ML20199F435: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,~.       . -   .-     --   .-       _           -             - - .   - - . .   _ - .   - . - ...__. - - - - . - . . _ _._~ .-.
{{#Wiki_filter:,~.
    ,
. -
            *
.-
        g.
--
  g*           v584roq                                         UNITED STATES
.-
          8
_
          4            g                         NUCLEAR REGULATORY COMMISSION
-
                                                                                                                                                {
- - .
                                                                                                                                                ;
- - . .
                                                                    REGION til
_ - .
        y                                                   801 WARRENVILLE ROAD
- . - ...__. - - - - . - . . _ _._~ .-.
          ,,                                               LISLE, ILLINOIS 60532-4351                                                           I
*
          %
,
,
g.
              9*****                                       January 28, 1998
g*
                                                                                                                                                l
v584roq
                    ur. John x. wood
UNITED STATES
                    Vlos Presiderd- Nuclear
{
>
g
                    Davie-Besse Nucisar Power Station
NUCLEAR REGULATORY COMMISSION
                    Centerior Service Company
4
                    5501 Nortn State Route 2                                                                                                     .
8
                    Oak Hartor, OH 43449
REGION til
y
801 WARRENVILLE ROAD
,,
LISLE, ILLINOIS 60532-4351
%9*****
January 28, 1998
,
ur. John x. wood
Vlos Presiderd- Nuclear
Davie-Besse Nucisar Power Station
>
Centerior Service Company
5501 Nortn State Route 2
.
Oak Hartor, OH 43449
'
'
                    SUBJECT:         NRC INSPECTION REPORT No. 50-346/97015(DRP}
SUBJECT:
,                  Dear Mr. Wood:                                                                                                               i
NRC INSPECTION REPORT No. 50-346/97015(DRP}
                    on January 7.1998, the NRC completed an inspection at your Davis-Besse site. The enclosed
Dear Mr. Wood:
                    report presents the results of that irwpection.
i
,
on January 7.1998, the NRC completed an inspection at your Davis-Besse site. The enclosed
report presents the results of that irwpection.
4
4
                    During this inspection period, the plant was operated safely and in <accordance with plant
During this inspection period, the plant was operated safely and in <accordance with plant
                    procedures. A minor plant transient caused by the failure of a servo control valve was effectively
procedures. A minor plant transient caused by the failure of a servo control valve was effectively
                    handled by operators. Although your corrective action program was generally effective in
handled by operators. Although your corrective action program was generally effective in
                    identifying and resolving issuss, a prior opportunity to identify the servo control valve problem
identifying and resolving issuss, a prior opportunity to identify the servo control valve problem
                    was missed by the engineering department. No violations of NRC requirements were identified,
was missed by the engineering department. No violations of NRC requirements were identified,
                    in accordance with 10 CFR 2.790 of the NRC's " Rules of PractPa," a copy of this letter and its
in accordance with 10 CFR 2.790 of the NRC's " Rules of PractPa," a copy of this letter and its
                    enclosure will be placed in the NRC Pubk Document Room.
enclosure will be placed in the NRC Pubk Document Room.
.
.
l                                                                     Sincerely,
l
                                                                            DV                      /fW W
Sincerely,
                                                                      Geoffrey E. Grant, Director
/fW
                                                                      Division of Reactor Projects
W
                    Docket No.:       50 346                                                                                               f
DV
                    Ucense No.: NPF-3                                                                                                     I
Geoffrey E. Grant, Director
                                                                                                                                                i
Division of Reactor Projects
,                  Enclosure:       Inspection Report
Docket No.:
                                        No. 50-348/97015(DRP)                                                                               [
50 346
!                   See Attached Distribution
f
Ucense No.: NPF-3
I
i
Enclosure:
Inspection Report
,
No. 50-348/97015(DRP)
[
!
See Attached Distribution
;
;
                                                              $ II[ JII9llI .L!
$ II[ JII9llI .L!
                  9802040012 980128
9802040012 980128
                  PDR     ADOCK 05000346
PDR
                                                                                                            AhU$                             }
ADOCK 05000346
AhU$
}


