UNITED STATES | |||
{ | |||
g | |||
NUCLEAR REGULATORY COMMISSION | |||
4 | |||
8 | |||
REGION til | |||
y | |||
801 WARRENVILLE ROAD | |||
,, | |||
LISLE, ILLINOIS 60532-4351 | |||
%9***** | |||
January 28, 1998 | |||
, | |||
ur. John x. wood | |||
Vlos Presiderd- Nuclear | |||
Davie-Besse Nucisar Power Station | |||
> | |||
Centerior Service Company | |||
5501 Nortn State Route 2 | |||
. | |||
Oak Hartor, OH 43449 | |||
' | ' | ||
SUBJECT: | |||
NRC INSPECTION REPORT No. 50-346/97015(DRP} | |||
Dear Mr. Wood: | |||
i | |||
, | |||
on January 7.1998, the NRC completed an inspection at your Davis-Besse site. The enclosed | |||
report presents the results of that irwpection. | |||
4 | 4 | ||
During this inspection period, the plant was operated safely and in <accordance with plant | |||
procedures. A minor plant transient caused by the failure of a servo control valve was effectively | |||
handled by operators. Although your corrective action program was generally effective in | |||
identifying and resolving issuss, a prior opportunity to identify the servo control valve problem | |||
was missed by the engineering department. No violations of NRC requirements were identified, | |||
in accordance with 10 CFR 2.790 of the NRC's " Rules of PractPa," a copy of this letter and its | |||
enclosure will be placed in the NRC Pubk Document Room. | |||
. | . | ||
l | l | ||
Sincerely, | |||
/fW | |||
W | |||
DV | |||
Geoffrey E. Grant, Director | |||
Division of Reactor Projects | |||
Docket No.: | |||
50 346 | |||
! | f | ||
Ucense No.: NPF-3 | |||
I | |||
i | |||
Enclosure: | |||
Inspection Report | |||
, | |||
No. 50-348/97015(DRP) | |||
[ | |||
! | |||
See Attached Distribution | |||
; | ; | ||
$ II[ JII9llI .L! | |||
9802040012 980128 | |||
PDR | |||
ADOCK 05000346 | |||
AhU$ | |||
} | |||
.. , | |||
. - . _ . | |||
_ _ . _ _ | |||
_ . . _ _ . . _ _ _ _ . _ _ - _ _ _ _ _ _ . | |||
_ | |||
- .. | |||
i,' | |||
* | |||
, | , | ||
J. Wood - | |||
2.. | |||
4 | 4 | ||
oc wfencl: | |||
John P. Stetz, Senior | |||
Vice President- Nuclear | |||
J. H. Lash, Plant Manager | |||
J. L Freels, Manager | |||
Regulatory Affairs | |||
State Liaison Omoor, State | |||
of Ohio | |||
Robert E. Owen, Ohio | |||
; | ; | ||
Department of Heal.a | |||
' | ' | ||
O. A. Glazer, State of Ohio, | |||
Public Utilities Commission | |||
> | > | ||
> | > | ||
| Line 100: | Line 134: | ||
4 | 4 | ||
a | a | ||
-- - | |||
. | |||
. | |||
. _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ . _ . _ . _ | |||
_ .. _ _ _ _ _ _ _ _ .. _ ._ .._ _ _ _ _ | |||
1 | |||
, | , | ||
i | i | ||
! | ! | ||
January 28, 1998 | |||
l!. . . | |||
Mr. John K. Wood | |||
Vice Presidert- Nuclear | |||
Deve Besse Nuclear Power Station | |||
] | ] | ||
L | Centerior Service Company | ||
L | |||
5501 North State Route 2 | |||
oak Narbor, oN 43449 | |||
; | [ | ||
SUBJECT: | |||
NRC INSPECTION REPORT No. 50 346/97015(DRP) | |||
) | |||
; | |||
Dear Mr. Wood: | |||
. | . | ||
On January 7,1998, the NRC completed an inspection at your Davis Besse site. The enclosed | |||
i | i | ||
4 | 4 | ||
report presents the results of that inspection. | |||
; | ; | ||
During this inspection periM, the plant was operated safely and in accordance with plant | |||
