.6 21.1 20.4 23.4 34.9 46.6 26.4 1 P.M.
21.2 34.8 32.1 26.5 13.1 16.9 22.6 20.4 23.9 33.6 45.4 26.1 2
20.4 33.9 31.6 26.0 12.6 18.1 23.7 23.0 24.1 32.3 44.7 25.4 3
18.7 31.7 29.6 24.2 12.4 18.3 23.4 23.1 23.5 29.8 42.3 24.1 4
18.3 30.5 28.6 23.6 10.6 18.1 23.7 22.4 23.3 29.1 42.4 25.3 5
22.1 33.8 29.1 24.1 10.4 18.9 23.9 22.6 23.1 30.4 49.5 30.9 6
30.9 39.3 31.9 24.7 10.1 17.3 22.8 22.0 22.8 30.9 58.5 34.6 7
31.6 42.8 34.9 26.0 10.1 14.1 20.6 19.2 22.9 37.1 57.1 33.9 8
28.9 43.1 37.9 28.4 10.3 13.4 19.6 18.3 25.3 39.6 54.6 33.5 4
9 26.8 41.2 37.2 29.6 12.1 14.8 19.8 21.6 26.4 36.3 51.3 31.8 10 24.8 38.4 35.8 28.6 11.4 15.1 21.6 20.9 24.4 33.8 45.4 29.0 11 26.0 40.2 42.0 29.0 13.6 17.1 28.2 22.9 34.6 44.6 57.2 33.2 12 18.5 36.1 34.5 25.2 9.2 11.1 18.2 14.6 25.9 32.2 43.6 25.9 NOTE Cl) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983


COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1995 ONLY (MILLS PER KWH IN 1983 DOLLARS)
COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1995 ONLY (MILLS PER KWH IN 1983 DOLLARS)
HOUR                                     PEAKC1) PERIOD HOURS ENDING:         JAN   FEB   MAR     APR   MAY     JUNE JULY AUG     SEPT OCT   NOV   DEC 10 A.M.         68.1 103.3 106.1 93.2 35.7 32.6 39.3 35.2 49.4 91.8 61.8 46.0 11             72.7 108.8 112.1 104.4 43.9 39.1 50.8 43.0 65.0 109.5 66.5 47.8 12             67.8 97.9 105.8 99.1 45.9 44.3 62.1 48.5 73.3 104.0 64.1 46.5 1 P.M.       62.1   88.6 95.6 88.5 44.0 50.5 71.5 55.2 76.0 89.6 58.7               42.3 2             65.7 92.3 100.3 95.0 55.3 62.0 87.8 76.2 90.6 104.4 62.7               44.6 3             60.6 81.9 90.8 87.3 53.6 58.6 102.4 86.9 93.3 94.5 58.8               41.3 4             56.8 71.0 77.4 81.7 43.4 50.2 96.7 88.6 84.0 80.4 57.4                 38.8 5             65.6   68.9 70.9 66.4 39.9 42.8 78.2 67.4 74.3 68.5 67.6               51.5 6             87.3 88.4 69.5 59.4 31.4 36.0 62.3 49.8 60.6 64.7 83.5                 61.2 7             82.6 102.7 81.6 61.7 26.6 31.2 48.0 40.7 45.6 77.4 71.7               55.1 8             70.9 93.4 88.8 72.5 24.9 26.8 40.5 35.0 52.8 83.8 63.7                 49.5 9             59.3 76.0 78.1 73.3 30.1 28.1 38.6 38.9 51.4 70.1 57.4                 44.5 10             46.0 63.1 60.0 53.7 29.2 26.7 35.9 31.9 46.3 63.8 50.0                 36.6 HOUR                                   OFF-PEAKC 2) PERIOD HOURS ENDING:         JAN   FEB   MAR   APR     MAY     JUNE JULY AUG   SEPT OCT     NOV   DEC 1 A.M.         20.8 34.1   35.4   27.5     8.4     8.7 13.5   9.6 18.6 23.1   25.9 13.1 2             16.6 29.5   31.7   23.8     7.5     7.7 10.2   8.3 14.4 18.4   21.4 11.1 3             14.6 26.8   30.1   21.5     7.2     7.2   8.8   7.7 12.3 17.0   19.2 10.1 4             13.5 25.5   28.9   20.3     7.1     7.0   8.2   7.3 10.6 16.2   17.8   9.6 5             13.7 26.0   29.4   20.7     7.1     6.9   7.9   7.1 10.5 16.5   18.1   9.8 6             16.8 30.5   32.6   23.5     7.2     7.1   8.0   7.4 12.8 18.8   22.2 12.0 7             25.0 38.9   38.8   29.3     8.6     7.8 10.1   8.5 19.5 29.3   30.3 17.3 8             33.3 48.6   47.5   38.1   17.9   12.6 17.7 15.6 29.8 40.7   36.3 23.6 9             45.7 67.3   70.0   61.7   24.9   20.6 29.0 23.1 33.0 55.6   47.0 33.2 10             27.1 36.7   38.9   31.4   13.6   12.9 15.3 14.1 18.6 28.2   28.6 16.6 11             28.9 39.2   41.9   34.0   15.1   14.9 19.0 18.9 22.1 32.3   31.3 19.0 12             29.9 40.3   41.6   34.2   15.6   16.8 22.5 21.7 23.7 32.6   32.1 18.8 1 P.M.         30.4 39.6   40.6   34.3   15.9   18.1 23.9 21.6 24.1 31.4   31.6 17.8 2             29.6 38.6   39.9   33.8   15.5   19.2 25.0 24.4 24.1 30.1   31.1 17.2 3             27.4 36.1   37.3   31.7   15.1   19.4 24.6 24.4 23.6 27.8   29.6 16.6 4             27.1 34.8   35.9   31.0   12.3   19.3 25.2 23.8 23.4 27.1   29.6 17.1 5             31.6 38.3   36.6   31.4   12.0   20.4 25.4 24.1 23.3 28.4   34.8 22.4 6             40.8 44.4   39.6   32.1   11.5   18.4 24.2 23.4 22.9 28.9   40.4 27.1 7             41.4 48.6   43.4   33.4   11.4   15.4 22.1 20.6 23.1 35.1   39.6 26.2 8             38.6 48.9   47.4   36.6   11.9   14.3 21.1 19.6 25.4 37.4   38.3 25.6 9             36.6 46.6   46.3   38.3   14.9   15.9 21.4 23.3 26.6 34.3   36.3 23.3 10             34.8 43.1 44.4       36.4   13.5   16.5 23.1 22.4 24.4 31.9   32.4 19.9 11             35.7 46.1 50.3       39.6   19.4   18.1 30.2 23.9 34.3 43.1   40.2 25.3 12             27.8 40.0 41.2       34.8   12.0   11.6 19.9 15.3 25.3 31.5   32.3 18.4 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
HOUR PEAKC1) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
68.1 103.3 106.1 93.2 35.7 32.6 39.3 35.2 49.4 91.8 61.8 46.0 11 72.7 108.8 112.1 104.4 43.9 39.1 50.8 43.0 65.0 109.5 66.5 47.8 12 67.8 97.9 105.8 99.1 45.9 44.3 62.1 48.5 73.3 104.0 64.1 46.5 1 P.M.
62.1 88.6 95.6 88.5 44.0 50.5 71.5 55.2 76.0 89.6 58.7 42.3 2
65.7 92.3 100.3 95.0 55.3 62.0 87.8 76.2 90.6 104.4 62.7 44.6 3
60.6 81.9 90.8 87.3 53.6 58.6 102.4 86.9 93.3 94.5 58.8 41.3 4
56.8 71.0 77.4 81.7 43.4 50.2 96.7 88.6 84.0 80.4 57.4 38.8 5
65.6 68.9 70.9 66.4 39.9 42.8 78.2 67.4 74.3 68.5 67.6 51.5 6
87.3 88.4 69.5 59.4 31.4 36.0 62.3 49.8 60.6 64.7 83.5 61.2 7
82.6 102.7 81.6 61.7 26.6 31.2 48.0 40.7 45.6 77.4 71.7 55.1 8
70.9 93.4 88.8 72.5 24.9 26.8 40.5 35.0 52.8 83.8 63.7 49.5 9
59.3 76.0 78.1 73.3 30.1 28.1 38.6 38.9 51.4 70.1 57.4 44.5 10 46.0 63.1 60.0 53.7 29.2 26.7 35.9 31.9 46.3 63.8 50.0 36.6 HOUR OFF-PEAKC 2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
20.8 34.1 35.4 27.5 8.4 8.7 13.5 9.6 18.6 23.1 25.9 13.1 2
16.6 29.5 31.7 23.8 7.5 7.7 10.2 8.3 14.4 18.4 21.4 11.1 3
14.6 26.8 30.1 21.5 7.2 7.2 8.8 7.7 12.3 17.0 19.2 10.1 4
13.5 25.5 28.9 20.3 7.1 7.0 8.2 7.3 10.6 16.2 17.8 9.6 5
13.7 26.0 29.4 20.7 7.1 6.9 7.9 7.1 10.5 16.5 18.1 9.8 6
16.8 30.5 32.6 23.5 7.2 7.1 8.0 7.4 12.8 18.8 22.2 12.0 7
25.0 38.9 38.8 29.3 8.6 7.8 10.1 8.5 19.5 29.3 30.3 17.3 8
33.3 48.6 47.5 38.1 17.9 12.6 17.7 15.6 29.8 40.7 36.3 23.6 9
45.7 67.3 70.0 61.7 24.9 20.6 29.0 23.1 33.0 55.6 47.0 33.2 10 27.1 36.7 38.9 31.4 13.6 12.9 15.3 14.1 18.6 28.2 28.6 16.6 11 28.9 39.2 41.9 34.0 15.1 14.9 19.0 18.9 22.1 32.3 31.3 19.0 12 29.9 40.3 41.6 34.2 15.6 16.8 22.5 21.7 23.7 32.6 32.1 18.8 1 P.M.
30.4 39.6 40.6 34.3 15.9 18.1 23.9 21.6 24.1 31.4 31.6 17.8 2
29.6 38.6 39.9 33.8 15.5 19.2 25.0 24.4 24.1 30.1 31.1 17.2 3
27.4 36.1 37.3 31.7 15.1 19.4 24.6 24.4 23.6 27.8 29.6 16.6 4
27.1 34.8 35.9 31.0 12.3 19.3 25.2 23.8 23.4 27.1 29.6 17.1 5
31.6 38.3 36.6 31.4 12.0 20.4 25.4 24.1 23.3 28.4 34.8 22.4 6
40.8 44.4 39.6 32.1 11.5 18.4 24.2 23.4 22.9 28.9 40.4 27.1 7
41.4 48.6 43.4 33.4 11.4 15.4 22.1 20.6 23.1 35.1 39.6 26.2 8
38.6 48.9 47.4 36.6 11.9 14.3 21.1 19.6 25.4 37.4 38.3 25.6 9
36.6 46.6 46.3 38.3 14.9 15.9 21.4 23.3 26.6 34.3 36.3 23.3 10 34.8 43.1 44.4 36.4 13.5 16.5 23.1 22.4 24.4 31.9 32.4 19.9 11 35.7 46.1 50.3 39.6 19.4 18.1 30.2 23.9 34.3 43.1 40.2 25.3 12 27.8 40.0 41.2 34.8 12.0 11.6 19.9 15.3 25.3 31.5 32.3 18.4 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983


