NUREG-1143, Forwards full-term OL DPR-21,authorizing Operation at steady-state Reactor Core Power Levels Up to 2,011 Mwt & Notice of Issuance,Per 720901 Application.Safety Evaluation Supporting full-term OL Issued as NUREG-1143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[NUREG-1143, Forwards Draft Sser (NUREG-1143) Issued in Oct 1985,for Review & Comments.App a Tech Specs to Provisional OL DPR-21 Will Be Reissued in Entirety as App a to OL DPR-21]]
| number = ML20215N572
| issue date = 10/31/1986
| title = Forwards full-term OL DPR-21,authorizing Operation at steady-state Reactor Core Power Levels Up to 2,011 Mwt & Notice of Issuance,Per 720901 Application.Safety Evaluation Supporting full-term OL Issued as NUREG-1143
| author name = Miraglia F
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee name = Opeka J
| addressee affiliation = NORTHEAST NUCLEAR ENERGY CO.
| docket = 05000245
| license number =
| contact person =
| case reference number = RTR-NUREG-1143
| document report number = GL-86-10, NUDOCS 8611070006
| package number = ML20215N573
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 4
| project =
| stage = Approval
}}
 
=Text=
{{#Wiki_filter:__
[pn og    o                          UNITED STATES j y,n -      kE            NUCLEAR REGULATORY COMMISSION 3?'                                WASHINGTON, D. C. 20555 o-
              !                              October 31, 1986
    \ .%.... ,o Docket No.: 50-245 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270
 
==Dear Mr. Opeka:==
 
==SUBJECT:==
ISSUANCE OF FULL-TERM OPERATING LICENSE DPR-21 Re:        Millstone Nuclear Power Station, Unit 1 In response to your application, dated September 1,1972, for conversion of your provisional operating license to a full-term license, the Commission has issued the enclosed Facility Operating License No. DPR-21 to operate the Millstone Nuclear Power Station, Unit 1, at steady-state reactor core power levels not in excess'of 2011 Megawatts (thermal), in accordance with the provisions of the license and the technical specifications.
Millstone Nuclear Power Station, Unit 1, has operated since October 7,1970 under Provisional Operating License No. DPR-21. Facility Operating License No. DPR-21 supersedes Provisional Operating License No. DPR-21 in its entirety.
All orders issued under the Prov.isional Operating License remain in effect under Facility Operating License No. DPR-21.
We are reformatting the license, as n'ecessary, to achieve consistency with the language used in contemporary licenses. Certain requirements have been deleted from the license itself because they are already in the technical specifications or they are no longer-applicable. The license changes have been agreed to by your staff.
There were certain exemptions granted under the provisional license and those remain in effect. Those exemptions have been included in section 2.0 of the enclosed license.
We have included a revised license condition for the fire protection program (2.C.(3)) that incorporates the standard presented in Generic Letter 86-10, even though implementation is not yet complete. We recognize that, pending the completion of implementation, you will not have explicit procedures for determining whether plant modifications affect the ability to achieve and maintain a safe shutdown in the event of a fire, nor will you update the FSAR (in accordance with the provisions of the schedular exemption from 10 CFR 50.71). In the interim, we will expect you to apply those procedures 8611070006 PDR          e61031 ADOCK 05000245 PDR k
 
e                                                                                                j Mr. John F. Opeka                            associated with design changes reviewed under 10 CFR 50.59 to determine whether any design changes significantly decrease the level of fire protection and submit letter reports annually to describe any changes in the fire protection program.
The' technical specifications contained in Appendix A are being reissued in their entirety incorporating all applicable changes through Amendment 111. The numbering system for future amendments-to the license and technical specification changes for the new Facility Operating License No. DPR-21 will begin with number one (1).
The licensee entered into Indemnity Agreement No. B-39 on May 9, 1969, which remains in effect.
The staff's safety evaluation supporting issuance of the full-term operating license has been issued as NUREG-1143 (October 1985) and NUREG-1143,
  . Supplement No. 1 (August 1986). In an evaluation _ dated December 17, 1984, as noticed in the FEDERAL REGISTER on December 26, 1984, the staff concluded that a supplement to the Final Environmental Statement, issued in June 1973, was not necessary.
A copy of the Notice being forwarded to the FEDERAL REGISTER for publication is also enclosed.
Sincerely, Original si330d DY rrank J niridia, Frank J. Miraglia, Director Division of PWR Licensing - B
 
