ML20206N175: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 20: Line 20:
m,,,,
m,,,,
North Atlantic Energy Service Corporation 1
North Atlantic Energy Service Corporation 1
a    North                                             v.o. nex am sea'''""' N" o3874 i
North v.o. nex am a
i7 Atlantic                                                (603) 474-9321 The Northeast Utilitien Sptem                 1 I
i7 Atlantic sea'''""' N" o3874 (603) 474-9321 i
May 6,1999                                   j i
The Northeast Utilitien Sptem 1
Docket No. 54143 NYN-99052 United States Nuclear Regulatory Commission Attention: Document Control Desk                                                                                 l Washington, DC 20555-0001 Seabrook Station April 1999 Monthly Operating Report Enclosed please find Monthly Operating Report 99-04. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of April,1999 and is                       ;
I May 6,1999 j
submitted in accordance with the requirements of Seabrook Station Technical Specification                       l 6.8.1.5.
i Docket No. 54143 NYN-99052 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station April 1999 Monthly Operating Report Enclosed please find Monthly Operating Report 99-04. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of April,1999 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter,                           please   contact Mr. James M. Peschel, Regulatory Compliance Manager, at (603) 773-7194.
Should you require further information regarding this
: matter, please contact Mr. James M. Peschel, Regulatory Compliance Manager, at (603) 773-7194.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
bELLA                                                         'I W. A. DiProlio[
bELLA
Station Director cc:
'I W. A. DiProlio[
H. J. Miller, NRC Region I Administrator
Station Director
                                                                                                                        }
}
J. T Harrison, NRC Project Manager, Project Directorate 1-2 R. K. Lorson, NRC Senior Resident Inspector 9905170159 990430 PDR
cc:
                                                          'G'G R        ADOCK 05000443 PDR
H. J. Miller, NRC Region I Administrator J. T Harrison, NRC Project Manager, Project Directorate 1-2 R. K. Lorson, NRC Senior Resident Inspector
'G'G 9905170159 990430 PDR ADOCK 05000443 R
PDR


