| number = ML20153C234
| number = ML20153C234
| issue date = 08/23/1988
| issue date = 08/23/1988
| title = Provides Clarification of Rev 15 to Physical Security Plan Per NRC 880708 Ltr.Per Generic Ltr 87-10,util Finds Granting Temporary Access W/O Requirement of Verifying Character Refs Acceptable
| title = Provides Clarification of Rev 15 to Physical Security Plan Per NRC .Per Generic Ltr 87-10,util Finds Granting Temporary Access W/O Requirement of Verifying Character Refs Acceptable
| author name = Hairston W
| author name = Hairston W
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = GL-87-10, NUDOCS 8809010043
| document report number = GL-87-10, NUDOCS 8809010043
| title reference date = 07-08-1988
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
Line 22: Line 23:
==SUBJECT:==
==SUBJECT:==
Reply to Nuclear Regulatory Commission letter                                  -
Reply to Nuclear Regulatory Commission letter                                  -
dated July 8, 1988 on Revision 15 to the Farley Physical Security Plan Dear Sir This letter responds to the requested clarification in the Nuclear Regulatory Commission letter dated July 8, 1988 concerning 10CFR50.54(p) changes in Revision 15 to the Farley Physical Security Plan.
dated July 8, 1988 on Revision 15 to the Farley Physical Security Plan Dear Sir This letter responds to the requested clarification in the Nuclear Regulatory Commission {{letter dated|date=July 8, 1988|text=letter dated July 8, 1988}} concerning 10CFR50.54(p) changes in Revision 15 to the Farley Physical Security Plan.
Alabama Power Company's intent in Revision 15 was to upgra6e the background screening criteria from ANSI 18.17 to ANS 3.3., In addition, the Plan was revised to address the steps Alabtma Power Company takes in granting temporary access authorization.                Revision 13 contained a require-ment for the deve19r ent of two (2) character references as this was erroneously believed            io be done as a routine part of Alabama Power Com-pany's employment process.            Prior to issuing Revision 15, it was determined that character references are supplied by the~anplicant but are not veri-fled by Employment prior to hiring an individuali rather, the references are verified during the background screening process after employment. As such, Revision 15 did not include the requirement for verification of character references prior to granting temporary access authorization.
Alabama Power Company's intent in Revision 15 was to upgra6e the background screening criteria from ANSI 18.17 to ANS 3.3., In addition, the Plan was revised to address the steps Alabtma Power Company takes in granting temporary access authorization.                Revision 13 contained a require-ment for the deve19r ent of two (2) character references as this was erroneously believed            io be done as a routine part of Alabama Power Com-pany's employment process.            Prior to issuing Revision 15, it was determined that character references are supplied by the~anplicant but are not veri-fled by Employment prior to hiring an individuali rather, the references are verified during the background screening process after employment. As such, Revision 15 did not include the requirement for verification of character references prior to granting temporary access authorization.
Alabama Power Company considers this to be acceptable and in accordance with the guidance in Generic Letter 87-10, and in the opinion of Alabama                                  !
Alabama Power Company considers this to be acceptable and in accordance with the guidance in Generic Letter 87-10, and in the opinion of Alabama                                  !

Revision as of 17:31, 10 December 2021

Provides Clarification of Rev 15 to Physical Security Plan Per NRC .Per Generic Ltr 87-10,util Finds Granting Temporary Access W/O Requirement of Verifying Character Refs Acceptable
ML20153C234
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/23/1988
From: Hairston W
ALABAMA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
GL-87-10, NUDOCS 8809010043
Download: ML20153C234 (2)


Text

- .

  1. 1 Al bamaFbwerCompany 600 No;th 181h Street Post Offee Box 2841 Birmingham, Alabama 3529144(.4 Telephone 20$ 2501837 W. G. Hairston,lle Senior Vice President NxtearOperaws Alabama Power tM soaham eiectre system Docket No. 50-348 Docket No. 50-364 10CFR50.54(p)

August 23, 1988 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Station P1-137 Vashington, DC 20555

SUBJECT:

Reply to Nuclear Regulatory Commission letter -

dated July 8, 1988 on Revision 15 to the Farley Physical Security Plan Dear Sir This letter responds to the requested clarification in the Nuclear Regulatory Commission letter dated July 8, 1988 concerning 10CFR50.54(p) changes in Revision 15 to the Farley Physical Security Plan.

Alabama Power Company's intent in Revision 15 was to upgra6e the background screening criteria from ANSI 18.17 to ANS 3.3., In addition, the Plan was revised to address the steps Alabtma Power Company takes in granting temporary access authorization. Revision 13 contained a require-ment for the deve19r ent of two (2) character references as this was erroneously believed io be done as a routine part of Alabama Power Com-pany's employment process. Prior to issuing Revision 15, it was determined that character references are supplied by the~anplicant but are not veri-fled by Employment prior to hiring an individuali rather, the references are verified during the background screening process after employment. As such, Revision 15 did not include the requirement for verification of character references prior to granting temporary access authorization.

Alabama Power Company considers this to be acceptable and in accordance with the guidance in Generic Letter 87-10, and in the opinion of Alabama  !

Power Company the-e changes do not decrease the safeguards (*fe:tiveness of '

the security plat  !

In all cases the ANS 3.3 background screening criteria Tre being i used for the granting of access authorization. The NUMARC guidelines vill be considered after they are endorsed by the Nuclear Regulatory Comelssion.

Revision 15 did not contain a commitment in section 1.3.4 that the three (3) years of uninterrupted trustworthy employment be with the j certifying contractor. It was Alabama Power Company's in tent to incor- i porate this commitrent. It vili. be added in the next rsavision to the )

secur4ty plan issued after the date of this letter.

8809010043 880823 PER ADOCK 05000348 a l C PDC -

  1. 1 1

- s.

,j. . . .

l Reply to !Iuclear Regulatory Commissior.

Letter dated July 8, 1988 August 23, 1988 Page two i

Alabama Power Company does not issue temporary access authorization to security force members as Alabama Power Company does not believe that 10CFR73, Appendix B allows access authorisation to be granted. security guard applicants /new hires until after verification that the individual has no felony convictions that reflect on the reliability of the individual.

Section 1.4.2 of the Plan vill be' revised in the next revision issued after the date of this letter to clarify that security force members are given access authorization based on completion of an ANS 3.3 backgrount screening or three (3) or more years of uninterrupted employment by Alebama Power company.

Alabama Power Company hopes that these clarifications vill address the NRC's concern 3. Should you have further questions, we vill be glad to discuss them.

Yours very truly,

. I ida . ht.Y~ $

V. G. Hairston, III i

JGSimab cci Mr. L. B. Long Dr. J N. Grace Mr. . A. Reeves  !

Mr. V. H. Bradford 1

e a

l i