ML20211M440: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:, , , . . . . . . . . . , . - .                   .
{{#Wiki_filter:, , , . . . . . . . . . , . - .
                                                                                      . ..                             ..   .
.
                                                                                                                  .       ..   .
. ..
                                                                                                                                  .
.
                                                                                                                                      ,
..
                                                                                                                                    .
..
    .               e
.
                        t h* "8 8%                                                 UNIT E D sTATss
.
        7.~
.
                                              k                  NUCLEAR REGULATORY COMMISSION
.
        ,g                                                                                 RE0loN lv
,
                                                                            sit RYAN PLAZA DRIVE. suliE 400
e
                                                                              ARLINGTON. texas 740114e64
.
                          *****                                                               9 997
t h* "8 8%
                                                                                    DCT
UNIT E D sTATss
                                  Charles M. Dugger, Vice President
k
                                  Operations Waterford 3
7.~
                                  Entergy Operations, Inc.
NUCLEAR REGULATORY COMMISSION
                                  P.O. Box B
,g
                                  Killona, Louisiana 70066
RE0loN lv
sit RYAN PLAZA DRIVE. suliE 400
ARLINGTON. texas 740114e64
*****
DCT
9 997
Charles M. Dugger, Vice President
Operations Waterford 3
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
'
'
                                  SUBJECT:           NRC INSPECTION REPORT 50 382/9715
SUBJECT:
                                  Dear Mr. Dugger:
NRC INSPECTION REPORT 50 382/9715
  .
Dear Mr. Dugger:
                                                Thank you for your letter of September 29,1997, in response to our letter and
.
                                  Notice of Violation dated August 28,1997. We have reviewed your reply and, as
Thank you for your letter of September 29,1997, in response to our letter and
                                  discussed with you during a telephone conference on October 2,1997, the information
Notice of Violation dated August 28,1997. We have reviewed your reply and, as
                                                                                                                                        {
discussed with you during a telephone conference on October 2,1997, the information
                                  you provided for the corrective steps that have been taken and the results achieved for
{
                                                                                                                                        3
you provided for the corrective steps that have been taken and the results achieved for
3
i
i
'                                                                                                                                       l
l
                                  Violation 9715 03 did not fully address what was reque:sted, it is our understanding that
'
                                  you will provide this information in a supplement to your previous response. Your
Violation 9715 03 did not fully address what was reque:sted, it is our understanding that
                                  response to the concerno raised in Violation 9715-06 was adequate. We will review the
you will provide this information in a supplement to your previous response. Your
                                  implementation of your corrective actions during a future inspection to det' ermine that full
response to the concerno raised in Violation 9715-06 was adequate. We will review the
                                  compliance has been achieved and will be maintained.                                                 l
implementation of your corrective actions during a future inspection to det' ermine that full
                                                                                                      Sincorely,
compliance has been achieved and will be maintained.
                                                                                                      }-           /                   '
l
                                                                                                        4
Sincorely,
                                                                                                      . H. iarrel,   ilef
}-
                                                                                                      Pr) Ject Section D
/
                                    Docket No.: 50 382
'
                                  License No.: NPF 38
4H. iarrel,
                                  cc:
ilef
                                    Executive Vice President and
.
                                          Chief Operating Officer
Pr) Ject Section D
                                                                                }r)O!)17   ,
Docket No.: 50 382
                                    Entergy Operations, Inc.
License No.: NPF 38
                                    P.O. Box 31995
cc:
                                  Jackson, Mississippi 39286-1995
Executive Vice President and
                                            9710140205 971009                                                       -
}r)O!)17
                                            PDR   ADOCK 05000302
,
                                            0                   PDR
Chief Operating Officer
      .
Entergy Operations, Inc.
                                                                  __.. _ _       _
P.O. Box 31995
Jackson, Mississippi 39286-1995
9710140205 971009
-
PDR
ADOCK 05000302
0
PDR
.
__.. _ _
_