p .
p>.-
> .-                                             COMMONWEALTH EDISON COMPANY
COMMONWEALTH EDISON COMPANY
                              ' ESTIMATED AVERAGE PEAK S OFF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1996 ONLY (MILLS PER KWH IN 1983 DOLL ARS)
' ESTIMATED AVERAGE PEAK S OFF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1996 ONLY (MILLS PER KWH IN 1983 DOLL ARS)
HOUR                                           PEAK (1) PERIOD HOURS ENDING:         JAN     FEB     MAR     APR     MAY       JUNE JULY AUG         SEPT OCT   NOV DEC 10 A.M.         52.7   95.1 135.5 123.5 39.2 34.8 41.5 38.0 64.4 131.4 115.3 56.2 11               56.0   102.2 139.5 133.1 49.1 41.9 55.5 47.0 C5.5 343.4 122.6 58.7 12               52.7   89.0 135.2 129.1 51.5 48.0 69.b 53.6 95.0 140.1 119.4 57.0 1 P.M.       48.7   78.6 126.9 118.6 49.2 54.9 79.5 61.9 96.6 129.4 110.3 51.2 2             51.1   82.3 131.0 124.9 63.3 67.4 95.7 86.3 110.4 140.1 117.0 54.2 3             47.5   71.4 122.5 117.4 60.9 64.2 109.2 98.1 110.7 133.1 109.6 50.2
HOUR PEAK (1) PERIOD HOURS ENDING:
: 4.           44.8   61.1 107.8 110.9 48.6 54.9 104.1 97.2 103.6 120.6 107.0 47.1 5             51.1   59.1 99.3 90.7 44.8 46.2 86.9 75.6 93.5 105.1 122.0 64.4 6             66.5   78.0   97.1 79.6       35.3     38.3   69.2 55.2 78.5 99.3 135.6 78.5 7             63.1   94.6   112.4 83.3       31.1     33.3 52.1 44.3 58.6 117.2 128.0 69.6 8             54.8   83.6   120.0 99.1       29.6     29.0 42.9 37.7 69.0 123.9 118.6 61.4 9             46.7   65.7   108.4 99.9       34.2     30.2 40.6 42.2 66.9 107.5 106.9 53.5 10               36.5 54.4     82.3 69.8       34.7     28.8 37.2 34.6 58.1 95.1 86.7 44.1 HOUR                                         OFF-PEAKC2) PERIOD HOURS ENDING:         JAN     FEB     MAR     APR     MAY     JUNE JULY AUG           SEPT OCT   NOV DEC 1 A.M.       15.5   26.8   40.6   35.5   11.1       9.4 15.0 10.4 25.7       33.7 37.7 15.8 2             12.7   22.5   35.7   32.0       9.4       8.2 11.2         8.7 21.0 28.8 32.7 12.9 3             11.4   20.5   33.6   29.6     8.7       7.6   9.6       8.0 18.0   27.1 30.1 11.6 4             10.7   19.6   32.1   28.4       8.5       7.3   8.7       7.5 15.3   25.9 28.1 10.9 5             10.8   19.9   32.7   28.8     8.5       7.2   S.4       7.3 15.2   26.4 28.4 11.1 6             12.8   23.7   36.8   31.5     8.7       7.4   8.5       7.7 18.5   29.1 33.3 14.2 7             18.9   32.1   46.5   37.0   11.2       8.2 11.0         8.9 25.8 38.5 43.3 21.2 8             26.3   41.5   61.9   47.0     23.6     13.6 19.5       17.1 35.1 58.0 55.5 29.0 9             36.0   58.3   94.5   83.5     28.9     22.2 31.2       24.9 42.0 84.4 83.9 39.9 10               20.4   29.9   46.8   37.9     19.4     13.9 16.4       15.2 23.6 38.5 45.1 21.1 11               21.9   31.7   50.8   41.6     21.3     15.9 20.2       20.1 28.1 44.9 49.2 24.4 12               22.4   32.4   49.9   41.8     22.1     17.6 23.7       23.0 30.1 44.6 50.0 24.1 1 P.M.       22.3   32.1   48.6   41.8     21.9     19.0 25.1       23.3 30.6 42.1 48.9 23.2 2             21.6   31.3   47.6   41.0     21.6     20.1 26.4       25.9 30.6 40.1 47.9 22.4 3             20.1   29.6   44.3   37.8     21.1     20.3 25.9       26.1 29.9 36.7 45.0 21.1 4             19.6   28.5   42.6   36.6     17.9     20.1 26.3       25.4 29.6 35.9 45.0 21.9 5             22.9   31.1   43.3   37.3     17.4     20.9 26.6       25.8 29.6 37.1 53.3 29.3 6             31.2   35.9   47.1   38.2     16.6     19.4 25.4       25.2 29.1 37.8 64.1 34.4
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.
    -        7            31.9   38.9   51.9   40.3     16.5     15.6 23.2       22.3 29.4 46.2 62.4 33.4 8             29.3   39.3   57.4   45.4     16.6     15.1 22.1       21.3 31.8 50.1 59.6 32.9 9             27.2   37.4   55.9   48.3     20.5     16.3 22.3       24.9 32.9 45.0 55.4 30.4 10               25.3   35.1   53.0   45.1     18.8     16.8 24.3       24.2 30.8 41.1 48.6 26.4 11               27.7   39.1   65.0   48.2     25.4     19.6 32.5       26.1 40.5 58.3 60.8 31.1 12               20.9   32.8   49.7   42.4     16.8     12.5 22.0       16.9 32.1 41.3 45.9 22.8 NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
52.7 95.1 135.5 123.5 39.2 34.8 41.5 38.0 64.4 131.4 115.3 56.2 11 56.0 102.2 139.5 133.1 49.1 41.9 55.5 47.0 C5.5 343.4 122.6 58.7 12 52.7 89.0 135.2 129.1 51.5 48.0 69.b 53.6 95.0 140.1 119.4 57.0 1 P.M.
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4,     1983
48.7 78.6 126.9 118.6 49.2 54.9 79.5 61.9 96.6 129.4 110.3 51.2 2
                                                                                -. _}}
51.1 82.3 131.0 124.9 63.3 67.4 95.7 86.3 110.4 140.1 117.0 54.2 3
47.5 71.4 122.5 117.4 60.9 64.2 109.2 98.1 110.7 133.1 109.6 50.2 4.
44.8 61.1 107.8 110.9 48.6 54.9 104.1 97.2 103.6 120.6 107.0 47.1 5
51.1 59.1 99.3 90.7 44.8 46.2 86.9 75.6 93.5 105.1 122.0 64.4 6
66.5 78.0 97.1 79.6 35.3 38.3 69.2 55.2 78.5 99.3 135.6 78.5 7
63.1 94.6 112.4 83.3 31.1 33.3 52.1 44.3 58.6 117.2 128.0 69.6 8
54.8 83.6 120.0 99.1 29.6 29.0 42.9 37.7 69.0 123.9 118.6 61.4 9
46.7 65.7 108.4 99.9 34.2 30.2 40.6 42.2 66.9 107.5 106.9 53.5 10 36.5 54.4 82.3 69.8 34.7 28.8 37.2 34.6 58.1 95.1 86.7 44.1 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.
15.5 26.8 40.6 35.5 11.1 9.4 15.0 10.4 25.7 33.7 37.7 15.8 2
12.7 22.5 35.7 32.0 9.4 8.2 11.2 8.7 21.0 28.8 32.7 12.9 3
11.4 20.5 33.6 29.6 8.7 7.6 9.6 8.0 18.0 27.1 30.1 11.6 4
10.7 19.6 32.1 28.4 8.5 7.3 8.7 7.5 15.3 25.9 28.1 10.9 5
10.8 19.9 32.7 28.8 8.5 7.2 S.4 7.3 15.2 26.4 28.4 11.1 6
12.8 23.7 36.8 31.5 8.7 7.4 8.5 7.7 18.5 29.1 33.3 14.2 7
18.9 32.1 46.5 37.0 11.2 8.2 11.0 8.9 25.8 38.5 43.3 21.2 8
26.3 41.5 61.9 47.0 23.6 13.6 19.5 17.1 35.1 58.0 55.5 29.0 9
36.0 58.3 94.5 83.5 28.9 22.2 31.2 24.9 42.0 84.4 83.9 39.9 10 20.4 29.9 46.8 37.9 19.4 13.9 16.4 15.2 23.6 38.5 45.1 21.1 11 21.9 31.7 50.8 41.6 21.3 15.9 20.2 20.1 28.1 44.9 49.2 24.4 12 22.4 32.4 49.9 41.8 22.1 17.6 23.7 23.0 30.1 44.6 50.0 24.1 1 P.M.
22.3 32.1 48.6 41.8 21.9 19.0 25.1 23.3 30.6 42.1 48.9 23.2 2
21.6 31.3 47.6 41.0 21.6 20.1 26.4 25.9 30.6 40.1 47.9 22.4 3
20.1 29.6 44.3 37.8 21.1 20.3 25.9 26.1 29.9 36.7 45.0 21.1 4
19.6 28.5 42.6 36.6 17.9 20.1 26.3 25.4 29.6 35.9 45.0 21.9 5
22.9 31.1 43.3 37.3 17.4 20.9 26.6 25.8 29.6 37.1 53.3 29.3 6
31.2 35.9 47.1 38.2 16.6 19.4 25.4 25.2 29.1 37.8 64.1 34.4 7
31.9 38.9 51.9 40.3 16.5 15.6 23.2 22.3 29.4 46.2 62.4 33.4 8
29.3 39.3 57.4 45.4 16.6 15.1 22.1 21.3 31.8 50.1 59.6 32.9 9
27.2 37.4 55.9 48.3 20.5 16.3 22.3 24.9 32.9 45.0 55.4 30.4 10 25.3 35.1 53.0 45.1 18.8 16.8 24.3 24.2 30.8 41.1 48.6 26.4 11 27.7 39.1 65.0 48.2 25.4 19.6 32.5 26.1 40.5 58.3 60.8 31.1 12 20.9 32.8 49.7 42.4 16.8 12.5 22.0 16.9 32.1 41.3 45.9 22.8 NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY
( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983
-. _}}

Latest revision as of 02:23, 15 December 2024

Provides Addl Antitrust Info Including Document Inadvertently Omitted from 830902 Response to NRC 830606 Questions
ML20076K623
Person / Time
Site: Byron  
Issue date: 09/08/1983
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
7273N, NUDOCS 8309150087
Download: ML20076K623 (16)


Text

'

f D Corrimonwealth Edison

) Ona F4st Nttional Plaza. Chicago. tilinois O

Address Rzply to: Postoffice BE767 v

\\

Chicago. Illinois 60690 September 8, 1983 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Generating Station Units 1 and 2 Antitrust Analysis NRC Docket Nos. 50-454 and 50-455 References (a):

August 6, 1982, letter from A.

