ML20199J024: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_-                                                                                                            -
{{#Wiki_filter:_-
d     PARSONS Daniel L Curry vne anonn. r4xiear servm Partons Energy & Ctorn.ca!s Group inc-
d PARSONS Daniel L Curry vne anonn. r4xiear servm Partons Energy & Ctorn.ca!s Group inc-
    * ' 2675 (A&gantown Road a Headirq Pennsytvania 19007 * (610) 855-2366
* ' 2675 (A&gantown Road a Headirq Pennsytvania 19007 * (610) 855-2366
* Fax: (610) 8G-2002 januan 28,1998                 .,
* Fax: (610) 8G-2002 januan 28,1998 Docket No. 50-336 Parsons NUM2-PPNR 1050-L U.S. Nuclear Regulatory Commission Attention: Ihcument Control Desk Washington. D.C. 20555 Millstone Nuclear Power Station Unit No. 2 Indsngn_ dent Corrective Action Veri 6 cation Program (ICAVP)
Docket No. 50-336 Parsons NUM2-PPNR 1050-L U.S. Nuclear Regulatory Commission Attention: Ihcument Control Desk Washington. D.C. 20555 Millstone Nuclear Power Station Unit No. 2 Indsngn_ dent Corrective Action Veri 6 cation Program (ICAVP)
Gentlemen:
Gentlemen:
On January 13, 1998, Parsons Power Group Inc. (PPGI) participated in a publicly observed meeting with the U. S. Nuclear Regulatory Commission (NRC) and Northeast Nuclear Energy Compa'sy (NNECo). The meeting was held in the training center at the Millstone site. The primary purpose of the meeting was to discuss the status of the Millser.e Unit 2 IndependcrA Corrective Action Verification Piogram (ICAVP).
On January 13, 1998, Parsons Power Group Inc. (PPGI) participated in a publicly observed meeting with the U. S. Nuclear Regulatory Commission (NRC) and Northeast Nuclear Energy Compa'sy (NNECo). The meeting was held in the training center at the Millstone site. The primary purpose of the meeting was to discuss the status of the Millser.e Unit 2 IndependcrA Corrective Action Verification Piogram (ICAVP).
PPGl presented an overall Unit 2 project summary and provided the status of Tier 1, Tier 2 and Tier 3 ectivities. Key activities included in the project summary include:
PPGl presented an overall Unit 2 project summary and provided the status of Tier 1, Tier 2 and Tier 3 ectivities. Key activities included in the project summary include:
* NRC Implementation audit of Parsons efforts was completed in December.
NRC Implementation audit of Parsons efforts was completed in December.
* Tier i resources focused on completion of HPSI system review
Tier i resources focused on completion of HPSI system review The Corrective Action review scope was identified and the review was initiated.
* The Corrective Action review scope was identified and the review was initiated.
Tier 2 Critical Design Characteristics validation phase is underway.
* Tier 2 Critical Design Characteristics validation phase is underway.
All Tier 3 sample populations l' ave been selected with exception of Vendor manual review.
* All Tier 3 sample populations l' ave been selected with exception of Vendor manual review.
Target submittal date for the Unit 2 ICAVP Final Report is April 30,1998.
* Target submittal date for the Unit 2 ICAVP Final Report is April 30,1998.
Enclosure i provides a list of primary participants in the meeting. Enclosure 2 provides the handout used by Parsons during the presentatics Please call me at (610) 855-2366 if you have any questions.
Enclosure i provides a list of primary participants in the meeting. Enclosure 2 provides the handout used by Parsons during the presentatics Please call me at (610) 855-2366 if you have any questions.
Sincerely,                                     ,
i Sincerely, rm 1., Y,'
i rm 1., Y ,'
l
                                  ~,a                                                  . /1. A     .                          l
. /1. A
                        ~%3                                                   a a (/,[. w n Daniel L. Curry 9802050187 900128                                           Parsons ICAVP Project Director PDR     ADOCK 05000336 P                           PDR b                                                                           ,    l,
~,a
~%3 a a (/,[. w n Daniel L. Curry 9802050187 900128 Parsons ICAVP Project Director PDR ADOCK 05000336 P
PDR b
l,


  ,I DLC:djv
,I DLC:djv
    * , Ittach,ments     1. List of Primary Participants
*, Ittach,ments 1.
: 2. Presentation 11andout ec:       E. Imbro (2) - USNRC                       J. Fougere - NNECo
List of Primary Participants 2.
: 11. Eichenholz - USNRC                     Rep. Terry Concanrwe NEAC R. Laudenat - NNECo                       Project Files i
Presentation 11andout ec:
E. Imbro (2) - USNRC J. Fougere - NNECo
: 11. Eichenholz - USNRC Rep. Terry Concanrwe NEAC R. Laudenat - NNECo Project Files i
ITNR1050 dx
ITNR1050 dx


3 j
3 j
l .
l List of Primary Participants US Nuclea" Regulatory Commission Gene Imbro Steve Reynolds Harold Eichenholz John Nakoski Parsons Power Group Inc.
Enclosure 1 List of Primary Participants US Nuclea" Regulatory Commission                                                                                                                                 '
Dan Curry Eric Blocher Rich Glaviano Wayne Dobson Michael Akins Northeast Nuclear Energy Company s
Gene Imbro Steve Reynolds Harold Eichenholz John Nakoski Parsons Power Group Inc.
M, L. Bowling, Jr. (part-time)
Dan Curry Eric Blocher Rich Glaviano Wayne Dobson Michael Akins Northeast Nuclear Energy Company                                                                                                                                   s M, L. Bowling, Jr. (part-time)
Ray Necci Joseph Fougere
Ray Necci Joseph Fougere                                                                                                                                                     }
}
4 PPNR1050. doc i
4 PPNR1050. doc i


4 4
4 4
a   9 Enclosure 2 l'PGl l'resentation Itandout i
a 9
r g'
l'PGl l'resentation Itandout i
i:
rg' i:
I ITNR1050 doc
I ITNR1050 doc


e       p I
e p
MILLSTOM ENIT 2 STATE S OF ICAVP Parsons Power January 13,1998 Waterford, CT w
MILLSTOM ENIT 2 I
L MREM ouuw i
STATE S OF ICAVP Parsons Power January 13,1998 Waterford, CT w
L MREM i
ouuw


Agenda Millstone Unit 2 ICAVP e Project Summary           - D. Curry
Agenda Millstone Unit 2 ICAVP e Project Summary
,        e Status Tier 1 Activities   - M. Akins i
- D. Curry e Status Tier 1 Activities
e Status Tier 2 Activities   -
- M. Akins i
R. Glaviano e Status Tier 3 Activities   - W. Dobsen l
e Status Tier 2 Activities R. Glaviano l
e Project Schedute           -
e Status Tier 3 Activities
D. Curry w" - PARSONS 2
- W. Dobsen e Project Schedute
- D. Curry w
PARSONS 2
Ol/13N8
Ol/13N8


