ML20205G849: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-                                                     __          _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:-
s                                                                                                                                                 .
s
  \
\\
                                                                      )
)
WISCONSIN Electnc eom coum 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE.WI S3201 (414)277 2345 August 1, 1986 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention:                                               Mr. George Lear, Project Director PWR Project Directorate 1 Gentlemen:
WISCONSIN Electnc eom coum 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE.WI S3201 (414)277 2345 August 1, 1986 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr. George Lear, Project Director PWR Project Directorate 1 Gentlemen:
DOCKETS 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Gentlemen:
DOCKETS 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Gentlemen:
Enclosed are three copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures.                                                                                                                                                         These revisions consist of page changes which should be filed in your copies of the subject document in accordance with the attached instructions.
Enclosed are three copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures.
These revisions consist of page changes which should be filed in your copies of the subject document in accordance with the attached instructions.
Please note that procedures that contain names and telephone numbers are stamped "NRC ONLY, Not for Public Disclosure."
Please note that procedures that contain names and telephone numbers are stamped "NRC ONLY, Not for Public Disclosure."
Copies of affected procedures, with names and numbers deleted, are provided to assure confidentiality and facilitate your distribution to the public documents room.
Copies of affected procedures, with names and numbers deleted, are provided to assure confidentiality and facilitate your distribution to the public documents room.
Please return the receipt forms for these copies to:
Please return the receipt forms for these copies to:
Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, n   w m                                           /
Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, n
Sol Burstein Vice Chairman of -he Board Enclosures                                                                                                                                                                                                   'f Copies to NRC Resident Inspector Incident Response Center, Region III
w m
                                                                                                                      ~
/
8608190639 860801 PDR                       ADOCK 05000266 F                                                         PDR
Sol Burstein Vice Chairman of -he Board Enclosures
    -                _ _ _ _ _ _ _ _ _ _ . _ _ . _ . _ _ _ _ .}}
'f Copies to NRC Resident Inspector Incident Response Center, Region III 8608190639 860801
~
PDR ADOCK 05000266 F
PDR
_ _ _ _ _ _ _ _ _ _. _ _. _. _ _ _ _.}}

Latest revision as of 16:07, 7 December 2024

Forwards Public Version of Emergency Plan Implementing Procedures,Including Rev 5 to EPIP 6.3, Exclusion Area Evacuation & Rev 0 to EPIP 6.9, Site Boundary Control Ctr (Sbcc) Evacuation. W/860812 Release Memo
ML20205G849
Person / Time
Site: Point Beach  
Issue date: 08/01/1986
From: Burstein J
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML20205G856 List:
References
NUDOCS 8608190639
Download: ML20205G849 (1)


Text

-

s

\\

)

WISCONSIN Electnc eom coum 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE.WI S3201 (414)277 2345 August 1, 1986 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Attention:

Mr. George Lear, Project Director PWR Project Directorate 1 Gentlemen:

DOCKETS 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Gentlemen:

Enclosed are three copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures.

These revisions consist of page changes which should be filed in your copies of the subject document in accordance with the attached instructions.

Please note that procedures that contain names and telephone numbers are stamped "NRC ONLY, Not for Public Disclosure."

Copies of affected procedures, with names and numbers deleted, are provided to assure confidentiality and facilitate your distribution to the public documents room.

Please return the receipt forms for these copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, n

w m

/

Sol Burstein Vice Chairman of -he Board Enclosures

'f Copies to NRC Resident Inspector Incident Response Center, Region III 8608190639 860801

~

PDR ADOCK 05000266 F

PDR

_ _ _ _ _ _ _ _ _ _. _ _. _. _ _ _ _.