ML20141C454: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000285/1985009]]
| number = ML20141C454
| issue date = 04/02/1986
| title = Discusses Insp Rept 50-285/85-09 on 850429-0503 & Forwards Notice of Violation.Further Response Necessary to Document Actions Taken on Each Specific Item.Civil Penalty Not Proposed Due to Opportunity for Extension of Item
| author name = Martin R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Andrews R
| addressee affiliation = OMAHA PUBLIC POWER DISTRICT
| docket = 05000285
| license number =
| contact person =
| document report number = EA-86-029, EA-86-29, NUDOCS 8604070251
| package number = ML20141C460
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 3
}}
See also: [[see also::IR 05000429/2005003]]
 
=Text=
{{#Wiki_filter:!
          ..
            A
    ,; '
                                                      APR  2 EE6
          Docket No.    50-285'                                      ,
        -License No.    DPR-40
        'IUL 86-29-
                Omaha Public Power District
              ~ ATTN:  R. L. Andrews, Division Manager-
                        Nuclear Production
                1623 Harney Street-
                Omaha, Nebraska 68102
                Gentlemen:
                SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT No. 50-255/85-09)
                This refers to the special team inspection conducted by the NRC April 29 -
              - May 3,1985 of activities authorized by Operating License No. DPR-40 for the
                Fort Calhoun Station. The results of this inspection were previously sent to you
                by our letter of July 26, 1985. The inspection team identified six deficiencies
                classified as Potential Enforcement / Unresolved Items. We have determined from a
                further. review of these matters during a followup inspection by Region IV on-
                November 18-22, 1985 and meetings with your staff in the Region IV office on
                December 12-13, 1985 that five of the six Potential Enforcement / Unresolved Items
                were in violation of NRC requirements.    Since you waived your opportunity to
                hold an enforcement conference, one was not conducted.
                We consider Violation A in the enclosed Notice of Violation involving
                qualification of Conax Electrical Penetration Assemblies within the scope of
                10 CFR 50.49 requirements to be of significant concern. The modification devised
                by Omaha Public Power District (OPPD), after it was discovered that Teflon seals
                and conductor insulation in the penetration assemblies had failed qualification
                tests, consisted of potting the junction between the penetration assembly bodies
                and the related pigtail wires using room temperature vulcanizing (RTV) silicone
                rubber. Since you failed to test the penetration assemblies after making
                the modification, the ability of the RTV material to remain bonded through
                the differential expansions and the severe environment of a LOCA was not
                assured in this application. Thus, the penetration units still were not
                appropriately qualified. The extent 6f the deficiency is very broad in
                that the electrical circuits for all equipment located inside containment
'
                must pass through the penetration assemblies; power, control, and
                instrumentation wiring for both safety-related and non-safety-related equipment
'
                inside containment potentially could be affected.
                CERTIFIED MAIL
                RETURN RECEIPT REOUESTED
1
<
i                              8604070251 860402
.
                              PDR ADOCK 05000285
,                              O                PM
                                                                                                L
l                                                                                          )    '
                                                                                                    )
    _
 
    .            .                        __      __--                --. _    --              .  .-- __.          .- -
                '
              '
,
  l
                    Omaha Public Power District                              -2-
                    In accordance with the " General Statement of Policy and Procedure for NRC
                    Enforcement Actions," 10 CFR Part 2 Appendix C (1985), Violation A described
                    in the enclosed Notice has been classified at a Severity Level III. The other
                    violations have each been classified at a Severity Level IV. Normally, a civil
!                    penalty is considered for a Severity Level III violation. However, after
:                    consultation with the Director, Office of Inspection and Enforcement, I have
i                  decided that a civil penalty will not be proposed in this case because the
                    violations were identified prior to November 30, 1983 and this item is of the
                    type for which an extension prior to November 30, 1985 could have been granted
                    if requested before the deadline. We also recognize that following identification
                    of this problem by the NRC, you provided complete and timely reports concerning
                    your evaluation and corrective actions and you took extensive corrective action,
                    including the replacement of all penetration assemblies with units that have
                    been appropriately qualified.
                    You are required to respond to this letter and you should follow the instructions
                    specified in the enclosed Notice when preparing your response. Our inspection
I
                    activities and your letter dated January 11, 1986 indicate that corrective
                    actions are now complete. However, further response from you is necessary to
                    document the actions you have taken on each specific iten and to address any
                    other actions you plan to take to ensure that other deficiencies similar to those
                    noted do not adversely affect any other safety-related equipment. Where you have
                    already responded in writing to these findings (such as your letter of October 11,
                    1985), you do not need to repeat that information but need only reference
                    earlier communications and add additional detail not already contained therein.
                    After reviewing your response to this Notice, including your proposed corrective
                    actions, the NRC will determine whether further NRC enforcement action is
                    necessary to ensure compliance with NRC regulatory requirements.
                    In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
                    Title 10, Code of Federal Regulations, a copy of this letter and its enclosure                                      1
                                                                                                                                          '
                    will be placed in the NRC Public Document Room.
,
,
                    The responses directed by this letter and the enclosed Notice are not subject
'
                    to the clearance procedures of the Office of Management and Budget as required
                    by the Paperwork Reduction Act of 1980, PL 96-511.
                                                                                Sincerely,
                                                                                Original signed by:
                                                                                R.4 tert D. Martin
                                                                                Robert D. Martin
                                                                                Regional Administrator
1
                    Enclosure:
                    Notice of Violation
e
!
l
      . - . .        -.    ._  .--      -    ._,    - . . - , _ , - -              ,,_-.- ,, - ,_ -        . . ,. -      .- - . . - .
 
.
  :
    Omaha Public Power Distret                    -4-
    Distribution:
    PDR
    SECY
    CA
    JMTaylor, IE
    RVollmer, IE
    JAxelrad, IE
                          >
    ABBeach, IE
    JLieberman, ELD
    GZech, IE
    VPotopovs, IE
    RWilson, IE
    FIngram, PA
    JCrooks, AEOD
    BHayes, OI
    GEdles, OIA
    DNussbaumer, OSP
    Enforcement Officers
      RI, RII, RIII, RV
    IE/ES
    IE/EA
    DCS
    State of Nebraska Radiation Control Program Director
    RIV Distribution:                                                                      _
    Regional Administrator, RMartin                                            ,-
    Division Director                                                      /
    Branch Chief, RPB
    Branch Chief, RSB                                              /
                                                                      /      .
                                                                                      l
    DHunnicutt                                                                                /
    DNorman                                                    -
                                                                            f
                                                                                          -
    A. Johnson
                                                            !
                                                                                [
    RIreland                                                            ,/,                    t
    DPowers                                              [          -
                                                                      '
                                                                                              I
    Resident Inspector                                    (
    CWisner (ltr hd)
    RDoda
    RIV Files
                                              RV                    O                  I
    IE:E        ELD % m                    i
                                              RMartin      xej rad
                                                                        '
                                                                                er J y1 r
    ABBE        JLieberman      GZech                                    .
    3/3/86      85/8/86                      43/38/86    3g/86          /p/86          3/ g{86
                              )63/3/86
    RIV:C        ES      AC:RSP      C:RS        C:R          D:D            E0          RA
                  Norman DHunni    t DHunter                    EJohnson DPowers RM<          in
    RIrelandp%/g>/86f.,/l$/86
      2. / tt/86
                                        f //3  /8fr"Q;  Gagliardo
                                                      Vj3/86      g/ /86 c7 hfi/86 4 / 7 /86
}}

Revision as of 20:45, 3 September 2020