9
9
                                                                                  ~
~
Project Summary e Completed NRC Implementation Audit e Identified and Initiated Corrective Action Review Scope e Tier 1 Topical Area and Program Reviews Scheduled Separately e Tier 1 Piping and Electrical Enclosure Sample Plans submitted to NRC e Tier 2 CDC Validation phase undenvay e Tier 3- Phase II samples selected w/e Vendor Manuals e Tier 3 sample plan change for setpoint and calculation reviews submitted to NRC e Target submittal date for Unit 2 ICAVP Final Report is April 28,1998 U
Project Summary e
3 P " PARSONS mium l
Completed NRC Implementation Audit e
Identified and Initiated Corrective Action Review Scope e
Tier 1 Topical Area and Program Reviews Scheduled Separately e
Tier 1 Piping and Electrical Enclosure Sample Plans submitted to NRC e
Tier 2 CDC Validation phase undenvay e
Tier 3-Phase II samples selected w/e Vendor Manuals e
Tier 3 sample plan change for setpoint and calculation reviews submitted to NRC e
Target submittal date for Unit 2 ICAVP Final Report is April 28,1998 l
U P " PARSONS mium 3
l
[


W Discrepancy Reports I
W Discrepancy Reports I
e Status as of January 9,1998
i e Status as of January 9,1998 I
!        253   Preliminary Discrepancy Reports (DRs) Initiated l
253 Preliminary Discrepancy Reports (DRs) Initiated l
l         170   Valid DRs Issued to NNECo, NRC, NEAC i
l 170 Valid DRs Issued to NNECo, NRC, NEAC i
6   DRs determined to be invalid during review process
6 DRs determined to be invalid during review process l
_          .                                          m _m_
t 1
m _m_


l                                                                       .
l l
                                                                      ~
~
Discrepancy Reports l
Discrepancy Reports l
e Response Status as of January 9,1998 80 NU Responses Received 54 Comments on NU Response Approved and Issued 34 DRs Conside d Open (follow-up or pending) 20 DRs Closed 12   DRs Closed as Invalid - (Previously Identified by NU or Basis Invalid) 8 DRs Closed as Confirmed Discrepancies t
e Response Status as of January 9,1998 80 NU Responses Received 54 Comments on NU Response Approved and Issued j
E om3m       5                                             L  PARSONS
34 DRs Conside d Open (follow-up or pending) 20 DRs Closed 12 DRs Closed as Invalid - (Previously Identified by NU or Basis Invalid) 8 DRs Closed as Confirmed Discrepancies j
t E
L PARSONS l
om3m 5


Project Efficiencies                                               -
l i
e Daily RAI Clarification & Prioritization Call e Twice-Tveekly Conference Call to discuss technical issues (NRC & NEAC Monitor) continuing                                               l e Bi-Weekly Progress Report and Schedule Update e Sampling Plan Revisions                                                       '
Project Efficiencies
;                + Tier 3: Calculations and Setpoints
~
                  + Tier 1: Piping and Electrical Enclosures e Discrepancy Report Processing
e Daily RAI Clarification & Prioritization Call e Twice-Tveekly Conference Call to discuss technical issues j
                  + Added DR Response Clarification Contact l                 + Initiated DR Resolution Conferences                                 .
(NRC & NEAC Monitor) continuing
I mnm         6                                           L  PARSONS
[
l e Bi-Weekly Progress Report and Schedule Update e Sampling Plan Revisions Tier 3: Calculations and Setpoints
+
+ Tier 1: Piping and Electrical Enclosures e Discrepancy Report Processing Added DR Response Clarification Contact
+
7 l
Initiated DR Resolution Conferences
+
I L
PARSONS mnm 6


      -- s_ 4,m.m,u.snk,M.s     ,, 4K,,,sa__aam,_u.__   A__, Lam,o_KM4 m A_ s & ,.mLmm,_   J4 A_ A e_ m m y _s,,w,m,y     .gm_b, ,_s.o._pssKy be, WM mmwe-sa m mm m.._ _Jms-m mA_,,_,4anim -4       a h
s_
I
4,m.m,u.snk,M.s 4K,,,sa__aam,_u.__
!                                                                                                                                                                                                        i n             .
A__, Lam,o_KM4 m A_ s
1
,.mLmm,_
!                                                                                                                                                                                                2 0
J4 A_ A e_ m m y _s,,w,m,y
.gm_b,
,_s.o._pssKy be, WM mmwe-sa m mm m.._ _Jms-m mA_,,_,4anim -4 a
h I
i n
2 0
e E
e E
I i
I i
h 4
h 4
8 t
8 t
1 l,
1 l
i 1
i 1
l                                                                                           O                           d l
l O
                                                                                        . M                          , 4 i
d 4
                                                                                          .                            y Y
l M
i                                                                                                                     @
Y i
y i
l i
l i
i i
i i
f i                                                                                                                                                                                                 b 1
f i
b 1
4 A
4 A
.                                                                                                                                                                                                  :d 5
:d 5


Tier       1   Status e Resources focused on completion of HPSI to support issue of Report e AFW on hold till receipt of new calculations e HVAC and EDG Licensing Basis (Form 2) in for review e Holding on many programs pending receipt ofinformation from XSECo g                 i o ,,,, y,         ,
Tier 1 Status e Resources focused on completion of HPSI to support issue of Report e AFW on hold till receipt of new calculations e HVAC and EDG Licensing Basis (Form 2) in for review e Holding on many programs pending receipt ofinformation from XSECo i
                                                    ." PARSONS I
g o,,,, y, PARSONS I
I


