ENS 54896: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 21: | Line 21: | ||
The irradiator facility has replaced the level switches and updated the preventative maintenance frequency for the valves and switches to prevent a repeat of this event. | The irradiator facility has replaced the level switches and updated the preventative maintenance frequency for the valves and switches to prevent a repeat of this event. | ||
The source was never uncovered. No release or personnel exposure occurred. | The source was never uncovered. No release or personnel exposure occurred. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200922en.html#en54896 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Revision as of 07:30, 22 September 2020
Where | |
---|---|
Becton Dickinson Infusion Therapy Systems Inc Broken Bow, Nebraska (NRC Region 4) | |
License number: | 04-01-01 |
Organization: | Ne Div Of Radioactive Materials |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+40.45 h1.685 days <br />0.241 weeks <br />0.0554 months <br />) | |
Opened: | Brian Miller 13:56 Sep 11, 2020 |
NRC Officer: | Thomas Herrity |
Last Updated: | Sep 11, 2020 |
54896 - NRC Website | |