r -
r -
    . .
.
          Entergy Operations, Inc.                                   2
.
          Vice President, Operations bupport
Entergy Operations, Inc.
          Entergy Operations, Inc.
2
          P.O. Box 31995
Vice President, Operations bupport
          Jackson, Mississippl 3928610^7
Entergy Operations, Inc.
          Wise, Carter, Child & Caraway
P.O. Box 31995
          P.O. Box 651
Jackson, Mississippl 3928610^7
l         Jackson, Mississippl 39205
Wise, Carter, Child & Caraway
          General Manager, Plant Operations                                     4
P.O. Box 651
                                    ~~~                     ~~
l
          Waterford 3 SES~ ~                                                 ~ i
Jackson, Mississippl 39205
          Entergy Operations, Inc.
General Manager, Plant Operations
l         P.O. Box B
4
Waterford 3 SES~ ~
~~
~
i
~~~
Entergy Operations, Inc.
l
P.O. Box B
!
!
          Killona, Loulslana 70066
Killona, Loulslana 70066
          Manager Licensing Manager
Manager Licensing Manager
          Waterford 3 SES                                                       >
Waterford 3 SES
          Entergy Operations, Inc,                                               l
>
          P.O. Box B
Entergy Operations, Inc,
          Killona, Loulslana 70066
l
          Chairman
P.O. Box B
          Loulslana Public Service Commission
Killona, Loulslana 70066
        - One American Place, Suite 1630                                         l
Chairman
          Baton Rouge, Louisiana 70825 1697                                     ,
Loulslana Public Service Commission
          Director, Nuclear Safety &                                             '
- One American Place, Suite 1630
            Regulatory Affairs
l
          Waterford 3 SES
Baton Rouge, Louisiana 70825 1697
        ~ Entergy Operations, Inc.
,
                  .
Director, Nuclear Safety &
        . P.O. Box B
'
          Killona, Louisiana - 70066
Regulatory Affairs
          William H. Spell, Administrator
Waterford 3 SES
        . Loulslana Radiation Protection Division
~ Entergy Operations, Inc.
          P.O. Box 82135 - -
.
          Baton Rouge, Loulslana 70884 2135-
. P.O. Box B
        ._ Parish President
Killona, Louisiana - 70066
          St. Charles Parish
William H. Spell, Administrator
          P.O. Box 302:
. Loulslana Radiation Protection Division
          Hahnville, Loulslana 70057
P.O. Box 82135 -
                --     -
-
                        _
Baton Rouge, Loulslana 70884 2135-
                              . .    . _ . . . . - . , . . . . - - -
._ Parish President
                                  -
St. Charles Parish
                                                                              _
P.O. Box 302:
                                                                        ____.
Hahnville, Loulslana 70057
--
-
. .
_
-
. _ . . . . - . , . . . . - - -
_
____.


  - - -
- - -
              .             .
.
                              Entergy Operations, Inc.                                   3
.
                              Mr. Williern A. Cross
Entergy Operations, Inc.
                              Bethesda Licensing Office
3
                              3 Metro Center
Mr. Williern A. Cross
                              Suite 610
Bethesda Licensing Office
                              Bethesda, Maryland 20814
3 Metro Center
                              Winston & Strawn
Suite 610
i                             1400 L Streeti N.W.-
Bethesda, Maryland 20814
L                             Washington, D.C.- 20005 3502-                                                 ,
Winston & Strawn
i
1400 L Streeti N.W.-
L
Washington, D.C.- 20005 3502-
f
f
, ,               ,. , ._,             .2   ,,,-         ~...             . ,             -     . ---   .
,
                                                                                                                                -
, ,
,. , ._,
.2
,,,-
~...
. ,
-
. ---
.
-
i-
i-
                                                                                                                                  i
i
        -- -;- . ,--a.,,+~   ,+.y.;~w.,n n m.     r- .
-- -;- . ,--a.,,+~ ,+.y.;~w.,n n m.
                                                        +.n-     o -:,c-+ n,.   - , + - < - - - - -   ~~ -     - - - - ~ - =
r-
                                                                                                                            .
. +.n-
                                                                                                                              -
o
-:,c-+
n,.
- , + - < - - - - -
~~ -
- - -
-
~ - =
-
.


-
-
  . .
.
      Entergy Operations, Inc.                                   4-                                     OCT - 91997
.
      bec to DCD (IE01)
Entergy Operations, Inc.
      bec distrib. by RIV:
4-
      Regional Administrator                         Resident inspector
OCT - 91997
      DRP Director                                   DRS PSB
bec to DCD (IE01)
      Branch Chief (DRP/D)                           MIS System
bec distrib. by RIV:
      Project Engineer (DRP/D)                       RIV File
Regional Administrator
      Branch Chief (DRP/TSS)
Resident inspector
DRP Director
DRS PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
,
,
1
1
l
l
      DOCUMENT NAME: R:\_WAT\WT715AK.LAK
DOCUMENT NAME: R:\\_WAT\\WT715AK.LAK
      To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
To receive copy of document, indicate in box: "C" = Copy without enclosures
      RIV:C:DRP/D
"E" = Copy with enclosures "N" = No copy
      PHHarrell;df (8f
RIV:C:DRP/D
        10/q /97
PHHarrell;df (8f
                                                  OFFICIAL RECORD COPY
10/q /97
OFFICIAL RECORD COPY


              .           .
.
                                . Entergy Operations, Inc.                                                       4                 OCT - 91997-
.
. Entergy Operations, Inc.
4
OCT - 91997-
l
l
!
!
                              ' bec distrib. by RIV:
' bec distrib. by RIV:
                                .
.
                                ; Regional Administrator                                               Resident inspector
; Regional Administrator
  ,                            ;.DRP Director .                               _
Resident inspector
                                                                                                        DRS PSB
;.DRP Director .
                                    Branch Chief (DRP/D)                               .,             MIS System-
_
                                    Project Engineer (DRP/D)                                           RIV File
DRS PSB
                                . Branch Chief (DRP/TSS)
,
    : ):
Branch Chief (DRP/D)
      - - . . , .. . . ~ , , . . ,,._: .                                 . .-                 ,
.,
                                                                                                                      ..   _
MIS System-
                                                                                                                                                    ._ ._
Project Engineer (DRP/D)
                                                                                                                          .
RIV File
. Branch Chief (DRP/TSS)
: ):
- - . . , .. . . ~ , , . . ,,._: .
. .-
,
..
_
._
._
.
f
f
            .
.
                      ,                         -                                               -                             -                   ~
,
        .+
-
                        <
-
            -
-
      ;, , :
~
                                  -         --
.+
                  .
<
                                    DOCUMENT NAME: R:\ WAT\WT715AK LAK-
-
                                  E To pooolve copy c4 document, incliosto in boa: "C" = Copy without encloswes "E" = Copy with encloswes "N" = No copy
;, , :
                    ,                RIV:C:DRP/D .
-
                                      PHHarrell;df (N f r
--
                            ~
.
                                      10/q /97 -
DOCUMENT NAME: R:\\ WAT\\WT715AK LAK-
                                                                                                    - OFFICIAL RECORD COPY                               ;
E To pooolve copy c4 document, incliosto in boa: "C" = Copy without encloswes
          ,
"E" = Copy with encloswes "N" = No copy
              .
RIV:C:DRP/D .
                                                                                                    v
,