O
O
                                                                ~
~
HPSI System Report Started e Most of the design information in-house e Outstanding RAIs minor in nature e Received Tier-2 input for CDC verification l
HPSI System Report Started e Most of the design information in-house e Outstanding RAIs minor in nature e Received Tier-2 input for CDC verification l
e Placeholders wi:1 be taken for many programs e Corrective Action Review on HPSI critical path i
e Placeholders wi:1 be taken for many programs e Corrective Action Review on HPSI critical path i
E
E PARSONS 9
                                                          "  PARSONS 01/l_W3 9
01/l_W3 l
l


l Select Systems                                                                                                                                               .
l Select Systems j
j
+
                              +
Tier 1 - HPSI E)oundaries & Data Ga'henng General Schedule i
* Tier 1 - HPSI E)oundaries & Data Ga'henng                                                                                                                                           ,
Mod.
* General                     :
n'
Schedule i           Mod.     n' Mod. Review Checklist                               !
[
Resiew/ Cross Checkl                         l l                                                     Closcout f             f             I                           I Vendor Manuals                       :              1           4 j
I Mod. Review
IIPSI Report                           '
(
                                                                                                                                            =               1           1         1       i e                4             4         4       i I
Checklist Resiew/ Cross Checkl l
l                                                                                                                                                     k
l Closcout
{
f f
I I
j Vendor Manuals 1
4 IIPSI Report
=
1 1
1 i
4 4
4 i
e I
l k
____j l
____j l
I Review Procedures                                                                                           [
I Review Procedures
[
i._____p_____
i._____p_____
Corrective Action                                                                                               !
Corrective Action Review
Review
; _ _ _ _ _4_ _ _ _ _ p ;
                                                        ; _ _ _ _ _4_ _ _ _ _ p ;                ;          ;                ;        ;              ;
I i
I i
l                                                   System               Form 2 (License Basis)                 Form 3 (Design Basis - Comp)                                                           l l                                                   Boundary           Form 3 (Design Basis- System)                     Form 7 (System Mods) l Diagrams               Form 5 (Mod Screen)                         Form 8 (Ops. Procedures)                                                       t
l System Form 2 (License Basis)
!                                                    Form i               Form 6 (Mod Listing)                             Form 9 (Testing)                                                           l Form 10 (P&ID Walkdown)                           Form 10 (Walkdown)                           Final Sy stems Report I                                                                                                                                                                                                       k t
Form 3 (Design Basis - Comp) l l
Boundary Form 3 (Design Basis-System)
Form 7 (System Mods)
{
l Diagrams Form 5 (Mod Screen)
Form 8 (Ops. Procedures) t Form i Form 6 (Mod Listing)
Form 9 (Testing) l Form 10 (P&ID Walkdown)
Form 10 (Walkdown)
Final Sy stems Report I
k t
I i
I i
j                         1001/97           10 l
j 1001/97 10 l


i I
i select Systems i
+
Tier 1 - AFW
~ s & Data G ng General l
_ Deservlicensing E asis Schedule I
Mod.
in PI-7 g
Lic. Docs Mod. Redew l
Calcs (D B) l q
Checklist l
Review' Cross Check!
j g
Closecut j
(
I t
t Vendor Manuals i
4 I
i Completed Mods Packages AFW Report k
l All UIRs'ACR/AR I
t t
t t
i 8
4 4
4 I
b 4
All Calculations l
All Pic "uies (OMT) r Specifications
----i I
t Review Procedures p_____j._____
l f
I Corrective Action f
Resiew I_____I_____
1 1
8 8
I t
4 i
i i
i i
select Systems                                                                                                                                              .                i
i i
              +
L i
* Tier 1 - AFW
l System Form 2 (License Basis)
                    ~ s & Data G      ng                                                                                                                                          ;
Form 3 (Design Basis - Comp) i Boundary Form 3 (Design Basis-System)
General                              :
Form 7 (System Mods) f Diagrams Form 5 (Mod Screen)
_ Deservlicensing E asis l
Form 8 (Ops. Procedures)
Schedule Mod.        in
* I'
;                                PI-7                                                                                      g                                                        ;
;                            Lic. Docs                                        Mod. Redew                                                                                          l Calcs (D B)                                                                                  q                Checklist l                                                                                                                    l Review' Cross Check!
g                                                                            Closecut j
j t
I                            t Vendor Manuals                i              4              I                              i
!                                                  Completed Mods Packages                                                                  AFW Report                      k    l All UIRs'ACR/AR                                              I              t              t              t        t    i 4
8              4              4              4          I    b All Calculations l                                                     All Pic "uies (OMT)                                                                                                          r Specifications                                                                                                          !
!                                                                                                                                  ----i                                            ,
I                                                                                                                                                                                t
!                                                                        Review Procedures
;                                  p_____j._____
f I                                                                      Corrective Action                                                                                            f
;                                                                    Resiew                                                                                                      !
I                                                                  !
I_____I_____                  1          1          8          8                      t 4          i          i          i          i            i L
                                  *                              *
* i l
System               Form 2 (License Basis)                 Form 3 (Design Basis - Comp)                                                       i Form 7 (System Mods)
Boundary           Form 3 (Design Basis- System)
;                              Diagrams               Form 5 (Mod Screen)                     Form 8 (Ops. Procedures)
[
[
4 Form i               Form 6 (Mod Listing)                         Form 9 (Testing)                                                               l Form 10 (P&ID Waikdown)                       Form 10 (Walkdown)                             Final Systems Report             L l
4 Form i Form 6 (Mod Listing)
i i
Form 9 (Testing) l Form 10 (P&ID Waikdown)
t l
Form 10 (Walkdown)
i                                                                                                                                                                                   !
Final Systems Report L
4      10f2187       10                                                                                                                                                         ,
l i
it l
i 10f2187 10 4
b
b


i i
i i
Select Systems                                                                                                                                                                                                                 ,
Select Systems
          +
+
* Tier 1 - Group 2                                                                                             '
Tier 1 - Group 2 aries & Data hering i
aries & Data     hering                                                                                                                                                                                                                       i
+
                                                                      +                                                                                               General                                                         :
General 1
Schedule A
Schedule A
Mod. Scjreening *,
Mod. Scjreening *,
PI-7                   i             i                                                                                     g                                                                                                 ;
PI-7 i
Lic. Docs     d                                       f Mod. Review f                                 f               I Cales (D B)                                                                                                                                     Checklist All PDCEs               j                          d                                                                     Resiew/ Cross Checkt                                                                     j All PDCRs                                           l                                                                         Closcout                                                                           ;
i g
t                  i             t Vendor Manuals                                     i                 i             i Completed Mods Packages                                                                                             System Report                                                           k All UIRs/ACR/AR                                                                       I                 f             f                                               f               8 All Calculations                                                                                                                                                                                 l All Procedures (OMT)
Lic. Docs d
Specifications
Mod. Review l
,                                    ,    Fielp Walkdowq                 ,              ,        ,                ,                            ,                ,                                                                                          f i         i           i             i             i         .                                            i                   ----I                                                                                    ;
f f
i Review Procedures i                                            f                I
f I
[____[_____l                         t               i Correctise Action                                                                                                                                                                   ;
Checklist Cales (D B)
l--__{_____t                        1 Rniew I                 I               t                                             n                                                                                           [
All PDCEs d
t
Resiew/ Cross Checkt j
* l System                     Form 2 (License Basis)                   Form 3 (Design Basis - Comp)                                                                                                                           j Boundary             Form 3 (Design Basis- System)                       Form 7 (53stem Mods)
j All PDCRs l
Diagrams                       Form 5 (Mod Screen)                       Form 8 (Ops. Procedures)
Closcout t
Form 1                       Form 6 (Mad Listing)                                 Form 9 (Testing)                                                                                                                         l Form 10 (P&ID Walldown)                           Form 10 (Waikdown)                                                       Final Systems Report 10C1/97           14 i
i t
Vendor Manuals i
i i
Completed Mods Packages System Report k
All UIRs/ACR/AR I
f f
f 8
All Calculations l
All Procedures (OMT)
I Specifications
{
f Fielp Walkdowq
----I i
i i
i i
i i
Review Procedures
[____[_____l t
i i
f I
Correctise Action 1 Rniew I I
t n
[
l--__{_____t t
l System Form 2 (License Basis)
Form 3 (Design Basis - Comp) j Boundary Form 3 (Design Basis-System)
Form 7 (5 stem Mods) 3 Diagrams Form 5 (Mod Screen)
Form 8 (Ops. Procedures)
Form 1 Form 6 (Mad Listing)
Form 9 (Testing) l Final Systems Report f
Form 10 (P&ID Walldown)
Form 10 (Waikdown) 10C1/97 14 i