==Enclosures:==
: 1. Facility Operating License No. DPR-21
: 2. Notice of Issuance                                DISTRIBUTION
* letter &. license only IBailey      C -NRCDocket.Filec PDR            ACRS (10)3r
* FSchroede WRegan            Local PDR      FMiraglia)
LHarmon, IE      ISAP R/F        NIM .
WLambe, PRAB      CGrimes
* TBarnhart(4)
HDenton*          OGC-Bethesda(2) WJones -
cc w/ enclosures                                        Edordan        LFMB, RDiggs See next page                                            BGrimes        OPA-CMiles JPartlow        Gray File PAnderson      MBoyle JShea            IDinitz *
  *See Previous Concurrences                                                EMcPeek*
ISAP:DPL-B*        ISAP:DPL-B*        D:ISAP:DPL-B*            SSPD:DPL-B*      OGC-Bethesda*
JShea:mn            PAnderson          CGrimes                  EMcPeek        2. h menn 10/L,/86          10/ L/86            10/ G/86                10/(,/86        10/24/86 D- .& ,
B                      (\c w t h d c en n i N    cecmeny b, eder              lia          ID itz    Oct ec$#        td per      telecen unth 10  /86            1/      6 I, Q hb2        Ichcl%
10f[/86
 
I Mr. John F. Opeka                        associated with design changes reviewed under 10 CFR 50.59 to determine whether any design changes significantly decrease the level of fire protection and submit letter reports annually to describe any changes in the fire protection program.
The technical specifications contained in Appendix A are being reissued in their entirety incorporating all applicable changes through Amendment 111. The numbering system for future amendments to the license and technical specification changes for the new Facility Operating License No. DPR-21 will begin with number one (1).
The licensee entered into Indemnity Agreement No. B-39 on May 9, 1969, which remains in effect.
The staff's safety evaluation supporting issuance of the full-term operating license has been issued as NUREG-1143'(October 1985) and NUREG-1143, Supplement No. 1 (August 1986). In an evaluation dated December 17, 1984, as noticed in the FEDERAL REGISTER on December 26, 1984, the staff concluded that a supplement to the Final Environmental Statement, issued in June 1973, was not necessary.
A copy of the Notice being forwarded to the FEDERAL REGISTER for publication is also enclosed.
Sincerely, Y            Y    . Li Frank . iragli , Director Division of PWR Licensing - B
 
==Enclosures:==
: 1. Facility Operating License No. DPR-21
: 2. Notice of Issuance cc w/ enclosures:
See next page
 
Mr. John F.'0peka                        Millstone Nuclear Power Station Northeast Nuclear Energy Company        Unit No. I cc:
Gerald Garfield, Esquire                Kevin McCarthy, Director Day, Berry & Howard                      Radiation Control Unit Counselors at Law                        Department of Environmental City Place                                  Protection Hartford, Connecticut 06103-3499        State Office Building Hartford, Connecticut 06106 Edward ~J. Hroczka Vice President, Nuclear Operations      Richard M. Kacich, Supervisor Northeast Utilities Service Company      Operating Nuclear Plant Licensing Post Office Box 270                      Northeast Utilities Service Company Hartford, Connecticut 06141-0270        Post Office Box 270 Hartford, Connecticut 06141-0270 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division                                            o 80 Washington Street Hartford, Connecticut 06106-Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue -
King of Prussia, Pennsylvania, 19406 Northeast Nuclear Energy Company-ATTN: Superintendent Millstone Nuclear Power Station P. O. Box 128      .
Waterford, Connecticut 06385 Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station P. O. Box 811 Niantic, Connecticut 06357 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385}}

Revision as of 07:38, 2 December 2021