    W-y''       Y M       M     4 % Mrl('Y M,- i,M.m% D. W'4dph id , .g   ed   _g_j.i.,,, gg , , ,           .
PHHarrell;df (N f r
                                                                                                                                                          I
~
10/q /97 -
- OFFICIAL RECORD COPY
;
,
.
v
W-y''
Y
M
M
4 % Mrl('Y M,- i,M.m% D. W'4dph
id , .g
ed
_g_j.i.,,,
gg , , ,
.
I


                                          '
'
  9,n           =
9,n
                    _,q--..
=
                                                                          '
_,q--..
    '
'
      . . -
'
                            ;;
;;
x                    - Entemv
. . -
                    ' 4 ~                                                                        M ~~
x
                                        ~ ' O/                     <w                             Mlona, LA 70006
- Entemv
    ,
M ~~
                                                                  _ / ^ j'N                       Tel 504 739 6242
' 4 ~
                                                                                    ___
~ ' O/
                                                                                      _
<w
                                                                                                  y c.nww see
Mlona, LA 70006
                                                              'dIfff'f .lllrR{y}9,               JOd*3' * ' " * ' ' ' ' ' " ' '   i
_ / ^ j'N
                                                                .f.                     c-/Ne
Tel 504 739 6242
                                                                              04
,
                                                                *Kk, ;p76g f                     W3F1-97-0229
'dIfff'f .lllrR{y}9,
                                                                                                  A4 05
___
                                                                                                                                    J
y c.nww see
                                                                                j
_
        ,
JOd*3' * ' " * ' ' ' ' ' " ' '
                                                                                  .
i
                                                                                                                                    ,
.f.
                  5
c-/Ne
                                September 29,.1997;
04
*Kk,
;p7 g f
W3F1-97-0229
J
6
A4 05
,
,
                              .U.S. Nuclear Regulatory Commission -
j
L                             ATTN: Document Control Desk"
.
                            ' Washington, D.CJ20555
,
                                  ..
5
*                                                                                                                                    !
September 29,.1997;
                                                  .
,
                            L Subject:       Waterford 3 SES                                                                   -1
.U.S. Nuclear Regulatory Commission -
            '
L
                                              Docket No. 50-382 -                                                                   !
ATTN: Document Control Desk"
                                              License No. NPF-38'                                                               l
' Washington, D.CJ20555
                                              NRC Inspection Report 50-382/97-15-
..
                                                          .
.
                                              Reply to Notice of Violation
!
  '
L Subject:
                                Gentlemen:
Waterford 3 SES
L'                             ..
-1
                                                                                                                                  q
*
                            . In accordance with 10CFR2.201, Entergy Operation 3, Inc. hereby submits in .         ..
Docket No. 50-382 -
                                                                                                                                .i
!
                            : Attachment.1 the msoonse to the violations identified in Enclosure 1 of the subject
'
                        C Inspection Report                                 *
License No. NPF-38'
                                                                              '
l
                            : If you have any questions concoming thle r6sponse, please contact me at (504) 739 -                 '
NRC Inspection Report 50-382/97-15-
              .
.
                            : 6242 or Tim Gaudet at (504) 739-6666.                                                                 ,
Reply to Notice of Violation
                                Very truly yours,-
Gentlemen:
          4                               _
L'
                                  E.C. Ewing
..
                            i Director, L     _   .
q
                        >: Nuclear Safety & Regulatory Affairs-
'
                            LECE/DMU/ OPP /tjs
. In accordance with 10CFR2.201, Entergy Operation 3, Inc. hereby submits in .
                              ~ Attachment .
..
                                    ,                              3 T-1 % 09
.i
      . mg 3pp,
: Attachment.1 the msoonse to the violations identified in Enclosure 1 of the subject
C Inspection Report
'
*
: If you have any questions concoming thle r6sponse, please contact me at (504) 739 -
'
: 6242 or Tim Gaudet at (504) 739-6666.
,
.
Very truly yours,-
4
_
E.C. Ewing
i Director, L
_
.
>: Nuclear Safety & Regulatory Affairs-
LECE/DMU/ OPP /tjs
~ Attachment .
3 T-1 % 09
,
. mg 3pp,


.
.
  ,
,
                                                              , . . . . . . . . -.
. . . . . . . . -.
                                                                                    g
g
                                                                                    <
,
      ,   ,.
<
      k
,.
,
k
.;
.;
              /NRCInsMi Ron eport 97-15
/NRCInsMi Ron eport 97-15
              - Reply to Notice if Violation
- Reply to Notice if Violation
                W3F1-97-0229.
W3F1-97-0229.
                                                                                  '
_ Page 2
    ,         _ Page 2
'
                September 29,1997 <
,
                cc:        /E W Merschoff(NRC Region IV)
September 29,1997 <
                                , .
/E W Merschoff(NRC Region IV)
cc:
, .
L
L
                              C.P. Patel (NRC-NRR) -
C.P. Patel (NRC-NRR) -
                            . J. Smith
. J. Smith
j.                             N.S. Reynolds
j.
                              NRC Resident inspectors Office
N.S. Reynolds
                                                                                      I
NRC Resident inspectors Office
                                                                                      l
I
                                                                                      l
l
                                                                                      ,
l
                    e
,
        -i
e
  -
-i
                                                                                      t
-
t


        -       .-         _.
,
  ,
-
    '
.-
                                                                                                        1
_.
      ,   .
'
                                                                                    ' ATTACHMENT TO
1
    y
,
                                                                                          W3F1-97-0229
.
                                                                                          PAGE 1 OF 5
' ATTACHMENT TO
                                                  ATTACHMENT 1                                       -
y
              ENTERGY OPERATIONS, INC. RESPONSE TO THE VIOLATIONS IDENTIFIED IN
W3F1-97-0229
                                  ENCLOSURE 1 OF INSPECTION REPORT 97-15
PAGE 1 OF 5
ATTACHMENT 1
-
ENTERGY OPERATIONS, INC. RESPONSE TO THE VIOLATIONS IDENTIFIED IN
ENCLOSURE 1 OF INSPECTION REPORT 97-15
.
.
:             VIOLATION NO. 9715-03
:
            L10 CFR 50.65(a)(1) states, in part, that each holder of an operating license shall
VIOLATION NO. 9715-03
              monitor the performance or condition of structures, systems, or components, against
L10 CFR 50.65(a)(1) states, in part, that each holder of an operating license shall
              licensee-established goais and such goals shall be established commensurate with