Corrective Action Review e Sorted ACRs, CRs and ARs population approximately 2500 per system e Using a Corrective Action Evaluation Tool
Corrective Action Review e Sorted ACRs, CRs and ARs population approximately 2500 per system j
            + Establishes Review Issues
e Using a Corrective Action Evaluation Tool
!          + Flags changes to ARs and CRs following completion of review e Revised Form 4 to reflec1: changes to Corrective Action Program g ,, ,         i3
+ Establishes Review Issues
                                                        <"            PARSONS
+ Flags changes to ARs and CRs following completion of review i
e Revised Form 4 to reflec1: changes to Corrective Action Program g,,,
i3 PARSONS i


                                                        ~
~
l Tier 2 - Status s Design Basis Event Analyses Review and Validation in Progress e 12 Discrepancy Reports issued based upon Tier 2 work s NRC Approval of CDCs for 23 of 29 events (remaining expected week of 1/12) l oun,         u
l Tier 2 - Status s Design Basis Event Analyses Review and Validation in Progress e 12 Discrepancy Reports issued based upon Tier 2 work s NRC Approval of CDCs for 23 of 29 events (remaining expected week of 1/12) l u
: oun,


l     Tier 2 - Design Basis Event                                           ~
l Tier 2 - Design Basis Event
(DBEv) Review                                                             -
~
Event Category Number of   Analysis Validation Scheduled DBEv's     Review   Compicte Completion RC Flow Reduction       2         2                 23 Jan 98 2 @ 90 %
(DBEv) Review Event Category Number of Analysis Validation Scheduled DBEv's Review Compicte Completion RC Flow Reduction 2
Reactivity               6         6                 30 Jan 98 4 @ 90 %
2 2 @ 90 %
Radioactive Releases   4         4           -
23 Jan 98 Reactivity 6
13 Feb 98 Loss of Heat Sink       4         4           -
6 4 @ 90 %
20 Feb 98 Overcooling             5           1         -
30 Jan 98 Radioactive Releases 4
27 Feb 98 RC Pressure Boundary     4         3         -
4 13 Feb 98 Loss of Heat Sink 4
13 Mar 98 Containment Analyses     4         4         -
4 20 Feb 98 Overcooling 5
20 Mar 98
1 27 Feb 98 RC Pressure Boundary 4
                                                                                                      /
3 13 Mar 98 Containment Analyses 4
Total       29         25     6 @ 90 %
4 20 Mar 98
/
Total 29 25 6 @ 90 %
(
(
E em.ws             is                                             L    PARSONS
E L
PARSONS em.ws is


Tier 2 - Design Basis Event (DBEv) Review Event Category   Nuraber of Analysis Validation   Scheduled DBEv's   Review   Complete     Completion RC Flow Reduction       2         2     2 @ 90 %     23 Jan 98 Reactivity               6         6     4 @ 90 %     30 Jan 98 Radioactive Releases     4         4         -
Tier 2 - Design Basis Event (DBEv) Review Event Category Nuraber of Analysis Validation Scheduled DBEv's Review Complete Completion RC Flow Reduction 2
13 Feb 98 Loss of Heat Sink       4         4         -
2 2 @ 90 %
20 Feb 98 Overcooling             5         1         -
23 Jan 98 Reactivity 6
27 Feb 98 RC Pressure Boundary     4         3         -
6 4 @ 90 %
13 Mar 98 Containment Analyses     4         4         -
30 Jan 98 Radioactive Releases 4
20 Mar 98 Total         29       25     6 @ 90 %
4 13 Feb 98 Loss of Heat Sink 4
4 20 Feb 98 Overcooling 5
1 27 Feb 98 RC Pressure Boundary 4
3 13 Mar 98 Containment Analyses 4
4 20 Mar 98 Total 29 25 6 @ 90 %
l U
l U
i o , ,, ,             ,3                                                   PARSONS
i o,,,,
,3 PARSONS


l i   Tier 2 -Information Needs e Critical RAIs for Accident Mitigation Systems Validation:
l i
Tier 2 -Information Needs e Critical RAIs for Accident Mitigation Systems Validation:
17 RAI's Submitted Based on Pilot RAI Process for AMSR Systems
17 RAI's Submitted Based on Pilot RAI Process for AMSR Systems
          - NNECo Provide Calculations Identified by Parsons l             0 9 RAls Remain Open (ECD January 16)
- NNECo Provide Calculations Identified by Parsons l
          - NNECo System Engineers Review Calcs Listed on RAI's o Identify Superceded and Revised Cales o Identify Additional Calcs (Provide to Parsons) o Schedule Assumes All Cales Received by January 16 o 12 RAIs Remain Open                                             ,
0 9 RAls Remain Open (ECD January 16)
e 8 Design Basis Events Being Reanalyzed by NNECo O Schedule Assumes Design Inputs Available by Feb 13               ,
- NNECo System Engineers Review Calcs Listed on RAI's o Identify Superceded and Revised Cales o Identify Additional Calcs (Provide to Parsons) o Schedule Assumes All Cales Received by January 16 o 12 RAIs Remain Open e 8 Design Basis Events Being Reanalyzed by NNECo O Schedule Assumes Design Inputs Available by Feb 13 E
E oi,im           is                                                 L PARSONS
L PARSONS oi,im is


i Tier 3 - Process Review Summary                                               -
i Tier 3 - Process Review Summary e Sample plan changes submitted to NRC based on Tier 1 calculation and setpoint reviews e Phase II sample selection complete except for vendor manuals e Review completed for following samples:
e Sample plan changes submitted to NRC based on Tier 1 calculation and setpoint reviews e Phase II sample selection complete except for vendor manuals e Review completed for following samples:
+ Equivalency Substitutions and Commercial Grade Dedication
        + Equivalency Substitutions and Commercial Grade Dedication
+ Equipment / Parts Safety Classification Changes
        + Equipment / Parts Safety Classification Changes
+ Maintenan.e Procedure Revisions
        + Maintenan.e Procedure Revisions
+ Operations and Surveillance Procedure Revisions
        + Operations and Surveillance Procedure Revisions
+ Emergency and Abnormal Operations Procedure Revisions i
        + Emergency and Abnormal Operations Procedure Revisions i
i rg 4" 3 PARSONS meum n
rg                             i 4" 3 PARSONS meum           n