Tealston to W.

F. Naughton.

(b):

September 2, 1983, letter from T. R.

Tramm to H. R. Denton.

Dear Mr. Denton:

This letter provides additional antitrust information for the Byron Generating Station.

Enclosed is one memorandum which was inadvertently omitted in the referenge (b) responses to the reference (a)

NRC questions.

Exhibit 5 of reference (b) contained copies of recent correspon-dence relating to the possible sale of electricity to other utilities.

A meeting on May 10, 1983 with representatives of Wisconsin Public Power Inc. is discussed in those documents but the meeting summary is not included.

The enclosed May 12, 1983 memorandum by Mr. Robert Beckwith was inadvertently omitted from Exhibit 5.

Please address further questions to this office.

Very truly yours,

/[2 t 4%

T. R.

Tramm Nuclear Licensing Administrator 1m If 7273N 8309150087 830908 i

PDR ADOCK 05000454 M

PDR

.~

May 12, 1983

SUBJECT:

Meeting with Wisconsin Public Power Inc. (WPPI)

May 10, 1983 Attending:

kPPT.

CECO D. W. Penn R. L. Bolger E. Mullins R. Beckwith R. Philley (Atty.)

R. L. Kraatz R. G. Ferguson (IL4B) i The two parties met to discuss possible sales of power and energy ar 2

discussed in W. B. Behnke's letter of March 18, 1983 and Mr. Penn's letter et April 15, 1983.

Following is a summary of the discussion.

1.

CECO made two Eeneral proposals that might satisfy WPPI's needs:

(a) A 50 MW participation in Byron Station through 1996 at about

$20/kW-month (firm cost to be confirmed by additional study).

WPPI would receive energy at Byron cost including fuel and pro rata O&M. Any back fitting requirements would also be shared pro rata.

g/

(b) A 50 firm sale with a beginning capacity charge of about

$5/ '-month (firm charge to be confirmed by additional study) and energy charges off system margin. A summary of Edison's expected marginal costs was provided.

(c) In the above, or any other transactions, power and energy would be delivered at one of CECO's interconnection points. Any third party transmission would be arranged by WPPI.

2.

WPPI is not interested in participating in the Byron or Braidwood plants, but would consider LaSalle (See Item 5 following.)

3.

WPPI prefers a fixed capacity charge for any transaction that may be agreed upon.

4.

WPPI would be willing to consider a one-time, up-front capacity charge for any long term transaction.

5.

WPPI requested firm proposals for the following:

(a) A long-term firm sale with energy of f the system margin. In addition, the capacity charge was to be stated in terms of a one-time, up-front payment rather than as a periodic amount.

(b) A 50 MW ownership in Powerton Station allocated evenly across both units. All normal ownership obligations and benefits would accrue to WPPI.

j i

_=

t I

(c) A 50 MW ownership in LaSalle Station allocated evenly across both units. All normal ownership obligations and benefits would accrue to WPPI.

6.

Ceco agreed to submit proposal in two to four weeks.

+

1 e

'd 67 R. Beckwith cc:

R. L. Bolger H. M. Dellsy R. G. Ferguson R. L. Kraatz 4

6 1341S

ib COMMONUEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1984 ONLY (MILLS PER KUH IN 1983 DOLL ARS)

[

HOUR PEAK (1) PERIOD HOURS l

ENDING:

JAt!

FEB PAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC l

l 10 A.M.

49.4 45.8 46.6 52.5 45.3 44.6 46.3 39.5 55.8 56.9 54.6 43.1 l

11 50.3 47.4 47.5 55.5 50.4 47.7 50.9 43.4 61.1 58.4 55.2 43.4 12 49.2 45.6 46.6 53.9 51.9 51.1 55.5 43.4 63.2 57.6 54.8 43.2 1 P.M.

48.8 44.4 46.3 51.4 50.2 55,2 59.9 44.5 65.1 56.9 54.3 42.9 3

3 49.1 44.5 46.4 53.1 54.6 63.6 70.2 51.4 73.3 58.1 54.7 43.1 3

49.8 43.9 46.2 51,1 50.G 61.0 82.3 54.9 78.1 57.3 54.0 42.0 4

48 0 42.4 45.7 50.4 50.4 55.1 76.4 59.2 69.7 56.5 53.8 40.5 l

5 49.3 42.0 44.9 49.3 49.2 50.1 63.0 48.6 65.5 53.3 55.3 44.1 I

6 55.1 44.2 44.6 47.1 43.6 45.9 55.6 44.1 53.1 52.3 61.3 48.3 7

53.5 45.7 45.9 47.9 40.9 44.0 50 1 42.4 53.1 56.0 56.6 45.7 l

8 50.2 44.4 46.0 49.9 39.8 41.3 47.1 39.3 56.3 56.4 55.0 43.5 9

48.6 43.2 45.7 49.9 43.1 42.2 45.8 41.6 55.9 53.9 54.3 44.1 10 44.9 41.0 42.9 45.2 44.1 41.1 43.9 38.4 52.2 52.7 50.9 39.9 i

HOUR OFF-PEAKC2) PERIOD HOURS ENDING:

JAN FE8 MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

35.3 29.2 29.6 33.1 28.1 27.9 34.3 21.5 35.6 36.5 37.2 23.3 2

35.3 29.2 29.5 32.1 25.8 25.4 31.5 21.1 35.5 36.5 37.1 23.2 3

33.5 28.0 29.1 30.8 24.2 22.9 29.1 19.1 34.4 36.4 36.5 22.6 4

31.7 27.3 28.5 30.2 23.4 21.4 27.4 17.2 32.8 36.2 35.6 21.8 5

32.3 27.5 28.7 30.4 23.3 20.8 26.4 16.3 32.7 36.3 35.4 21.8 6

34.0 28.6 29.2 32.0 24.0 21.5 26.4 17.5 34.2 36.3 36.3 22.4 I

7 36.4 32.9 32.1 32.6 27.0 25.0 30.2 20.0 35.2 37.8 39.5 25.6 8

40.5 36.3 37.5 38.6 35.1 30.7 33.7 26.5 40.2 43.4 43.4 30.4 9

43.6 39.2 41.1 44.9 38.7 35.8 37.4 31.2 43.4 47.9 48.6 36.4 10 33.4 29.0 29.6 30.4 28.9 27.6 27.8 22.9 30.4 36.9 38.4 23.1 11 35.0 29.6 30.6 31.6 30.1 29.6 30.4 25.9 33.1 39.0 39.4 25.2 12 35.7 29.3 30.1 31.1 30.7 30.8 33.0 28.2 34.6 38.5 40.0 24.9 1 P.M.

35.8 29.0 29.6 30.9 31.6 32.5 33.9 28.6 34.9 37.4 39.6 24.1 2

34.9 28.3 29.2 30.4 31.3 33.5 34.6 30.5 34.9 36.4 39.1 23.6 3

33.4 27.4 27.9 28.9 30.8 33.6 34.2 30.6 34.3 35.0 37.8 22.8 4

33.4 26.6 27.1 28.4 28.4 33.6 34.4 30.2 34.0 34.6 37.9 23.4 5

36.6 28.1 27.3 28.4 28.2 34.3 34.4 30.4 33.9 34.9 42.1 28.8 6

42.6 31.8 29.1 28.8 27.6 32.9 33.6 30.1 33.6 35.1 46.7 32.5 7

43.3 34.2 31.6 30.0 27.6 30.8 32.6 28.4 33.7 39.6 46.1 31.9 j

8 41.2 34.2 34.1 33.0 28.4 29.6 31.9 27.6 35.3 41.3 44.9 31.4 9

39.3 32.7 33.5 34.6 31.6 31.5 32.1 29.9 36.1 39.1 43.3 29.6 10 37.6 30.8 32.3 32.9 30.6 31.8 32.9 29.6 34.6 36.9 39.9 26.9 11 40.3 34.3 38.1 37.5 37.3 34.8 39.2 32.9 42.2 43.9 44.2 32.2 12 36.6 30.9 32.0 34.2 30.2 29.5 36.0 27.0 37.6 38.8 39.0 26.2 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983

COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1985 ONLY (MILLS PER KWH IN 1983 DOLLARS)

J 1

HOUR PEAK (1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

44.9 46.3 44.9 43.8 40.2 38.8 40.3 36.5 46.7 54.4 46.1 34.5 11 45.3 46.9 45.5 44.7 43.7 41.5 44.1 39.7 52.6 61.3 47.4 35.4 12 45.1 46.4 45.0 44.2 44.6 43.7 47.6 40.1 56.5 58.7 46.7 34.7 1 P.M.

44.7 46.0 44.3 43.6 43.4 46.5 50.6 42.3 59.0 54.6 45.6 34.0 2

45.0 46.1 44.9 43.8 49.2 52.8 58.4 49.1 67.5 59.1 46.2 34.2 3

44.6 45.8 44.8 43.5 48.4 50.7 68.6 52.7 72.5 55.7 45.4 33.2 4

44.1 44.4 44.4 43.4 43.3 46.7 63.7 56.3 63.2 53.2 45.3 31.8 5

44.9 44.1 43.9 42.7 42.6 43.4 52.8 46.3 58.2 50.3 47.6 37.1 1.

6 47.5 46.1 43.7 42.0 38.9 40.0 47.8 40.8 51.1 49.4 52.3 40.9 7

46.8 46.3 44.5 42.3 36.6 38.3 43.6 39.2 45.0 52.8 48.7 38.6 8

45.6 46.1 44.7 43.2 35.8 36.1 41.3 36.3 47.6 53.5 46.5 36.1 9

44.6 45.3 44.5 43.2 38.4 36.8 40.3 38.4 47.3 50.9 46.1 34.8 10 40.8 43.2 42.7 41.3 39.8 36.0 38.6 35.3 44.8 50.8 43.9 30.3 HOUR OFF-PEAK (2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

26.8 32.4 31.8 28.9 24.0 21.2 24.4 19.2 33.1 33.6 29.1 14.3 2

26.7 32.2 31.8 28.7 22.9 19.4 22.7 15.9 30.6 30.5 27.6 12.6 3

26.4 31.8 31.5 28.4 21.2 16.9 19.6 14.0 28.3 28.3 25.8 11.7 4

25.8 31.2 30.9 28.0 20.5 15.2 17.8 12.3 25.1 26.7 24.5 11.4 5

25.7 31.1 31.0 28.1 20.3 14.7 16.5 11.5 25.0 27.0 24.4 11.6 6

26.1 31.6 31.4 28.0 21.1 15.3 16.9 12.6 28.0 30.2 27.2 13.7 7

30.3 36.6 34.6 30.4 23.1 19.0 21.2 15.2 31.5 34.1 32.0 16.3 8

35.0 38.5 38.5 36.3 32.3 25.3 26.3 22.0 35.9 40.3 36.1 21.5 9

38.9 41.7 41.0 38.9 34.9 31.0 33.4 27.6 37.8 44.3 40.8 27.7 10 28.3 31.8 30.9 28.9 26.6 23.7 21.8 19.1 27.6 32.3 30.4 15.8 11 29.4 32.2 31.5 29.8 27.9 25.8 24.4 22.1 30.2 35.9 32.3 18.2 12 30.0 32.8 31.4 29.8 28.6 26.6 27.1 24.8 31.7 35.2 32.7 18.1 1 P.M.

