ENS 56018: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 24: | Line 24: | ||
All the pieces of the gauge were placed in a box and it was hauled back to the designated storage area in the Chantilly, VA office around 1700 EDT. After performing a leak test and once an all-clear report is received, the damaged gauge will be returned to the authorized distributor in the area, for them to repair it properly. | All the pieces of the gauge were placed in a box and it was hauled back to the designated storage area in the Chantilly, VA office around 1700 EDT. After performing a leak test and once an all-clear report is received, the damaged gauge will be returned to the authorized distributor in the area, for them to repair it properly. | ||
All authorized users will be informed about the incident immediately, and this will be discussed in detail at our safety meetings to reiterate and stress the importance of maintaining physical control of gauges when the gauge is not otherwise secured using two independent physical locking systems to prevent unauthorized access or removal. | All authorized users will be informed about the incident immediately, and this will be discussed in detail at our safety meetings to reiterate and stress the importance of maintaining physical control of gauges when the gauge is not otherwise secured using two independent physical locking systems to prevent unauthorized access or removal. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20220803en.html#en56018 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 07:30, 3 August 2022
Where | |
---|---|
Ecs Mid-Atlantic, Llc Washington, District Of Columbia (NRC Region 1) | |
License number: | 45-24974-01 |
Organization: | Ecs Mid-Atlantic, Llc |
Reporting | |
10 CFR 30.50(b)(2), Licensed Material Protection Equipment Failure | |
Time - Person (Reporting Time:+-0.8 h-0.0333 days <br />-0.00476 weeks <br />-0.0011 months <br />) | |
Opened: | Omer Duzyol 16:27 Jul 22, 2022 |
NRC Officer: | Bethany Cecere |
Last Updated: | Jul 26, 2022 |
56018 - NRC Website | |