                          _                    . - . _ . _ _ . _ _ _ . . _ _ . . _ _ _ _ . _ _ - _ _ _ _ _ _ .
.. ,
        .. ,
. - . _ .
      -
_ _ . _ _
          ..
_ . . _ _ . . _ _ _ _ . _ _ - _ _ _ _ _ _ .
  i
_
- ..
i,'
*
,
,
  * ,'
J. Wood -
              J. Wood -                                 2..
2..
4
4
              oc wfencl: John P. Stetz, Senior
oc wfencl:
                            Vice President- Nuclear
John P. Stetz, Senior
                        J. H. Lash, Plant Manager
Vice President- Nuclear
                        J. L Freels, Manager
J. H. Lash, Plant Manager
                            Regulatory Affairs
J. L Freels, Manager
                        State Liaison Omoor, State
Regulatory Affairs
                            of Ohio
State Liaison Omoor, State
                        Robert E. Owen, Ohio
of Ohio
Robert E. Owen, Ohio
;
;
Department of Heal.a
'
'
                            Department of Heal.a
O. A. Glazer, State of Ohio,
                        O. A. Glazer, State of Ohio,
Public Utilities Commission
                            Public Utilities Commission
>
>
>
>
Line 100: Line 134:
4
4
a
a
-- -


    .   . . _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ . _ . _ . _                                       _ .. _ _ _ _ _ _ _ _ .. _ ._ .._ _ _ _ _
.
.
. _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ . _ . _ . _
_ .. _ _ _ _ _ _ _ _ .. _ ._ .._ _ _ _ _
1
,
,
i
i
      1
!
!
                                                                              January 28, 1998
January 28, 1998
                  Mr. John K. Wood
l!. . .
                  Vice Presidert- Nuclear
Mr. John K. Wood
l!. . .            Deve Besse Nuclear Power Station
Vice Presidert- Nuclear
                  Centerior Service Company
Deve Besse Nuclear Power Station
]
]
L                 5501 North State Route 2
Centerior Service Company
                  oak Narbor, oN 43449
L
                                                                                                                                            l
5501 North State Route 2
[                  SUBJECT:                         NRC INSPECTION REPORT No. 50 346/97015(DRP)                                           )
oak Narbor, oN 43449
;                 Dear Mr. Wood:
[
SUBJECT:
NRC INSPECTION REPORT No. 50 346/97015(DRP)
)
;
Dear Mr. Wood:
.
.
On January 7,1998, the NRC completed an inspection at your Davis Besse site. The enclosed
i
i
                  On January 7,1998, the NRC completed an inspection at your Davis Besse site. The enclosed
4
4
                  report presents the results of that inspection.
report presents the results of that inspection.
;
;
                  During this inspection periM, the plant was operated safely and in accordance with plant
During this inspection periM, the plant was operated safely and in accordance with plant
                  procedures, A minor plant transient caused by the failure of a servo control valve was e"ded;
procedures, A minor plant transient caused by the failure of a servo control valve was e"ded;
                  handled by operators. Although your correctiie action program was generally effective in
handled by operators. Although your correctiie action program was generally effective in
                  identifying and resolving issues, a pitor opportunity to identify the servo control valve problem
identifying and resolving issues, a pitor opportunity to identify the servo control valve problem
                  was missed by the engineering department. No violations of NRC requirements were identified.
was missed by the engineering department. No violations of NRC requirements were identified.
                  In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
                  enclosure will be placed in the NRC Public Document Room.
enclosure will be placed in the NRC Public Document Room.
                                                                                    Sincerely,
Sincerely,
                                                                                      /s/ Marc L. Dapas for
/s/ Marc L. Dapas for
                                                                                    Geoffrey E. Grant, Director
Geoffrey E. Grant, Director
                                                                                    Division of Reactor Projects
Division of Reactor Projects
                    Docket No.:                     50-316
Docket No.:
                    Ucense No.: NPF-3 -
50-316
                    Enclosure:                       Inspection Report
Ucense No.: NPF-3 -
                                                      No. 50 346/97015(DRP)
Enclosure:
                                                                                                                                          ,
Inspection Report
                    See Attached Distribution
No. 50 346/97015(DRP)
                                                                                            SEE PREVIOUS CONCURRENCES
,
                    DOCUMENT NAME: GMavlWav97015.dtp
See Attached Distribution
                  To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E" = Copy
SEE PREVIOUS CONCURRENCES
                  with attach /enci "N" = No copy
DOCUMENT NAME: GMavlWav97015.dtp
                        OFFICE                     Rlli                 Rlll                       Rlli
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E" = Copy
                        NAME                       Kozakinmo             Creed /Section S.8         Grant Md'~
with attach /enci "N" = No copy
                        DATE                       01/   198           01/ /98                   01/f//98
OFFICE
                                                                          OFFICIAL RECORD COPY
Rlli
  i
Rlll
Rlli
NAME
Kozakinmo
Creed /Section S.8
Grant Md'~
DATE
01/
198
01/
/98
01/f//98
OFFICIAL RECORD COPY
i
:
:
  ! _.           . _ .       .       _ _ _ _ _ _ _                    _.           .     _.                     _ . . _ -           __
!
.
.
.
.
.
.
_.
. .
-
.
.
__


