{{Adams
#REDIRECT [[W3P86-1953, Monthly Operating Rept for Jul 1986]]
| number = ML20212K048
| issue date = 07/31/1986
| title = Monthly Operating Rept for Jul 1986
| author name = Cook K, Miller G
| author affiliation = LOUISIANA POWER & LIGHT CO.
| addressee name = Scroggins R
| addressee affiliation = NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
| docket = 05000382
| license number =
| contact person =
| document report number = W3P86-1953, NUDOCS 8608190053
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 9
}}
 
=Text=
{{#Wiki_filter:_    _ -
w s-    .
  ,,0 NRC MONTHLY OPERATING REPORT
 
==SUMMARY==
OF OPERATIONS WATERFORD 3 JULY 1986 The unit started the month in a shutdown condition. On July 1 at 1650, the generator was back on line. On July 2, the unit returned to 100% power. On July 8, the unit was manually shut down to replace reactor coolant pump 2B seal. On July 17 the generator was back on line. On July 18 the unit returned to 100% power. The unit continued operation at approximately 100% power to the end of the month.
h 8608190053 DR          860731 ADOCK 05000382 PDR
                                                                                                      #s 9
                                                                                                          'I
 
O s'
PRESSURIZER SAFETY VALVE FAILURES ARD CHALLENGES WATERFOPJ) 3 During the month of July 1986, there were no pressurizer safety valve failures or challenges.
I i
 
P
        ~
  '[                                       OPERATING DATA REPORT
                                                                                                      - 1 UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: AUGUST 1986 OPERATING STATUS
: 1. Docket: 50-382                                              Notes
: 2. Reporting Period: JULY 1986
: 3. Utility
 
==Contact:==
GEORGE MILLER Phone Number:  (504) 467-8211
: 4. Licensed Thermal Power (MWt): 3390
: 5. Nameplate Rating (Gross Mwe): 1153
: 6. Design Electrical Rating (Net MWe): 1104
: 7. Maximum Dependable Capacity (Gross NWe): 1120
: 8. Maximum Dependable Capacity (Net MWe): 1075
: 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, Give Reasons:
: 10. Power Level To Which Restricted, if Any (Net MWe):    NONE
: 11. Reasons For Restrictions, If Any: N/A This Month    Yr.-to-Date      Cumulative
: 12. Hours In Reporting Period                    744.0          5087.0        7464.0
: 13. Number Of Hours Reactor Was Critical          527.4          4249.3        6118.0
: 14. Reactor Reserve Shutdown Hours                                                15    Hours Generator On-Line                      511.9          4191.6        5998.6
: 16. Unit Reserve Shutdown Hours                                          !
l
                                                                                          .~ T E 2 y' uG
 
g OPERATING DATA REPORT (Continued)
This Month    Yr.-to-Date Cumulative
: 17. Gross Thermal Energy                                      1,646,157  13,809,476  19,451,915 Generated (MWH)
: 18. Gross Electrical Energy                                    544,650    4,661,540    6,559,390 Generated (MWH)
: 19. Net Electrical Energy                                      513,837    4,441,617    6,246,770 Generated (MWH)
: 20. Unit Service Factor                                          68.8        82.4        80.4
: 21. Unit Availability Factor                                      68.8        82.4        80.4
: 22. Unit Capacity Factor                                          64.2        81.2        77.9 (Using MDC Net)
: 23. Unit Capacity Factor                                          62.6        79.1        75.8 (Using DER Net)
: 24. Unit Forced Outage Rate -                                    31.2        -7.4        13.0
: 25. Unit Forced Outage Hours                                    232.1        333.7        898.5
: 26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outase, November - December 1986, 8 weeks.
: 27. If Shut Down At End of Report . Period, Estimated Date Of Startup:
: 28. Units In Test Status (Prior to Commercial Operation):
Forecast    Achieved INITIAL CRITICALITY                                          3/4/85 INITIAL ELECTRICITY                                          3/18/85 COMMERCIAL OPERATION                                        9/24/85 1
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE AUGUST 1986 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH JULY 1986 DAY      AVERAGE DAILY POWER LEVEL            DAY            AVERAGE DAILY POWER LEVEL (MWe-Net)                                          (MWe-Net) 1                  -11                      17  -                      558 2                    754                      18                          1031 3                    1084                    19                          1074 4                    1091                    20                          1075 5                    1086                    21                          1072 6                    1081                    22                          1078 7                    997                      23                          1074 8                  -10                      24                          1073 9                  -12                      25                          1073 10                  -12                      26                          1055 11                  -14                      27                          1071 12                  -20                      28                          1073 13                  -20                      29                          1071 14                  -15                      30                          1071 15                  -27                      31                          1069 16                  -40 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
+                                                                                                                                                                                                                                          S 1
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                  -
REPORT FOR JULY 1986                                                    .
DOCKET NO      50-382 UNIT NAME      WATERFORD 3                    .
DATE            AUGUST 1986 COMPLETED BY    GEORGE MILLER TELEPHONE      504-467-8211 Method of      Licensee                          Cause & Corrective Duration                  Shutting          Event    System  Component        Action to No.                                                                    Date            Type t  (HOURS)    REASON 2    Down Reactor 3  Report #      Codei      Codes    Prevent Recurrence i
86-10                                                                            860630          F        16.8        A              4            86-013      JC        CON      At 100% power, a reactor trip occurred on low DNBR due to a position indication failure for control element assembly
                                                                                                                                                                                                                  #35.
86-11                                                                            860708 F              215.3          A              1              N/A        AB        SEAL    Unit was manually shut down to replace reactor coolant pump 2B seal.
I                                                                                            2                                        3 F: Forced                                                                                      Reason:                                  Method S: Scheduled                                                                                  A-Equipment Failure (Explain)            1-Manual B-Maintenance or Test                    2-Manual Scram.
C-Refueling                              3-Automatic Scram.
D-Regulatory Restriction                4-Continuation        4 E-Operator Training &                    5-Load Reduction      IEEE Std. 805-1984 License Examination                  9-Other                5 F-Administrative                                                IEEE Std. 803A-1983 G-Operational Error (Explain)
H-Other (Explain)
 
