ENS 55018: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{ENS notification | {{ENS notification | ||
| event number = 55018 | | event number = 55018 | ||
| facility = Hayre Mcelory & Associates | | facility = Hayre Mcelory &Amp; Associates | ||
| Organization = Wa Office Of Radiation Protection | | Organization = Wa Office Of Radiation Protection | ||
| license number = WN-I0566-1 | | license number = WN-I0566-1 | ||
Line 10: | Line 10: | ||
| utype = | | utype = | ||
| cfr = Agreement State | | cfr = Agreement State | ||
| emergency class = Non Emergency | | emergency class = Non Emergency | ||
| notification date = 12/02/2020 17:48 | | notification date = 12/02/2020 17:48 | ||
| notification by = Steve Matthews | | notification by = Steve Matthews | ||
Line 16: | Line 16: | ||
| event date = 11/30/2020 00:00 PST | | event date = 11/30/2020 00:00 PST | ||
| last update date = 12/02/2020 | | last update date = 12/02/2020 | ||
| title = | | title = Portable Density Guage Run Over | ||
| event text = The following was received from the State of Washington via email: | | event text = The following was received from the State of Washington via email: | ||
On Monday, November 30, 2020, at a construction site at 2800 MLK Jr South, Seattle, WA, a density gauge was run over by a mini dozer. The source was extended and in use at the time. When the device was run over, the handle that is used to extend and retract the source rod broke off from the gauge completely, leading to concern that the source rod had also broken off. Personnel on site were evacuated and the area secured. | On Monday, November 30, 2020, at a construction site at 2800 MLK Jr South, Seattle, WA, a density gauge was run over by a mini dozer. The source was extended and in use at the time. When the device was run over, the handle that is used to extend and retract the source rod broke off from the gauge completely, leading to concern that the source rod had also broken off. Personnel on site were evacuated and the area secured. |
Revision as of 01:39, 15 January 2021
Where | |
---|---|
Hayre Mcelory &Amp; Associates Redmond, Washington (NRC Region 4) | |
License number: | WN-I0566-1 |
Organization: | Wa Office Of Radiation Protection |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+57.8 h2.408 days <br />0.344 weeks <br />0.0792 months <br />) | |
Opened: | Steve Matthews 17:48 Dec 2, 2020 |
NRC Officer: | Solomon Sahle |
Last Updated: | Dec 2, 2020 |
55018 - NRC Website | |