30.4 32.6 31.1 30.1 29.5 28.4 28.6.;24. 8 31.8 34.9 32.4 17.1 2

30.1 32.0 30.8 29.9 29.4 29.9 30.0 27.1 31.5 33.4 32.1 16.8 3

28.6 30.6 29.8 28.1 28.9 30.2 29.5 27.1 31.0 31.6 30.9 16.4 4

28.5 29.8 29.3 27.7 27.3 30,1 29.7 26.4 30.6 30.8 30.9 16.3 i

5 31.2 32.1 29.5 28.1 27.2 31.0 29.7 26.9 30.4 32.1 34.5 20.0 6

36.1 35.6 31.0 28.6 26.4 29.4 29.1 26.4 30.3 33.3 38.4 23.0 4

7 36.4 37.7 32.6 29.6 26.6 27.1 28.1 23.9 30.3 36.9 37.9 22.4 8

35.1 37.9 34.1 31.8 27.4 26.0 27.3 23.3 31.3 39.3 36.9 22.1 I

9 34.1 36.8 33.7 32.9 29.8 28.6 27.6 26.3 31.9 36.8 35.5 20.6 10 33.0 35.1 32.9 31.7 29.1 28.8 28.9 25.7 30.6 34.4 32.6 18.4 11 35.8 37.6 39.7 36.2 34.5 30.3 35.4 27.7 38.4 42.5 38.7 21.1 12 31.0 36.0 35.0 33.2 27.8 23.7 28.7 22.4 35.2 35.9 32.9 17.6 NOTER (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 e

COMMONWEALTH EDISON COMPANY j

ESTIMATED AYERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1986 ONLY (MILLS PER KWH IN 1983 DOLLARS)

HOUR PE AK(1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

41.3 47.0 45.4 42.9 31.1 30.6 32.6 29.7 35.4 40.9 40.5 28.1 11 42.8 48.1 46.4 44.6 35.9 34.5 37.4 33.3 39.4 44.6 41.7 29.2 12 41.7 46.7 45.3 43.7 36.8 37.1 41.3 35.1 41.5 43.3 41.1 28.5 1 P.M.

40.2 45.5 44.5 41.9 35.6 39.7 44.5 37.7 42.4 40.3 39.8 26.7 2

41.0 45.9 44.6 43.2 41.1 45.2 51.8 44.4 47.1 43.5 40.7 27.3 3

40.1 44.9 44.2 41.7 40.1 43.5 61.0 47.7 50.4 41.4 39.5 26.2 4

39.4 42.6 43.1 40.5 35.0 39.9 55.9 51.6 44.8 39.7 39.2 25.2 5

41.2 42.1 42.0 38.5 33.3 36.7 47.0 41.5 42.2 37.6 41.8 31.3 6

46.2 45.5 41.8 36.3 29.2 32.6 41.4 35.5 38.3 36.9 44.8 35.4 7

45.1 46.9 43.4 37.1 26.1 30.2 36.2 32.8 34.2 39.2 42.8 33.0 8

42.7 45.8 43.9 39.2 25.0 27.3 33.3 29.5 36.5 39.7 41.1 30.1 9

40.2 43.8 43.2 39.2 28.6 28.3 32.8 31.9 36.1 38.3 40.2 27.1 10 34.1 40.5 39.8 34.0 28.4 27.3 31.5 27.5 37.5 38.4 37.3 23.2 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

19.2 23.5 24.3 17.7 11.5 11.7 14.8 11.1 18.4 16.1 19.3 9.7 2

16.6 22.3 23.7 15.7 9.9 10.4 12.0 9.7 15.4 13.5 16.6 8.8 3

15.0 20.4 22.4 14.5 9.3 9.5 10.7 9.1 13.7 12.3 15.2 8.4 4

14.1 19.5 21.3 14.0 9.0 9.0 9.9 8.5 11.8 11.4 14.3 8.2 5

14.4 19.6 21.6 14.2 9.0 8.9 9.5 8.2 11.8 11.6 14.3 8.3 6

16.4 22.3 23.5 15.6 9.2 9.0 9.6 8.5 13.8 13.4 16.7 9.3 7

20.6 28.4 29.0 18.4 11.7 10.2 11.7 9.5 18.2 18.8 21.6 11.8 8

26.6 33.2 33.6 25.3 19.4 14.8 16.6 14.5 26.0 26.5 27.6 15.3 9

33.0 38.6 38.7 33.6 24.6 22.0 25.3 20.9 27.8 31.7 33.7 21.3 10 21.4 25.1 26.6 18.3 16.3 14.2 14.3 13.1 18.1 18.9 21.2 11.1 11 22.6 26.1 28.4 19.6 17.6 15.6 16.4 15.6 21.1 21.9 22.4 12.4 12 23.1 26.9 28.2 19.7 18.1 17.1 18.6 17.9 22.8 19.9 22.7 12.4 1 P.M.

23.4 26.6 27.8 19.1 18.4 18.3 19.8 17.2 22.6 19.2 22.3 12.1 2

22.9 25.9 27.3 18.9 18.1 18.9 20.2 19.6 22.5 17.9 21.9 11.9 3

21.6 24.5 25.8 18.1 17.8 18.9 19.8 19.4 21.6 16.9 20.9 11.4 4

21.3 23.6 25.1 17.7 15.1 18.8 20.1 18.2 20.8 16.2 20.9 11.6 5

24.1 25.9 25.6 18.1 14.9 19.3 20.1 18.1 20.6 16.6 24.1 13.8 6

29.9 29.6 27.3 18.1 14.4 18.3 19.1 17.6 20.4 17.6 27.9 15.6 7

30.3 31.9 29.6 18.5 14.4 15.7 17.4 15.9 20.3 19.6 27.4 15.3 8

28.6 32.3 31.9 20.4 14.8 15.1 16.8 15.5 21.9 21.9 26.4 15.1 9

27.4 31.1 31.3 21.4 17.8 15.7 16.9 17.3 22.9 19.4 25.1 14.4 10 26.2 29.1 30.2 20.1 16.6 15.9 18.1 16.6 20.9 17.1 22.3 12.9 11 27.5 31.9 37.1 25.1 20.8 19.8 25.4 20.3 28.7 27.6 29.4 14.7 12 21.7 28.2 30.3 21.0 15.6 15.1 18.7 15.4 21.7 20.2 22.3 12.4 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (230FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983

- - - ~. -.. -, -,

COMMONWEALTH EDISON COMPANY l

ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1987 ONLY (MILLS PER KWH IN 1983 DOLLARS) i HOUR PEAKC1) PERIOD HOURS ENDING:

JAN FE8 MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

36.9 41.7 56.1 49.0 36.8 19.6 26.3 25.3 40.5 44.7 40.8 25.0 11 38.4 43.0 58.5 51.1 41.7 24.4 31.0 28.4 44.7 47.1 42.1 26.2 12 37.1 40.9 56.0 50.0 42.7 26.7 35.0 31.0 47.2 46.1 41.4 25.4 1 P.M.

35.4 39.5 54.2 48.1 41.5 29.0 37.7 33.7 48.3 44.7 40.0 22.9 2

36.5 39.7 54.6 49.3 47.7 33.5 43.1 39.7 53.8 46.3 41.1 24.0 3

35.4 38.8 53.5 47.9 46.8 32.7 49.7 42.5 57.9 45.1 39.7 22.6 4

34.7 36.3 51.1 46.9 41.0 29.6 46.1 45.5 51.4 44.2 39.5 21.9 5

36.6 35.7 49.4 45.5 39.4 26.6 39.6 37.1 47.7 42.6 42.1 28.4 6

41.8 39.3 49.0 44.0 35.3 22.2 35.1 31.3 43.2 41.9 45.4 32.7 7

40.7 41.5 51.9 44.5 33.0 19.3 30.3 28.1 39.0 44.0 43.2 30.3 8

38.2 39.9 53.0 46.3 32.1 16.6 27.0 25.0 40.9 44.2 41.3 27.3 9

35.6 37.8 51.4 46.3 34.7 17.4 26.0 27.4 40.7 42.8 40.8 23.6 10 29.3 33.6 46.7 42.4 35.3 16.5 25.1 22.7 41.3 43.8 38.3 20.1 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

13.9 16.4 34.8 26.4 16.7 7.8 10.3 8.9 22.8 20.9 20.8 8.5 2

12.2 13.8 33.9 24.8 13.9 7.2 8.6 8.0 20.3 18.7 17.9 7.9 3

11.3 12.6 32.5 23.0 12.7 7.0 8.0 7.6 18.1 17.7 16.3 7.6 4

10.7 12.2 31.5 22.1 12.2 6.8 7.6 7.3 15.9 17.0 15.2 7.4 5

10.8 12.2 31.7 22.3 12.1 6.8 7.4 7.2 15.8 17.2 15.3 7.5 6

12.1 14.3 33.9 24.3 12.6 6.9 7.5 7.3 18.3 18.8 18.0 8.2 7

15.2 18.7 37.5 27.5 16.9 7.3 8.5 8.0 22.3 24.6 23.3 10.1 8

21.6 26.2 41.4 34.5 26.6 9.9 12.6 12.5 31.0 32.5 28.4 12.8 9

28.5 32.4 47.5 40.6 30.3 13.3 19.2 16.9 31.5 36.5 34.5 18.6 10 16.4 18.3 33.4 27.6 21.7 9.7 11.0 10.6 21.6 23.6 23.0 9.6 11 16.9 19 0 35.3 29.0 23.2 10.7 12.9 13.1 24.7 25.9 24.6 10.6 12 17.3 19.1 35.1 29.4 23.5 11.4 15.1 15.0 26.0 26.3 25.1 10.6 1 P.M.

17.2 18.9 34.6 29.9 23.9 12.4 16.1 14.6 26.4 25.6 25.0 10.3 2

16.9 18.1 34.2 29.5 23.7 13.0 16.8 16.7 26.4 24.6 24.6 10.1 3

16.1 17.1 32.6 27.9 23.4 13.1 16.4 16.6 26.1 22.7 23.6 9.7 4

16.1 16.4 31.8 27.3 20.9 12.9 16.6 15.8 25.9 22.3 23.8 10.1 5

17.6 17.9 32.2 27.8 20.5 13.6 16.6 15.9 25.9 23.1 27.1 12.1 6

' 22.6 21.1 34.3 28.3 19.6 12.4 15.7 15.5 25.6 23.6 30.4 13.8 7

22.9 22.9 36.6 29.4 19.6 10.9 14.4 13.6 25.6 28.1 30.1 13.4 8

21.1 23.4 38.9 31.8 20.1 10.5 13.9 13.2 27.4 29.6 29.3 13.2 9

20.0 21.8 38.4 32.8 23.8 11.3 13.9 15.1 28.1 27.6 28.1 12.4 10 19.1 20.1 37.1 31.8 22.4 11.4 14.9 14.6 26.7 25.6 25.5 11.1 11 21.1 24.0 42.9 35.3 28.3 11.8 19.1 16.9 34.5 35.3 32.1 13.4 12 15.9 19.0 38.6 31.4 21.5 9.5 13.3 12.8 26.8 26.0 24.2 10.5 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY (2)0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 l

COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1988 ONLY (MILLS PER KWH IN 1983 DOLLARS)

HOUR PEAKC 1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

31.7 33.2 44.0 42.4 31.3 19.5 26.4 25.7 43.3 69.8 50.8 38.5 11 33.4 34.8 95.1 44.1 35.6 24.4 31.1 30.2 52.3 81.3 52.7 39.5 12 31.9 31.8 44.0 43.3 36.4 26.8 35.1 33.0 57.5 77.5 51.7 38.8 1 P.M.

