ML20199F339: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-99-002, Forwards Rev 36 to Issue 4 of Physical Security Plan (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Listed Changes Being Submitted Utilizing Criteria in GL 95-08.Encl Withheld (Ref 10CFR2.790(d) & 10CFR73.21)]]
| number = ML20199F339
| issue date = 01/08/1999
| title = Forwards Rev 36 to Issue 4 of Physical Security Plan (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Listed Changes Being Submitted Utilizing Criteria in GL 95-08.Encl Withheld (Ref 10CFR2.790(d) & 10CFR73.21)
| author name = Jain S
| author affiliation = DUQUESNE LIGHT CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000334, 05000412
| license number =
| contact person =
| document report number = GL-95-08, GL-95-8, L-99-002, L-99-2, NUDOCS 9901210294
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:,
1 SAFEGUARDS INFORMATION                                                ;
l                  ggh                        Beaver Valley Power 3tation Shippingport PA 15077-0004
                                                                                                        )
i knor[ ras 6 dent
                        ,                                                  January 8,1999  Fax!N$!US$$
Nuclear Power Division                                          L-99-002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk l      Washington, DC 20555-0001
 
==Subject:==
Beaver Valley Power Station, Unit No. I and No. 2
.                        BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 BVPS Physical Security Plan (PSP)                                                !
Enclosed is Revision 36 to Issue 4 of the Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) (Base Plan, Safeguards Contingency Plan, and the Training and Qualification Plan). These changes are being submitted utilizing the criteria described in NRC Generic Letter 95-08. Revision 36 changes include the following:                              l 1
: 1. The Base Plan Chapter 1 and Figures 1-1 and 1-2 now include the new licensee position of Access Specialist. Also, for consistency, a reference to Duquesne Light Company was replaced with the word " licensee."
: 2. The Base Plan Chapter 1 clarifies the duties that Response Team Members are able to perform, and includes a clarification of when duty weapons are to be kept fully loaded.
: 3. The Base Plan Chapter 1 specifies that details available to the station as to Local Law Enforcement Agencies (LLEA) response times, available equipment, etc., are identified as provided by the specific LLEAs.
: 4. The Base Plan Chapter 3 includes the addition of a reference to PSP Figure 3-5 for additional clarity.
: 5. The Safeguards Contingency Plan Chapter I was updated to reflect the changes noted above in Item 1.        Minor editorial changes were included and in-text references were corrected.
ENCLOSURES CONTAIM SAFECUARDS' INFORM ATION. UPON SEP ARATION                          DEllVERING' THIS PACE 15 DECONTROLLED                          7 g
00ALliV ENERGV 9901210294 990108 SAFEGU ARDS INFORMATION
{DR ADOCK 0500g34
 
!    1        Beaver Valley Power St: tion, Unit No. I and No. 2
;              BVPS Physical Security Plan (PSP)
Page 2                                                                                          l
]                                                                                                               ;
Y                                                                                                              !
: 6. The Safeguards Contingency Plan Chapters 2 through 7 were revised to update a            1
;                    previously submitted title change from the contractor position of Security Shift 1
Supervisor to that of Security Shift Captain. Minor typographical errors were also corrected.
!              7. The Training and Qualification Plan (TQP) Chapter 1 was modified to use the term          i j                    " uncorrected" rather than "incorrectable" to be consistent with the wording utilized q                    for the vision requirements identified in 10 CFR 73, Appendix B.                          ;
i              8. The TQP Chapter 2, Table 2-1, Individual Responsibility Matrix was revised to              !
j                    include additional tasks for the Security Force Supervisor and for the Security Shift Captain. Tasks not required for unarmed CAS/SAS Supervisors were removed;                l l                    however, CAS/SAS Supervisors who are trained as anned contingency force                    l l                    members are required to continue to complete all additional tasks as identified in        i the Matrix for Response Team Member.
These changes have been reviewed and judged not to decrease the safeguards
            ^
effectiveness of the BVPS Physical Security Plan. Accordingly, this revision is being submitted in accordance with 10 CFR 50.54(p)(2).
The enclosed materials are considered proprietary under the provision of 10 CFR 2.790(d), and Safeguards Information under the provisions of 10 CFR 73.21, and are thereby exempt from public disclosure.
If you have any questions conceming this matter, please contact Mr. M. S. Ackerman at (412) 393-5203.
Sincerely, Sushil C. Jain c:    Addressee (4 copies of enclosure)
Mr. D. S. Collins, Project Manager (w/o enclosure)
Mr. D. M. Kern, Sr. Resident Inspector (w/o enclosure)
Mr. H. J. Miller, NRC Region I Administrator (2 copies)
ENCLOSURES CONTAtM SAFECUARDS INFORMATION, UPON SEPARATION THIS PAGE IS DECONTROLLEO SAFEGUARDS INFORMATION}}

Revision as of 07:48, 10 December 2024