                                                      August 20,1999
,
          Mr. Guy G. Campbell
-,
          Vice President - Nuclear
August 20,1999
          FirstEnergy Nuclear Operating Company
Mr. Guy G. Campbell
        : Davis-Besse Nuclear Power Station
Vice President - Nuclear
          5501 North State Route 2
FirstEnergy Nuclear Operating Company
          Oak Harbor, OH 43449-9760                                                                           j
: Davis-Besse Nuclear Power Station
                                                                                                              :
5501 North State Route 2
          SUBJECT:         DAVIS-BESSE INSPECTION REPORT 50-346/99009(DRP)                                   !
Oak Harbor, OH 43449-9760
                                                                                                              !
j
                                                                                                              '
:
          Dear Mr. Campbell:'
SUBJECT:
  .
DAVIS-BESSE INSPECTION REPORT 50-346/99009(DRP)
  '
Dear Mr. Campbell:'
          On August 2,1999, the NRC completed an inspection at your Davis-Besse site. The enclosed
'
          report presents the results of that inspection.
.
        ~ The plant was operated in a conservative manner throughout the inspection period. The
On August 2,1999, the NRC completed an inspection at your Davis-Besse site. The enclosed
          decision to ensure the functionality of the startup feedwater pump after receiving information
'
          that it would provide a substantid benefit to mitigate the consequences of a loss of feedwater
report presents the results of that inspection.
          accident was a good example of conservative decision-making. Examples of inattention-to-
~ The plant was operated in a conservative manner throughout the inspection period. The
          detail by operators concerning the reasons for computer point alarms and by electrical
decision to ensure the functionality of the startup feedwater pump after receiving information
          maintenance personnel during work on heat trace equipment detracted from the otherwise -
that it would provide a substantid benefit to mitigate the consequences of a loss of feedwater
          good performance during this inspection period.
accident was a good example of conservative decision-making. Examples of inattention-to-
          Based on the results"of this inspection, the NRC has determined that two violations of NRC
detail by operators concerning the reasons for computer point alarms and by electrical
          requirements occurred. These violations, which were reported to the NRC in licensee event
maintenance personnel during work on heat trace equipment detracted from the otherwise -
          reports, are being treated as Non-Cited Violations (NCVs), consistent with Appendix C of the
good performance during this inspection period.
          Enforcement PolicyL These NCVs are described in the subject inspection report. If you contest
Based on the results"of this inspection, the NRC has determined that two violations of NRC
        - the violations or the severity level of these NCVs, you should provide a response within 30 days
requirements occurred. These violations, which were reported to the NRC in licensee event
          ' of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory
reports, are being treated as Non-Cited Violations (NCVs), consistent with Appendix C of the
          Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the
Enforcement PolicyL These NCVs are described in the subject inspection report. If you contest
          Regional Administrator, Region Ill, and the Director, Office of Enforcement, United States
- the violations or the severity level of these NCVs, you should provide a response within 30 days
          Nuclear Regulatory Commission, Washington, DC 20555-0001.
' of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory
                                                                                                            J
Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the
                                                                                                              1
Regional Administrator, Region Ill, and the Director, Office of Enforcement, United States
      P
Nuclear Regulatory Commission, Washington, DC 20555-0001.
      8                           44,
J
                                PDR
1
P
8
44,
PDR
,.
,.
                                    '
A'.
        A'.                                                                                                    l
'


p!' y-
p!'
        -
-
      r
y-
s
r
          ; G. Campbell
s
                                                                          '
; G. Campbell
                                                                          -2-
-2-
                        "
'
                                          ..,.
"
          L in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
. . , .
        - enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
L in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
            Document Room.
- enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
                                        ,     ,
Document Room.
                                                                        Sincerely,
,
                                                                        Thomas J. Kozak, Chief
,
                                                                                    .
Sincerely,
                                                                        Reactor Projects Branch 4
Thomas J. Kozak, Chief
            Docket No. 50-346
.
        ' License No. NPF-3
Reactor Projects Branch 4
            Enclosure:         Inspection Report 50-346/99009(DRP)
Docket No. 50-346
          ~ cc w/ encl:       J. Stetz, Senior Vice President - Nuclear
' License No. NPF-3
                                J. Lash, Plant Manager
Enclosure:
                                J. Freels, Manager, Regulatory Affairs -
Inspection Report 50-346/99009(DRP)
                                M. O'Reilly, FirstEnergy
~ cc w/ encl:
                                State Liaison Officer, State of Ohio
J. Stetz, Senior Vice President - Nuclear
                                R. Owen, Ohio Department of Health
J. Lash, Plant Manager
                                C. Glazer, Chairman, Ohio Public
J. Freels, Manager, Regulatory Affairs -
                                  Utilities Commission
M. O'Reilly, FirstEnergy
            Distributica:
State Liaison Officer, State of Ohio
            RPC (E-Mail)'             .
R. Owen, Ohio Department of Health
            SNB (Project Mgr.)(E-mail)
C. Glazer, Chairman, Ohio Public
            J. Caldwell, Rlli w/enci
Utilities Commission
          ~ B. Clayton, Rill w/ encl
Distributica:
            SRI Davis-Besse w/ encl
RPC (E-Mail)'
            DRP w/enci
.
            DRS w/ encl
SNB (Project Mgr.)(E-mail)
            Rlli PRR w/enct
J. Caldwell, Rlli w/enci
            PUBLIC IE-01 w/ encl
~ B. Clayton, Rill w/ encl
            Docket File w/enci-
SRI Davis-Besse w/ encl
            GREENS
DRP w/enci
            LEO (E-Mail)
DRS w/ encl
            DOCDESK (E-Mail) '
Rlli PRR w/enct
                                  260037
PUBLIC IE-01 w/ encl
            .. DOCUMENT NAME: G\DAVi\DAV99009 DRP.WPD
Docket File w/enci-
            To receive a co w of this ME :: ^ Indicate in the box *C* = Copy w/o attach /enci "E" = Co)y w/ attach /enci "N' = No copy
GREENS
                OFFICE       Rlli               , _.
LEO (E-Mail)
                NAME         Kozak/ml 4/7 >
DOCDESK (E-Mail) '
                DATE-         08/96/99 V
260037
                                                          - OFFICIAL RECORD COPY
.. DOCUMENT NAME: G\\DAVi\\DAV99009 DRP.WPD
To receive a co w of this ME :: ^ Indicate in the box *C* = Copy w/o attach /enci "E" = Co)y w/ attach /enci "N' = No copy
OFFICE
Rlli
,
_.
NAME
Kozak/ml 4/7 >
DATE-
08/96/99 V
- OFFICIAL RECORD COPY
}}
}}

