NUREG-0800, Notice of Issuance & Availability of Revised SRP Sections 9.2.1 & 9.2.2 of NUREG-0800, SRP for Review of SARs for Nuclear Power Plants: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[NUREG-0800, Forwards SE Accepting Licensee 981203 Ltr Which Proposed Revs to Responsibilities of Plant Operations Review Committee (NUREG-0800) & GL 93-07,as Described in Chapter 17.2 of USAR]]
| number = ML20199K006
| issue date = 06/24/1986
| title = Notice of Issuance & Availability of Revised SRP Sections 9.2.1 & 9.2.2 of NUREG-0800, SRP for Review of SARs for Nuclear Power Plants
| author name = Denton H
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee name =
| addressee affiliation =
| docket =
| license number =
| contact person =
| case reference number = RTR-NUREG-0800, RTR-NUREG-800
| document report number = NUDOCS 8607080482
| document type = FEDERAL REGISTER NOTICES, TEXT-CODE OF FEDERAL REGULATIONS
| page count = 4
}}
 
=Text=
{{#Wiki_filter:.                                                                                    l U. S. NUCLEAR REGULATORY COMMISSION NUREG-0800 i
1
                      " STANDARD REVIEW PLAN FOR THE REVIEW 0F SAFETY                j ANALYSIS REPORTS FOR NUCLEAR POWER PLANTS" NOTICE OF ISSUANCE AND AVAILABILITY REVISED SRP SECTION 9.2.1 AND SECTION 9.2.2 The U. S. Nuclear Regulatory Commission (NRC) has published a revision to SRP Section 9.2.1, " Station Service Water System" and to SRP Section 9.2.2,
  " Reactor Auxilia.] Cealing Water System" of NUREG-0800, " Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants," LWR Edition (SRP).
The revision consists of SRP Section 9.2.1, Rev. 4 and Section 9.2.2, Rev. 3.
The revised SRP Sections incorporate the resolution of Generic Issues 36,
  " Loss of Service Water (Calvert Cliffs, Unit 1)." These revisions ao not incorporate any new guidelines or requirements. These SRPs were clarified to alert reviewers to evaluate whether interconnected trains could lead to the total loss of all service water cooling. The acceptance criteria were also      ,.
changed to clarify that all requirements of General Design Criterion 4 (missiles, pipe whip, jet loads and environmental conditions) and not just l
 
flow instabilities have to be met. All changes to the SRP Sections are identifi ed by lines in the margins of the revised SRP sections.
The revised SRP sections are effective immediately. A copy is expected to be availablo in the Public Document Room within two weeks.      Copies of the revised SRP Sections or of the complete Standard Review Plan, NUREG-0800, Accession No. PD-81-920199, are available for purchase from the National Technical Information Service, 5285 Port Royal Road, Springfield, Virginia 22161; telephone (703) 487-4650.
Dated at Bethesda, Maryland this 24th day of June, 1986.
FOR THE NUCLEAR REGULATORY COMMISSION
                                                    /                  k Harold R. Denton, Director Office of Nuclear Reactor Regulation t
e
                            - - _}}

Latest revision as of 20:21, 14 December 2020