procedures, A minor plant transient caused by the failure of a servo control valve was e"ded; | |||
handled by operators. Although your correctiie action program was generally effective in | |||
identifying and resolving issues, a pitor opportunity to identify the servo control valve problem | |||
was missed by the engineering department. No violations of NRC requirements were identified. | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its | |||
enclosure will be placed in the NRC Public Document Room. | |||
Sincerely, | |||
/s/ Marc L. Dapas for | |||
Geoffrey E. Grant, Director | |||
Division of Reactor Projects | |||
Docket No.: | |||
50-316 | |||
Ucense No.: NPF-3 - | |||
Enclosure: | |||
Inspection Report | |||
No. 50 346/97015(DRP) | |||
, | |||
See Attached Distribution | |||
SEE PREVIOUS CONCURRENCES | |||
DOCUMENT NAME: GMavlWav97015.dtp | |||
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E" = Copy | |||
with attach /enci "N" = No copy | |||
OFFICE | |||
Rlli | |||
Rlll | |||
Rlli | |||
NAME | |||
Kozakinmo | |||
Creed /Section S.8 | |||
Grant Md'~ | |||
DATE | |||
01/ | |||
198 | |||
01/ | |||
/98 | |||
01/f//98 | |||
OFFICIAL RECORD COPY | |||
i | |||
: | : | ||
! | |||
. | |||
. | |||
. | |||
. | |||
. | |||
. | |||
_. | |||
. . | |||
- | |||
. | |||
. | |||
__ | |||
., | |||
. | |||
- . - | |||
.. . | |||
- | |||
. | |||
. | |||
. | |||
.- - | |||
-- | |||
- | |||
.. | |||
' | ' | ||
. | |||
-. | |||
January 28, 1998 | |||
Mr. John K. Wood | |||
Vice President - Nuclear | |||
Davis-Besse Nuclear Power Station | |||
' | ' | ||
Centerior Service Company | |||
5501 North State Route 2 | |||
Oak Harbor OH 43449 | |||
SUBJECT: | |||
NRC INSPECTION REPORT NO. 50-346/97015(DRP) | |||
: | |||
Dear Mr, Wood: | |||
On January 7,1998, the NRC completed an inspection at your Davis-Besse site. The enclosed | |||
report presents the results of that inspection. | |||
During this inspection period, the plant was operated safely and in accordance with plant | |||
' | |||
procedures. A minor plant transient caused by the failure of a servo control valve was effectively | |||
handled by operators. Although your corrective action program was generally effective in | |||
identifying and resolving isst ts, a prior opportunity to identify the servo control valve problem | |||
was missed by the engineering department. No violations of NRC requirements were identified. | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its | |||
enclosure will be placed in the NRC Public Document Room. | |||
Sincerely, | |||
/s/ Marc L. Dapas for | |||
Geoffrey E. Grant, Director - | |||
Division cf Reactor Projects | |||
Docket No.: | |||
50-346 | |||
License No.: NPF-3 | |||
Enclosure: | |||
Inspection Report | |||
No. 50-346/97015(DRP) | |||
- See Attached Distribution | |||
DOCUMENT NAME: G:\\davi\\dav97015.drp | |||
To receive a copy of this document, indicate b 'he box "C" = Copy without attach /enci "E" = Copy | |||
with attach /enci "N" = No copy | |||
, | |||
b | |||
Rlli | |||
$ | |||
Rlll | |||
Rlli | |||
OFFICE | |||
Rill | |||
NAME | |||
Kozak: nmo h | |||
Crbekon S.8 | |||
Grant | |||
f.* c.! | |||
t.e** m | |||
DATE | |||
01///98 | |||
01[,/98 | |||
01/ /98 | |||
01/ /98 | |||
OFFICIAL RECORD COPY | |||
1 | |||
_. | |||
. _ . _ | |||
_. | |||
_ _ _ | |||
_ . _ _ | |||