                .       - . -             .. .         -     .                     .             .- -      -- -
.,
      .,                                                                                  .
.
      ..
- . -
  '
.. .
    .
-
  -.
.
                                                      January 28, 1998
.
          Mr. John K. Wood
.
          Vice President - Nuclear
.- -
--
-
..
'
'
          Davis-Besse Nuclear Power Station
.
          Centerior Service Company
-.
          5501 North State Route 2
January 28, 1998
          Oak Harbor OH 43449
Mr. John K. Wood
:          SUBJECT:            NRC INSPECTION REPORT NO. 50-346/97015(DRP)
Vice President - Nuclear
          Dear Mr, Wood:
Davis-Besse Nuclear Power Station
          On January 7,1998, the NRC completed an inspection at your Davis-Besse site. The enclosed
          report presents the results of that inspection.
'
'
          During this inspection period, the plant was operated safely and in accordance with plant
Centerior Service Company
          procedures. A minor plant transient caused by the failure of a servo control valve was effectively
5501 North State Route 2
          handled by operators. Although your corrective action program was generally effective in
Oak Harbor OH 43449
          identifying and resolving isst ts, a prior opportunity to identify the servo control valve problem
SUBJECT:
          was missed by the engineering department. No violations of NRC requirements were identified.
NRC INSPECTION REPORT NO. 50-346/97015(DRP)
          In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
:
          enclosure will be placed in the NRC Public Document Room.
Dear Mr, Wood:
                                                          Sincerely,
On January 7,1998, the NRC completed an inspection at your Davis-Besse site. The enclosed
                                                            /s/ Marc L. Dapas for
report presents the results of that inspection.
                                                          Geoffrey E. Grant, Director -
During this inspection period, the plant was operated safely and in accordance with plant
                                                            Division cf Reactor Projects
'
          Docket No.:         50-346
procedures. A minor plant transient caused by the failure of a servo control valve was effectively
          License No.: NPF-3
handled by operators. Although your corrective action program was generally effective in
          Enclosure:         Inspection Report
identifying and resolving isst ts, a prior opportunity to identify the servo control valve problem
                                No. 50-346/97015(DRP)
was missed by the engineering department. No violations of NRC requirements were identified.
          - See Attached Distribution
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
          DOCUMENT NAME: G:\davi\dav97015.drp
enclosure will be placed in the NRC Public Document Room.
          To receive a copy of this document, indicate b 'he box "C" = Copy without attach /enci "E" = Copy
Sincerely,
          with attach /enci "N" = No copy                   ,
/s/ Marc L. Dapas for
            OFFICE      Rill                b   Rlli           $     Rlll                 Rlli
Geoffrey E. Grant, Director -
            NAME       Kozak: nmo h Crbekon S.8                       Grant
Division cf Reactor Projects
            DATE        01///98
Docket No.:
                                                f.* c.! t.e** m
50-346
                                                  01[,/98               01/ /98             01/ /98
License No.: NPF-3
                                                  OFFICIAL RECORD COPY
Enclosure:
                                                                                                                  l
Inspection Report
                                                                                                                  l
No. 50-346/97015(DRP)
                                                                                                                  1
- See Attached Distribution
DOCUMENT NAME: G:\\davi\\dav97015.drp
To receive a copy of this document, indicate b 'he box "C" = Copy without attach /enci "E" = Copy
with attach /enci "N" = No copy
,
b
Rlli
$
Rlll
Rlli
OFFICE
Rill
NAME
Kozak: nmo h
Crbekon S.8
Grant
f.* c.!
t.e** m
DATE
01///98
01[,/98
01/ /98
01/ /98
OFFICIAL RECORD COPY
1


