{{Adams
#REDIRECT [[IR 07100023/2011005]]
| number = ML20236M386
| issue date = 11/09/1987
| title = Forwards NRC Resident Ofc Status Rept for 871023-1105
| author name = Linville J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name = Kane W
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000277, 05000278
| license number =
| contact person =
| document report number = NUDOCS 8711130111
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 4
}}
 
=Text=
{{#Wiki_filter:,                                                                                              .
m M, .                                                                                                        ,
1
                                                                                                                        .a r
l
                                                                                                      +            '
09 NOVi1987 Docket Nos.. 50-277'                                                                                  l
                                  '50-278.
                                                                                                                        ]
MEMORANDUM FOR:          William F. 'Kane,: Director, Division of Reactor' Project's1
                'FROM:                  ' J. C. Linville, Chief, Reactor' ProjectsiSection~ 2A'                ,
 
==SUBJECT:==
PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR THE'-
                                          ' PERIOD October 23 - November 5, 1987.-      -
Enclosed is the' Peach Bottom periodic status report from/the' NRC Resident-Office at Peach Bottom. .Three.NRC. resident inspectors l monitored activ'ities.
at the plant during the report' period.
                                                                ~
These status reports are intene'ed to provide NRC management and the public with an overview of plant activities and-NRC inspection activities. Subsequent ~
                                                                  ~
inspection reports will' address many of.these 'topicsLin:more detail.
Sign
                                                                  -James'C. Linville, Chief                              :
Reactor Projects.Section PA'.                      .j
 
==Enclosure:==
As. Stated I
1 l
1 i
0FFICIAL RECORD COPY:        PB'-STATUS / REPORT - 0001.0.0l j
O'71'1130111 871109 . . .                                          11/09/87 jor mocooggy                                                                          Q l, p                ,
m-            --      --        .    -            _-
1                          '
 
E 1
William F. Kane                        2      Qhg iggy                              j l
cc w/ encl:                                                                            l Dickinson M. Smith,. Manager, Peach Bottom-Atomic Power S'ation t                          1 John S. Kemper, Senior Vice President, Engineering and Production                      I Thomas S. Shaw, Jr. , Vice President, Production                                    {
Troy B. Conner, Jr. , Esquire                                                        i W. H. Hirst, Director, Joint Generation Projects Department,                          d Atlantic Electric                                                                .
G. Leitch, Nuclear Generation Manager                                                l Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)              'l Raymond L. Hovis,. Esquire Thomas Magette, Power Plant. Siting, Nuclear Evaluations                            ],
W. M. Alden, Engineer in Charge,- Licensing Section Doris Poulson, Secretary of Harford County Council                                    J Public Document Reom (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector                                                              i Commonwealth of Pennsylvania bec w/encis:                                                                          -
Region I Docket Room (with concurrences)                                            '
J. Taylor, EDO T. Murley, NRR R. Starostecki, NRR F. Miraglia, NRR S. Varga, NRR
: 9. Boyer, NRR W. Butler, NRR R. Martin, NRR W. Rutsell, RI W. Johnston, RI T. Martin, RI                                                                        ,
S. Collins, RI                                                                      !
R. Gallo, RI                                                                        !
K. Abraham, RI M. Miller, RI J. Williams, RI L. Scholl, RI l
i                                                    1 l
RLDP    .,,h,        W. - , e ,
11M/87 11/O{/87                  0FFICIAL RECORD COPY    PB STATUS REPORT - 0002.0.0      j 11/09/87
 
