ML20063J514: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[2CAN029403, Monthly Operating Rept for Jan 1994 for Arkansas Nuclear One,Unit 2]]
| number = ML20063J514
| issue date = 01/31/1994
| title = Monthly Operating Rept for Jan 1994 for Arkansas Nuclear One,Unit 2
| author name = Mims D, Whitt M
| author affiliation = ENTERGY OPERATIONS, INC.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000368
| license number =
| contact person =
| document report number = 2CAN029403, 2CAN29403, NUDOCS 9402230323
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 8
}}
 
=Text=
{{#Wiki_filter:*
4
        . ~-                                                                                                                                                      cat rsv on r tiaa iac-
                    --                  Enter 9Y                                                                                                                    n , 1 s , wo                .
Operations                                                                                                                  ~
                                                                                                                                                                    - e. ace ,
                                                                                                                                                                                  . ea o .
_ . , , , . - . _ . _ _ . . . . . _ _ . .          . . . _ . . . _s.._ _ _ . _ , _ . . _ . . , _ . _ _ , . . . _ _ . . . . . _ . . _  . . _ _ _ _ . _ . _ _ . _ . .
February 15,1994 2CAN029403 U. S.      .uclear Regulatory Commission Document Control Desk hiail Station Pl-137 Washington, DC 20555
 
==Subject:==
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report Gentlemen:
The Arkansas Nuclear One - Unit 2 Monthly Operating Report (MOR) for January,1994 is attached. This report is submitted in accordance with ANO-2 Technical Specification 6.9.1.6. Also,in accordance with ANO-2 Technical Specification 6.9.1.5.c and NUREG-0737, Item II.K.3.3, attached is the 1993 Annual Report of Challenges to Pressurizer Safety Valves.
Very truly yours, l
i Af qd C. -th'6                                                                                                                            ,
Dwight C. Mims                                                                                                                            l Director, Licensing DCM/jrh Attachment l
1 I l hR hhD C                  B                                                                                                              i t                                                                                                            _.
 
                                                            't U.S.NRC February 15, 1994                                  .
2CAN029403 Page 2 cc:  Mr. Leonard 1 Callan                          !
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400                ;
Arlington, TX 76011-8064                      '
i NRC Senior Resident inspector                  ,
Arkansas Nuclear One - ANO 1 & 2 Number 1, Nuclear Plant Road Russellville, AR 72801                        !
Mr. George Kalman NRR Project Manager, Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-11-3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852                      ;
i j              Mr, Thomas W. Alexion NRR Project Manager, Region IV/ANO-2 U. S. Nuclear Regulatory Commission NRR Mail Stop 131I-3                          ,
One White Flint North                        ;
11555 Rockville Pike Rockville, Maryland 20852 I
t L
S I
A e
t E
 
  . _._                  ..-                  _  __                ~._ _              . _ -                ,                    _  .
OPERATING DATA REPORT                                                        l DOCKET NO:        50-368 DATE:            February 3,1994 COMPLETED BY: M. S. Whitt TELEPHONE:        (501) 964-5560 QPfiMTING STATUS                                                                                                          q i
: 1. Unit Name: Arkansas Nuclear One - Unit 2                                                                              !
: 2. Reporting Period:            January 1-31,1994
: 3. Licensed Thermal Power (MWI): 2.815                                                                                  t 4    Nameplate Rating (Gross MWe): 942.57
: 5. Design Electrical Rating (Net MWe): 912                                                                              ;
: 6. Maximum Dependable Capacity (Gross MWe): 897
: 7. Maximum Dependable Capacity (Net MWe): 858                                                                            l
: 8. If Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since                                                j Last Report, Give Reasons:                                                                                            i
: 9. Power Level To Which Restricted. If Any (Net MWe): None                                                              l
: 10. Reasons For Restrictions. If Any:          Nonc                                                                      j MONTH              YR-TO-DATE            GMULATIVE I 1. Hours in Reporting Period .                                744.0                744.0              121,440.0
: 12. Number ofIlours Reactor was Critical . .      .                                        744.0                744.0                93,565.7      !
: 13. Reactor Reserve Shutdown llours .        .                                            0.0                    0.0                    0.0 I4. llours Generator On-Line .                                  744.0                744.0                91,670.0
: 15. Unit Reserve Shutdown Hours . .                              0.0                    0.0                    0.0 -
: 16. Gross Thermal Energy Generated (MWII) .                          .                    2,060,587              2,060,587            243,040,570      '
: 17. Gross Electrical Energy                                                                                              i Generated (MWH) .                                        681,903                681,903              80,004,240
: 18. Net Electrical Energy Generated (MWH) .                                        651,769                651,769              76,124,678 ~    7
: 19. Unit Service Factor .                  .                    100.0                100.0                    75.5
: 20. Unit Availability Factor .                                  100.0                100.0                    75.5
: 21. Unit Capacity Factor (Using MDC Net) .                                          102.1                102.1                    73.1      l
: 22. Unit Capacity Factor (Using DEC Net) .                                            96.1                  96.1                    68.7
: 23. Umt Forced Outage Rate . .                                .
0.0                    0.0                    11.1
: 24. Shutdow ns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):                                          !
Refueling Outage 2R10 is scheduled for March 11.1994 through April 24.1994.
25,  if Shut Down At End of Report Period. Estimated Date of                                                              l Startup.
: 26. Units in Test Status (Prior to Commercial Operation):                                                                '
Forecast          Achieved INITIAL CRD ICALITY                                                  12/05/78 INITI AL ELECTRICITY                                                  12/26n8 COMMERCIAL OPERATION                                                      03/26/80                        ;
i i
 
