ML20148A954: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES g Efooq'o g*                                            NUCLEAR REGULATORY COMMISSION g   [                   n                                     REClONIV 5                    g                          611 RYAN PLAZA DRIVE. suite 1000
{{#Wiki_filter:UNITED STATES g Efooq'o NUCLEAR REGULATORY COMMISSION g*
* 2                               ARLINGTON, TEXAS 76011 j
g
                              +/                                         15 SEP 1978 f
[
Docket No. 99900526/78-01 Black & Veatch Consulting Engineers Attn:           Mr. R. D. Woodsen Head, Power Division Post Office Box 8495 Kansas City, Missouri                   64114 Gentlemen:
REClONIV n
Thank you for your letter of September 7,1978, in response to our {{letter dated|date=August 15, 1978|text=letter dated August 15, 1978}}. As a result of our review, we find that additional information, as discussed with your Mr. R. E. Blaisdell during a telephone call on September 13, 1978, is needed. The additional information necessary is summarized as follows:
611 RYAN PLAZA DRIVE. suite 1000 5
                                                  ~      ~
g j
I                     Response B:             A description of the actions that will be taken based on the results of the investigation scheduled for completion   .
2 ARLINGTON, TEXAS 76011
on October 30, 1978.
+/
15 SEP 1978 f
Docket No. 99900526/78-01 Black & Veatch Consulting Engineers Attn:
Mr. R. D. Woodsen Head, Power Division Post Office Box 8495 Kansas City, Missouri 64114 Gentlemen:
Thank you for your letter of September 7,1978, in response to our 15, 1978. As a result of our review, we find letter dated August that additional information, as discussed with your Mr. R. E. Blaisdell during a telephone call on September 13, 1978, is needed. The additional information necessary is summarized as follows:
I Response B:
A description of the actions that will be taken based on
~
~
the results of the investigation scheduled for completion on October 30, 1978.
The scope and salient points of the on-the-job training that was accomplished, and how this training was documented.
The scope and salient points of the on-the-job training that was accomplished, and how this training was documented.
The tentative schedule for internal audits in the areas of document control and QA r .ords.
The tentative schedule for internal audits in the areas of document control and QA r.ords.
Response C:             Describe how the "QA Group instructions" are related to the
Response C:
                                                , formalized program of the Quality Assurance Program-Nuclear.
Describe how the "QA Group instructions" are related to the
, formalized program of the Quality Assurance Program-Nuclear.
Please provide this additional information within twenty (20) days in order that we may complete our review in a timely manner.
Please provide this additional information within twenty (20) days in order that we may complete our review in a timely manner.
Sincerely, 1 I,           r t
Sincerely, 1 I, t
j hk(%           e-Uldis Potapovs, C ie Vendor Inspection Branch a
r hk(%
e-j Uldis Potapovs, C ie Vendor Inspection Branch a
L
L
                  . - - ,      _ . _ - .}}
_. _ -.}}

Latest revision as of 12:26, 11 December 2024

Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in QA Program Insp Rept 99900526/78-01.Requests Addl Info Re Corrective Actions Re QA Records & on-the-job Training Program within 30 Days
ML20148A954
Person / Time
Issue date: 09/15/1978
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Woodson R
BLACK & VEATCH
Shared Package
ML20148A937 List:
References
REF-QA-99900526 NUDOCS 7810310011
Download: ML20148A954 (1)


Text

UNITED STATES g Efooq'o NUCLEAR REGULATORY COMMISSION g*

g

[

REClONIV n

611 RYAN PLAZA DRIVE. suite 1000 5

g j

2 ARLINGTON, TEXAS 76011

+/

15 SEP 1978 f

Docket No. 99900526/78-01 Black & Veatch Consulting Engineers Attn:

Mr. R. D. Woodsen Head, Power Division Post Office Box 8495 Kansas City, Missouri 64114 Gentlemen:

Thank you for your letter of September 7,1978, in response to our 15, 1978. As a result of our review, we find letter dated August that additional information, as discussed with your Mr. R. E. Blaisdell during a telephone call on September 13, 1978, is needed. The additional information necessary is summarized as follows:

I Response B:

A description of the actions that will be taken based on

~

~

the results of the investigation scheduled for completion on October 30, 1978.

The scope and salient points of the on-the-job training that was accomplished, and how this training was documented.

The tentative schedule for internal audits in the areas of document control and QA r.ords.

Response C:

Describe how the "QA Group instructions" are related to the

, formalized program of the Quality Assurance Program-Nuclear.

Please provide this additional information within twenty (20) days in order that we may complete our review in a timely manner.

Sincerely, 1 I, t

r hk(%

e-j Uldis Potapovs, C ie Vendor Inspection Branch a

L

_. _ -.