                                                                                                                                              =
=
Tier 3 Summary Schedule Logic                                                                                                           -
Tier 3 Summary Schedule Logic 4
4
D g$$ilisililEE4 J
!          DJg$$ilisililEE4 RAI&
f RAI&
j             Conferences     SpeOfY             SPEC 1
j Conferences SpeOfY SPEC 1 i
            -Populatim t;,                                               Phase i Obtain & Review     Sample RAI           -                                     "
-Populatim t;,
Phase i Obtain & Review Sample RAI 8
-Understanding 8
g j
Documents Follow up RAls i
]
Ref. Doc. etc.
i
\\
Phnw if Sngle,
8
8
            -Understanding        g          -                                      -                                          8 Documents                              Follow up RAls Ref. Doc. etc.
Phnw if Sngle ,
+
+
                                                              =         bpeofy         8 Phase II RAI                 Obtain & Review Sample Sample items                                                                                 ~
=
Follow up RAls FBI Report     8 NRC COMMENTS m
bpeofy Phase II RAI Obtain & Review Sample I
O 01/1198                 18                                                                                                     L      PARSONS
Sample f
items
~
Follow up RAls
[
FBI Report 8
NRC COMMENTS
[
t mO L
PARSONS 01/1198 18 i


1 Tier 3 Inspection Areas - Status EngineeringUcerisingh           SarTpie               leerm Nurfber   Selected Chemined Reviewed         Rerrerks SdpirtCharges(SCR)                       5         5         5       3   FWB98(12/8)
1 Tier 3 Inspection Areas - Status EngineeringUcerisingh SarTpie leerm Nurfber Selected Chemined Reviewed Rerrerks SdpirtCharges(SCR) 5 5
SpecicWicnRNsiers                       31         31       31       2 32         32       32       8 DrairgRWsiers t.hirgTier1 &2Fbsdts                   SarrpleRanRssicn CablationRMsiars UmrsirgDnmertCisrges                     19         19       19       7 ftnw kanes wFtparts,(IT:R)               32         32       32     15 BpmerirgVukFbqtest,(BAR)                 32         32       32       6 TBD                                 FtwewcnHi!
5 3
VendarTedried HanTution Sttfatai     151       151       151     41 E
FWB98(12/8)
                                                                                                    " PARSONS 01/I19g               19
SpecicWicnRNsiers 31 31 31 2
DrairgRWsiers 32 32 32 8
CablationRMsiars t.hirgTier1 &2Fbsdts SarrpleRanRssicn UmrsirgDnmertCisrges 19 19 19 7
ftnw kanes wFtparts,(IT:R) 32 32 32 15 BpmerirgVukFbqtest,(BAR) 32 32 32 6
VendarTedried HanTution TBD FtwewcnHi!
Sttfatai 151 151 151 41 E
PARSONS 19 01/I19g


                                                                                                            .      s Tier 3 Inspection Areas - Status I                                               I 4
s Tier 3 Inspection Areas - Status I
Parts Dedcation,Subsetusion,&       Sanple       Ikers Safetyr3==aiEcadion                 Nunter SW   Chtained Reviemed             Remuks i
I l
Cume=M GadeDedcation                   32   132   132     132     ftpartinProgess I
Parts Dedcation,Subsetusion,&
i aw wawSaraus                          32   32     32       32     apatinaugess MEPLSafetyCassficdianGerJes           32   32     32       32     ftportinRugess i
Sanple Ikers 4
!                                Stbtdal   96   196   196     196 E3 omm                   m
Safetyr3==aiEcadion Nunter SW Chtained Reviemed Remuks i
                                                                                                  '"  PARSONS
Cume=M GadeDedcation 32 132 132 132 ftpartinProgess I
i aw awSaraus 32 32 32 32 apatinaugess w
i MEPLSafetyCassficdianGerJes 32 32 32 32 ftportinRugess i
Stbtdal 96 196 196 196 l
I t
E3 omm m
PARSONS


t Tier 3 Inspection Areas - Status Operationsand Whintenance               Sample           itens Number Selected Obtained Reviewed           Rev ki, Opmtim Procedres (4 poced # nia 10 changes)       4       4         4       4   Reportin Proyiess Aln ou ul Ops (4 procedtres wf mirt 10 change     4       4         4       4   Reportin Rogress EOP(4 proceduresv/ min 10 changes)                 4       4         4       4   Reportin Prvyiess Stzveillance (4 procedtres vi nirt 10 changes)     4       4         4       4   Reportin Progress Maintenance (4 pacedres W nin 10 changes)           4     4         4         4   Reportin Progress IST Procedtres (4 pmdtres v/ mirt 10 chang         4     4         4         3                               ,
t Tier 3 Inspection Areas - Status Operationsand Whintenance Sample itens Number Selected Obtained Reviewed Rev ki, Opmtim Procedres (4 poced # nia 10 changes) 4 4
ISI Procedtses (4 procedtres wf min 10 change     4       4       4         3                               :
4 4
ASNE SectionXIRepair/ Replace                     10     10       10       1 Tenp Changes /Jtsrper, Lifted Lead, Bypass         25     25       25       18 Stbtotal   63     63       63       45 5"
Reportin Proyiess Aln ou ul Ops (4 procedtres wf mirt 10 change 4
ovuw                   2,                                                                     PARSONS
4 4
4 Reportin Rogress EOP(4 proceduresv/ min 10 changes) 4 4
4 4
Reportin Prvyiess Stzveillance (4 procedtres vi nirt 10 changes) 4 4
4 4
Reportin Progress Maintenance (4 pacedres W nin 10 changes) 4 4
4 4
Reportin Progress IST Procedtres (4 pmdtres v/ mirt 10 chang 4
4 4
3 ISI Procedtses (4 procedtres wf min 10 change 4
4 4
3 ASNE SectionXIRepair/ Replace 10 10 10 1
Tenp Changes /Jtsrper, Lifted Lead, Bypass 25 25 25 18 Stbtotal 63 63 63 45 5"
PARSONS ovuw 2,