AVERAGE DAILY UNIT POWER LEVEL
* DOCKET NO:    50-368 UNIT:          Two                    ,
DATE:          February 3,1994 COMPLETED BY: M. S. Whitt TELEPilONE:    (501) 964-5560 MONTil 1;tmaryJ994 DAY              AVERAGE DAILY POWER LEVEL                                                            ,
(MWe-Nei)
I              .                  895 2                                  896 3                                  896 4                                  896                                                              I 5                                  896                                                                .
6                                  894 7                                  898 8                                  896 9    ,                      ,      896 10 .                        .      897
: 11.            ..                  894 12 .                          ,    887                                                              s 13 .              .              890                                                                ,
14 .                              892 i-              15,                                893                                                                ;
16 ,                              893
: 17.      .                        892                                                                >
18,                                892
: 19.                                890 l              20.                .    ..        890                                                              4
: 21.                                724 22 .                                704
: 23.                                794                                                              I
: 24.                            . 882                                                            ;
: 25.                                880
: 26.                                881
: 27.      .                          881 l
: 28.                                884                                                                i
: 29.                                884                                                          .i
!              30.                                884                                                              l
!                31.                                888                                                              I l
i AVGS: 876                                                                    j i
i LNSTRUCTION
                                                                                                                  -i On this format, list the average daily unit power level in MWe-Net for each                          !
day in reporting month. Complete to the nearest whole megawatt.                                      ;
i 1
i a
l;                                                                                                                -
: t. .                .
                                                                                                                  -l
 
                                                                                                            '1 l
l NRC MONTIILY OPERATING REPORT 1
OPERATING
 
==SUMMARY==
 
JANUARY 1994
                                                                                                              ]
UNIT TWO                                                  i l
The unit began the month of January operating at 100% power. At 0030 hours on the twenty-Grst, an elective power reduction was initiated to locate and plug a very small condenser tube leak. The leakage was low enough that the steam generator chemistry                ;
remained within speciGcations. After the tube was plugged at 1125 on the twenty-third, the unit return to full power operation at 1717 on the same day. Unit 2 operated at 100% power for the remainder of the month.
t i
l l
l i
l a
 
4 UNIT SilUTDOWNS AND POWER REDUCTIONS
,                                                                  REPORT FOR JANUARY,1994                                                              .
DOCKET NO..      50-368 UNIT NA31E        ANO Umt 2 DATE              February 3,1994 COMPLETED BY      M. S. Whin TELEPIIONE        501- % *-5560 SIETIIOD OF    LICENSEE DURATION                  SilUTTING DOWN      EVENT        SYSTEM COMPONENT        CAUSE & CORRECTIVE ACTION TO M        DATE TYPE'      (IfoURS)      REASONt        REACTOR 2      REPORTE        CODE'    CODE 5              PR EVENT RECI'RR ENCE
.      none W
t i
1                  2                                                3                            4 I
F: Forced          Reason:                                          Method:                      Exhibit G - Instructions S: Scheduled        A - Equipment Failure (Esplain)                  1 - Manual                  for Preparation of Data B - Maintenance of Test                          2 - Manual Scram.            Entry Sheets for Licensee C - Refueling                                    3 - Automatic Scram.        Event Report (LER) Flie (NUREG-0161)
D- Regulatory Restriction ~                      4 - Continuation
!                          E - Operator Training & Ucense Examination      5 -lead Reduction i                          F-- Administration                              9 - Other -                5 G - Operational Ermr                                                          Exhibit 1 - Same Source II - Other (Explain)
 
    .      . . . . . .          .                  _        --      -      . . -  . ..-              . .    -          -          ~_  ~ ..
          ~
e 4          DATE: January,1994 REFUELING INFORMATION
: 1.          Name of facility: Arkansas Nuclear One - Unit 2
: 2.          Scheduled date for next refueling shutdown. Mprch 11.1994                                                  l
: 3.          Scheduled date for restart following refueling. April 24.1994
: 4.          Will refueling or resumption of operation thereafler require a technical specification change or other license amendment? If answer is yes, what, in general, will there be? If answer is no, has the reload fuel design and core configuration' been reviewed by yc,ur Plant Safety Review Committee to determine whether any unreviewed safety questions are associated                      -
with the core reload (Ref.10 CFR Section 50.59)?                                                          -
Xes. Technic.aLSaesification chinges to relocate;2qlqJpscific par.gmelers to a Core OpsIatiDELinlits.Jlep.g_rL
: 5.          Scheduled date(s) for submitting proposed licensing action and supporting information.
QuLngelsub1nitted July 22,199_3L
: 6.          Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes                ,
in fuel design, new operating procedures.
EQut                                                                                                      :
: 7.          The number of fuel assemblies (a)in the core and (b) in the spent fuel storage pool.
a) 177                    b) 565
: 8.          The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.                      -
present 988              increase size by 0
: 9.          The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
DATE: 1997                        (Loss of full core off-load capability)                                ,
g              .e-..e    t,- * , . , i-.,- -    ,s-. o +-      e ,      ---w - , ,      ..  ,    e    .,  - -    w
 
(J I  .  =
ATTACilMENT
                                                                                                            .l l
ANNUAL REPORT OF SAFETY VALVE                                                  :
I FAILURES AND CIIALLENGES UNIT TWO                                                    ,
This annual report is submitted in the January Monthly Operating Report in response to requirements implemented as a result of NUREG-0737, Item II.K.3.3 and to fulfill Technical Specification reporting requirements (TS 6.9.1.5.C).
For ANO-2, no challenges to the primary system code safeties have occurred in the year 1993.
4 1
i 4
                                                                                                  ._ _ _ _ .}}

Latest revision as of 02:03, 1 June 2023