IA-88-464, Expresses Thanks & Appreciation at Comments & Review Re Termination of Proposed Rev to SRP 3.9.3: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
#REDIRECT [[IA-88-464, Requests That Generic Issue (GI) 119.1, Pipe Rupture Requirements & Decoupling of Seismic Loads Be Subsumed in Remaining Portion of GI B-6, Loads,Load Combinations & Stress Limits]] | |||