monitor the performance or condition of structures, systems, or components, against
              safety.
licensee-established goais and such goals shall be established commensurate with
              10 CFR 50.65(a)(2) states, in part, that monitoring under paragraph (a)(1) is not
safety.
              required where it has been demonstrated that the performance or condition of a
10 CFR 50.65(a)(2) states, in part, that monitoring under paragraph (a)(1) is not
              structure, system, or component is being effectively controlled through the
required where it has been demonstrated that the performance or condition of a
,            performance of appropriate preventive maintenance such that the structure, system,
structure, system, or component is being effectively controlled through the
              or component remains capable of performing its intended safety function. Paragraph
performance of appropriate preventive maintenance such that the structure, system,
              (c) states, "[t]he requirements of this section shall be implemented by each licensee
:            no later than July 10,1996. "
            - Contrary to the above, as of January 1997, for the emergency lighting system, the
              licensee: (1) failed to establish goals commensurate with safety as described in 10
,
,
            _ CFR 50.65(a)(1); or (2) as an alternative, failed to demonstrate that the performance
or component remains capable of performing its intended safety function. Paragraph
              of the above specified system was effectively controlled through the performance of -
(c) states, "[t]he requirements of this section shall be implemented by each licensee
              appropriati preventive maintenance and that the system remained capable of
:
no later than July 10,1996. "
- Contrary to the above, as of January 1997, for the emergency lighting system, the
licensee: (1) failed to establish goals commensurate with safety as described in 10
_ CFR 50.65(a)(1); or (2) as an alternative, failed to demonstrate that the performance
,
of the above specified system was effectively controlled through the performance of -
appropriati preventive maintenance and that the system remained capable of
pcrforming its intended function in that neither the unavailability of the function
'
'
              pcrforming its intended function in that neither the unavailability of the function
performed by the system was monitored nor an acceptable alternative method for
              performed by the system was monitored nor an acceptable alternative method for
compliance proposed.
              compliance proposed.
This is a Severity Level IV violation (Supplement 1) (50-382/9715-03).
              This is a Severity Level IV violation (Supplement 1) (50-382/9715-03).
RESPONSE-
,            RESPONSE-
,
              (1)'   Reason for the Violation
(1)'
Reason for the Violation
.
.
                      Entergy admits this violation and believes it to be the result of inadequate         ;
Entergy admits this violation and believes it to be the result of inadequate
                                                                                                          l
;
;                    - mansgement oversight. In September of 1996, the Maintenance Rule Expert
;
:                    Panel discussed the need to scope the Emergency Lighting System (LTE) into
- mansgement oversight. In September of 1996, the Maintenance Rule Expert
                      the Maintenance Rule. At the end of 1996, LTE was officially approved for
Panel discussed the need to scope the Emergency Lighting System (LTE) into
                      entry into the Maintenance Rule by the Expert Panel. Subsequent to this,
:
                                                                                                          1
the Maintenance Rule. At the end of 1996, LTE was officially approved for
entry into the Maintenance Rule by the Expert Panel. Subsequent to this,


*; .
*;
                                                                                                        p
p
      .. <
.
                                                                                  ATTACHMENTTO
..
%                                                                                     W3F1-g7-0229
<
                                                                                      - PAGE 2__OF. 5
ATTACHMENTTO
                                                                                                        '
%
              ,
W3F1-g7-0229
                  performance criteria for LTE were prepared and presented to the Expert               -
- PAGE 2__OF. 5
                  Panel. Differing interpretations of the industry's position on emorgency
'
                  lighting prevented the Expert Panel from reaching a consensus on the .
,
                  systems - performance criteria. As a result of personnel turncver and an --
performance criteria for LTE were prepared and presented to the Expert
                  extended refueling outage, no further Expert Panel meetings _were held .
-
                  Approval of LTE's Maintenance Rule function and criteria were therefore not
Panel. Differing interpretations of the industry's position on emorgency
                  completed in a timely manner.-
lighting prevented the Expert Panel from reaching a consensus on the .
                                                                                                            )
systems - performance criteria. As a result of personnel turncver and an --
                  A review of systems scoped in the Maintenance Rule was performed to
extended refueling outage, no further Expert Panel meetings _were held .
                  identify any other systems whose historical review may not be complete or-
Approval of LTE's Maintenance Rule function and criteria were therefore not
completed in a timely manner.-
)
A review of systems scoped in the Maintenance Rule was performed to
identify any other systems whose historical review may not be complete or-
whose function and criteria were not approved, in addition to LTE, it was
<
determined that the communication / paging (CMP) and communication / radio
(CMR) systems did'not yet have a Maintenance Rule function or criteria .
approved by the Expert Panel.- The maintenance history review of these
.
systems is also not complete,
a
V
.
l
p
'(2)
Corrective Steps That Have Been Taken and the Results Achieved
Condition Report g7-2038 was generated to place this event in the Waterford
3 corrective action program.
<(3)
LCorrective Steps Which Will Be Taken to Avoid Further Violations
in accordance with 10 CFR50.65 paragraph (a)(2), provisions will be made to
monitor the reliability performance of the emergency lighting and the
<
<
                  whose function and criteria were not approved, in addition to LTE, it was
communication systems; Reliability critoria has been established, reviewed
                  determined that the communication / paging (CMP) and communication / radio
and approved by the Expert Panel. The maintenance history review of these
                  (CMR) systems did'not yet have a Maintenance Rule function or criteria .
systems is in progress and once completed will be reviewed against their
                  approved by the Expert Panel.- The maintenance history review of these                    .
: respective (a)(2) reliability performance criteria. At that time, a system (a)(1)
                  systems is also not complete,                                                            a
or (a)(2) categorization will be made, if determined that (a)(1) status is
V          .                                                                                                l
warranted, then (a)(1) goals will be. established.
p          '(2)  Corrective Steps That Have Been Taken and the Results Achieved
.(4)
                  Condition Report g7-2038 was generated to place this event in the Waterford
Date When Full Compliance Will Be Achieved
                  3 corrective action program.
: The above corrective actions are in progress and will be completed by
            <(3) LCorrective Steps Which Will Be Taken to Avoid Further Violations
December 18, igg 7, when system categorizations will have been made. If
                  in accordance with 10 CFR50.65 paragraph (a)(2), provisions will be made to
warranted, (a)(1) goals will then be established. Upon completion'of the
  <
above, Waterford 3 will be in full compliance.
                  monitor the reliability performance of the emergency lighting and the