Project Schedule Milestones               .
Project Schedule Milestones (as of January 12,1998)
(as of January 12,1998) l Status     Report Completion e Tier 1
Status Report Completion l
              + HPSI                 2/19/98
e Tier 1
              + AFW                   4/13/98
+ HPSI 2/19/98
              + EDG                   4/3/98
+ AFW 4/13/98
              + HVAC                   4/6/98 e Tier 2                   3/27/98 e Tier 3                   3/11/98 e Final                     4/28/98 E
+ EDG 4/3/98
o,in,         n
+ HVAC 4/6/98 e Tier 2 3/27/98 e Tier 3 3/11/98 e Final 4/28/98 E
o,in, n


Potential Schedule Impacts s NNECo Information Processing e Number and Complexity of Discrepancy Repods e Use of Placeholders - Tracking
Potential Schedule Impacts s NNECo Information Processing e Number and Complexity of Discrepancy Repods e Use of Placeholders - Tracking e Design Basis Availability (AFW, Piping, etc.)
!          e Design Basis Availability (AFW, Piping, etc.)
s Program / Topical Area Rework e Availability of 6 Updated Analysis (Tier 2)
s Program / Topical Area Rework
U PARSONS U
,          e Availability of 6 Updated Analysis (Tier 2)
01/13/98 l
U
                                                          " PARSONS 01/13/98 U
l


hh- A   am.--nv.n..h*__Am. Auw wa.42.w_.-+Jm.e e s. 4 _hM.4-a     *J-.hmmA m-   n.h_w J we-__mw hM.m.__m,m.m. p.ed w4.e m e s Aww m.pm h-46, 4
hh-A am.--nv.n..h*__Am.
h h
Auw wa.42.w_.-+Jm.e e s. 4
2 i                                                                                                                                          O I                       .-    --
_hM.4-a
W           (
*J-.hmmA m-n.h_w J we-__mw hM.m.__m,m.m.
p.ed w4.e m e s Aww m.pm h-46, 4
h h2 i
O I
W
[I i
[I i
                                                                                                                                $s i
$s i
i                                                                       b N
i b
e                                                                             )
N e
l                                                                       @d                                                                           i
l d
                                                                      <s                                                                               ,
s C
C 4
m 4
m Q                                                                         =
Q
=
d E
d E
l
l
Line 317: Line 478:
l
l
~
~
n o
n os n
s n
an l
a n
P
l
[
[
P n
no ita mro fn I
i o
pu kca s
t a
I l
m r
l ll lllllll}}
f o
I n
p u
k c
s a
I l     l ll lllllll}}

Latest revision as of 05:27, 8 December 2024

Provides List of Primary Participants in 980113 Publicly Observed Meeting W/Nrc & Nene at Millstone Site,To Discuss Status of Millstone Unit 2 Independent Corrective Action Verification Program.W/Handouts
ML20199J024
Person / Time
Site: Millstone 
Issue date: 01/28/1998
From: Curry D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUM2-PPNR-1050, NUDOCS 9802050187
Download: ML20199J024 (29)


Text

_-

d PARSONS Daniel L Curry vne anonn. r4xiear servm Partons Energy & Ctorn.ca!s Group inc-

  • ' 2675 (A&gantown Road a Headirq Pennsytvania 19007 * (610) 855-2366
  • Fax: (610) 8G-2002 januan 28,1998 Docket No. 50-336 Parsons NUM2-PPNR 1050-L U.S. Nuclear Regulatory Commission Attention: Ihcument Control Desk Washington. D.C. 20555 Millstone Nuclear Power Station Unit No. 2 Indsngn_ dent Corrective Action Veri 6 cation Program (ICAVP)

Gentlemen:

On January 13, 1998, Parsons Power Group Inc. (PPGI) participated in a publicly observed meeting with the U. S. Nuclear Regulatory Commission (NRC) and Northeast Nuclear Energy Compa'sy (NNECo). The meeting was held in the training center at the Millstone site. The primary purpose of the meeting was to discuss the status of the Millser.e Unit 2 IndependcrA Corrective Action Verification Piogram (ICAVP).

PPGl presented an overall Unit 2 project summary and provided the status of Tier 1, Tier 2 and Tier 3 ectivities. Key activities included in the project summary include:

NRC Implementation audit of Parsons efforts was completed in December.

Tier i resources focused on completion of HPSI system review The Corrective Action review scope was identified and the review was initiated.

Tier 2 Critical Design Characteristics validation phase is underway.

All Tier 3 sample populations l' ave been selected with exception of Vendor manual review.

Target submittal date for the Unit 2 ICAVP Final Report is April 30,1998.

Enclosure i provides a list of primary participants in the meeting. Enclosure 2 provides the handout used by Parsons during the presentatics Please call me at (610) 855-2366 if you have any questions.

i Sincerely, rm 1., Y,'

l

. /1. A

~,a

~%3 a a (/,[. w n Daniel L. Curry 9802050187 900128 Parsons ICAVP Project Director PDR ADOCK 05000336 P

PDR b

l,

,I DLC:djv

  • , Ittach,ments 1.

List of Primary Participants 2.

Presentation 11andout ec:

E. Imbro (2) - USNRC J. Fougere - NNECo

11. Eichenholz - USNRC Rep. Terry Concanrwe NEAC R. Laudenat - NNECo Project Files i

ITNR1050 dx

3 j

l List of Primary Participants US Nuclea" Regulatory Commission Gene Imbro Steve Reynolds Harold Eichenholz John Nakoski Parsons Power Group Inc.