    _. . _ . _   _.     _ _ _ _ . _ _           _                   _ __.   __ _ _ __ . _ . _ . . . _ _ _ . _ . . ._ . _
_.
        ,
. _ . _
  .
_.
  .
_ _ _
_ . _ _
_
_ __.
__ _ _ __ .
_ . _ . . .
_
_
. _ . . . . _
_
_
,
.
.
4
4
                J. Wood                                           -2-
J. Wood
                ocw/ encl:     John P. Stetz, Senior
-2-
                                  Vice President- Nudear
ocw/ encl:
                                J. H. Lash, Plant Manager
John P. Stetz, Senior
                                J. L Freets, Manager
Vice President- Nudear
J. H. Lash, Plant Manager
J. L Freets, Manager
Regulatory Affairs
'
'
                                    Regulatory Affairs
State Liaison Officer, State
                                State Liaison Officer, State
of Ohio
                                    of Ohio
Robert E. Owen, Ohio
                                Robert E. Owen, Ohio
Department of Health
'
'
                                    Department of Health
C. A. Glazer, State of Ohio,
                                C. A. Glazer, State of Ohio,
Public Utilities Commission
                                    Public Utilities Commission
Distnbution-
                Distnbution-
i
i               Docket File w/enci                             SRI Davis-Besse w/enci
Docket File w/enci
                PUBLIC IE-01 w/enci                             A. B. Beach w/enct
SRI Davis-Besse w/enci
                Project Manager, NRR w/enci                     Deputy RA w/enci
PUBLIC IE-01 w/enci
                Rlil Enf. Coordinator w/enci                   Rill PRR w/enci
A. B. Beach w/enct
                CAA1 w/enci(E-mail)                             DRS (2) w/onci
Project Manager, NRR w/enci
Deputy RA w/enci
Rlil Enf. Coordinator w/enci
Rill PRR w/enci
CAA1 w/enci(E-mail)
DRS (2) w/onci
TSS w/onci
DOCDESK (E-mail)
<
<
                TSS w/onci                                      DOCDESK (E-mail)
DRP w/onci
                DRP w/onci
,
,
.
}}
}}

Latest revision as of 07:46, 10 December 2024

Forwards Insp Rept 50-346/97-15 on 971110-980107.No Violations Noted
ML20199F435
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/28/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20199F438 List:
References
50-346-97-15, NUDOCS 9802040012
Download: ML20199F435 (5)


See also: IR 05000346/1997015

Text

,~.

. -

.-

--

.-

_

-

- - .

- - . .

_ - .

- . - ...__. - - - - . - . . _ _._~ .-.

,

g.

g*

v584roq

UNITED STATES

{

g

NUCLEAR REGULATORY COMMISSION

4

8

REGION til

y

801 WARRENVILLE ROAD

,,

LISLE, ILLINOIS 60532-4351

%9*****

January 28, 1998

,

ur. John x. wood

Vlos Presiderd- Nuclear

Davie-Besse Nucisar Power Station

>

Centerior Service Company

5501 Nortn State Route 2

.

Oak Hartor, OH 43449

'

SUBJECT:

NRC INSPECTION REPORT No. 50-346/97015(DRP}

Dear Mr. Wood:

i

,

on January 7.1998, the NRC completed an inspection at your Davis-Besse site. The enclosed

report presents the results of that irwpection.

4

During this inspection period, the plant was operated safely and in <accordance with plant

procedures. A minor plant transient caused by the failure of a servo control valve was effectively

handled by operators. Although your corrective action program was generally effective in

identifying and resolving issuss, a prior opportunity to identify the servo control valve problem

was missed by the engineering department. No violations of NRC requirements were identified,

in accordance with 10 CFR 2.790 of the NRC's " Rules of PractPa," a copy of this letter and its

enclosure will be placed in the NRC Pubk Document Room.

.

l

Sincerely,

/fW

W

DV

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.:

50 346

f

Ucense No.: NPF-3

I

i

Enclosure:

Inspection Report

,

No. 50-348/97015(DRP)

[

!

See Attached Distribution

$ II[ JII9llI .L!

9802040012 980128

PDR

ADOCK 05000346

AhU$

}

.. ,

. - . _ .

_ _ . _ _

_ . . _ _ . . _ _ _ _ . _ _ - _ _ _ _ _ _ .

_

- ..

i,'

,

J. Wood -

2..