OPERATING DATA REPORT DOCKET NO.         50-443 UNIT Seabrook 1 DATE May 1,1999 COMPLETED BY         P.E. Nardone TELEPIIONE (603) 773-7074 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:                                                                       Seabrook Station Unit 1
50-443 UNIT Seabrook 1 DATE May 1,1999 COMPLETED BY P.E. Nardone TELEPIIONE (603) 773-7074 OPERATING STATUS 1.
: 2. Reporting Period:                                                                 APRIL 1999
Unit Name:
: 3. Licensed Thermal Power (MWt):                                                                           3411
Seabrook Station Unit 1 2.
: 4. Nameplate Rating (Gross MWe):                                                                           1242
Reporting Period:
: 5. Design Electrical Ranng (Net MWe):                                                                       1148
APRIL 1999 3.
: 6. Maximum Dependable Capacity (Gross MWe):                                                                 1204
Licensed Thermal Power (MWt):
: 7. Maximum Dependable Capacity (Net MWe):                                                                   1158
3411 4.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last       Not Applicable Report, Give Reasons:
Nameplate Rating (Gross MWe):
: 9. Power Level To Which Restricted, if Any (Net MWe):                               None
1242 5.
: 10. Reasons For Restrictions, If Any:                                                 Not Applicable This Month         Yr-to-Date           Cumulative i1. Ilours in Reporting Period                                                 719.0             2879.0             1008 % .0
Design Electrical Ranng (Net MWe):
: 12. Number of flours Reactor Was Critical                                       0.0             2044.7               66107.6
1148 6.
: 13. Reactor Reserve Shutdown flours                                             0.0                 0.0               953.3
Maximum Dependable Capacity (Gross MWe):
: 14. Ilours Generator On-Line                                                     0.0             2040.4               63567.7
1204 7.
: 15. Unit Reserve Shutdown flours                                                 0.0                 0.0                   0.0
Maximum Dependable Capacity (Net MWe):
: 16. Gross Thermal Energy Generated (MWil)                                       0.0           6908315           211068688
1158 8.
                                                                                                                                                      )
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Not Applicable Report, Give Reasons:
: 17. Gross Elec. Energy Generated (MWil)                                         0.0           2444884             73802831   ;
9.
i
Power Level To Which Restricted, if Any (Net MWe):
: 18. Net Electrical Energy Generated (MWil)                                       0.0           2352764             70938849 l
None 10.
                  *19. Urut Service Factor                                                         0.0               70.9                 81.6
Reasons For Restrictions, If Any:
                  *20. Unit Availability Factor                                                     0.0               70.9                 81.6
Not Applicable This Month Yr-to-Date Cumulative i1.
                  *21. Unit Capacity Factor (Using MDC Net)                                         0.0               70.6                 79.5
Ilours in Reporting Period 719.0 2879.0 1008 %.0 12.
                  *22. Umt Capacity Factor (Using DER Net)                                         0.0               71.2                 79.9
Number of flours Reactor Was Critical 0.0 2044.7 66107.6 13.
                  *23. Unit Forced Outage Rate                                                       0.0                 0.0                   7.1
Reactor Reserve Shutdown flours 0.0 0.0 953.3 14.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,           Refuel'ug,03/27/99, 45 dap                                   j and Duration of Each):                                                                                                     1
Ilours Generator On-Line 0.0 2040.4 63567.7 15.
: 25. If Shut Down At End Of Report Period, Estimated Date of       Restart. 05/11/99 Startup:
Unit Reserve Shutdown flours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWil) 0.0 6908315 211068688
)
17.
Gross Elec. Energy Generated (MWil) 0.0 2444884 73802831 i
18.
Net Electrical Energy Generated (MWil) 0.0 2352764 70938849 l
*19.
Urut Service Factor 0.0 70.9 81.6
*20.
Unit Availability Factor 0.0 70.9 81.6
*21.
Unit Capacity Factor (Using MDC Net) 0.0 70.6 79.5
*22.
Umt Capacity Factor (Using DER Net) 0.0 71.2 79.9
*23.
Unit Forced Outage Rate 0.0 0.0 7.1 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, Refuel'ug,03/27/99, 45 dap j
and Duration of Each):
1 25.
If Shut Down At End Of Report Period, Estimated Date of Restart. 05/11/99 Startup:
1
1
* NOTE: " Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operaton began.                                     l increased MDC values (Itens 6 & 7) starting 12/01/95.
* NOTE: " Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operaton began.
l increased MDC values (Itens 6 & 7) starting 12/01/95.
Updated item 4 per NUREG4020 in July 1998.
Updated item 4 per NUREG4020 in July 1998.
1 of 4 l
1 of 4 l
l


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-443 UNIT Seabrook i DATE May 1,1999 COMPLETED BY         P.E. Nardone TELEPilONE (603) 773-7074 MONTH APRIL, 1999 DAY               AVERAGE DAILY POWER LEVEL                                           DAY             AVERAGE DAILY POWER LEVEL (MWe-Net)                                                                             (MWe-Net) 1                               0                                                 17                               0 2                               0                                                 18                               0 3                               0                                                 19                               0 4                               0                                                 20                               0 5                               0                                                 21                               0 6                               0                                                 22                               0 7                               0                                                 23                               0 8                               0                                                 24                               0 9                               0                                                 25                               0 10                               0                                                 26                               0 11                               0                                                 27                               0 12                               0                                                 28                               0
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
                +
50-443 UNIT Seabrook i DATE May 1,1999 COMPLETED BY P.E. Nardone TELEPilONE (603) 773-7074 MONTH APRIL, 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
13                               0                                                 29                               0 14                               0                                                 30                               0 15                               0                                                   -
(MWe-Net) 1 0
16                               0                                                   -
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
+
13 0
29 0
14 0
30 0
15 0
16 0
INSTRUCTIONS On this fornn* list the average da ly unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
INSTRUCTIONS On this fornn* list the average da ly unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
2 of 4
2 of 4


