ML20138A899: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:"ek. e,_
{{#Wiki_filter:"ek e,_
Y CensumersEat}gy A CMS Eneqty Company               Big Rott Pont NuclearPlant   Kenneek n Peeners 10269IEr3I No@               Plant GeneralManager Ctarlevoux, MI49720 4
Y CensumersEat}gy A CMS Eneqty Company Big Rott Pont NuclearPlant Kenneek n Peeners 10269IEr3I No@
April 22, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC           20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - TECHNICAL SPECIFICATION CHANGE REQUEST DATED OCTOBER 15, 1996 - SUPPLEMENT.
Plant GeneralManager Ctarlevoux, MI49720 4
April 22, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - TECHNICAL SPECIFICATION CHANGE REQUEST DATED OCTOBER 15, 1996 - SUPPLEMENT.
A request for change to the Big Rock Point Technical Specifications is enclosed. This request supersedes the previous request forwarded to the Commission by {{letter dated|date=October 15, 1996|text=letter dated October 15, 1996}}. The purpose of this supplement is to withdraw the petition to implement Option B, Performance Based Requirements, to Appendix J of 10 CFR Part 50.
A request for change to the Big Rock Point Technical Specifications is enclosed. This request supersedes the previous request forwarded to the Commission by {{letter dated|date=October 15, 1996|text=letter dated October 15, 1996}}. The purpose of this supplement is to withdraw the petition to implement Option B, Performance Based Requirements, to Appendix J of 10 CFR Part 50.
The other changes that involve typographical errors, technical specification / procedure consistency, and the Big Rock Point organization are still desired.
The other changes that involve typographical errors, technical specification / procedure consistency, and the Big Rock Point organization are still desired.
In accordance with 10 CFR 50.92, Consumers Energy Company has made a determination that the proposed amendment involves no significant hazards considerations
In accordance with 10 CFR 50.92, Consumers Energy Company has made a determination that the proposed amendment involves no significant hazards considerations
                                                                                                          \
\\
                                                                                                            \
\\
ad GM Robert J Addy Plant Manager                                                                     KOf CC: Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point ATTACHMENTS
ad GM KOf Robert J Addy Plant Manager CC: Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point ATTACHMENTS
[ $N!k b                     5
[ $N!k b
                                                                                  } \ \ ((\         )kllk}}
}
\\ \\ ((\\
)kllk 5}}

Latest revision as of 20:13, 11 December 2024

Forwards Request for Change to Ts,Withdrawing Petition to Implement Option B,Performance Based Requirements to App J of 10CFR50
ML20138A899
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/22/1997
From: Addy R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138A904 List:
References
NUDOCS 9704280281
Download: ML20138A899 (1)


Text

"ek e,_

Y CensumersEat}gy A CMS Eneqty Company Big Rott Pont NuclearPlant Kenneek n Peeners 10269IEr3I No@

Plant GeneralManager Ctarlevoux, MI49720 4

April 22, 1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - TECHNICAL SPECIFICATION CHANGE REQUEST DATED OCTOBER 15, 1996 - SUPPLEMENT.

A request for change to the Big Rock Point Technical Specifications is enclosed. This request supersedes the previous request forwarded to the Commission by letter dated October 15, 1996. The purpose of this supplement is to withdraw the petition to implement Option B, Performance Based Requirements, to Appendix J of 10 CFR Part 50.

The other changes that involve typographical errors, technical specification / procedure consistency, and the Big Rock Point organization are still desired.

In accordance with 10 CFR 50.92, Consumers Energy Company has made a determination that the proposed amendment involves no significant hazards considerations

\\

\\

ad GM KOf Robert J Addy Plant Manager CC: Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point ATTACHMENTS

[ $N!k b

}

\\ \\ ((\\

)kllk 5