Latest revision as of 00:06, 6 December 2024

Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations
ML20211D117
Person / Time
Site: Davis Besse 
Issue date: 08/20/1999
From: Kozak T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Campbell G
CENTERIOR ENERGY
Shared Package
ML20211D122 List:
References
50-346-99-09, NUDOCS 9908260180
Download: ML20211D117 (2)


See also: IR 05000346/1999009

Text

J

,

-,

August 20,1999

Mr. Guy G. Campbell

Vice President - Nuclear

FirstEnergy Nuclear Operating Company

Davis-Besse Nuclear Power Station

5501 North State Route 2

Oak Harbor, OH 43449-9760

j

SUBJECT:

DAVIS-BESSE INSPECTION REPORT 50-346/99009(DRP)

Dear Mr. Campbell:'

'

.

On August 2,1999, the NRC completed an inspection at your Davis-Besse site. The enclosed

'

report presents the results of that inspection.

~ The plant was operated in a conservative manner throughout the inspection period. The

decision to ensure the functionality of the startup feedwater pump after receiving information

that it would provide a substantid benefit to mitigate the consequences of a loss of feedwater

accident was a good example of conservative decision-making. Examples of inattention-to-

detail by operators concerning the reasons for computer point alarms and by electrical

maintenance personnel during work on heat trace equipment detracted from the otherwise -

good performance during this inspection period.

Based on the results"of this inspection, the NRC has determined that two violations of NRC

requirements occurred. These violations, which were reported to the NRC in licensee event

reports, are being treated as Non-Cited Violations (NCVs), consistent with Appendix C of the

Enforcement PolicyL These NCVs are described in the subject inspection report. If you contest

- the violations or the severity level of these NCVs, you should provide a response within 30 days

' of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the

Regional Administrator, Region Ill, and the Director, Office of Enforcement, United States

Nuclear Regulatory Commission, Washington, DC 20555-0001.

J

1

P

8

44,

PDR

,.

A'.

'

p!'

-

y-

r

s

G. Campbell

-2-

'

"

. . , .

L in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

- enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Document Room.

,

,

Sincerely,

Thomas J. Kozak, Chief

.

Reactor Projects Branch 4

Docket No. 50-346

' License No. NPF-3

Enclosure:

Inspection Report 50-346/99009(DRP)

~ cc w/ encl:

J. Stetz, Senior Vice President - Nuclear

J. Lash, Plant Manager

J. Freels, Manager, Regulatory Affairs -

M. O'Reilly, FirstEnergy

State Liaison Officer, State of Ohio

R. Owen, Ohio Department of Health

C. Glazer, Chairman, Ohio Public

Utilities Commission

Distributica:

RPC (E-Mail)'

.

SNB (Project Mgr.)(E-mail)

J. Caldwell, Rlli w/enci

~ B. Clayton, Rill w/ encl

SRI Davis-Besse w/ encl

DRP w/enci

DRS w/ encl

Rlli PRR w/enct

PUBLIC IE-01 w/ encl

Docket File w/enci-

GREENS

LEO (E-Mail)

DOCDESK (E-Mail) '

260037

.. DOCUMENT NAME: G\\DAVi\\DAV99009 DRP.WPD

To receive a co w of this ME :: ^ Indicate in the box *C* = Copy w/o attach /enci "E" = Co)y w/ attach /enci "N' = No copy

OFFICE

Rlli

,

_.

NAME

Kozak/ml 4/7 >

DATE-

08/96/99 V

- OFFICIAL RECORD COPY