T N
TNEVE RP1 Ofo T
E V
4 1
E R                                                      _
e 7
P1 Ofo 4     T 1 e   7 Ne 9     n   0     Og a i  9 9
Ne 9
o  7-dr          I                                                     -
n 0
k o
9 o
1 a
7 Og i
3 7      TP 3    o 1 N   7     C 4
a 9
b r           )     A 4
d I
0 a
k 1
e y
r 3
E.
TP o
3 0     EE     '
a 7
E 5   S   M   P   6
3 o
(     VC I
N 7
* TN CE O. T E TY E B     N     ER    E RT I
C 1
N N A             O     RO T
A 4
E U D DE        l I
r 3
P     OC K           T          CE
)
* C           E   EL          R O
4 b
L P   E     &
y E.
D           M   T      E S
0 EE a
O          U C          A C
a 0
T N
e 6
E S                              V#                                                     _
E 5
N                             ET                                                     _
S M
O                             E R    A I
P VC
T E
(
SP NE ER O    /
I TN C E
N                                             -
. T E Y E E R O
C                             C U                             I L
E T
D E                                                           h0
B N
                                                                    )
RT I
R                                                             t n=
N N A O
o R                             G                             mno                      _
RO T U D D l
E Ni si ua   t W                               a 'R aO i
O C E
or u v
I E
eD O                             bT                             r (
T P
P                             iC l
K E E C E R
mpno)                   4 SA D                             FE     4             a mrca mimotc a r
L C
f o
L O
N                              OR                   rSf ul c            d p 3
P ET E
A                             DN                   Si tcd e x a eREu S                              OW I
D M
laa l
S O
: uu mienr(              r I   O              nnotnwe N                             TD E          txaa u
U C
t uood W                             M dMMACPO e - - - - - -
AC TNE S
O                                         M1 23459 D                                       3 T
V #
U I                            2 I                             N                                   n S                             O                                 i o
N ET R
t S      C                           a T                             A                                 i n
A O
I E                                   m N                             R                                   a x
EE O
U                                                                E
/
                                                )                 e i
I SP N
n                s n
T NE C
                                                                          )
ER C
n a                e     i a
U I
lp                 c lp N)
D L
OS               E x          nL o
E
i x
)
t i&          E T R I               (    s 0                    t           (
h0 R
e e       c A U     9                   ig             r 1         rT u r        r t    n       o RO I    7        l ia o si ei n r )
t n=
r n UI D(               Fe c        Ra ieEil r
o R
v t lap a
G mn o
tnn e a ntor gryT a r nx mnia         oi i( ts  toe pt elel taina         r in uiu        ur           r e f ge meh nqa o      e   e   pd     pt
E N
                              'E           sEMRROAOO P       S   a - - - - - - - -
si t
Y           e RABCDEFGI                         I T
i ua W
a 'R ioru aO eD v
O bT r
(
iC mpn 4
P l
o)
SA a
mr mim f
D FE 4
c otc a
r a
o N
OR rSf ul d p 3
c cd e x A
DN laa Si eRE OW l
ta u
mienr(
S O
: uu I
r I
nnotnwe N
TD txaa uood t
u E
dMMACPO W
M e - - - - - -
O M1 23459 D
3 TU I
2 I
N no S
O it S
C a
T A
n I
E i
m N
R ax U
E
)
e n
s
)
n n
i e
i a
a N) lp i
lp c
x nL x
OS E
o E
i&
t R
0
(
I s
t
(
T e e c
U 9
rT ig r
A u
tr 1
n o
R O l
r si r )
7 n
r n UI i o ei I
D(
Fe Ra ieEil a
v a
r t lap c
yT a tnn gr r nx e a ntor t el toe s
mnia oi i(
pt el taina r ur r e inuiu ge meh f
nqa e e pd pt
'E osEMRROAOO P
S a - - - - - - - -
Y e
T RABCDEFGI I
2 9
2 9
9 E       9
9 E
                                        /
9
/
9 T
1 9
A 0
1
/
L, D
40 I
d P
d le R
u ed A
c e r h oc 3
FS 1
1 O.
4 TN N
9 9
9 9
T        1 1  A      0
FS OM I
                                        /
L, D        4 0
I d
R              dedleu P
A                c e r h oc 1          3  FS 1
T  O.      4 9
N  N        9    : :
FS O            I M