_
                  communication systems; Reliability critoria has been established, reviewed
_
                  and approved by the Expert Panel. The maintenance history review of these
                  systems is in progress and once completed will be reviewed against their
                : respective (a)(2) reliability performance criteria. At that time, a system (a)(1)
                  or (a)(2) categorization will be made, if determined that (a)(1) status is
                  warranted, then (a)(1) goals will be. established.
            .(4)   Date When Full Compliance Will Be Achieved
                : The above corrective actions are in progress and will be completed by
                  December 18, igg 7, when system categorizations will have been made. If
                  warranted, (a)(1) goals will then be established. Upon completion'of the
                  above, Waterford 3 will be in full compliance.
                                                                                            _             _


            .                                         .
.
                                                                                    .
.
                                                                                          . .
.
                                                                                                  . . . . . . .
.
                                                                                                                  ...y
.
  ., _ ;.
. . . . . . .
4                                                                                ATTACHMENT TO
...y
                        -
., _
                                                                                      W3F1-97-0229
;.
                                                                                      PAGE 3 OF 5-
ATTACHMENT TO
            - ENTERGY OPERATIONS, INC. RESPONSE TO THE VIOL.ATION IDENTIFIED IN
4
                                ENCLOSURE 1 OF INSPECTION REPORT 97-15
W3F1-97-0229
          VIOLATION NO. 9715-06
-
          '10 CFR Part 50, Appendix R, Section Ill(J), states that emergency lighting units with
PAGE 3 OF 5-
            at least an 8-hour battery power supply shall be provided in all areas needed for
- ENTERGY OPERATIONS, INC. RESPONSE TO THE VIOL.ATION IDENTIFIED IN
            operation of safe shutdown equipment and in access and egress routes thereto.
ENCLOSURE 1 OF INSPECTION REPORT 97-15
            Safety Evaluation Report, Supolement 8, Section 9, and Updated Final Safety
VIOLATION NO. 9715-06
          Analysis Report, Table 9.5.1-4, both indicate that the chilled water system is required
'10 CFR Part 50, Appendix R, Section Ill(J), states that emergency lighting units with
            for safe shutdown following a fire.
at least an 8-hour battery power supply shall be provided in all areas needed for
            Contrary to the above, as of August 9,1997, emergency lighting units with at least
operation of safe shutdown equipment and in access and egress routes thereto.
            an 8-hour battery power supply were not provided for the reactor auxiliary building
Safety Evaluation Report, Supolement 8, Section 9, and Updated Final Safety
            stainuell leading to the +46-foot Chilled Water System room, an access and egress
Analysis Report, Table 9.5.1-4, both indicate that the chilled water system is required
            route for an area needed for operation of safe shutdown equipment.'
for safe shutdown following a fire.
            This is a Severity Level IV violation (Supplement l} (50-382/9715-06).
Contrary to the above, as of August 9,1997, emergency lighting units with at least
            RESPONSE                                                                                                     '
an 8-hour battery power supply were not provided for the reactor auxiliary building
          -(1)-     Reason for the Violation
stainuell leading to the +46-foot Chilled Water System room, an access and egress
                    Waterford 3 admits to the violation of the Appendix R requirement to provide a                     w
route for an area needed for operation of safe shutdown equipment.'
                    lighted path to equipment required for safe shutdown. The violation resulted
This is a Severity Level IV violation (Supplement l} (50-382/9715-06).
                    from an apparent inadequate initial evaluation. In the case cited in the
RESPONSE
                    ' violation (Essential Chillers), an Appendix R path had been established to the
'
                                                                                                                        '
-(1)-
                  . equipment. However, access via the path could be blocked by smoke in the
Reason for the Violation
                                  .
Waterford 3 admits to the violation of the Appendix R requirement to provide a
                                                                          _
w
  '
lighted path to equipment required for safe shutdown. The violation resulted
                    hallway of the Control Room envelope. - During subsequent walkdowns, it was
from an apparent inadequate initial evaluation. In the case cited in the
                    determined that an Appendix R lighted path had not been established to
' violation (Essential Chillers), an Appendix R path had been established to the
                    ACCW valves required for safe shutdown.
. equipment. However, access via the path could be blocked by smoke in the
            -(2)     Corrective Steps That Have Been Taken and the Results Achieved
'
                  - A plant walkdown was conducted in applicable areas to assess the adequacy
.
                  . of Appendix R emergency lighted pathways to equipment required for safe
_
                    shutdown. Based on results from the walkdown, a more appropriate pathway
hallway of the Control Room envelope. - During subsequent walkdowns, it was
                    (a stairwell leading from the +21 to the +46 elevation) was selected to
'
                    facilitate Operator access to the Essential Chillers during a Control Room fire.
determined that an Appendix R lighted path had not been established to
                                                                                        _                       _
ACCW valves required for safe shutdown.
-(2)
Corrective Steps That Have Been Taken and the Results Achieved
- A plant walkdown was conducted in applicable areas to assess the adequacy
. of Appendix R emergency lighted pathways to equipment required for safe
shutdown. Based on results from the walkdown, a more appropriate pathway
(a stairwell leading from the +21 to the +46 elevation) was selected to
facilitate Operator access to the Essential Chillers during a Control Room fire.
_
_


0.                                                                                                                 )
0.
    .         .
)
                                                                                            ATTACHMENT TO
.
  N.
.
                                                                                                W3F1-97-0229
ATTACHMENT TO
                                                                                                  PAGE 4 OF 5
N.
                          Also, it was determined that an Appendix R lighed path had not been
W3F1-97-0229
                          established to two ACCW valves.
PAGE 4 OF 5
                  (3)-     Corrective Steps Which Will Be Taken to Avold Further Violations
Also, it was determined that an Appendix R lighed path had not been
                          Based on results frorn the plant walkdown,8 hour Appendix R lighting units
established to two ACCW valves.
                          are being installed in the following locations to establish required lighted
(3)-
                          paths:
Corrective Steps Which Will Be Taken to Avold Further Violations
                                    e
Based on results frorn the plant walkdown,8 hour Appendix R lighting units
                                          in the stairway from +21 to +46 to the Essential Chillers, and             l
are being installed in the following locations to establish required lighted
                                    *      in the path to two ACCW Valves (ACC 138A&B).                               I
paths:
                          In addition to the above installations,8 hour Appendix R lighting units are
in the stairway from +21 to +46 to the Essential Chillers, and
