{{Adams
#REDIRECT [[RA-97-053, Forwards Rept Entitled, Westinghouse Test Reactor TR-2, Final Decommissioning Plan. Rept Provides General Plan & Time Schedule for Radiological Remediation of Wtr Facility on Westinghouse Waltz Mill Site]]
| number = ML20151K588
| issue date = 07/31/1997
| title = Forwards Rept Entitled, Westinghouse Test Reactor TR-2, Final Decommissioning Plan. Rept Provides General Plan & Time Schedule for Radiological Remediation of Wtr Facility on Westinghouse Waltz Mill Site
| author name = Nardi A
| author affiliation = WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000022
| license number =
| contact person =
| document report number = RA-97-053, RA-97-53, NUDOCS 9708060115
| package number = ML20151K593
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:'
77          \
n                                                                                y=/
w j
Westinghouse                  Energy Systems                                    Ba 355 Electric Corporation                                                            Pittsburgh PennsyNania 15230 0355 RA-97-053
            ,                                                                                  July 31,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Document Control Center                                                                                  l
 
==Subject:==
Submittal of Decommissioning Plan for the Westinghouse Test Reactor USNRC License Number TR-2, Docket 50-22 l
 
==Reference:==
: 1) Westinghouse Letter dated June 17,1996 from A.J. Nardi to USNRC
: 2) Westinghouse Letter dated Nov. 27,1996 from A.J. Nardi to USNRC                                l
: 3) Westinghouse Letter dated April 7,1997 from A.J. Nardi to USNRC l
The Westinghouse Electric Corporation hereby submits the attached report entitled
            " Westinghouse Test Reactor, TR-2, Final Decommissioning Plan" This report provides a general plan and time schedule for the radiological remediation of the WTR facility on the Westinghouse Waltz Mill Site which is covered by L.icense Number TR-2. Westinghouse has presented an overall schedule and set of priorities for the Waltz Mill Site (Reference 1) and has submitted the Remediation Plan (Reference 2) for certain facilities covered by USNRC License Number SNM-770, Westinghouse previously submitted a conceptual version of this Decommissioning Plan (Reference 3).
The overall priorities and objectives for the Waltz Mill Site remain as stated in the referenced letters. The first priority is to address the soil and groundwater issues so that the site can be removed from the SDMP list, followed by remediation of cenain SNM-770 retired facilities, and finally to decommission the Westinghouse Test Reactor facility so that the TR-2 license can be terminated.
Since Westinghouse plans to transfer the WTR facility to the SNM-770 license, the Decommissioning Plan is based on objectives which recognize the ALARA concept along with the intent to continue the use of the facility for licensed operations. The Plan provides the objectives, schedule, and remediation approaches. Note that this plan is not a detailed engineering plan. Additional engineering detail will be defined as specific plans are developed.
9700060115 970731                '
kk !k!!(!        ,      ,
 
The basic approach presented in the attached Decommissioning Plan is to:
1
: 1) Remove the remaining reactor vessel internal contents, the reactor vessel, and the biological shield.
                                                                                                                  )
: 2) Transfer the remaining radioactive material and WTR facilities to the SNM-770 license.
: 3) Perform an independent verification that the reactor vessel and biological shield have been removed.
: 4) Terminate the TR-2 license.
l If you have any questions concerning this matter, please contact me at the above address or by telephone at (412) 374-4652.
Sincerely,
                          ,a                        /
A. Joseph Nardi, Lic nse Administrator ESBU Regulatory Affairs cc:      Dr. Ronald R. Bellamy U. S. Nuclear Regulatory Commission, Region I 475 Allendale Road King of Prussia, PA 19406 Mr. James G. Yusko PA Department of Environmental Protection 400 Waterfront Drive Pittsburgh, PA 15222 i
Attachment                                                                                            '
Copies Transmitted: 3 notarized and 5 conformed COMMONWEALTH OF PENNSYLVANIA)
COUNTY OF ALLEGHENY) ss Sworn and subscribed before me this
            ,.5/ day of %je                  ,1997.
                              " /
s m s n J)s w                      '
[        Notary Public Notarial Seal Yvonne N. Thompsori, fJota v Pubhe Monroevdle Doro. Al:egheny Coun My Commission Expres Aug 2.19{.y.
Mombur, Pmnsyvanu Assoaanon al tetnu                                                            i i
: w.                                                                                                            .}}

Latest revision as of 02:44, 11 December 2021