29.8 29.6 42.5 41.5 35.3 29.2 37.8 35.8 59.8 68.4 49.6 36.2 2

31.1 30.0 43.0 42.8 40.7 33.7 43.5 43.0 71.0 78.0 51.1 37.6 3

'9.5 28.5 42.3 41.2 39.7 32.8 50.4 46.6 76.2 71.5 49.5 35.5 4

29.1 25.1 41.3 40.1 34.9 29.8 46.6 51.2 66.0 63.3 49.0 33.7 5

31.3 24.2 40.2 38.0 33.5 26.7 39.9 40.0 59.0 57.4 53.4 41.5 6

37.1 29.3 39.8 36.0 29.8 22.2 35.2 33.4 49.8 55.5 61.7 45.8 7

36.0 33.0 41.6 36.7 27.2 19.1 30.3 29.3 41.1 61.9 55.1 43.2 8

33.2 30.3 42.1 38.7 26.2 16.2 27.0 25.4 45.3 65.2 51.5 40.4 9

29.9 27.0 41.3 38.7 29.3 17.1 26.0 28.1 44.6 58.1 49.2 37.7 10 23.0 21.5 37.6 34.0 30.2 16.1 25.1 23.1 42.6 56.5 46.5 31.9 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

10.3 9.1 22.6 18.0 12.2 7.6 9.8 8.2 21.0 26.1 29.5 11.6 2

9.3 8.4 19.8 15.7 10.4 7.1 8.3 7.5 16.8 21.7 25.2 10.1 3

8.7 8.1 18.3 14.4 9.8 6.8 7.7 7.1 14.4 20.3 23.0 9.5 4

8.4 8.0 17.2 13.8 9.5 6.7 7.4 6.9 12.5 19.4 21.5 9.1 l

5 8.5 8.0 17.6 14.1 9.4 6.7 7.3 6.8 12.4 19.7 21.7 9.2 6

9.2 8.6 20.4 15.6 9.6 6.8 7.3 7.0 14.9 22.0 25.8 11.1 l

7 11.7 10.6 25.5 18.7 12.3 7.1 8.2 7.6 21.5 30.9 33.0 14.6 8

16.1 15.5 31.5 25.8 21.4 9.6 12.2 11.7 30.4 39.9 37.3 21.2 9

23.3 22.8 36.5 33.4 25.2 13.0 18.9 16.9 31.4 48.3 42.8 28.7 10 13.9 12.4 24.6 19.6 17.6 9.6 10.7 10.2 19.7 29.7 30.9 14.4 11 14.4 12.8 25.9 21.7 19.1 10.4 12.6 12.6 22.9 33.1 33.3 16.0 12 14.7 12.9 26.2 20.9 19.3 11.2 14.8 14.6 24.4 33.6 33.9 15.9 1 P.M.

14.9 12.6 25.9 20.3 19.3 12.1 15.8 14.3 24.8 32.7 33.6 14.9 2

14.6 12.4 25.4 20.0 18.8 12.8 16.4 16.3 24.0 31.6 33.2 14.7 3

14.0 11.6 24.3 18.6 18.6 12.9 16.1 16.1 24.5 29.4 31.9 14.1 4

13.8 11.1 23.6 18.4 15.9 12.7 16.1 15.4 24.3 28.9 32.1 14.3 5

15.3 12.2 24.1 18.3 15.5 13.4 16.1 15.4 24.3 30.0 36.3 17.9 6

18.8 14.1 26.0 18.8 15.1 12.2 15.3 15.1 23.9 30.4 40.8 21.2 l

7 18.9 15.4 27.9 19.1 14.9 10.7 13.9 13.1 24.1 36.0 40.1 20.5 8

17.8 15.7 29.8 21.9 14.9 10.3 13.3 12.8 26.1 37.9 39.1 20.0 9

16.9 14.8 29.4 23.4 17.6 11.1 13.5 14.5 27.1 35.5 37.4 18.4 10 16.4 13.6 28.6 21.4 16.1 11.3 14.3 14.1 25.3 33.3 34.1 16.0 11 15.9 13.5 34.7 25.8 22.4 11.4 18.8 16.9 34.7 42.6 40.8 20.4 12 12.6 10.7 27.1 21.9 16.4 9.2 12.9 11.5 27.3 33.0 35.0 15.4 l

NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 l

COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL i

ENERGY COSTS FOR EACH HOUR OF THE DAY: 1989 ONLY (MILLS PER KWH IN 1983 DOLL ARS)

HOUR PE AKC 1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

37.3 53.8 62.9 51.9 23.3 22.8 28.5 25.3 30.9 49.4 45.7 35.6 11 39.0 56.4 66.7 56.1 29.7 27.8 34.3 31.0 35.6 54.8 47.2 36.7 12 37.5 52.2 62.8 54.0 30.8 30.7 39.1 33.9 37.8 53.0 46.5 35.9 1 P.M.

35.2 48.9 57.9 50.3 29.1 33.5 42.8 36.8 38.6 48.9 44.7 33.4 2

36.7 49.9 60.1 52.6 35.7 39.4 51.3 44.3 43.4 53.3 46.0 34.7 3

34.5 46.9 56.0 49.9 34.5 37.7 62.3 48.2 47.0 50.3 44.5 32.6 4

33.0 44.4 51.3 48.1 28.1 34.0 56.4 53.8 41.2 46.6 44.0 30.8 5

36.5 43.9 49.4 43.2 25.3 30.4 45.4 41.3 38.0 43.4 47.3 38.6 6

43.4 48.7 49.0 40.9 19.2 25.7 39.2 34.3 33.8 42.3 52.3 42.9 7

42.1 53.5 52.7 41.7 15.4 21.3 33.1 29.4 29.4 45.8 48.6 40.4 8

38.6 50.2 55.4 45.1 14.1 17.5 29.3 25.0 31.9 47.4 46.4 37.6 9

34.3 45.5 51.6 45.3 17.9 18.5 28.2 28.1 31.7 43.9 44.6 34.6 10 26.6 42.6 46.1 38.7 16.8 17.2 26.6 22.2 31.0 43.5 41.1 28.8 HOUR OFF-P EAKC 2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

10.0 26.8 30.1 20.5 7.0 7.3 9.2 7.9 9.4 15.8 18.5 10.8 2

8.9 22.2 26.1 17.3 6.7 6.8 7.9 7.2 8.1 12.8 14.5 9.6 3

8.4 19.8 24.3 15.5 6.6 6.7 7.3 7.0 7.6 12.0 13.3 9.1.

4 8.1 18.7 23.1 14.6 6.6 6.6 7.0 6.8 7.2 11.6 12.3 8.8 5

8.1 19.2 23.6 15.0 6.6 6.5 6.9 6.7 7.2 11.8 12.5 8.9 6

8.9 23.5 27.1 17.2 6.6 6.6 7.0 6.9 7.7 13.1 15.5 10.6 7

11.7 31.3 33.4 23.1 7.2 6.9 7.7 7.3 9.9 21.0 23.4 13.5 8

18.2 35.5 38.7 29.4 10.8 9.1 11.3 10.8 17.4 30.5 29.5 19.2 9

26.1 40.5 46.6 38.8 15.8 13.5 19.9 16.3 21.9 36.3 37.0 26.6 10 14.3 27.4 31.9 24.3 10.1 9.6 10.9 10.4 11.3 22.5 23.8 14.4 11 15.1 29.1 34.2 26.0 10.9 10.7 13.0 12.9 13.4 24.5 25.6 15.4 12 15.4 30.1 34.1 26.5 11.3 11.4 15.3 14.9, 14.4 24.6 26.3 15.3 1 P.M.

15.3 29.9 33.6 27.0 11.4 12.4 16.4 14.6 14.4 23.7 26.3 14.3 2

14.9 29.3 33.0 26.7 11.1 13.1 17.2 16.8 14.4 22.6 25.9 14.0 3

14.1 27.6 31.1 25.1 10.9 13.2 16.7 16.6 13.6 20.3 25.0 13.6 4

13.9 26.6 30.3 24.6 9.7 13.1 16.7 15.8 13.1 19.7 25.1 13.8 5

15.8 29.3 30.8 25.0 9.6 13.7 16.7 15.9 13.0 20.3 28.6 17.1 6

20.9 33.4 33.2 25.6 9.3 12.6 15.9 15.4 12.9 20.6 32.1 20.4 7

21.3 36.1 35.9 26.7 9.3 10.8 14.5 13.5 12.7 25.4 31.6 19.7 8

19.3 36.3 38.7 28.9 9.4 10.4 13.8 13.1 13.9 27.1 30.9 19.3 9

18.0 35.1 38.0 29.9 11.1 11.3 13.7 14.9 14.4 24.7 29.8 17.6 10 16.8 33.0 36.6 28.9 10.4 11.4 14.9 14.4 13.3 22.1 27.3 15.3 11 18.0 35.6 41.7 31.7 11.7 11.7 19.7 16.2 20.2 32.5 33.5 18.1 12 12.6 72.4 35.8 28.2 8.3 8.6 12.4 10.7 12.3 22.6 25.3 13.6 NOTES ( 1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4.

1983 y_m.

(

COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1990 ONLY (MILLS PER KWH IN 1983 DOLLARS)

HOUR PEAK (1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

38.4 55.7 82.5 63.3 28.8 24.2 30.2 27.4 33.9 77.9 59.2 40.7 11 40.1 58.3 87.8 76.1 34.0 29.2 36.2 33.0 39.6 92.2 62.9 4 ~. 8 12 38.5 53.9 82.3 72.2 35.0 32.1 41.6 36.0 42.6 87.6 61.0 91.0 1 P.M.

