ML21244A349: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[M210098, GE Hitachi Nuclear Energy - ESBWR Design Certification Annual 10 CFR 50.46 Report for 2021]]
{{Adams
| number = ML21244A349
| issue date = 09/01/2021
| title = GE Hitachi Nuclear Energy - ESBWR Design Certification Annual 10 CFR 50.46 Report for 2021
| author name = Catts M
| author affiliation = GE Hitachi Nuclear Energy
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05200010
| license number =
| contact person =
| case reference number = M210098
| document type = Annual Operating Report, Letter
| page count = 4
}}
 
=Text=
{{#Wiki_filter:GE Hitachi Nuclear Energy Michelle P. Catts Senior Vice President Nuclear Programs 3901 Castle Hayne Road P.O. Box 780 M/C A-18 Wilmington, NC 28402 USA T 910 200-9836 Michelle.Catts@ge.com M210098                                                                       Docket 52-010 10 CFR 50.46 10 CFR 50.46(a)(3)(iii) 10 CFR Part 52, Appendix E September 1, 2021 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
 
==Subject:==
ESBWR Design Certification Annual 10 CFR 50.46 Report for 2021 GE Hitachi Nuclear Energy (GEH), as the applicant for the ESBWR Design Certification (10 CFR Part 52, Appendix E), submits this annual report under 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Reactors." Specifically,  is the 2021 annual report for the ESBWR Design Certification for emergency core cooling system (ECCS) evaluation model changes or errors that affect the peak cladding temperature (PCT) calculation. There is no change to any reported analysis results.
By this letter, GEH also notifies the licensees, DTE Electric Company for Enrico Fermi Nuclear Plant Unit 3, and Dominion Virginia Power for North Anna Unit 3, in accordance with 10 CFR 50.46(a)(3)(iii), because the licenses for these units reference the ESBWR Design Certification.
Please contact me if you have any questions regarding this information.
Sincerely, Michelle P. Catts Senior Vice President, Nuclear Programs
 
M210098                                                            Page 2 of 2 September 1, 2021 Commitments: No additional commitments are made.
 
==Enclosure:==
: 1. ESBWR Design Certification 10 CFR 50.46 Annual Report - 2021 cc:      E. Lenning, NRC J. Colaccino, NRC M. Brandon, DTE R. Westmoreland, DTE D. Aitken, Dominion C. Sly, Dominion S. Sinah, Dominion DBR-0033424 R6
 
Enclosure 1 M210098 ESBWR Design Certification 10 CFR 50.46 Annual Report - 2021
 
M210098                                                                              Page 1 of 1 ESBWR Design Certification 2021 Annual Report Under 10 CFR 50.46(a)(3)(iii)
Emergency Core Cooling System Model Plant Name:              ESBWR Design Certification (Docket 52-010; 10 CFR Part 52, Appendix E)
Utility Name:            GE Hitachi (as holder for the ESBWR Final Design Certification)
Reporting Year: 2021*
Evaluation Model: TRACG Net PCT      Absolute LBPCT Effect      PCT Effect Analysis of Record Licensing Basis PCT 600°F (LBPCT), with prior updates Prior 10 CFR 50.46 Changes or Error Corrections A.                                                          PCT =    +/- 0°F        + 0°F
        - Previous years Prior 10 CFR 50.46 Changes or Error Corrections B.                                                          PCT =    +/- 0°F        + 0°F
        - This year (itemized below):
2021 Non-condensable Gas Error in Zero Cell Side 0
Branch C. Absolute Sum of 10 CFR 50.46 Changes                PCT =      + 0°F          + 0°F Projected LBPCT based on these changes                600°F
* The reporting period is 9/17/2020 through 08/30/2021. The sum of the peak cladding temperature (PCT) from the most recent analysis using an acceptable evaluation model and the estimates of PCT effect for changes and errors identified because this analysis is less than 2,200°F.
Most Recent Previous Report (2020): Letter, M. P. Catts (GEH) to Document Control Desk (NRC),
M200131, ESBWR Design Certification Annual 10 CFR 50.46 Report for 2020, September 25, 2020.}}