                          being installed in the following locations as enhancements to other paths:
l
                                    e      in front of the Reactor Trip Breakers,
e
                                    e     near 4160 voit switchgear 3A-S, and
in the path to two ACCW Valves (ACC 138A&B).
                                    e
I
                                          near the Chilled Water isolation valves.
*
                          While these corrective actions are being implemented, the Operators have
In addition to the above installations,8 hour Appendix R lighting units are
                          flash lights available for lighting their path to the applicable safe shutdown
being installed in the following locations as enhancements to other paths:
                          equipment. The paths are partially illuminated via emergency diesel
in front of the Reactor Trip Breakers,
                          generator backed lighting units. The majority of the path to the east side
e
                          ACCW valve is located outside of the building and is therefore illuminated
near 4160 voit switchgear 3A-S, and
                          during daylight tours.
e
                          Operators will review this violation as pad of their required reading to increase
near the Chilled Water isolation valves.
                          awareness of the potential need for use of flashlights in the identified areas
e
                          during the interim until the required lighting units are installed.
While these corrective actions are being implemented, the Operators have
                          Established lighted Appendix R paths will be identified in the Operations safe
flash lights available for lighting their path to the applicable safe shutdown
                          shutdown procedure.
equipment. The paths are partially illuminated via emergency diesel
                          Permanent, controlled documentation of established Appendix R emergency
generator backed lighting units. The majority of the path to the east side
                          lighted pathways will be prepared.
ACCW valve is located outside of the building and is therefore illuminated
                  (4)     Date When Full Compliance Will Be Achieved
during daylight tours.
                          Installation of the Appendix R lighting in the areas listed above will be
Operators will review this violation as pad of their required reading to increase
                          completed by 1/30/98, with the exception of the ACCW valve path, which will
awareness of the potential need for use of flashlights in the identified areas
                          be complete by 6/30/98.
during the interim until the required lighting units are installed.
Established lighted Appendix R paths will be identified in the Operations safe
shutdown procedure.
Permanent, controlled documentation of established Appendix R emergency
lighted pathways will be prepared.
(4)
Date When Full Compliance Will Be Achieved
Installation of the Appendix R lighting in the areas listed above will be
completed by 1/30/98, with the exception of the ACCW valve path, which will
be complete by 6/30/98.
.
. . . ..
. . . . ,
..
.
..
.
. . .
.
.
.
.
.
..
.
.
      . . . ..
                                ..
                  . . . . ,
                                        .
                                                ..    .
                                                          . . .
                                                                              .
                                                                                  .    .
                                                                                          .
                                                                                                .
                                                                                                              .. .


                                            .
.
                                                              ..   .
..
                                                                                          .
.
                                                                                                  ..   ..       .
.
                                                                                                                  . .. .. . .
..
J . . . ..                                                                                   ATTACHMENT TO
..
    '.
.
                                                                                                  W3F1-97-0229
. ..
                                                                                                      PAGE 5 OF 5
.. . .
                              - Operator required reading will be complete by 10/20/97.                               *
J . . . ..
                                Preparation of controlled documentation of established Appendix R paths will
ATTACHMENT TO
                                be completed by 1/30/98.
'.
                                The revision of the safe shutdown procedure (as described above) will be
W3F1-97-0229
                                completed by 3/31/98.'
PAGE 5 OF 5
                                                                                                                                  l
- Operator required reading will be complete by 10/20/97.
                                Upon completion of the above, Waterford 3 will be in full compliance.
*
Preparation of controlled documentation of established Appendix R paths will
be completed by 1/30/98.
The revision of the safe shutdown procedure (as described above) will be
completed by 3/31/98.'
l
Upon completion of the above, Waterford 3 will be in full compliance.
I.
I.
s
s
t
t
                      -
-
  ,
,
        ..
..
          . . . . .,   1 . ..
. . . . .,
                                              .
1
                                                  . .     . ..
. ..
                                                                              . ..
.
                                                                                              ..'         .
. .
                                                                                                            2 -
. ..
                                                                                                                              - -
. ..
..'
.
2
-
-
-
}}
}}

Latest revision as of 21:47, 5 December 2024

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/97-15 Issued on 970828
ML20211M440
Person / Time
Site: Waterford 
Issue date: 10/09/1997
From: Harrell P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
50-382-97-15, NUDOCS 9710140205
Download: ML20211M440 (5)


See also: IR 05000382/1997015

Text

, , , . . . . . . . . . , . - .

.

. ..

.

..

..

.

.

.

.

,

e

.

t h* "8 8%

UNIT E D sTATss

k

7.~

NUCLEAR REGULATORY COMMISSION

,g

RE0loN lv

sit RYAN PLAZA DRIVE. suliE 400

ARLINGTON. texas 740114e64

DCT

9 997

Charles M. Dugger, Vice President

Operations Waterford 3

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

'

SUBJECT:

NRC INSPECTION REPORT 50 382/9715

Dear Mr. Dugger:

.

Thank you for your letter of September 29,1997, in response to our letter and

Notice of Violation dated August 28,1997. We have reviewed your reply and, as

discussed with you during a telephone conference on October 2,1997, the information

{

you provided for the corrective steps that have been taken and the results achieved for

3

i

l

'

Violation 9715 03 did not fully address what was reque:sted, it is our understanding that

you will provide this information in a supplement to your previous response. Your

response to the concerno raised in Violation 9715-06 was adequate. We will review the

implementation of your corrective actions during a future inspection to det' ermine that full

compliance has been achieved and will be maintained.

l

Sincorely,

}-

/

'

4H. iarrel,

ilef

.

Pr) Ject Section D

Docket No.: 50 382

License No.: NPF 38

cc:

Executive Vice President and

}r)O!)17

,

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

9710140205 971009

-

PDR

ADOCK 05000302

0

PDR

.

__.. _ _

_

r -

.

.

Entergy Operations, Inc.

2

Vice President, Operations bupport

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippl 3928610^7

Wise, Carter, Child & Caraway

P.O. Box 651

l

Jackson, Mississippl 39205

General Manager, Plant Operations

4

Waterford 3 SES~ ~

~~

~

i