36.2 50.6 74.5 65.4 33.8 35.1 45.8 39.2 43.8 76.3 57.0 38.2 2

37.6 51.6 78.1 69.6 40.0 41.4 55.7 48.6 50.7 88.2 59.9 39.8 3

35.5 48.6 71.1 64.7 39.0 39.4 68.0 53.6 55.7 80.2 57.1 37.3 4

33.9 45.7 62.6 61.6 33.2 35.4 61.5 59.9 47.5 69.7 55.9 35.4 5

37.6 45.2 58.8 53.8 30.9 31.6 48.9 44.8 43.2 61.4 63.8 44.0 6

44.8 50.4 58.1 50.7 25.3 27.1 41.6 36.6 37.7 58.8 76.9 49.0 7

43.4 55.4 65.2 51.8 21.5 22.8 35.0 31.5 32.2 67.6 66.8 45.9 8

39.6 52.0 70.1 56.8 20.0 18.9 31.0 27.2 35.2 72.1 60.7 42.8 9

35.2 47.0 63.1 57.2 24.3 19.9 29.9 30.2 34.8 62.4 55.9 40.0 10 27.6 43.6 53.1 48.2 24.3 18.6 28.3 24.5 34.7 59.2 50.2 34.0 HOUR OFF-PEAKC 2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

10.2 23.2 34.9 26.9 8.4 7.5 9.8 8.2 11.4 24.5 27.8 13.9 2

8.9 18.5 31.0 23.0 7.6 6.9 8.1 7.5 9.5 19.9 23.8 11.9 3

8.4 16.3 29.2 20.7 7.3 6.7 7.5 7.1 8.7 18.6 21.5 11.0 4

8.1 15.4 27.9 19.5 7.2 6.6 7.2 6.9 7.9 17.7 20.1 10.5 5

8.1 15.8 28.4 20.0 7.2 6.6 7.0 6.8 7.9 18.0 20.4 10.6 6

9.0 19.9 31.9 22.8 7.3 6.6 7.1 6.9 8.7 20.3 24.3 13.1 7

11.9 28.6 37.7 29.1 8.5 7.0 8.0 7.6 12.0 30.2 31.7 17.9 8

18.7 34.9 44.3 36.8 15.9 9.6 12.2 11.8 20.9 40.2 37.7 23.5 9

26.8 40.8 57.4 49.0 20.8 14.5 21.5 17.9 24.1 51.3 46.7 31.3 10 14.4 25.0 37.4 30.3 14.0 9.9 11.4 10.8 13.4 30.1 30.7 18.3 11 15.1 26.6 39.9 32.8 15.4 11.1 13.8 13.9 15.9 33.9 33.4 20.4 12 15.6 27.7 39.7 33.2 15.9 12.1 16.3 16.1 17.1 34.3 34.1 20.1 1 P.M.

15.4 27.4 39.0 33.6 16.1 12.9 17.6 15.6 17.1 33.3 33.7 19.1 2

15.1 26.8 38.4 33.1 15.8 13.9 18.3 18.1 16.8 32.1 33.3 18.6 3

14.4 25.1 36.4 30.8 15.4 13.9 17.7 17.9 15.7 29.9 31.7 17.9 4

14.5 24.1 35.4 30.1 12.8 13.8 17.9 16.9 14.9 29.3 31.9 18.1 5

15.9 26.9 35.9 30.6 12.6 14.6 18.0 16.9 14.8 30.4 36.6 23.1 6

20.5 31.2 38.4 31.4 11.9 13.2 16.9 16.4 14.6 30.9 41.9 27.3 7

20.9 33.9 41.4 32.9 11.9 11.3 15.2 14.6 14.6 36.4 41.1 26.5 8

19.0 34.2 44.6 36.3 12.3 10.8 14.6 14.0 16.1 38.5 39.9 25.9 9

17.8 32.9 43.8 37.9 14.8 11.8 14.7 16.1 17.2 35.7 37.9 23.9 10 16.7 30.9 42.3 36.1 13.6 12.1 15.9 15.5 15.1 33.6 34.3 20.8 11 18.6 34.4 46.2 39.0 17.3 12.6 21.5 17.9 24.1 42.6 41.1 24.6 12 12.9 29.5 40.2 34.5 11.3 8.9 13.5 11.6 15.4 32.1 33.6 18.7 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983

je COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1991 ONLY (MILLS PER KWH IN 1983 DOLLARS)

HOUR PEAK (1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

42.2 55.1 57.5 48.3 23.2 26.0 31.8 29.6 36.4

~,2 2 82.7 44.6 11 44.2 57.8 60.7 51.7 29.5 31.0 38.5 35.1 43.0 82.9 89.2 46.0 12 42.3 53.2 57.4 50.0 30.5 34.1 44.7 38.5 46.5 78.7 86.1 45.0 1 P.M.

39.7 49.5 53.1 46.9 29.0 37.6 49.8 42.2 48.2 68.8 78.6 41.8 2

41.4 50.6 55.0 48.8 35.4 44.8 61.6 53.6 56.6 79.3 84.1 43.5 3

39.0 47.1 51.4 46.6 34.3 42.3 75.3 59.8 62.2 72.3 78.5 40.9 4

37.2 44.0 47.1 45.1 28.0 37.7 68.4 66.3 52.8 63.3 76.4 38.8 5

41.3 43.4 45.3 40.7 25.3 33.5 53.5 49.1 47.5 56.6 90.0 48.7 l

6 49.7 49.2 44.8 38.8 19.2 28.9 44.8 39.1 41.0 54.5 107.3 55.7 7

48.0 54.7 48.5 39.5 15.5 24.6 37.0 33.6 34.7 61.6 95.3 51.3 8

43.6 50.9 50.9 42.5 14.2 20.6 32.6 29.3 37.9 65.5 85.4 47.2 9

38.7 45.4 47.4 42.7 18.0 21.7 31.5 32.3 37.3 57.4 75.9 44.0 10 30.4 41.8 41.6 36.6 17.3 20.4 29.7 26.7 37.1 55.3 63.2 37.9 l

HOUR OFF-PEAKC2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT N0Y DEC l

1 A.M.

10.9 24.1 23.0 16.4 7.1 7.7 10.4 8.6 12.3 21.5 35.1 17.7 l

2 9.5 19.5 18.8 14.0 6.8 7.1 8.6 7.7 9.9 17.1 31.1 14.5 l

3 8.8 17.2 17.2 12.6 6.6 6.8 7.8 7.3 8.9 15.9 28.9 12.9 4

8.5 16.3 16.1 11.9 6.6 6.7 7.4 7.0 8.1 15.1 27.2 12.1 5

8.5 16.6 16.6 12.2 6.6 6.6 7.2 6.9 8.1 15.4 27.4 12.4 6

9.5 20.8 19.9 13.8 6.6 6.7 7.3 7.1 9.1 17.5 31.4 15.7 i

7 12.8 29.2 128.0 19.5 7.2 7.2 8.4 7.8 13.1 27.9 38.8 22.4 8

20.7 34.0 33.4 26.6 11.2 10.1 13.3 12.7 23.0 38.0 45.5 26.9 9

29.4 40.0 41.9 35.8 15.8 15.8 23.3 19.5 26.2 47.3 61.8 34.9 10 15.5 24.7 26.9 21.2 10.1 10.5 12.2 11.3 14.8 27.9 38.2 22.1 11 16.4 26.4 28.9 23.0 11.1 11.6 14.8 14.7 17.9 31.3 41.3 24.9 12 16.8 27.4 29.0 23.4 11.5 12.8 17.6 17.2 19.1 31.8 41.9 24.8 1 P.M.

16.6 27.2 28.6 23.8 11.7 13.9 18.6 16.7 19.4 30.9 41.4 24.6 2

16.3 26.5 27.9 23.3 11.4 14.8 19.6 19.1 19.4 29.9 40.8 24.1 3

15.4 24.9 26.2 20.9 11.1 14.9 19.1 18.9 18.6 27.8 38.9 22.9 4

15.4 23.9 25.3 20.1 9.8 14.8 19.3 18.1 18.1 27.2 39.0 23.9 5

17.1 26.6 25.8 20.5 9.6 15.4 19.3 18.4 17.8 28.4 44.6 28.9 6

22.4 30.9 28.4 21.2 9.4 14.1 18.2 17.8 17.5 28.9 51.1 31.9 7

22.8 33.5 31.4 22.9 9.3 11.8 16.6 15.3 17.4 34.1 50.1 31.3 8

20.6 33.9 34.1 26.4 9.6 11.3 15.7 14.9 19.6 36.1 48.6 30.9 9

19.1 32.6 33.4 28.3 11.2 12.4 15.8 17.3 20.7 33.6 46.1 29.6 10 17.9 30.6 32.3 26.6 10.6 12.6 17.3 16.8 18.5 31.6 41.6 27.4 l

11 20.4 33.6 38.0 28.3 12.0 13.7 23.3 19.5 26.6 40.4 49.2 31.3 l

12 14.0 30.2 30.5 24.2 8.5 9.5 14.8 12.5 17.1 29.8 40.8 24.5 l

l NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY l

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDA'/ PLUS ALL SATURDAY 8 SUNDAY HOURS i

l SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983 i

I

~

COMMONWEALTH EDISOM COMPANY ESTIMATED AVERAGE FEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1992 ONLY (MILLS PER KWH IN 1983 DOLL ARS)

HOUR PEAK (1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

55.1 78.0 97.9 66.5 24.9 27.7 33.3 31.2 36.8 63.0 52.2 42.9 11 58.4 84.4 103.9 74.5 31.9 33.1 40.9 36.4 44.1 74.5 55.1 44.3 12 54.9 73.3 97.6 70.7 33.1 36.7 48.0 39.8 48.1 70.6 53.6 43.4 1 P.M.

51.0 64.8 87.9 63.5 31.4 40.8 54.1 43.7 50.0 61.7 50.4 39.8 2

53.5 67.5 92.5 67.9 38.9 49.4 67.6 56.0 59.3 71.2 52.7 41.7 3

49.9 59.4 83.7 62.7 37.8 46.3 82.3 62.7 65.0 64.8 50.4 38.9 4

47.3 52.5 71.8 59.4 30.4 40.7 75.3 69.1 55.1 56.9 49.6 36.6 5

53.4 51.2 66.3 50.5 27.4 35.9 58.6 51.1 49.3 51.3 55.8 47.3 6

69.2 64.3 65.1 46.6 20.6 30.8 48.1 40.5 41.9 49.5 66.9 54.6 7

65.5 77.3 75.5 47.9 16.5 26.2 39.1 35.0 34.9 55.4 58.3 50.0 8

57.1 68.5 82.0 53.9 15.1 22.0 34.2 30.9 38.4 58.7 53.3 45.7 9

49.1 55.5 72.5 54.3 19.2 23.2 32.9 33.7 38.0 51.9 49.8 42.2 10 39.8 48.2 57.3 43.2 18.4 21.8 31.0 28.6 37.7 50.3 45.5 35.0 HOUR OFF-PEAK (2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

19.0 29.6 34.6 21.6 7.2 7.9 11.4 9.1 12.9 17.9 22.8 13.5 2

15.5 25.8 30.9 18.2 6.8 7.2 9.2 8.0 10.4 14.2 18.5 11.5 3

13.8 23.8 29.3 16.3 6.7 6.8 8.2 7.5 9.3 13.2 16.5 10.5 4

12.8 23.0 28.0 15.3 6.7 6.7 7.9 7.2 8.4 12.5 15.2 10.1 5

13.0 23.3 28.5 15.7 6.6 6.7 7.6 7.1 8.3 12.8 15.5 10.3 6

15.6 26.8 31.9 18.1 6.7 6.8 7.6 7.3 9.4 14.5 19.2 12.6 7

22.7 33.5 37.8 24.3 7.3 7.3 9.0 8.1 13.8 24.3 27.6 17.3 8

29.9 39.2 46.1 31.3 11.7 10.5 14.4 13.8 24.0 34.5 33.5 23.2 9

38.7 50.3 65.1 45.9 16.9 16.8 24.8 20.9 26.2 42.5 41.5 31.7 10 23.4 29.4 37.1 26.1 11.0 10.9 12.9 12.1 15.9 24.4 26.5 15.4 11 24.9 31.1 40.1 28.4 12.1 12.4 15.8 15.8 19.0 27.3 28.8 17.1 12 25.4 31.9 39.6 28.8 12.6 13.8 17.9 18.1 20.5 27.7 29.6 16.8 1 P.M.

