ML20210T254: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
JAN 0/ '87 10:13 HRC REGION 3R | JAN 0/ '87 10:13 HRC REGION 3R P02 i nr. ' | ||
ANN AllBOR e .mamaume . | ANN AllBOR e.mamaume.. | ||
_/ | _/ | ||
P.O. Box 1147 Ar.n Arbor, MI 48106-II47 Jan. 5, | neumousa.ar--- | ||
. _ - = | |||
.:m-% | |||
w, | |||
.r | |||
..e 240 E. lfuron street P.O. Box 1147 Ar.n Arbor, MI 48106-II47 Jan. 5, 1987 James Kepaler FREEDOM OF liiFORMt. TION Director. Region III ACT REQUEST fluc l e a r Re gu l a t o ry Comm1641on | |||
~h 7-/[ | |||
799 Roosevelt Roads Bidt. 4 g | |||
Glen Ellyn, Illinois 60137 | Glen Ellyn, Illinois 60137 | ||
/ | |||
Dear Mr. Keppler Under the Freedom of Information Act, I request the followings Copies of any correspondence in possession of the Nuclear Regulatory Commissione Region III, between architects and/or. | Dear Mr. Keppler Under the Freedom of Information Act, I request the followings Copies of any correspondence in possession of the Nuclear Regulatory Commissione Region III, between architects and/or. | ||
engineering companies retained by Detroit Edison and Edison regardine the matter of completing engineering calculations prior to the utility obtaining its operating license for the Fermi II plant. | engineering companies retained by Detroit Edison and Edison regardine the matter of completing engineering calculations prior to the utility obtaining its operating license for the Fermi II plant. | ||
Sincerely, | Sincerely, | ||
) | |||
yh | p yh GC6L Tina tam R e p o r,t e r 4313) 994-6861 i | ||
l l | l l | ||
l l | l l | ||
l | l s | ||
87- | 8702180134 870105 87-PDR eld '* ' | ||
^/,*p,g7 | |||
-.:-=---- | |||
--- <}} | |||
Latest revision as of 01:08, 6 December 2024
| ML20210T254 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/05/1987 |
| From: | Lam T ANN ARBOR NEWS, ANN ARBOR, MI |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| FOIA-87-13 NUDOCS 8702180134 | |
| Download: ML20210T254 (1) | |
Text
.
JAN 0/ '87 10:13 HRC REGION 3R P02 i nr. '
ANN AllBOR e.mamaume..
_/
neumousa.ar---
. _ - =
.:m-%
w,
.r
..e 240 E. lfuron street P.O. Box 1147 Ar.n Arbor, MI 48106-II47 Jan. 5, 1987 James Kepaler FREEDOM OF liiFORMt. TION Director. Region III ACT REQUEST fluc l e a r Re gu l a t o ry Comm1641on
~h 7-/[
799 Roosevelt Roads Bidt. 4 g
Glen Ellyn, Illinois 60137
/
Dear Mr. Keppler Under the Freedom of Information Act, I request the followings Copies of any correspondence in possession of the Nuclear Regulatory Commissione Region III, between architects and/or.
engineering companies retained by Detroit Edison and Edison regardine the matter of completing engineering calculations prior to the utility obtaining its operating license for the Fermi II plant.
Sincerely,
)
p yh GC6L Tina tam R e p o r,t e r 4313) 994-6861 i
l l
l l
l s
8702180134 870105 87-PDR eld '* '
^/,*p,g7
-.:-=----
--- <