ML20135F181: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
Scuthem Company Servces. Inc Post 0"ce Box 2625 l | ~ | ||
Vogtle Project | Scuthem Company Servces. Inc Post 0"ce Box 2625 l | ||
September 13, 1985 i | Bnningham, Atabama 3$202 Telephone 205 870 6011 i | ||
l Director of Nuclear Reactor Regulation | Vogtle Project September 13, 1985 i | ||
SER OPEN ITEM 1: EQUIPMENT QUALIFICATION | l Director of Nuclear Reactor Regulation Files X3BL01 Attention: Ms. Elinor G. Adensas, Chief Logs GN-701 Licensing Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. | ||
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 i | |||
CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 l | |||
V0GTE EECTRIC CENERATING PLANT - UNITS 1 AND 2 SER OPEN ITEM 1: EQUIPMENT QUALIFICATION | |||
{ | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
As requested in NRC {{letter dated|date=January 15, 1985|text=letter dated January 15, 1985}}, we are submitting the enclosed draf t Environmental Qualification Report for your review. The report includes a discussion on qualification methodology and provides a Master List of Vogtle harsh environment safety-related equipment by systems. | |||
As requested in NRC {{letter dated|date=January 15, 1985|text=letter dated January 15, 1985}}, we are submitting the enclosed draf t Environmental Qualification Report for your review. The report includes a discussion on qualification methodology and provides a Master List | It also provides Systes Component Evaluation Work Sheets, which summarize | ||
of Vogtle harsh environment safety-related equipment by systems. It also provides Systes Component Evaluation Work Sheets, which summarize | 'r qualification of this equipment. The report indicates that the Vogtle qualification program is approximately 92% complete and installation l | ||
(mounting) is approximately 61% complete of which 19% is ready for service. | |||
Two copies of the report are being suanitted directly to your consultant. | Two copies of the report are being suanitted directly to your consultant. | ||
If your staff requires any additional information, please do not hesitate to r | |||
call me. | |||
l Sincerely. | l Sincerely. | ||
.h. | |||
J. A. Bailey Project Licensing Manager Enclosure JAB /JHW/sm xc | J. A. Bailey Project Licensing Manager Enclosure JAB /JHW/sm xc D. O. Foster J. E. Joiner, Esquire M. A. Miller (3) | ||
l | B. W. Churchill, Esquire j | ||
L. T. Gucwa | R. A. Thomas B. Jones, Esquire (w/o encl.) | ||
L. Fowler | l C. Bockhold, Jr. | ||
T. Johnson (w/o encl.) | |||
L. T. Gucwa C. D. Teper (w/o encl.) | |||
L. Fowler Clarke Kido Jag Singh Vogtle Project File p'2mP.! F=)lp g | |||
-}} | |||
Latest revision as of 03:03, 12 December 2024
| ML20135F181 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/13/1985 |
| From: | Bailey J SOUTHERN COMPANY SERVICES, INC. |
| To: | Adensam E, Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20135F185 | List: |
| References | |
| GN-701, NUDOCS 8509170185 | |
| Download: ML20135F181 (1) | |
Text
.
~
Scuthem Company Servces. Inc Post 0"ce Box 2625 l
Bnningham, Atabama 3$202 Telephone 205 870 6011 i
Vogtle Project September 13, 1985 i
l Director of Nuclear Reactor Regulation Files X3BL01 Attention: Ms. Elinor G. Adensas, Chief Logs GN-701 Licensing Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 i
CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 l
V0GTE EECTRIC CENERATING PLANT - UNITS 1 AND 2 SER OPEN ITEM 1: EQUIPMENT QUALIFICATION
{
Dear Mr. Denton:
As requested in NRC letter dated January 15, 1985, we are submitting the enclosed draf t Environmental Qualification Report for your review. The report includes a discussion on qualification methodology and provides a Master List of Vogtle harsh environment safety-related equipment by systems.
It also provides Systes Component Evaluation Work Sheets, which summarize
'r qualification of this equipment. The report indicates that the Vogtle qualification program is approximately 92% complete and installation l
(mounting) is approximately 61% complete of which 19% is ready for service.
Two copies of the report are being suanitted directly to your consultant.
If your staff requires any additional information, please do not hesitate to r
call me.
l Sincerely.
.h.
J. A. Bailey Project Licensing Manager Enclosure JAB /JHW/sm xc D. O. Foster J. E. Joiner, Esquire M. A. Miller (3)
B. W. Churchill, Esquire j
R. A. Thomas B. Jones, Esquire (w/o encl.)
l C. Bockhold, Jr.
T. Johnson (w/o encl.)
L. T. Gucwa C. D. Teper (w/o encl.)
L. Fowler Clarke Kido Jag Singh Vogtle Project File p'2mP.! F=)lp g
-