_ | |||
_ __. | |||
__ _ _ __ . | |||
_ . _ . . . | |||
_ | |||
_ | |||
. _ . . . . _ | |||
_ | |||
_ | |||
, | |||
. | |||
. | |||
4 | 4 | ||
J. Wood | |||
-2- | |||
ocw/ encl: | |||
John P. Stetz, Senior | |||
Vice President- Nudear | |||
J. H. Lash, Plant Manager | |||
J. L Freets, Manager | |||
Regulatory Affairs | |||
' | ' | ||
State Liaison Officer, State | |||
of Ohio | |||
Robert E. Owen, Ohio | |||
Department of Health | |||
' | ' | ||
C. A. Glazer, State of Ohio, | |||
Public Utilities Commission | |||
Distnbution- | |||
i | |||
i | Docket File w/enci | ||
SRI Davis-Besse w/enci | |||
PUBLIC IE-01 w/enci | |||
A. B. Beach w/enct | |||
Project Manager, NRR w/enci | |||
Deputy RA w/enci | |||
Rlil Enf. Coordinator w/enci | |||
Rill PRR w/enci | |||
CAA1 w/enci(E-mail) | |||
DRS (2) w/onci | |||
TSS w/onci | |||
DOCDESK (E-mail) | |||
< | < | ||
DRP w/onci | |||
, | , | ||
. | |||
}} | }} | ||
Latest revision as of 07:46, 10 December 2024
| ML20199F435 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/28/1998 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Wood CENTERIOR ENERGY |
| Shared Package | |
| ML20199F438 | List: |
| References | |
| 50-346-97-15, NUDOCS 9802040012 | |
| Download: ML20199F435 (5) | |
See also: IR 05000346/1997015
Text
,~.
. -
.-
--
.-
_
-
- - .
- - . .
_ - .
- . - ...__. - - - - . - . . _ _._~ .-.
,
g.
g*
v584roq
UNITED STATES
{
g
NUCLEAR REGULATORY COMMISSION
4
8
REGION til
y
801 WARRENVILLE ROAD
,,
LISLE, ILLINOIS 60532-4351
%9*****
January 28, 1998
,
ur. John x. wood
Vlos Presiderd- Nuclear
Davie-Besse Nucisar Power Station
>
Centerior Service Company
5501 Nortn State Route 2
.
Oak Hartor, OH 43449
'
SUBJECT:
NRC INSPECTION REPORT No. 50-346/97015(DRP}
Dear Mr. Wood:
i
,
on January 7.1998, the NRC completed an inspection at your Davis-Besse site. The enclosed
report presents the results of that irwpection.
4
During this inspection period, the plant was operated safely and in <accordance with plant
procedures. A minor plant transient caused by the failure of a servo control valve was effectively
handled by operators. Although your corrective action program was generally effective in
identifying and resolving issuss, a prior opportunity to identify the servo control valve problem
was missed by the engineering department. No violations of NRC requirements were identified,
in accordance with 10 CFR 2.790 of the NRC's " Rules of PractPa," a copy of this letter and its
enclosure will be placed in the NRC Pubk Document Room.
.
l
Sincerely,
/fW
W
DV
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.:
50 346
f
Ucense No.: NPF-3
I
i
Enclosure:
Inspection Report
,
No. 50-348/97015(DRP)
[
!
See Attached Distribution
$ II[ JII9llI .L!
9802040012 980128
ADOCK 05000346
AhU$
}
.. ,
. - . _ .
_ _ . _ _
_ . . _ _ . . _ _ _ _ . _ _ - _ _ _ _ _ _ .
_
- ..
i,'
,
J. Wood -
2..
4
oc wfencl:
John P. Stetz, Senior
Vice President- Nuclear
J. H. Lash, Plant Manager
J. L Freels, Manager
Regulatory Affairs
State Liaison Omoor, State
of Ohio
Robert E. Owen, Ohio
Department of Heal.a
'
O. A. Glazer, State of Ohio,
Public Utilities Commission
>
>
i
1
4
4
a
-- -
.
.
. _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ . _ . _ . _
_ .. _ _ _ _ _ _ _ _ .. _ ._ .._ _ _ _ _
1
,
i
!
January 28, 1998
l!. . .