4

oc wfencl:

John P. Stetz, Senior

Vice President- Nuclear

J. H. Lash, Plant Manager

J. L Freels, Manager

Regulatory Affairs

State Liaison Omoor, State

of Ohio

Robert E. Owen, Ohio

Department of Heal.a

'

O. A. Glazer, State of Ohio,

Public Utilities Commission

>

>

i

1

4

4

a

-- -

.

.

. _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ . _ . _ . _

_ .. _ _ _ _ _ _ _ _ .. _ ._ .._ _ _ _ _

1

,

i

!

January 28, 1998

l!. . .

Mr. John K. Wood

Vice Presidert- Nuclear

Deve Besse Nuclear Power Station

]

Centerior Service Company

L

5501 North State Route 2

oak Narbor, oN 43449

[

SUBJECT:

NRC INSPECTION REPORT No. 50 346/97015(DRP)

)

Dear Mr. Wood:

.

On January 7,1998, the NRC completed an inspection at your Davis Besse site. The enclosed

i

4

report presents the results of that inspection.

During this inspection periM, the plant was operated safely and in accordance with plant

procedures, A minor plant transient caused by the failure of a servo control valve was e"ded;

handled by operators. Although your correctiie action program was generally effective in

identifying and resolving issues, a pitor opportunity to identify the servo control valve problem

was missed by the engineering department. No violations of NRC requirements were identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.:

50-316

Ucense No.: NPF-3 -

Enclosure:

Inspection Report

No. 50 346/97015(DRP)

,

See Attached Distribution

SEE PREVIOUS CONCURRENCES

DOCUMENT NAME: GMavlWav97015.dtp

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E" = Copy

with attach /enci "N" = No copy

OFFICE

Rlli

Rlll

Rlli

NAME

Kozakinmo

Creed /Section S.8

Grant Md'~

DATE

01/

198

01/

/98

01/f//98

OFFICIAL RECORD COPY

i

!

.

.

.

.

.

.

_.

. .

-

.

.

__

.,

.

- . -

.. .

-

.

.

.

.- -

--

-

..

'

.

-.

January 28, 1998

Mr. John K. Wood

Vice President - Nuclear

Davis-Besse Nuclear Power Station

'

Centerior Service Company

5501 North State Route 2

Oak Harbor OH 43449

SUBJECT:

NRC INSPECTION REPORT NO. 50-346/97015(DRP)

Dear Mr, Wood:

On January 7,1998, the NRC completed an inspection at your Davis-Besse site. The enclosed

report presents the results of that inspection.

During this inspection period, the plant was operated safely and in accordance with plant

'

procedures. A minor plant transient caused by the failure of a servo control valve was effectively

handled by operators. Although your corrective action program was generally effective in

identifying and resolving isst ts, a prior opportunity to identify the servo control valve problem

was missed by the engineering department. No violations of NRC requirements were identified.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director -

Division cf Reactor Projects

Docket No.:

50-346

License No.: NPF-3

Enclosure:

Inspection Report

No. 50-346/97015(DRP)

- See Attached Distribution

DOCUMENT NAME: G:\\davi\\dav97015.drp

To receive a copy of this document, indicate b 'he box "C" = Copy without attach /enci "E" = Copy

with attach /enci "N" = No copy

,

b

Rlli

$

Rlll

Rlli

OFFICE

Rill

NAME

Kozak: nmo h

Crbekon S.8

Grant

f.* c.!

t.e** m

DATE

01///98

01[,/98

01/ /98

01/ /98

OFFICIAL RECORD COPY

1

_.

. _ . _

_.

_ _ _

_ . _ _

_

_ __.

__ _ _ __ .

_ . _ . . .

_

_

. _ . . . . _

_

_

,

.

.

4

J. Wood

-2-

ocw/ encl:

John P. Stetz, Senior

Vice President- Nudear

J. H. Lash, Plant Manager

J. L Freets, Manager

Regulatory Affairs

'

State Liaison Officer, State

of Ohio

Robert E. Owen, Ohio

Department of Health

'

C. A. Glazer, State of Ohio,

Public Utilities Commission

Distnbution-

i

Docket File w/enci

SRI Davis-Besse w/enci

PUBLIC IE-01 w/enci

A. B. Beach w/enct

Project Manager, NRR w/enci

Deputy RA w/enci

Rlil Enf. Coordinator w/enci

Rill PRR w/enci

CAA1 w/enci(E-mail)

DRS (2) w/onci

TSS w/onci

DOCDESK (E-mail)

<

DRP w/onci

,

.