IR 05000390/2017003: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 11/22/2017 | | issue date = 11/22/2017 | ||
| title = Non-Concurrence on Watts Bar Nuclear Plant - Nuclear Regulatory Commission Integrated Inspection Report 05000390/2017003, 05000391/2017003 | | title = Non-Concurrence on Watts Bar Nuclear Plant - Nuclear Regulatory Commission Integrated Inspection Report 05000390/2017003, 05000391/2017003 | ||
| author name = Rapp C | | author name = Rapp C | ||
| author affiliation = NRC/RGN-II/DRP | | author affiliation = NRC/RGN-II/DRP | ||
| addressee name = | | addressee name = |
Revision as of 16:46, 18 June 2019
ML17326A235 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 11/22/2017 |
From: | Curtis Rapp Division Reactor Projects II |
To: | |
Shared Package | |
ML17326A219 | List: |
References | |
IR 2017003 | |
Download: ML17326A235 (10) | |