Mr. John K. Wood
Vice Presidert- Nuclear
Deve Besse Nuclear Power Station
]
Centerior Service Company
L
5501 North State Route 2
oak Narbor, oN 43449
[
SUBJECT:
NRC INSPECTION REPORT No. 50 346/97015(DRP)
)
Dear Mr. Wood:
.
On January 7,1998, the NRC completed an inspection at your Davis Besse site. The enclosed
i
4
report presents the results of that inspection.
During this inspection periM, the plant was operated safely and in accordance with plant
procedures, A minor plant transient caused by the failure of a servo control valve was e"ded;
handled by operators. Although your correctiie action program was generally effective in
identifying and resolving issues, a pitor opportunity to identify the servo control valve problem
was missed by the engineering department. No violations of NRC requirements were identified.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
/s/ Marc L. Dapas for
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.:
50-316
Ucense No.: NPF-3 -
Enclosure:
Inspection Report
No. 50 346/97015(DRP)
,
See Attached Distribution
SEE PREVIOUS CONCURRENCES
DOCUMENT NAME: GMavlWav97015.dtp
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E" = Copy
with attach /enci "N" = No copy
OFFICE
Rlli
Rlll
Rlli
NAME
Kozakinmo
Creed /Section S.8
Grant Md'~
DATE
01/
198
01/
/98
01/f//98
OFFICIAL RECORD COPY
i
!
.
.
.
.
.
.
_.
. .
-
.
.
__
.,
.
- . -
.. .
-
.
.
.
.- -
--
-
..
'
.
-.
January 28, 1998
Mr. John K. Wood
Vice President - Nuclear
Davis-Besse Nuclear Power Station
'
Centerior Service Company
5501 North State Route 2
Oak Harbor OH 43449
SUBJECT:
NRC INSPECTION REPORT NO. 50-346/97015(DRP)
Dear Mr, Wood:
On January 7,1998, the NRC completed an inspection at your Davis-Besse site. The enclosed
report presents the results of that inspection.
During this inspection period, the plant was operated safely and in accordance with plant
'
procedures. A minor plant transient caused by the failure of a servo control valve was effectively
handled by operators. Although your corrective action program was generally effective in
identifying and resolving isst ts, a prior opportunity to identify the servo control valve problem
was missed by the engineering department. No violations of NRC requirements were identified.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Sincerely,
/s/ Marc L. Dapas for
Geoffrey E. Grant, Director -
Division cf Reactor Projects
Docket No.:
50-346
License No.: NPF-3
Enclosure:
Inspection Report
No. 50-346/97015(DRP)
- See Attached Distribution
DOCUMENT NAME: G:\\davi\\dav97015.drp
To receive a copy of this document, indicate b 'he box "C" = Copy without attach /enci "E" = Copy
with attach /enci "N" = No copy
,
b
Rlli
$
Rlll
Rlli
OFFICE
Rill
NAME
Kozak: nmo h
Crbekon S.8
Grant
f.* c.!
t.e** m
DATE
01///98
01[,/98
01/ /98
01/ /98
OFFICIAL RECORD COPY
1
_.
. _ . _
_.
_ _ _
_ . _ _
_
_ __.
__ _ _ __ .
_ . _ . . .
_
_
. _ . . . . _
_
_
,
.
.
4
J. Wood
-2-
ocw/ encl:
John P. Stetz, Senior
Vice President- Nudear
J. H. Lash, Plant Manager
J. L Freets, Manager
Regulatory Affairs
'
State Liaison Officer, State
of Ohio
Robert E. Owen, Ohio
Department of Health
'
C. A. Glazer, State of Ohio,
Public Utilities Commission
Distnbution-
i
Docket File w/enci
SRI Davis-Besse w/enci
PUBLIC IE-01 w/enci
A. B. Beach w/enct
Project Manager, NRR w/enci
Deputy RA w/enci
Rlil Enf. Coordinator w/enci
Rill PRR w/enci
CAA1 w/enci(E-mail)
DRS (2) w/onci
TSS w/onci
DOCDESK (E-mail)
<
DRP w/onci
,
.