25.6 31.6 38.8 29.3 12.8 14.9 19.4 17.9 20.7 27.1 29.3 15.8 2

24.9 30.9 38.1 28.8 12.4 15.9 20.2 20.4 20.6 26.1 28.8 15.4 3

23.1 29.3 35.8 26.5 12.2 16.0 19.7 20.4 19.9 23.9 27.6 14.9 4

22.7 28.6 34.5 25.8 10.4 15.8 20.0 19.4 19.4 23.4 27.8 15.1 5

26.4 30.8 35.1 26.3 10.3 16.7 20.1 19.6 19.2 24.5 32.2 19.2 6

34.8 34.6 38.0 27.1 9.9 15.2 18.9 19.0 18.8 25.0 36.8 23.3 7

35.4 37.2 41.4 28.6 9.9 12.6 16.9 16.6 18.9 30.6 36.1 22.4 8

32.9 37.4 45.3 31.9 10.2 11.9 16.1 15.8 21.1 32.4 35.1 21.9 9

31.1 36.1 44.2 33.4 11.9 13.1 16.3 18.6 22.4 30.4 33.4 19.9 10 29.3 34.0 42.4 31.8 11.4 13.4 17.6 17.8 20.0 28.1 30.1 16.9 11 31.7 37.5 48.0 33.5 12.6 14.5 25.1 21.1 27.8 36.7 37.6 24.5 12 25.1 34.3 40.1 29.4 8.7 9.8 16.1 13.5 18.1 26.2 29.8 18.2 NOTES (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SxTURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983

COMMONWEALTH EDISON COMPANV ESTIMATED AVERAGE PEAK S OFF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1993 ONLY (MILLS PER KWH IN 1983 DOLLARS)

HOUR PEAKCl) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

45.8 74.6 111.9 79.5 32.4 29.2 35.1 32.3 45.1 105.0 76.3 46.6 11 48.4 79.4 117.7 89.2 39.3 34.7 43.7 39.3 57.6 121.5 82.4 48.2 12 45.9 71.0 111.5 84.6 40.9 38.7 52.2 44.2 64.6 116.5 79.4 47.1 1 P.M.

42.7 64.4 101.6 75.6 39.3 43.4 59.5 50.3 67.2 102.8 72.5 43.3 2

44.8 66.6 106.4 81.1 48.5 52.9 74.4 69.9 80.9 116.8 77.6 45.3 3

41.8 60.0 97.0 '74.6 47.1 49.5 89.5 79.9 85.0 107.5 72.4 42.3 4

39.6 53.8 83.3 70.3 38.7 43.2 32.8 82.9 74.8 93.4 70.5 39.9 5

44.6 52.6 76.4 58.5 35.9 37.6 64.8 61.7 66.1 79.9 83.4 51.7 6

55.9 64.0 74.8 53.4 28.6 32.3 52.4 45.5 54.1 75.4 100.6 60.6 7

53.5 74.1 87.5 55.0 24.4 27.8 41.7 37.2 42.0 90.2 88.5 54.9 8

47.6 67.3 95.0 63.1 22.9 23.6 36.1 32.1 47.8 96.9 78.8 49.8 9

41.4 56.6 84.0 63.6 27.5 24.8 34.6 35.6 46.7 81.8 70.2 45.3 10 31.8 49.7 64.4 49.2 28.0 23.4 32.6 29.2 43.3 74.7 58.7 38.1 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

13.4 30.6 36.6 28.0 9.1 8.2 11.9 8.8 17.3 28.1 30.9 15.1 2

11.3 26.1 32.4 24.5 8.1 7.4 9.3 7.8 13.5 23.3 26.9 12.7 3

10.3 23.5 30.7 22.3 7.7 7.0 8.2 7.3 11.6 21.7 24.6 11.5 4

9.8 22.3 29.3 21.1 7.6 6.8 7.8 7.0 10.0 20.8 23.1 10.9 5

9.9 22.8 29.9 21.6 7.5 6.8 7.5 6.9 10.0 21.1 23.3 11.1 6

11.3 27.2 33.5 24.2 7.7 6.9 7.6 7.1 11.9 23.7 27.4 13.9 7

15.9 34.7 40.7 29.7 9.3 7.4 9.2 7.9 18.1 33.4 34.8 19.4 8

22.6 40.3 50.6 36.6 18.3 11.1 15.7 13.8 28.5 46.6 41.5 25.5 9

31.8 50.7 75.0 54.4 23.5 18.0 26.3 21.1 31.0 65.4 56.9 34.7 10 17.9 31.6 41.6 31.8 15.8 11.5 13.4 12.3 18.3 34.3 34.8 18.5 11 18.9 33.8 44.6 34.4 17.5 13.1 16.5 16.6 21.6 38.9 37.7 20.8 12 19.3 34.9 44.1 34.6 18.0 14.6 19.9 19.3 23.2 39.0 38.4 20.6 1 P.M.

18.8 34.4 43.1 34.9 18.2 15.9 21.1 19.1 23.6 37.4 37.8 19.5 2

18.3 33.6 42.3 34.3 17.7 16.9 22.2 21.8 23.6 35.9 37.1 19.1 3

17.4 31.6 39.8 31.9 17.6 17.1 21.9 21.6 23.1 33.3 35.3 18.3 4

16.9 30.5 38.4 31.3 14.5 16.9 22.7.

20.9 22.9 32.6 35.4 18.5 5

19.2 33.4 39.0 31.7 14.1 17.9 22.3 21.3 22.9 33.8 40.9 23.9 6

26.5 38.5 41.9 32.4 13.4 16.1 21.1 20.6 22.4 34.3 47.1 28.4 7

27.1 41.7 45.8 33.9 13.4 13.4 19.2 17.7 22.6 40.8 46.2 27.6 8

24.6 42.1 50.1 37.3 13.4 12.6 18.1 16.9 24.9 43.6 44.5 26.9 9

22.6 40.2 48.9 39.1 16.6 14.0 18.4 20.1 25.9 39.9 42.1 24.6 10 21.1 37.6 46.8 37.1 15.3 14.3 20.0 19.5 23.9 36.9 38.0 21.3 11 23.5 39.6 53.9 30.6 19.7 15.6 27.0 21.4 32.9 49.4 45.6 27.3 12 17.6 35.9 43.3 34.8 12.8 10.4 17.5 13.4 23.8 35.6 36.9 20.7 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983

o COMMONUEALTH EDISOM COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1994 ONLY (MILLS PER KWH IN 1983 DOLLARS)

HOUR PEAK (1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

52.8 79.1 76.5 57.3 26.8 31.0 36.7 33.6 48.5 94.9 102.3 53.5 11 56.0 84.1 82.0 63.3 33.0 36.8 46.8 40.2 62.8 111.9 109.9 55.5 12 52.9 75.0 76.2 60.6 34.2 41.3 56.7 44.7 70.6 106.7 106.5 54.1 1 P.M.

49.0 67.6 68.2 55.1 32.7 46.7 65.0 50.1 73.3 92.7 97.4 49.0 2

51.4 70.2 71.9 58.4 39.8 57.2 81.0 67.5 87.6 107.1 104.2 51.7 3

47.9 62.7 64.8 54.4 38.6 53.7 96.0 76.8 90.8 97.4 97.0 48.1 4

45.4 55.8 56.4 51.8 31.9 46.4 89.7 80.8 81.2 83.6 94.4 45.3 5

51.4 54.4 52.8 44.7 29.1 40.1 71.1 60.4 72.0 71.5 109.9 60.2 6

65.7 67.3 52.2 41.1 22.6 34.1 56.9 45.7 58.8 67.5 125.9 72.4 7

62.6 78.5 59.0 42.3 18.4 29.7 44.4 38.3 45.0 80.7 116.0 64.8 8

54.9 70.9 63.8 47.4 16.9 25.5 37.8 33.4 51.6 87.0 105.8 57.8 9

47.3 58.9 56.9 47.7 21.3 26.7 36.1 36.8 50.4 73.1 94.7 51.4 10 36.5 51.1 47.5 37.8 20.3 25.3 33.7 30.8 45.6 66.7 77.5 43.0 HOUR OFF-PEAK (2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

13.9 30.4 27.6 17.5 7.3 8.5 12.3 9.4 19.2 23.9 35.4 18.7 2

11.6 25.6 23.0 14.7 6.9 7.5 9.5 8.1 15.0 19.1 30.3 15.2 3

10.5 23.0 21.2 13.2 6.7 7.1 8.4 7.5 12.8 17.8 27.7 13.5 4

10.0 21.8 19.9 12.4 6.7 6.9 7.9 7.2 11.0 16.9 25.9 12.6 5

10.1 22.3 20.4 12.7 6.7 6.9 7.6 7.0 11.0 17.2 26.1 13.0 6

11.7 26.9 24.2 14.6 6.8 7.0 7.7 7.3 13.2 19.5 30.9 16.6 7

17.1 34.8 31.8 20.2 7.5 7.7 9.4 8.2 20.0 30.1 41.0 23.7 8

25.3 40.9 38.5 26.7 12.6 12.0 16.3 14.9 30.0 42.2 50.8 29.5 9

35.9 52.5 51.0 40.1 18.3 19.5 27.4 22.3 32.7 58.4 75.1 39.6 10 19.6 31.8 30.4 23.6 11.3 12.3 14.3 13.3 18.5 30.3 42.3 23.4 11 21.0 34.1 32.9 25.4 12.4 14.1 17.7 17.6 21.9 34.6 45.9 26.4 12 21.1 35.2 32.9 25.8 12.9 15.6 21.1 20.4 23.4 34.9 46.6 26.4 1 P.M.