1
.                                                                                                              r ENCLOSURE PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR'THE PERI'00-October 23 - November 5, 1987                                          1 1.0 Plant Status As of 8:00 a.m. on November 5,1987, Unit 2 and- 3 are in a cold condition per the March 31, 1987,'NRC Order with coolant temperatures less than 200        -
degrees Fahrenheit. The Unit 3 core is completely off loaded.
2.0 Facility Operations Summary                                                                    j Unit 2 is completing a refueling outage which began March 13, 1987.
Final work is being performed to support the reactor pressure vessel                          .
hydrostatic test. Unit 3 has been in a cold condition per the March 31,                      I 1987, NRC Order since April 1, 1987. The Unit 3 recirculation system                        l pipe replacement outage is in progress. The Unit 3 core off load was                          d completed on October 28, 1987. In .adition, twenty-two control rod blades have been exchanged and twelve local power range monitor strings are currently being exchanged.
3.0 Items of Special Interest A public meeting was held on November 4, 1987, in Lancaster County,                          i Pennsylvania, to receive public comments on the' Philadelphia Electric                        j Company (PECo) Commitment to Excellence Action Plan. Fourteen people                      ;
spoke to express their views on this Plan.                                                  ;
4.0 Other Items of Interest 4.1 The licensee has implemented the following shift operations organizational changes:- (1) J. Cotton assumed the duties-of Super-intendent, Operations on October 23;'and (2) the Shift Managers assumed the duties previously held by the Shift Superintendents effective 11:00 p.m. on October 25. In addition, on October 23 the following announcements were made regarding the proposed PECo corporate / plant reorganization: (1) M. J. McCormick, Peach Bottom Plant Manager; and -(2) K. Powers Peach Bottom Project Manager.                        ,
4.2 On October 26, Unit 3 received a spurious triple low reactor water                      )
level signal. A blocking permit hari been applied to a Yarway level          -
j indicating switch so that it could be replaced. 'After the permit                      >
was applied, maintenance, personnel tried to dr?.in the water in the switch and went beyond the boundary of the permit. Subsequently,                        i the entire variable leg header was drained, causing the unplanned                    'I triple low signal. The only actions that occurred were a Unit 3                        l high pressure service water (HPSW) pump trip and a loss of shutdown                    j cooling (SOC) at Unit 2. Operators manually secured SDC on Unit 3                        ;
when the HPSW pump tripped. Operators restored SDC at tsoth units                    1 within three minutes.
l OFFICIAL RECORD COPY    PB STATUS REPORT - 0003.0.0                  l 11/09/87 l
l- - _- -- -_ _= - --    _ _ - -      - - _ _        _    -    --      _ - - - . _ - - - _ _
                                                                                                      - ___ j
 
2
  -s                                                                                                                                                                  ;
i 4.3 LThe licensee's security organization conducted a search of the Peach-Bottom site from 3:00 a.m. to 6:00 a.m. on October 30, using five-                        1 teams composed of trained drug dogs, handlers, Pennsylvania State                            l Police, and PECo security representative.      The' search encompassed                    !
areas both inside and outside the. Peach 6 : tom 2 & 3 protected                            l areas. The search teams were complimented by forensic experts and                          ]
licensee site security and station. management. No contraband was                        1 found. The licensee's investigation.into alleged drug activities is                        q continuing. All three NRC resident inspectors were on site and                              !
observed the search activities.
The resident' inspectors are following the licensee investigations and                        I corrective actions'regarding these' occurrences.                                                  ,
5.0 NRC Activities During the Period l  l l
Three NRC Resident Inspectors were assigned to monitor plant activities                          I between October 23 and November 5, 1987. These individuals consisted of the following:
1 Thomas P. Johnsor                      - Senior Resident Inspector Richard J. Urban                      - Resident Inspector Larry E. Myers                        - Resident Inspector                                      l t
Areas inspected included operational safety, shutdown order commitments, radiation protection, physical security, control room activities and demeanor, reportable events, surveillance testing, outage activities, maintenance, and outstanding items,                                                            i An inservice tdsting team inspection was perfonned at Peach Bottom by -                        i region based inspectors complimented by an NRC headquarters individual                        -l and a contractor from November 2 --November 6, 1987.
{
Three region based inspectors were also on site the week of November 6.                          l One inspector was reviewing existing unresolved items, one inspector was                          i reviewing recirculation pipe replacement activities, and one inspector                            !
was reviewing refueling cavity bellows seals.
The results of these inspections will be included in a future status-                            ,
report.                                                                                          l NRC Combined Inspection Report 50-277/87-18 and 50-278/87-18 was issued October 28, 1987. The inspection was an Environmental Qualification (EQ)
Team inspection conducted June 15 - 19, 1987. A review was conducted concerning the EQ program for establishing and maintaining the qualifica-tion of electrical equipment important to safety within the scope of 10 CFR 50.49. No violations were noted.
0FFICIAL RECORD COPY      PB STATUS REPORT - 0004.0.0 11/09/87