~~~

Entergy Operations, Inc.

l

P.O. Box B

!

Killona, Loulslana 70066

Manager Licensing Manager

Waterford 3 SES

>

Entergy Operations, Inc,

l

P.O. Box B

Killona, Loulslana 70066

Chairman

Loulslana Public Service Commission

- One American Place, Suite 1630

l

Baton Rouge, Louisiana 70825 1697

,

Director, Nuclear Safety &

'

Regulatory Affairs

Waterford 3 SES

~ Entergy Operations, Inc.

.

. P.O. Box B

Killona, Louisiana - 70066

William H. Spell, Administrator

. Loulslana Radiation Protection Division

P.O. Box 82135 -

-

Baton Rouge, Loulslana 70884 2135-

._ Parish President

St. Charles Parish

P.O. Box 302:

Hahnville, Loulslana 70057

--

-

. .

_

-

. _ . . . . - . , . . . . - - -

_

____.

- - -

.

.

Entergy Operations, Inc.

3

Mr. Williern A. Cross

Bethesda Licensing Office

3 Metro Center

Suite 610

Bethesda, Maryland 20814

Winston & Strawn

i

1400 L Streeti N.W.-

L

Washington, D.C.- 20005 3502-

f

,

, ,

,. , ._,

.2

,,,-

~...

. ,

-

. ---

.

-

i-

i

-- -;- . ,--a.,,+~ ,+.y.;~w.,n n m.

r-

. +.n-

o

-:,c-+

n,.

- , + - < - - - - -

~~ -

- - -

-

~ - =

-

.

-

.

.

Entergy Operations, Inc.

4-

OCT - 91997

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS PSB

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File

Branch Chief (DRP/TSS)

,

1

l

DOCUMENT NAME: R:\\_WAT\\WT715AK.LAK

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

RIV:C:DRP/D

PHHarrell;df (8f

10/q /97

OFFICIAL RECORD COPY

.

.

. Entergy Operations, Inc.

4

OCT - 91997-

l

!

' bec distrib. by RIV:

.

Regional Administrator

Resident inspector

.DRP Director .

_

DRS PSB

,

Branch Chief (DRP/D)

.,

MIS System-

Project Engineer (DRP/D)

RIV File

. Branch Chief (DRP/TSS)

):

- - . . , .. . . ~ , , . . ,,._: .

. .-

,

..

_

._

._

.

f

.

,

-

-

-

~

.+

<

-

, ,

-

--

.

DOCUMENT NAME: R:\\ WAT\\WT715AK LAK-

E To pooolve copy c4 document, incliosto in boa: "C" = Copy without encloswes

"E" = Copy with encloswes "N" = No copy

RIV:C:DRP/D .

,

PHHarrell;df (N f r

~

10/q /97 -

- OFFICIAL RECORD COPY

,

.

v

W-y

Y

M

M

4 % Mrl('Y M,- i,M.m% D. W'4dph

id , .g

ed

_g_j.i.,,,

gg , , ,

.

I

'

9,n

=

_,q--..

'

'

. . -

x

- Entemv

M ~~

' 4 ~

~ ' O/

<w

Mlona, LA 70006

_ / ^ j'N

Tel 504 739 6242

,

'dIfff'f .lllrR{y}9,

___

y c.nww see

_

JOd*3' * ' " * ' ' ' ' ' " ' '

i

.f.

c-/Ne

04

  • Kk,
p7 g f

W3F1-97-0229

J

6

A4 05

,

j

.

,

5

September 29,.1997;

,

.U.S. Nuclear Regulatory Commission -

L

ATTN: Document Control Desk"

' Washington, D.CJ20555

..

.

!

L Subject:

Waterford 3 SES

-1

Docket No. 50-382 -

!

'

License No. NPF-38'

l

NRC Inspection Report 50-382/97-15-

.

Reply to Notice of Violation

Gentlemen:

L'

..

q

'

. In accordance with 10CFR2.201, Entergy Operation 3, Inc. hereby submits in .

..

.i

Attachment.1 the msoonse to the violations identified in Enclosure 1 of the subject

C Inspection Report

'

If you have any questions concoming thle r6sponse, please contact me at (504) 739 -

'

6242 or Tim Gaudet at (504) 739-6666.

,

.

Very truly yours,-

4

_

E.C. Ewing

i Director, L

_

.

>: Nuclear Safety & Regulatory Affairs-

LECE/DMU/ OPP /tjs

~ Attachment .

3 T-1 % 09

,

. mg 3pp,

.

,

. . . . . . . . -.

g

,

<

,.

,

k

.;

/NRCInsMi Ron eport 97-15

- Reply to Notice if Violation

W3F1-97-0229.

_ Page 2

'

,

September 29,1997 <

/E W Merschoff(NRC Region IV)

cc:

, .

L

C.P. Patel (NRC-NRR) -

. J. Smith

j.

N.S. Reynolds

NRC Resident inspectors Office

I

l

l

,

e

-i

-

t

,

-

.-

_.

'

1

,

.

' ATTACHMENT TO

y

W3F1-97-0229

PAGE 1 OF 5

ATTACHMENT 1

-

ENTERGY OPERATIONS, INC. RESPONSE TO THE VIOLATIONS IDENTIFIED IN

ENCLOSURE 1 OF INSPECTION REPORT 97-15

.

VIOLATION NO. 9715-03

L10 CFR 50.65(a)(1) states, in part, that each holder of an operating license shall

monitor the performance or condition of structures, systems, or components, against

licensee-established goais and such goals shall be established commensurate with

safety.

10 CFR 50.65(a)(2) states, in part, that monitoring under paragraph (a)(1) is not

required where it has been demonstrated that the performance or condition of a

structure, system, or component is being effectively controlled through the

performance of appropriate preventive maintenance such that the structure, system,

,

or component remains capable of performing its intended safety function. Paragraph

(c) states, "[t]he requirements of this section shall be implemented by each licensee

no later than July 10,1996. "

- Contrary to the above, as of January 1997, for the emergency lighting system, the

licensee: (1) failed to establish goals commensurate with safety as described in 10

_ CFR 50.65(a)(1); or (2) as an alternative, failed to demonstrate that the performance

,

of the above specified system was effectively controlled through the performance of -

appropriati preventive maintenance and that the system remained capable of

pcrforming its intended function in that neither the unavailability of the function

'

performed by the system was monitored nor an acceptable alternative method for

compliance proposed.

This is a Severity Level IV violation (Supplement 1) (50-382/9715-03).

RESPONSE-

,

(1)'

Reason for the Violation

.

Entergy admits this violation and believes it to be the result of inadequate

- mansgement oversight. In September of 1996, the Maintenance Rule Expert

Panel discussed the need to scope the Emergency Lighting System (LTE) into

the Maintenance Rule. At the end of 1996, LTE was officially approved for

entry into the Maintenance Rule by the Expert Panel. Subsequent to this,

p

.