Latest revision as of 00:51, 2 March 2022

GE Hitachi Nuclear Energy - ESBWR Design Certification Annual 10 CFR 50.46 Report for 2021
ML21244A349
Person / Time
Site: 05200010
Issue date: 09/01/2021
From: Michelle Catts
GE Hitachi Nuclear Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
M210098
Download: ML21244A349 (4)


Text

GE Hitachi Nuclear Energy Michelle P. Catts Senior Vice President Nuclear Programs 3901 Castle Hayne Road P.O. Box 780 M/C A-18 Wilmington, NC 28402 USA T 910 200-9836 Michelle.Catts@ge.com M210098 Docket 52-010 10 CFR 50.46 10 CFR 50.46(a)(3)(iii) 10 CFR Part 52, Appendix E September 1, 2021 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

ESBWR Design Certification Annual 10 CFR 50.46 Report for 2021 GE Hitachi Nuclear Energy (GEH), as the applicant for the ESBWR Design Certification (10 CFR Part 52, Appendix E), submits this annual report under 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Reactors." Specifically, is the 2021 annual report for the ESBWR Design Certification for emergency core cooling system (ECCS) evaluation model changes or errors that affect the peak cladding temperature (PCT) calculation. There is no change to any reported analysis results.

By this letter, GEH also notifies the licensees, DTE Electric Company for Enrico Fermi Nuclear Plant Unit 3, and Dominion Virginia Power for North Anna Unit 3, in accordance with 10 CFR 50.46(a)(3)(iii), because the licenses for these units reference the ESBWR Design Certification.

Please contact me if you have any questions regarding this information.

Sincerely, Michelle P. Catts Senior Vice President, Nuclear Programs

M210098 Page 2 of 2 September 1, 2021 Commitments: No additional commitments are made.

Enclosure:

1. ESBWR Design Certification 10 CFR 50.46 Annual Report - 2021 cc: E. Lenning, NRC J. Colaccino, NRC M. Brandon, DTE R. Westmoreland, DTE D. Aitken, Dominion C. Sly, Dominion S. Sinah, Dominion DBR-0033424 R6

Enclosure 1 M210098 ESBWR Design Certification 10 CFR 50.46 Annual Report - 2021

M210098 Page 1 of 1 ESBWR Design Certification 2021 Annual Report Under 10 CFR 50.46(a)(3)(iii)

Emergency Core Cooling System Model Plant Name: ESBWR Design Certification (Docket 52-010; 10 CFR Part 52, Appendix E)

Utility Name: GE Hitachi (as holder for the ESBWR Final Design Certification)

Reporting Year: 2021*

Evaluation Model: TRACG Net PCT Absolute LBPCT Effect PCT Effect Analysis of Record Licensing Basis PCT 600°F (LBPCT), with prior updates Prior 10 CFR 50.46 Changes or Error Corrections A. PCT = +/- 0°F + 0°F

- Previous years Prior 10 CFR 50.46 Changes or Error Corrections B. PCT = +/- 0°F + 0°F

- This year (itemized below):

2021 Non-condensable Gas Error in Zero Cell Side 0

Branch C. Absolute Sum of 10 CFR 50.46 Changes PCT = + 0°F + 0°F Projected LBPCT based on these changes 600°F

  • The reporting period is 9/17/2020 through 08/30/2021. The sum of the peak cladding temperature (PCT) from the most recent analysis using an acceptable evaluation model and the estimates of PCT effect for changes and errors identified because this analysis is less than 2,200°F.

Most Recent Previous Report (2020): Letter, M. P. Catts (GEH) to Document Control Desk (NRC),

M200131, ESBWR Design Certification Annual 10 CFR 50.46 Report for 2020, September 25, 2020.