Dan Curry Eric Blocher Rich Glaviano Wayne Dobson Michael Akins Northeast Nuclear Energy Company s

M, L. Bowling, Jr. (part-time)

Ray Necci Joseph Fougere

}

4 PPNR1050. doc i

4 4

a 9

l'PGl l'resentation Itandout i

rg' i:

I ITNR1050 doc

e p

MILLSTOM ENIT 2 I

STATE S OF ICAVP Parsons Power January 13,1998 Waterford, CT w

L MREM i

ouuw

Agenda Millstone Unit 2 ICAVP e Project Summary

- D. Curry e Status Tier 1 Activities

- M. Akins i

e Status Tier 2 Activities R. Glaviano l

e Status Tier 3 Activities

- W. Dobsen e Project Schedute

- D. Curry w

PARSONS 2

Ol/13N8

9

~

Project Summary e

Completed NRC Implementation Audit e

Identified and Initiated Corrective Action Review Scope e

Tier 1 Topical Area and Program Reviews Scheduled Separately e

Tier 1 Piping and Electrical Enclosure Sample Plans submitted to NRC e

Tier 2 CDC Validation phase undenvay e

Tier 3-Phase II samples selected w/e Vendor Manuals e

Tier 3 sample plan change for setpoint and calculation reviews submitted to NRC e

Target submittal date for Unit 2 ICAVP Final Report is April 28,1998 l

U P " PARSONS mium 3

l

[

W Discrepancy Reports I

i e Status as of January 9,1998 I

253 Preliminary Discrepancy Reports (DRs) Initiated l

l 170 Valid DRs Issued to NNECo, NRC, NEAC i

6 DRs determined to be invalid during review process l

t 1

m _m_

l l

~

Discrepancy Reports l

e Response Status as of January 9,1998 80 NU Responses Received 54 Comments on NU Response Approved and Issued j

34 DRs Conside d Open (follow-up or pending) 20 DRs Closed 12 DRs Closed as Invalid - (Previously Identified by NU or Basis Invalid) 8 DRs Closed as Confirmed Discrepancies j

t E

L PARSONS l

om3m 5

l i

Project Efficiencies

~

e Daily RAI Clarification & Prioritization Call e Twice-Tveekly Conference Call to discuss technical issues j

(NRC & NEAC Monitor) continuing

[

l e Bi-Weekly Progress Report and Schedule Update e Sampling Plan Revisions Tier 3: Calculations and Setpoints

+

+ Tier 1: Piping and Electrical Enclosures e Discrepancy Report Processing Added DR Response Clarification Contact

+

7 l

Initiated DR Resolution Conferences

+

I L

PARSONS mnm 6

s_

4,m.m,u.snk,M.s 4K,,,sa__aam,_u.__

A__, Lam,o_KM4 m A_ s

,.mLmm,_

J4 A_ A e_ m m y _s,,w,m,y

.gm_b,

,_s.o._pssKy be, WM mmwe-sa m mm m.._ _Jms-m mA_,,_,4anim -4 a

h I

i n

2 0

e E

I i

h 4

8 t

1 l

i 1

l O

d 4

l M

Y i

y i

l i

i i

f i

b 1

4 A

d 5

Tier 1 Status e Resources focused on completion of HPSI to support issue of Report e AFW on hold till receipt of new calculations e HVAC and EDG Licensing Basis (Form 2) in for review e Holding on many programs pending receipt ofinformation from XSECo i

g o,,,, y, PARSONS I

I

O

~

HPSI System Report Started e Most of the design information in-house e Outstanding RAIs minor in nature e Received Tier-2 input for CDC verification l

e Placeholders wi:1 be taken for many programs e Corrective Action Review on HPSI critical path i

E PARSONS 9

01/l_W3 l

l Select Systems j

+

Tier 1 - HPSI E)oundaries & Data Ga'henng General Schedule i

Mod.

n'

[

I Mod. Review

(

Checklist Resiew/ Cross Checkl l

l Closcout

{

f f

I I

j Vendor Manuals 1

4 IIPSI Report

=

1 1

1 i

4 4

4 i

e I

l k

____j l

I Review Procedures

[

i._____p_____

Corrective Action Review

_ _ _ _ _4_ _ _ _ _ p ;

I i

l System Form 2 (License Basis)

Form 3 (Design Basis - Comp) l l

Boundary Form 3 (Design Basis-System)

Form 7 (System Mods)

{

l Diagrams Form 5 (Mod Screen)

Form 8 (Ops. Procedures) t Form i Form 6 (Mod Listing)

Form 9 (Testing) l Form 10 (P&ID Walkdown)

Form 10 (Walkdown)

Final Sy stems Report I

k t

I i

j 1001/97 10 l

i I

i select Systems i

+

Tier 1 - AFW

~ s & Data G ng General l

_ Deservlicensing E asis Schedule I

Mod.

in PI-7 g

Lic. Docs Mod. Redew l

Calcs (D B) l q

Checklist l

Review' Cross Check!

j g

Closecut j

(

I t

t Vendor Manuals i

4 I

i Completed Mods Packages AFW Report k

l All UIRs'ACR/AR I

t t

t t

i 8

4 4

4 I

b 4

All Calculations l

All Pic "uies (OMT) r Specifications


i I

t Review Procedures p_____j._____

l f

I Corrective Action f

Resiew I_____I_____

1 1

8 8

I t

4 i

i i

i i

L i

l System Form 2 (License Basis)

Form 3 (Design Basis - Comp) i Boundary Form 3 (Design Basis-System)

Form 7 (System Mods) f Diagrams Form 5 (Mod Screen)

Form 8 (Ops. Procedures)

[

4 Form i Form 6 (Mod Listing)

Form 9 (Testing) l Form 10 (P&ID Waikdown)

Form 10 (Walkdown)

Final Systems Report L

l i

it l

i 10f2187 10 4

b

i i

Select Systems

+

Tier 1 - Group 2 aries & Data hering i

+

General 1

Schedule A

Mod. Scjreening *,

PI-7 i

i g

Lic. Docs d

Mod. Review l

f f

f I

Checklist Cales (D B)

All PDCEs d

Resiew/ Cross Checkt j

j All PDCRs l

Closcout t

i t

Vendor Manuals i

i i

Completed Mods Packages System Report k

All UIRs/ACR/AR I

f f

f 8

All Calculations l

All Procedures (OMT)

I Specifications

{

f Fielp Walkdowq


I i

i i

i i

i i

Review Procedures

[____[_____l t

i i

f I

Correctise Action 1 Rniew I I

t n

[

l--__{_____t t

l System Form 2 (License Basis)

Form 3 (Design Basis - Comp) j Boundary Form 3 (Design Basis-System)

Form 7 (5 stem Mods) 3 Diagrams Form 5 (Mod Screen)

Form 8 (Ops. Procedures)

Form 1 Form 6 (Mad Listing)

Form 9 (Testing) l Final Systems Report f

Form 10 (P&ID Walldown)

Form 10 (Waikdown) 10C1/97 14 i

Corrective Action Review e Sorted ACRs, CRs and ARs population approximately 2500 per system j

e Using a Corrective Action Evaluation Tool

+ Establishes Review Issues

+ Flags changes to ARs and CRs following completion of review i

e Revised Form 4 to reflec1: changes to Corrective Action Program g,,,

i3 PARSONS i

~

l Tier 2 - Status s Design Basis Event Analyses Review and Validation in Progress e 12 Discrepancy Reports issued based upon Tier 2 work s NRC Approval of CDCs for 23 of 29 events (remaining expected week of 1/12) l u

oun,

l Tier 2 - Design Basis Event

~

(DBEv) Review Event Category Number of Analysis Validation Scheduled DBEv's Review Compicte Completion RC Flow Reduction 2