..

<

ATTACHMENTTO

%

W3F1-g7-0229

- PAGE 2__OF. 5

'

,

performance criteria for LTE were prepared and presented to the Expert

-

Panel. Differing interpretations of the industry's position on emorgency

lighting prevented the Expert Panel from reaching a consensus on the .

systems - performance criteria. As a result of personnel turncver and an --

extended refueling outage, no further Expert Panel meetings _were held .

Approval of LTE's Maintenance Rule function and criteria were therefore not

completed in a timely manner.-

)

A review of systems scoped in the Maintenance Rule was performed to

identify any other systems whose historical review may not be complete or-

whose function and criteria were not approved, in addition to LTE, it was

<

determined that the communication / paging (CMP) and communication / radio

(CMR) systems did'not yet have a Maintenance Rule function or criteria .

approved by the Expert Panel.- The maintenance history review of these

.

systems is also not complete,

a

V

.

l

p

'(2)

Corrective Steps That Have Been Taken and the Results Achieved

Condition Report g7-2038 was generated to place this event in the Waterford

3 corrective action program.

<(3)

LCorrective Steps Which Will Be Taken to Avoid Further Violations

in accordance with 10 CFR50.65 paragraph (a)(2), provisions will be made to

monitor the reliability performance of the emergency lighting and the

<

communication systems; Reliability critoria has been established, reviewed

and approved by the Expert Panel. The maintenance history review of these

systems is in progress and once completed will be reviewed against their

respective (a)(2) reliability performance criteria. At that time, a system (a)(1)

or (a)(2) categorization will be made, if determined that (a)(1) status is

warranted, then (a)(1) goals will be. established.

.(4)

Date When Full Compliance Will Be Achieved

The above corrective actions are in progress and will be completed by

December 18, igg 7, when system categorizations will have been made. If

warranted, (a)(1) goals will then be established. Upon completion'of the

above, Waterford 3 will be in full compliance.

_

_

.

.

.

.

.

. . . . . . .

...y

., _

.

ATTACHMENT TO

4

W3F1-97-0229

-

PAGE 3 OF 5-

- ENTERGY OPERATIONS, INC. RESPONSE TO THE VIOL.ATION IDENTIFIED IN

ENCLOSURE 1 OF INSPECTION REPORT 97-15

VIOLATION NO. 9715-06

'10 CFR Part 50, Appendix R, Section Ill(J), states that emergency lighting units with

at least an 8-hour battery power supply shall be provided in all areas needed for

operation of safe shutdown equipment and in access and egress routes thereto.

Safety Evaluation Report, Supolement 8, Section 9, and Updated Final Safety

Analysis Report, Table 9.5.1-4, both indicate that the chilled water system is required

for safe shutdown following a fire.

Contrary to the above, as of August 9,1997, emergency lighting units with at least

an 8-hour battery power supply were not provided for the reactor auxiliary building

stainuell leading to the +46-foot Chilled Water System room, an access and egress

route for an area needed for operation of safe shutdown equipment.'

This is a Severity Level IV violation (Supplement l} (50-382/9715-06).

RESPONSE

'

-(1)-

Reason for the Violation

Waterford 3 admits to the violation of the Appendix R requirement to provide a

w

lighted path to equipment required for safe shutdown. The violation resulted

from an apparent inadequate initial evaluation. In the case cited in the

' violation (Essential Chillers), an Appendix R path had been established to the

. equipment. However, access via the path could be blocked by smoke in the

'

.

_

hallway of the Control Room envelope. - During subsequent walkdowns, it was

'

determined that an Appendix R lighted path had not been established to

ACCW valves required for safe shutdown.

-(2)

Corrective Steps That Have Been Taken and the Results Achieved

- A plant walkdown was conducted in applicable areas to assess the adequacy

. of Appendix R emergency lighted pathways to equipment required for safe

shutdown. Based on results from the walkdown, a more appropriate pathway

(a stairwell leading from the +21 to the +46 elevation) was selected to

facilitate Operator access to the Essential Chillers during a Control Room fire.

_

_

0.

)

.

.

ATTACHMENT TO

N.

W3F1-97-0229

PAGE 4 OF 5

Also, it was determined that an Appendix R lighed path had not been

established to two ACCW valves.

(3)-

Corrective Steps Which Will Be Taken to Avold Further Violations

Based on results frorn the plant walkdown,8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Appendix R lighting units

are being installed in the following locations to establish required lighted

paths:

in the stairway from +21 to +46 to the Essential Chillers, and

l

e

in the path to two ACCW Valves (ACC 138A&B).

I

In addition to the above installations,8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Appendix R lighting units are

being installed in the following locations as enhancements to other paths:

in front of the Reactor Trip Breakers,

e

near 4160 voit switchgear 3A-S, and

e

near the Chilled Water isolation valves.

e

While these corrective actions are being implemented, the Operators have

flash lights available for lighting their path to the applicable safe shutdown

equipment. The paths are partially illuminated via emergency diesel

generator backed lighting units. The majority of the path to the east side

ACCW valve is located outside of the building and is therefore illuminated

during daylight tours.

Operators will review this violation as pad of their required reading to increase

awareness of the potential need for use of flashlights in the identified areas

during the interim until the required lighting units are installed.

Established lighted Appendix R paths will be identified in the Operations safe

shutdown procedure.

Permanent, controlled documentation of established Appendix R emergency

lighted pathways will be prepared.

(4)

Date When Full Compliance Will Be Achieved

Installation of the Appendix R lighting in the areas listed above will be

completed by 1/30/98, with the exception of the ACCW valve path, which will

be complete by 6/30/98.

.

. . . ..

. . . . ,

..

.

..

.

. . .

.

.

.

.

.

..

.

.

..

.

.

..

..

.

. ..

.. . .

J . . . ..

ATTACHMENT TO

'.

W3F1-97-0229

PAGE 5 OF 5

- Operator required reading will be complete by 10/20/97.

Preparation of controlled documentation of established Appendix R paths will

be completed by 1/30/98.

The revision of the safe shutdown procedure (as described above) will be

completed by 3/31/98.'