{{#Wiki_filter:February 18, 2021 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of VIRGINIA ELECTRIC AND POWER                              Docket Nos. 50-338-SLR and COMPANY                                                                50-339-SLR (North Anna Power Station, Units 1 and 2)
{{#Wiki_filter:}}
JOINT MOTION FOR CORRECTION OF THE TRANSCRIPT FOR THE ORAL ARGUMENT HELD ON FEBRUARY 4, 2021 Pursuant to 10 C.F.R. § 2.323(a) and consistent with 10 C.F.R. § 2.327(d), the NRC Staff, on behalf of itself, Beyond Nuclear, Inc., the Sierra Club, Inc., Alliance for a Progressive Virginia, Inc., Virginia Electric and Power Company, and Old Dominion Electric Cooperative (collectively, the Participants), hereby requests that the Atomic Safety and Licensing Board issue an Order correcting the official transcript of the Oral Argument held on February 4, 2021, as set forth in the errata listed in Attachment 1 hereto. The Participants submit that these corrections are necessary either to correct material errors in the transcript or to ensure that the transcript accurately reflects the statements made during the oral argument.
Accordingly, the Participants request that the transcript be revised to incorporate the corrections identified in Attachment 1 hereto. Each of the Participants has authorized the Staff to state that they join in this Motion.
Respectfully submitted,
                                                        /Signed (electronically) by/
Anita Ghosh Naber Counsel for NRC Staff Mail Stop: O-14-A44
 
2 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone: (301) 415-0764 E-mail: Anita.Naber@nrc.gov Dated at Gaithersburg, Maryland this 18th day of February, 2021
 
ATTACHMENT 1 ORAL ARGUMENT TRANSCRIPT ERRATA SHEET In the Matter of Virginia Electric and Power Company (North Anna Power Station, Units 1 and 2)
Docket Nos. 50-338-SLR and 50-339-SLR ASLBP No. 21-970-01-SLR-01 February 4, 2021 Teleconference Page  Line                Now Reads                                Should Read                Speaker 2    8      ryan.lightly@morganlewis.com            ryan.lighty@morganlewis.com            N/A 13    23    theres                                there are                              Curran 14    23    (Audio interference.)                  mitigate reactor accidents              Curran 15    14    theres                                there are                              Curran 17    2      sort of set this up                    set this framework up                  Curran 17    22    minimal                                Mineral                                Curran 18    1      the new                                a new                                  Curran 18    19    significant impacts.                    significant impacts?                    Curran 20    13    environmental impasse                  environmental impacts                  Curran 21    24    apply to Table B-1                      apply Table B-1                        Curran 27    2      their likelihood                        their low likelihood                    Lighty 28    1      And it's ultimately that this          And, ultimately, this                  Lighty 30    21    beyond-design-basis is not              beyond-design-basis earthquake is not  Lighty 33    25    beyond-design-basis, not                beyond-design-basis events, not        Lighty 37    6      In the area of interest in questions,  In its areas of interest and questions, Ghosh-Naber 38    18    design-basis actions                    design-basis accidents                  Ghosh-Naber 45    7      licenses                                licensees                              Ghosh-Naber 45    8      plant, implemented                      have implemented                        Ghosh-Naber 57    13    doesnt matter                          does matter                            Curran 58    17    GEIS and fully                          GEIS, which fully                      Lighty 59    1      covered by NEPA                        covered for NEPA                        Lighty 59    24    or the past                            over the past                          Lighty 62    18    at background acceleration              at the ground acceleration              Ghosh-Naber 65    2      because it was the                      because the                            Curran 71    25    there were so many                      was one of many                        Curran 73    8      instruction                            inspection                              Curran 76    7      LRF                                    LERF                                    Ghosh-Naber 77    15    an unfortunate matter                  an enforcement matter                  Lighty 79    12    advancements and analysis              advancements in analysis                Lighty 81    4      consequences are ripe                  consequences are high                  Lighty 81    5      consequences is a                      consequence is a                        Lighty 87    18    Mr. Lightly                            Mr. Lighty                              Lighty 92    13    and then, one of the                    let alone, any                          Lighty
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of VIRGINIA ELECTRIC AND POWER                          Docket Nos. 50-338-SLR and COMPANY                                                              50-339-SLR (North Anna Power Station, Units 1 and 2)
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305, I hereby certify that copies of the foregoing JOINT MOTION FOR CORRECTION OF THE TRANSCRIPT FOR THE ORAL ARGUMENT HELD ON FEBRUARY 4, 2021 dated February 18, 2021, have been served upon the Electronic Information Exchange (the NRCs E-Filing System), in the captioned proceeding, this 18th day of February 2021.
                                                /Signed (electronically) by/
Anita Ghosh Naber Counsel for NRC Staff Mail Stop: O-14-A44 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Telephone: (301) 415-0764 E-mail: Anita.Naber@nrc.gov Dated in Gaithersburg, Maryland this 18th day of February 2021}}

Revision as of 05:19, 18 January 2022

Joint Motion for Correction of the Transcript for the Oral Argument Held on February 4, 2021
ML21049A129
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/18/2021
From: Naber A
Alliance for a Progressive Virginia, Beyond Nuclear, NRC/OGC, Old Dominion Electric Cooperative, Sierra Club, Virginia Electric & Power Co (VEPCO)
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-338-SLR, 50-339-SLR, ASLBP 21-970-01-SLR-01, RAS 55973
Download: ML21049A129 (4)