ML15301A814: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML15301A814
| number = ML15301A814
| issue date = 10/28/2015
| issue date = 10/28/2015
| title = Ltr 10/28/15 Monticello Nuclear Generating Plant Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (BXJ)
| title = Ltr 10/28/15 Monticello Nuclear Generating Plant Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Gardner P A
| addressee name = Gardner P
| addressee affiliation = Northern States Power Co
| addressee affiliation = Northern States Power Co
| docket = 05000263
| docket = 05000263
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000263/2015007]]
See also: [[see also::IR 05000263/2015007]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::October 28, 2015]]
NUCLEAR REGULATORY COMMISSION
 
REGION III 2443 WARRENVILLE RD. SUIT
EA-15-206 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
E 210 LISLE, IL  60532
 
-4352  October 28, 2015
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
  EA-15-206 Mr. Peter A. Gardner
 
Site Vice President
==Dear Mr. Gardner:==
Monticello Nuclear Generating Plant
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
Northern States Power Company, Minnesota
dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we received contested a Non-Cited Violation (NCV) documented in Monticello Inspection Report 2015007. The contested NCV is "Failure to Review for Suitability of Application Safety-Related Relays Installed Beyond Their Service Life." We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon as we complete our evaluation.
2807 West County Road 75
 
Monticello, MN 55362
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
 
ACKNOWLEDGMENT
Sincerely,/RA/ Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV EA-15-206 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
OF DISPUTED VIOLATION OF NRC INSPECTION
 
REPORT 05000263/2015007
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007
  Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),  
 
dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we
==Dear Mr. Gardner:==
received contested a Non
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we received contested a Non-Cited Violation (NCV) documented in Monticello Inspection Report 2015007. The contested NCV is "Failure to Review for Suitability of Application Safety-Related Relays Installed Beyond Their Service Life." We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon as we complete our evaluation. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-Cited Violation (NCV) documented in Monticello  
 
Inspection  
Sincerely,/RA/ Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV DISTRIBUTION: See next page ADAMS Accession Number ML15301A814 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME ADunlop RSkokowski CLipa DATE 10/26/15 10/26/15 10/28/15 OFFICIAL RECORD COPY Letter to Mr. Peter from Ms. Christine A. Lipa dated October 28, 2015.
Report 2015007. The contested NCV is
 
"Failure to Review for Suitability of Application Safety
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007 DISTRIBUTION: Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ROPreports.Resource@nrc.gov
-Related Relays Installed Beyond Their Service Life."
  We are currently reviewing your basis for contesting
the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.
  Accordingly, we will inform you as soon as we complete our evaluation.
 
In accordance with Title 10 of the Code of Federal Regulations
  (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/   Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
  Docket No. 50
-263 License No. DPR
-22 cc: Distribution via LISTSERV  
  EA-15-206 Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
ACKNOWLEDGMENT
OF DISPUTED VIOLATION OF NRC INSPECTION
REPORT 05000263/2015007
  Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we
received contested a Non
-Cited Violation (NCV) documented in Monticello  
Inspection  
Report 2015007. The contested NCV is
"Failure to Review for Suitability of Application Safety
-Related Relays Installed Beyond Their Service Life."
  We are currently reviewing your basis for contesting
the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.
  Accordingly, we will inform you as soon as we complete our evaluation.
  In accordance with Title 10 of the Code of Federal Regulations
  (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/ Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
  Docket No. 50
-263 License No. DPR
-22 cc: Distribution via LISTSERV
DISTRIBUTION:
See next page
ADAMS Accession Number ML15301A814
  Publicly Available
  Non-Publicly Available
  Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/enc
l "N" = No copy
OFFICE RIII RIII RIII RIII NAME ADunlop RSkokowski
CLipa DATE 10/26/15 10/26/15 10/28/15 OFFICIAL RECORD COPY
 
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated
October 28, 2015.
  SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
ACKNOWLEDGMENT
OF DISPUTED VIOLATION OF NRC INSPECTION
REPORT 05000263/2015007
  DISTRIBUTION
: Janelle Jessie
RidsNrrDorlLpl3
-1 Resource
  RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker Carole Ariano
Linda Linn
DRPIII DRSIII Jim Clay Carmen Olteanu
ROPreports.Resource@nrc.gov
}}
}}

Revision as of 16:47, 20 June 2019

Ltr 10/28/15 Monticello Nuclear Generating Plant Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
ML15301A814
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/28/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Gardner P
Northern States Power Co
References
EA-15-206, IR 2015007
Download: ML15301A814 (3)


See also: IR 05000263/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III 2443 WARRENVILLE RD. SUIT

E 210 LISLE, IL 60532

-4352 October 28, 2015

EA-15-206 Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362

-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

ACKNOWLEDGMENT

OF DISPUTED VIOLATION OF NRC INSPECTION

REPORT 05000263/2015007

Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we

received contested a Non

-Cited Violation (NCV) documented in Monticello

Inspection

Report 2015007. The contested NCV is

"Failure to Review for Suitability of Application Safety

-Related Relays Installed Beyond Their Service Life."

We are currently reviewing your basis for contesting

the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.

Accordingly, we will inform you as soon as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/ Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50

-263 License No. DPR

-22 cc: Distribution via LISTSERV

EA-15-206 Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362

-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

ACKNOWLEDGMENT

OF DISPUTED VIOLATION OF NRC INSPECTION

REPORT 05000263/2015007

Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we

received contested a Non

-Cited Violation (NCV) documented in Monticello

Inspection

Report 2015007. The contested NCV is

"Failure to Review for Suitability of Application Safety

-Related Relays Installed Beyond Their Service Life."

We are currently reviewing your basis for contesting

the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.

Accordingly, we will inform you as soon as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely, /RA/ Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50

-263 License No. DPR

-22 cc: Distribution via LISTSERV

DISTRIBUTION:

See next page

ADAMS Accession Number ML15301A814

Publicly Available

Non-Publicly Available

Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/enc

l "N" = No copy

OFFICE RIII RIII RIII RIII NAME ADunlop RSkokowski

CLipa DATE 10/26/15 10/26/15 10/28/15 OFFICIAL RECORD COPY

Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated

October 28, 2015.

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

ACKNOWLEDGMENT

OF DISPUTED VIOLATION OF NRC INSPECTION

REPORT 05000263/2015007

DISTRIBUTION

Janelle Jessie

RidsNrrDorlLpl3

-1 Resource

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker Carole Ariano

Linda Linn

DRPIII DRSIII Jim Clay Carmen Olteanu

ROPreports.Resource@nrc.gov