                +
    ., .?
s WATERFORD UNIT 3 - PERFORMANCE
 
==SUMMARY==
SHEET FOR MONTS OF:              July                      . 19  86 CURRENT                          YEAR-TO-DATE CAPACITY FACTOR                                          62.56                                                      79.50 AVAILABILITY                                                70.9                                                          83.2 RPS TRIPS'i                                                  0                                                            4 MANUAL TRIPS                                                  0                                                            0 OPERATING EVENTS (10CFR50.72)                                5                                                            23 OPERATING EVENT MEETINGS                                      0                                                            0 (DENTON BRIEFINGS)
VIOLATIONS                                                    2                                                            12 FUEL FAILURES                                  0.01-0.02 dose eq. 1                      0.01-0.02 dose eq. I STEAM CENERATOR TUBES PLUGGED                                0                                                            0 RCP SEAL REPLACEMENT                                          3                                                            5 OPERATING STRETCH CORE                                      N/A                                                          N/A REFUELING OUTAGE                                              O                                                            O MAINTENANCE OUTAGES - PLANNED                                0                                                            1 DURATION MAINTENANCE OUTAGES - UNPLANNED                              1                                                            1 i              DURATION                                            7 days TECH SPEC CHANGES                                            0                                6 approved YTD EMERGENCY T.S. CHANGES                                        0                                                            0 SECURITY VIOLATIONS                                          1                                                            8 LERs (10CFR50.73)                                            2                                                            11 EMERGENCY EXERCISE                                            0                                                            0 LICENSING ACTIONS                                                                                                                !
OPENED COMPLETED REMAINING COMMENTS:        For power operation during the month, refer to the attached Monthly Operation Summary.
 
WATERFORD 3 SES                                                                                  4 OPERATION
 
==SUMMARY==
 
JULY                                                                                      .
I      2      3                4  5 6      7      8    9    10 11  12    13 14 15        16_ 17. . 18 19 _ 20_ 2_1_ 22, 23 24 25  26_  27  28 _29 30    31
                                                                            ,  gig                              ',1%                                                          1'30        -
1001 POWER                        -
g  -
y CasTn0LIn !enos                                        -3                      l@          0ESS IKP fkBTEfP (L-CCLSS
                                                      -                      2    RARE Ti si)                    i    TO %.PLaf(P SWS                                                      11    14-127            0142-2 f(Il 801 POWER                                                                                        (2A a 2B                                                Zm          9E%                      9%
                                                                                                                                                                            \ 88 %
Ill Iw                                                                                                        '
60% POWER -                                                          lS58-2058 96d      i                                                                STARTE) SGP 'B g_                                                                                                      N0526 40% POWER -
ASI                                                                                                            Sp    r0 20% POWER                                              (1                                        _TRIPTD FAIN
                                                                        ' _13                                              Q134 fL5tBIPE                    %      GRID Sn of T) GRID 160 MODE 1                                                l340                                                                                          .--1910 CRITICALITY                                        %
g                                            ,                                                    1750
!                                                                                                                  1 l              MODE 2                              _.            _  g                                                    013;-
STARTUP MODE 3                              --                                                                ~
hot STANDBY                                                                                                  015i                              ---H3 MODE 4                              -                                                                  --
                                                                                                                            -092)                            -
Ell T hu M WN JULY CAPACITY FACTOR
                                                                                                                            .Mi                          j THRuN#/8662.'56
                  $kHUTDOWN                                                                                                                                                                                          COPt1.ATIVE CAPACITY FACTOR FRaM COPTERCIAL OPERATIONS MODE 6                              -
REFUELING Tmu 7/31/86 75.71 1      2    3                4  5  6      7      8    9    10 III12. 13 14      15 16      17 :18    ...19 !20_21... 22        23 24 25 j26]27 l 28l29 l30 l31 JULY
 
o P
q L Louissama    / 317BARONNESTREET POWER & LIGHT
                                                              +  P. O. BOX 60340 NEW ORLEANS, LOUISlANA 70160  +
(504)595-3100 UTfu dSYsS[r5 August 14, 1986 W3P86-1953 A4.05 QA Mr. Ronald M. Scroggins Controller and Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==Subject:==
Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT
 
==Dear Mr. Scroggins:==
 
Enclosed is the subject monthly report which covers the operating statistics for the month of July 1986. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:ssf Enclosure cc:    R.D. Martin, NRC Region IV NRC, Director, Office of I&E G.W. Knighton, NRC-NRR NRC Resident Inspectors Office INPO Records Center (J.T. Wheelock)
B.W. Churchill W.M. Stevenson                                                                Q "AN EQUAL OPPORTUNITY EMPLOYER" IT 8 \}}

Latest revision as of 13:15, 9 July 2023