2 2 @ 90 %

23 Jan 98 Reactivity 6

6 4 @ 90 %

30 Jan 98 Radioactive Releases 4

4 13 Feb 98 Loss of Heat Sink 4

4 20 Feb 98 Overcooling 5

1 27 Feb 98 RC Pressure Boundary 4

3 13 Mar 98 Containment Analyses 4

4 20 Mar 98

/

Total 29 25 6 @ 90 %

(

E L

PARSONS em.ws is

Tier 2 - Design Basis Event (DBEv) Review Event Category Nuraber of Analysis Validation Scheduled DBEv's Review Complete Completion RC Flow Reduction 2

2 2 @ 90 %

23 Jan 98 Reactivity 6

6 4 @ 90 %

30 Jan 98 Radioactive Releases 4

4 13 Feb 98 Loss of Heat Sink 4

4 20 Feb 98 Overcooling 5

1 27 Feb 98 RC Pressure Boundary 4

3 13 Mar 98 Containment Analyses 4

4 20 Mar 98 Total 29 25 6 @ 90 %

l U

i o,,,,

,3 PARSONS

l i

Tier 2 -Information Needs e Critical RAIs for Accident Mitigation Systems Validation:

17 RAI's Submitted Based on Pilot RAI Process for AMSR Systems

- NNECo Provide Calculations Identified by Parsons l

0 9 RAls Remain Open (ECD January 16)

- NNECo System Engineers Review Calcs Listed on RAI's o Identify Superceded and Revised Cales o Identify Additional Calcs (Provide to Parsons) o Schedule Assumes All Cales Received by January 16 o 12 RAIs Remain Open e 8 Design Basis Events Being Reanalyzed by NNECo O Schedule Assumes Design Inputs Available by Feb 13 E

L PARSONS oi,im is

i Tier 3 - Process Review Summary e Sample plan changes submitted to NRC based on Tier 1 calculation and setpoint reviews e Phase II sample selection complete except for vendor manuals e Review completed for following samples:

+ Equivalency Substitutions and Commercial Grade Dedication

+ Equipment / Parts Safety Classification Changes

+ Maintenan.e Procedure Revisions

+ Operations and Surveillance Procedure Revisions

+ Emergency and Abnormal Operations Procedure Revisions i

i rg 4" 3 PARSONS meum n

=

Tier 3 Summary Schedule Logic 4

D g$$ilisililEE4 J

f RAI&

j Conferences SpeOfY SPEC 1 i

-Populatim t;,

Phase i Obtain & Review Sample RAI 8

-Understanding 8

g j

Documents Follow up RAls i

]

Ref. Doc. etc.

i

\\

Phnw if Sngle,

8

+

=

bpeofy Phase II RAI Obtain & Review Sample I

Sample f

items

~

Follow up RAls

[

FBI Report 8

NRC COMMENTS

[

t mO L

PARSONS 01/1198 18 i

1 Tier 3 Inspection Areas - Status EngineeringUcerisingh SarTpie leerm Nurfber Selected Chemined Reviewed Rerrerks SdpirtCharges(SCR) 5 5

5 3

FWB98(12/8)

SpecicWicnRNsiers 31 31 31 2

DrairgRWsiers 32 32 32 8

CablationRMsiars t.hirgTier1 &2Fbsdts SarrpleRanRssicn UmrsirgDnmertCisrges 19 19 19 7

ftnw kanes wFtparts,(IT:R) 32 32 32 15 BpmerirgVukFbqtest,(BAR) 32 32 32 6

VendarTedried HanTution TBD FtwewcnHi!

Sttfatai 151 151 151 41 E

PARSONS 19 01/I19g

s Tier 3 Inspection Areas - Status I

I l

Parts Dedcation,Subsetusion,&

Sanple Ikers 4

Safetyr3==aiEcadion Nunter SW Chtained Reviemed Remuks i

Cume=M GadeDedcation 32 132 132 132 ftpartinProgess I

i aw awSaraus 32 32 32 32 apatinaugess w

i MEPLSafetyCassficdianGerJes 32 32 32 32 ftportinRugess i

Stbtdal 96 196 196 196 l

I t

E3 omm m

PARSONS

t Tier 3 Inspection Areas - Status Operationsand Whintenance Sample itens Number Selected Obtained Reviewed Rev ki, Opmtim Procedres (4 poced # nia 10 changes) 4 4

4 4

Reportin Proyiess Aln ou ul Ops (4 procedtres wf mirt 10 change 4

4 4

4 Reportin Rogress EOP(4 proceduresv/ min 10 changes) 4 4

4 4

Reportin Prvyiess Stzveillance (4 procedtres vi nirt 10 changes) 4 4

4 4

Reportin Progress Maintenance (4 pacedres W nin 10 changes) 4 4

4 4

Reportin Progress IST Procedtres (4 pmdtres v/ mirt 10 chang 4

4 4

3 ISI Procedtses (4 procedtres wf min 10 change 4

4 4

3 ASNE SectionXIRepair/ Replace 10 10 10 1

Tenp Changes /Jtsrper, Lifted Lead, Bypass 25 25 25 18 Stbtotal 63 63 63 45 5"

PARSONS ovuw 2,

Project Schedule Milestones (as of January 12,1998)

Status Report Completion l

e Tier 1

+ HPSI 2/19/98

+ AFW 4/13/98

+ EDG 4/3/98

+ HVAC 4/6/98 e Tier 2 3/27/98 e Tier 3 3/11/98 e Final 4/28/98 E

o,in, n

Potential Schedule Impacts s NNECo Information Processing e Number and Complexity of Discrepancy Repods e Use of Placeholders - Tracking e Design Basis Availability (AFW, Piping, etc.)

s Program / Topical Area Rework e Availability of 6 Updated Analysis (Tier 2)

U PARSONS U

01/13/98 l

hh-A am.--nv.n..h*__Am.

Auw wa.42.w_.-+Jm.e e s. 4

_hM.4-a

  • J-.hmmA m-n.h_w J we-__mw hM.m.__m,m.m.

p.ed w4.e m e s Aww m.pm h-46, 4

h h2 i

O I

W

[I i

$s i

i b

N e

l d

s C

m 4

Q

=

d E

l

l

~

n os n

an l

P

[

no ita mro fn I

pu kca s

I l

l ll lllllll