l*
l*
','.                                      REFUELING INFORMATION REQUEST                                                             O DOCKET NO. 50 443 UNIT Seabrook i DATE May 1.1999 COMPLETED BY     P.E. Nardone TELEPHONE (603) 773-7074 1, Name of Facility:                                 Seabrook Unit 1
REFUELING INFORMATION REQUEST O
: 2. Scheduled date for next refueling shutdown:       Refueling Outage 6,     03/27/99
DOCKET NO.
: 3. Scheduled date for restart following refueling: Refueling Outage 6, 05/10/99 [ 45 days ]
50 443 UNIT Seabrook i DATE May 1.1999 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 1,
i
Name of Facility:
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?     )
Seabrook Unit 1 2.
N/A
Scheduled date for next refueling shutdown:
: 5. Schedule date(s) for submitting licensing action and supporting information:
Refueling Outage 6, 03/27/99 3.
N/A
Scheduled date for restart following refueling: Refueling Outage 6, 05/10/99 [ 45 days ]
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
i 4.
N/A
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
: 7. The number of fuel assemblies (a) in the core (b) in the spent fuel storage pool and (c) in the new fuel storage vault (a)       193                       ~(b)     456                         (c)       0
)
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been ;
N/A 5.
requested or is planned, in number of fuel assemblies:
Schedule date(s) for submitting licensing action and supporting information:
Present licensed capacity:     1236                                                                             i No increase in storage capacity requested or planned.
N/A 6.
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core (b) in the spent fuel storage pool and (c) in the new fuel storage vault (a) 193
~(b) 456 (c) 0 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 i
No increase in storage capacity requested or planned.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
The current licensed capacity is adequate until at least the year 2010.
The current licensed capacity is adequate until at least the year 2010.
4 of 4}}
4 of 4}}

Latest revision as of 01:13, 7 December 2024

Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With
ML20206N175
Person / Time
Site: Seabrook 
Issue date: 04/30/1999
From: Diprofio W, Nardone P
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-99052, NUDOCS 9905170159
Download: ML20206N175 (5)


Text

['

m,,,,

North Atlantic Energy Service Corporation 1

North v.o. nex am a

i7 Atlantic sea""' N" o3874 (603) 474-9321 i

The Northeast Utilitien Sptem 1

I May 6,1999 j

i Docket No. 54143 NYN-99052 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station April 1999 Monthly Operating Report Enclosed please find Monthly Operating Report 99-04. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of April,1999 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this

matter, please contact Mr. James M. Peschel, Regulatory Compliance Manager, at (603) 773-7194.

Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.

bELLA

'I W. A. DiProlio[

Station Director

}

cc:

H. J. Miller, NRC Region I Administrator J. T Harrison, NRC Project Manager, Project Directorate 1-2 R. K. Lorson, NRC Senior Resident Inspector

'G'G 9905170159 990430 PDR ADOCK 05000443 R

PDR

OPERATING DATA REPORT DOCKET NO.

50-443 UNIT Seabrook 1 DATE May 1,1999 COMPLETED BY P.E. Nardone TELEPIIONE (603) 773-7074 OPERATING STATUS 1.

Unit Name:

Seabrook Station Unit 1 2.

Reporting Period:

APRIL 1999 3.

Licensed Thermal Power (MWt):

3411 4.

Nameplate Rating (Gross MWe):

1242 5.

Design Electrical Ranng (Net MWe):

1148 6.

Maximum Dependable Capacity (Gross MWe):

1204 7.

Maximum Dependable Capacity (Net MWe):

1158 8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Not Applicable Report, Give Reasons:

9.

Power Level To Which Restricted, if Any (Net MWe):

None 10.

Reasons For Restrictions, If Any:

Not Applicable This Month Yr-to-Date Cumulative i1.

Ilours in Reporting Period 719.0 2879.0 1008 %.0 12.

Number of flours Reactor Was Critical 0.0 2044.7 66107.6 13.

Reactor Reserve Shutdown flours 0.0 0.0 953.3 14.

Ilours Generator On-Line 0.0 2040.4 63567.7 15.