21.2 34.8 32.1 26.5 13.1 16.9 22.6 20.4 23.9 33.6 45.4 26.1 2

20.4 33.9 31.6 26.0 12.6 18.1 23.7 23.0 24.1 32.3 44.7 25.4 3

18.7 31.7 29.6 24.2 12.4 18.3 23.4 23.1 23.5 29.8 42.3 24.1 4

18.3 30.5 28.6 23.6 10.6 18.1 23.7 22.4 23.3 29.1 42.4 25.3 5

22.1 33.8 29.1 24.1 10.4 18.9 23.9 22.6 23.1 30.4 49.5 30.9 6

30.9 39.3 31.9 24.7 10.1 17.3 22.8 22.0 22.8 30.9 58.5 34.6 7

31.6 42.8 34.9 26.0 10.1 14.1 20.6 19.2 22.9 37.1 57.1 33.9 8

28.9 43.1 37.9 28.4 10.3 13.4 19.6 18.3 25.3 39.6 54.6 33.5 4

9 26.8 41.2 37.2 29.6 12.1 14.8 19.8 21.6 26.4 36.3 51.3 31.8 10 24.8 38.4 35.8 28.6 11.4 15.1 21.6 20.9 24.4 33.8 45.4 29.0 11 26.0 40.2 42.0 29.0 13.6 17.1 28.2 22.9 34.6 44.6 57.2 33.2 12 18.5 36.1 34.5 25.2 9.2 11.1 18.2 14.6 25.9 32.2 43.6 25.9 NOTE Cl) PEAK HOURS MONDAY THROUGH FRIDAY ONLY

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983

COMMONWEALTH EDISON COMPANY ESTIMATED AVERAGE PEAK 8 0FF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1995 ONLY (MILLS PER KWH IN 1983 DOLLARS)

HOUR PEAKC1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

68.1 103.3 106.1 93.2 35.7 32.6 39.3 35.2 49.4 91.8 61.8 46.0 11 72.7 108.8 112.1 104.4 43.9 39.1 50.8 43.0 65.0 109.5 66.5 47.8 12 67.8 97.9 105.8 99.1 45.9 44.3 62.1 48.5 73.3 104.0 64.1 46.5 1 P.M.

62.1 88.6 95.6 88.5 44.0 50.5 71.5 55.2 76.0 89.6 58.7 42.3 2

65.7 92.3 100.3 95.0 55.3 62.0 87.8 76.2 90.6 104.4 62.7 44.6 3

60.6 81.9 90.8 87.3 53.6 58.6 102.4 86.9 93.3 94.5 58.8 41.3 4

56.8 71.0 77.4 81.7 43.4 50.2 96.7 88.6 84.0 80.4 57.4 38.8 5

65.6 68.9 70.9 66.4 39.9 42.8 78.2 67.4 74.3 68.5 67.6 51.5 6

87.3 88.4 69.5 59.4 31.4 36.0 62.3 49.8 60.6 64.7 83.5 61.2 7

82.6 102.7 81.6 61.7 26.6 31.2 48.0 40.7 45.6 77.4 71.7 55.1 8

70.9 93.4 88.8 72.5 24.9 26.8 40.5 35.0 52.8 83.8 63.7 49.5 9

59.3 76.0 78.1 73.3 30.1 28.1 38.6 38.9 51.4 70.1 57.4 44.5 10 46.0 63.1 60.0 53.7 29.2 26.7 35.9 31.9 46.3 63.8 50.0 36.6 HOUR OFF-PEAKC 2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

20.8 34.1 35.4 27.5 8.4 8.7 13.5 9.6 18.6 23.1 25.9 13.1 2

16.6 29.5 31.7 23.8 7.5 7.7 10.2 8.3 14.4 18.4 21.4 11.1 3

14.6 26.8 30.1 21.5 7.2 7.2 8.8 7.7 12.3 17.0 19.2 10.1 4

13.5 25.5 28.9 20.3 7.1 7.0 8.2 7.3 10.6 16.2 17.8 9.6 5

13.7 26.0 29.4 20.7 7.1 6.9 7.9 7.1 10.5 16.5 18.1 9.8 6

16.8 30.5 32.6 23.5 7.2 7.1 8.0 7.4 12.8 18.8 22.2 12.0 7

25.0 38.9 38.8 29.3 8.6 7.8 10.1 8.5 19.5 29.3 30.3 17.3 8

33.3 48.6 47.5 38.1 17.9 12.6 17.7 15.6 29.8 40.7 36.3 23.6 9

45.7 67.3 70.0 61.7 24.9 20.6 29.0 23.1 33.0 55.6 47.0 33.2 10 27.1 36.7 38.9 31.4 13.6 12.9 15.3 14.1 18.6 28.2 28.6 16.6 11 28.9 39.2 41.9 34.0 15.1 14.9 19.0 18.9 22.1 32.3 31.3 19.0 12 29.9 40.3 41.6 34.2 15.6 16.8 22.5 21.7 23.7 32.6 32.1 18.8 1 P.M.

30.4 39.6 40.6 34.3 15.9 18.1 23.9 21.6 24.1 31.4 31.6 17.8 2

29.6 38.6 39.9 33.8 15.5 19.2 25.0 24.4 24.1 30.1 31.1 17.2 3

27.4 36.1 37.3 31.7 15.1 19.4 24.6 24.4 23.6 27.8 29.6 16.6 4

27.1 34.8 35.9 31.0 12.3 19.3 25.2 23.8 23.4 27.1 29.6 17.1 5

31.6 38.3 36.6 31.4 12.0 20.4 25.4 24.1 23.3 28.4 34.8 22.4 6

40.8 44.4 39.6 32.1 11.5 18.4 24.2 23.4 22.9 28.9 40.4 27.1 7

41.4 48.6 43.4 33.4 11.4 15.4 22.1 20.6 23.1 35.1 39.6 26.2 8

38.6 48.9 47.4 36.6 11.9 14.3 21.1 19.6 25.4 37.4 38.3 25.6 9

36.6 46.6 46.3 38.3 14.9 15.9 21.4 23.3 26.6 34.3 36.3 23.3 10 34.8 43.1 44.4 36.4 13.5 16.5 23.1 22.4 24.4 31.9 32.4 19.9 11 35.7 46.1 50.3 39.6 19.4 18.1 30.2 23.9 34.3 43.1 40.2 25.3 12 27.8 40.0 41.2 34.8 12.0 11.6 19.9 15.3 25.3 31.5 32.3 18.4 NOTE (1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983

p>.-

COMMONWEALTH EDISON COMPANY

' ESTIMATED AVERAGE PEAK S OFF-PEAK PERIOD SHORT RUN MARGINAL ENERGY COSTS FOR EACH HOUR OF THE DAY: 1996 ONLY (MILLS PER KWH IN 1983 DOLL ARS)

HOUR PEAK (1) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 10 A.M.

52.7 95.1 135.5 123.5 39.2 34.8 41.5 38.0 64.4 131.4 115.3 56.2 11 56.0 102.2 139.5 133.1 49.1 41.9 55.5 47.0 C5.5 343.4 122.6 58.7 12 52.7 89.0 135.2 129.1 51.5 48.0 69.b 53.6 95.0 140.1 119.4 57.0 1 P.M.

48.7 78.6 126.9 118.6 49.2 54.9 79.5 61.9 96.6 129.4 110.3 51.2 2

51.1 82.3 131.0 124.9 63.3 67.4 95.7 86.3 110.4 140.1 117.0 54.2 3

47.5 71.4 122.5 117.4 60.9 64.2 109.2 98.1 110.7 133.1 109.6 50.2 4.

44.8 61.1 107.8 110.9 48.6 54.9 104.1 97.2 103.6 120.6 107.0 47.1 5

51.1 59.1 99.3 90.7 44.8 46.2 86.9 75.6 93.5 105.1 122.0 64.4 6

66.5 78.0 97.1 79.6 35.3 38.3 69.2 55.2 78.5 99.3 135.6 78.5 7

63.1 94.6 112.4 83.3 31.1 33.3 52.1 44.3 58.6 117.2 128.0 69.6 8

54.8 83.6 120.0 99.1 29.6 29.0 42.9 37.7 69.0 123.9 118.6 61.4 9

46.7 65.7 108.4 99.9 34.2 30.2 40.6 42.2 66.9 107.5 106.9 53.5 10 36.5 54.4 82.3 69.8 34.7 28.8 37.2 34.6 58.1 95.1 86.7 44.1 HOUR OFF-PEAKC2) PERIOD HOURS ENDING:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 1 A.M.

15.5 26.8 40.6 35.5 11.1 9.4 15.0 10.4 25.7 33.7 37.7 15.8 2

12.7 22.5 35.7 32.0 9.4 8.2 11.2 8.7 21.0 28.8 32.7 12.9 3

11.4 20.5 33.6 29.6 8.7 7.6 9.6 8.0 18.0 27.1 30.1 11.6 4

10.7 19.6 32.1 28.4 8.5 7.3 8.7 7.5 15.3 25.9 28.1 10.9 5

10.8 19.9 32.7 28.8 8.5 7.2 S.4 7.3 15.2 26.4 28.4 11.1 6

12.8 23.7 36.8 31.5 8.7 7.4 8.5 7.7 18.5 29.1 33.3 14.2 7

18.9 32.1 46.5 37.0 11.2 8.2 11.0 8.9 25.8 38.5 43.3 21.2 8

26.3 41.5 61.9 47.0 23.6 13.6 19.5 17.1 35.1 58.0 55.5 29.0 9

36.0 58.3 94.5 83.5 28.9 22.2 31.2 24.9 42.0 84.4 83.9 39.9 10 20.4 29.9 46.8 37.9 19.4 13.9 16.4 15.2 23.6 38.5 45.1 21.1 11 21.9 31.7 50.8 41.6 21.3 15.9 20.2 20.1 28.1 44.9 49.2 24.4 12 22.4 32.4 49.9 41.8 22.1 17.6 23.7 23.0 30.1 44.6 50.0 24.1 1 P.M.

22.3 32.1 48.6 41.8 21.9 19.0 25.1 23.3 30.6 42.1 48.9 23.2 2

21.6 31.3 47.6 41.0 21.6 20.1 26.4 25.9 30.6 40.1 47.9 22.4 3

20.1 29.6 44.3 37.8 21.1 20.3 25.9 26.1 29.9 36.7 45.0 21.1 4

19.6 28.5 42.6 36.6 17.9 20.1 26.3 25.4 29.6 35.9 45.0 21.9 5

22.9 31.1 43.3 37.3 17.4 20.9 26.6 25.8 29.6 37.1 53.3 29.3 6

31.2 35.9 47.1 38.2 16.6 19.4 25.4 25.2 29.1 37.8 64.1 34.4 7

31.9 38.9 51.9 40.3 16.5 15.6 23.2 22.3 29.4 46.2 62.4 33.4 8

29.3 39.3 57.4 45.4 16.6 15.1 22.1 21.3 31.8 50.1 59.6 32.9 9

27.2 37.4 55.9 48.3 20.5 16.3 22.3 24.9 32.9 45.0 55.4 30.4 10 25.3 35.1 53.0 45.1 18.8 16.8 24.3 24.2 30.8 41.1 48.6 26.4 11 27.7 39.1 65.0 48.2 25.4 19.6 32.5 26.1 40.5 58.3 60.8 31.1 12 20.9 32.8 49.7 42.4 16.8 12.5 22.0 16.9 32.1 41.3 45.9 22.8 NOTE:(1) PEAK HOURS MONDAY THROUGH FRIDAY ONLY

( 2) 0FF-PEAK HOURS MONDAY THROUGH FRIDAY PLUS ALL SATURDAY 8 SUNDAY HOURS SYSTEM PLANNING DEPARTMENT - APRIL 4, 1983

-. _