ML20132C346: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_    _
{{#Wiki_filter:_
                              .      . N         N TQ-
N N
* 97                 -
TQ-
Copyholder: DCC
* 97 Copyholder: DCC


==Title:==
==Title:==
Line 28: Line 28:


==Title:==
==Title:==
Site Emergency Plan Listed Below are New/ Revised Procedures which must be inserted into or discarded from yo 4
Site Emergency Plan Listed Below are New/ Revised Procedures which must be inserted into or discarded from yo Procedures Manual. Directions are as follows:
Procedures Manual. Directions are as follows:
4 Attached are the following Volume 9, rev.126, revisions:
Attached are the following Volume 9, rev.126, revisions:
: 1. Coversheet and Table of Contents
: 1. Coversheet and Table of Contents
: 2. Chapter 5, issued per QR# 1172-96
: 2. Chapter 5, issued per QR# 1172-96
: 3. Appendix M, issued per QR# 1288-96 Please insert in your controlled manual and discard former revisions, s
: 3. Appendix M, issued per QR# 1288-96 Please insert in your controlled manual and discard former revisions, s
Please sign, date, and return the acknowledgement form within 14 days to the Big Rock Point Plant Document Control Center:
Please sign, date, and return the acknowledgement form within 14 days to the Big Rock Point Plant Document Control Center:
Sirnature or Initials                         Date 1
Sirnature or Initials Date 1
L
L
                                                                                                                      /
/
t'70017                                                                                           i Si; 9612180294 961211 PDR F        ADOCK 05000155                                                                                       l PDR                                                                               !
Si t'70017 i
Issued By:   BRPDCC/ SCBrown Return To: Big Rock Point Plant 10269 U.S. 31 North                                                 Issue Date: 12/11/1996 Charlevoix, MI 49720 Transmittal Number: 297373 Attn: Document Control
9612180294 961211 PDR ADOCK 05000155 F
PDR Issued By:
BRPDCC/ SCBrown Return To: Big Rock Point Plant 10269 U.S. 31 North Issue Date: 12/11/1996 Charlevoix, MI 49720 Transmittal Number: 297373 Attn: Document Control


I TO:
I TO:
Line 54: Line 55:
: 3. Appendix M, issued per QR# 1288-96 Please insert in your controlled manual and discard former revisions.
: 3. Appendix M, issued per QR# 1288-96 Please insert in your controlled manual and discard former revisions.
Please sign, date, and return the acknowledgement form within 14 days to the Big Rock Point Plant Document Control Center:
Please sign, date, and return the acknowledgement form within 14 days to the Big Rock Point Plant Document Control Center:
Sienature or Initials                           Date i
Sienature or Initials Date i
Issued By:   BRPDCC/ SCBrown Return To: Big Rock Point Plant                                                       issue Date: 12/11/1996 10269 U.S. 31 North Charlevoix, MI 49720                                       Transmittal Number: 297373 Attn: Document Control}}
Issued By:
BRPDCC/ SCBrown Return To: Big Rock Point Plant issue Date: 12/11/1996 10269 U.S. 31 North Charlevoix, MI 49720 Transmittal Number: 297373 Attn: Document Control}}

Latest revision as of 11:14, 12 December 2024

Forwards Volume 9,rev 126, Site Emergency Plan & Volume 9A,rev 177, Site Epips
ML20132C346
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/11/1996
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
Shared Package
ML20132C299 List:
References
NUDOCS 9612180294
Download: ML20132C346 (2)


Text

_

N N

TQ-

  • 97 Copyholder: DCC

Title:

US NRC Location: Washington, DC 1

~

Procedure Number: 9

Title:

Site Emergency Plan Listed Below are New/ Revised Procedures which must be inserted into or discarded from yo Procedures Manual. Directions are as follows:

4 Attached are the following Volume 9, rev.126, revisions:

1. Coversheet and Table of Contents
2. Chapter 5, issued per QR# 1172-96
3. Appendix M, issued per QR# 1288-96 Please insert in your controlled manual and discard former revisions, s

Please sign, date, and return the acknowledgement form within 14 days to the Big Rock Point Plant Document Control Center:

Sirnature or Initials Date 1

L

/

Si t'70017 i

9612180294 961211 PDR ADOCK 05000155 F

PDR Issued By:

BRPDCC/ SCBrown Return To: Big Rock Point Plant 10269 U.S. 31 North Issue Date: 12/11/1996 Charlevoix, MI 49720 Transmittal Number: 297373 Attn: Document Control

I TO:

  • 97 Copyholder: DCC

Title:

US NRC Location: Washington, DC Procedure Number: 9

Title:

Site Emergency Plan Listed Below are New/ Revised Procedures which must be inserted into or discarded from your Procedures Manual. Directions are as follows:

Attached are the following Volume 9, rev.126, revisions:

1. Coversheet and Table of Contents
2. Chapter 5, issued per QR# 1172-96
3. Appendix M, issued per QR# 1288-96 Please insert in your controlled manual and discard former revisions.

Please sign, date, and return the acknowledgement form within 14 days to the Big Rock Point Plant Document Control Center:

Sienature or Initials Date i

Issued By:

BRPDCC/ SCBrown Return To: Big Rock Point Plant issue Date: 12/11/1996 10269 U.S. 31 North Charlevoix, MI 49720 Transmittal Number: 297373 Attn: Document Control