Unit Reserve Shutdown flours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWil) 0.0 6908315 211068688

)

17.

Gross Elec. Energy Generated (MWil) 0.0 2444884 73802831 i

18.

Net Electrical Energy Generated (MWil) 0.0 2352764 70938849 l

  • 19.

Urut Service Factor 0.0 70.9 81.6

  • 20.

Unit Availability Factor 0.0 70.9 81.6

  • 21.

Unit Capacity Factor (Using MDC Net) 0.0 70.6 79.5

  • 22.

Umt Capacity Factor (Using DER Net) 0.0 71.2 79.9

  • 23.

Unit Forced Outage Rate 0.0 0.0 7.1 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, Refuel'ug,03/27/99, 45 dap j

and Duration of Each):

1 25.

If Shut Down At End Of Report Period, Estimated Date of Restart. 05/11/99 Startup:

1

  • NOTE: " Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operaton began.

l increased MDC values (Itens 6 & 7) starting 12/01/95.

Updated item 4 per NUREG4020 in July 1998.

1 of 4 l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-443 UNIT Seabrook i DATE May 1,1999 COMPLETED BY P.E. Nardone TELEPilONE (603) 773-7074 MONTH APRIL, 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

+

13 0

29 0

14 0

30 0

15 0

16 0

INSTRUCTIONS On this fornn* list the average da ly unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

2 of 4

TNEVE RP1 Ofo T

4 1

e 7

Ne 9

n 0

9 o

7 Og i

a 9

d I

k 1

r 3

TP o

a 7

3 o

N 7

C 1

A 4

r 3

)

4 b

y E.

0 EE a

a 0

e 6

E 5

S M

P VC

(

I TN C E

. T E Y E E R O

E T

B N

RT I

N N A O

RO T U D D l

O C E

I E

T P

K E E C E R

L C

L O

P ET E

D M

S O

U C

AC TNE S

V #

N ET R

A O

EE O

/

I SP N

T NE C

ER C

U I

D L

E

)

h0 R

t n=

o R

G mn o

E N

si t

i ua W

a 'R ioru aO eD v

O bT r

(

iC mpn 4

P l

o)

SA a

mr mim f

D FE 4

c otc a

r a

o N

OR rSf ul d p 3

c cd e x A

DN laa Si eRE OW l

ta u

mienr(

S O

uu I

r I

nnotnwe N

TD txaa uood t

u E

dMMACPO W

M e - - - - - -

O M1 23459 D

3 TU I

2 I

N no S

O it S

C a

T A

n I

E i

m N

R ax U

E

)

e n

s

)

n n

i e

i a

a N) lp i

lp c

x nL x

OS E

o E

i&

t R

0

(

I s

t

(

T e e c

U 9

rT ig r

A u

tr 1

n o

R O l

r si r )

7 n

r n UI i o ei I

D(

Fe Ra ieEil a

v a

r t lap c

yT a tnn gr r nx e a ntor t el toe s

mnia oi i(

pt el taina r ur r e inuiu ge meh f

nqa e e pd pt

'E osEMRROAOO P

S a - - - - - - - -

Y e

T RABCDEFGI I

2 9

9 E

9

/

9 T

1 9

A 0

1

/

L, D

40 I

d P

d le R

u ed A

c e r h oc 3

FS 1

1 O.

4 TN N

9 9

FS OM I

l*

REFUELING INFORMATION REQUEST O

DOCKET NO.

50 443 UNIT Seabrook i DATE May 1.1999 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 1,

Name of Facility:

Seabrook Unit 1 2.

Scheduled date for next refueling shutdown:

Refueling Outage 6, 03/27/99 3.

Scheduled date for restart following refueling: Refueling Outage 6, 05/10/99 [ 45 days ]

i 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

)

N/A 5.

Schedule date(s) for submitting licensing action and supporting information:

N/A 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core (b) in the spent fuel storage pool and (c) in the new fuel storage vault (a) 193

~(b) 456 (c) 0 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present licensed capacity:

1236 i

No increase in storage capacity requested or planned.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.

The current licensed capacity is adequate until at least the year 2010.