ML15301A814: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML15301A814 | | number = ML15301A814 | ||
| issue date = 10/28/2015 | | issue date = 10/28/2015 | ||
| title = Ltr 10/28/15 Monticello Nuclear Generating Plant Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 ( | | title = Ltr 10/28/15 Monticello Nuclear Generating Plant Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj) | ||
| author name = Lipa C | | author name = Lipa C | ||
| author affiliation = NRC/RGN-III/DRS/EB2 | | author affiliation = NRC/RGN-III/DRS/EB2 | ||
| addressee name = Gardner P | | addressee name = Gardner P | ||
| addressee affiliation = Northern States Power Co | | addressee affiliation = Northern States Power Co | ||
| docket = 05000263 | | docket = 05000263 | ||
Line 14: | Line 14: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000263/2015007]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION III 2443 WARRENVILLE RD. SUIT | |||
EA-15-206 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637 | E 210 LISLE, IL 60532 | ||
-4352 October 28, 2015 | |||
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007 | EA-15-206 Mr. Peter A. Gardner | ||
Site Vice President | |||
Monticello Nuclear Generating Plant | |||
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), | Northern States Power Company, Minnesota | ||
dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we received contested a Non-Cited Violation (NCV) documented in Monticello Inspection Report 2015007. The contested NCV is "Failure to Review for Suitability of Application Safety-Related Relays Installed Beyond Their Service Life." We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon as we complete our evaluation. | 2807 West County Road 75 | ||
Monticello, MN 55362 | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | -9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT | ||
ACKNOWLEDGMENT | |||
Sincerely,/RA/ Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV EA-15-206 Mr. Peter Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637 | OF DISPUTED VIOLATION OF NRC INSPECTION | ||
REPORT 05000263/2015007 | |||
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007 | Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), | ||
dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we | |||
received contested a Non | |||
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we received contested a Non-Cited Violation (NCV) documented in Monticello Inspection Report 2015007. The contested NCV is "Failure to Review for Suitability of Application Safety-Related Relays Installed Beyond Their Service Life." We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses. Accordingly, we will inform you as soon as we complete our evaluation. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | -Cited Violation (NCV) documented in Monticello | ||
Inspection | |||
Sincerely,/RA/ Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV DISTRIBUTION: See next page ADAMS Accession Number ML15301A814 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/ | Report 2015007. The contested NCV is | ||
"Failure to Review for Suitability of Application Safety | |||
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000263/2015007 DISTRIBUTION: Janelle Jessie RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ROPreports.Resource@nrc.gov | -Related Relays Installed Beyond Their Service Life." | ||
We are currently reviewing your basis for contesting | |||
the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses. | |||
Accordingly, we will inform you as soon as we complete our evaluation. | |||
In accordance with Title 10 of the Code of Federal Regulations | |||
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy | |||
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ Christine A. Lipa, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket No. 50 | |||
-263 License No. DPR | |||
-22 cc: Distribution via LISTSERV | |||
EA-15-206 Mr. Peter A. Gardner | |||
Site Vice President | |||
Monticello Nuclear Generating Plant | |||
Northern States Power Company, Minnesota | |||
2807 West County Road 75 | |||
Monticello, MN 55362 | |||
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT | |||
ACKNOWLEDGMENT | |||
OF DISPUTED VIOLATION OF NRC INSPECTION | |||
REPORT 05000263/2015007 | |||
Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we | |||
received contested a Non | |||
-Cited Violation (NCV) documented in Monticello | |||
Inspection | |||
Report 2015007. The contested NCV is | |||
"Failure to Review for Suitability of Application Safety | |||
-Related Relays Installed Beyond Their Service Life." | |||
We are currently reviewing your basis for contesting | |||
the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses. | |||
Accordingly, we will inform you as soon as we complete our evaluation. | |||
In accordance with Title 10 of the Code of Federal Regulations | |||
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy | |||
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide | |||
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Sincerely, /RA/ Christine A. Lipa, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket No. 50 | |||
-263 License No. DPR | |||
-22 cc: Distribution via LISTSERV | |||
DISTRIBUTION: | |||
See next page | |||
ADAMS Accession Number ML15301A814 | |||
Publicly Available | |||
Non-Publicly Available | |||
Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/enc | |||
l "N" = No copy | |||
OFFICE RIII RIII RIII RIII NAME ADunlop RSkokowski | |||
CLipa DATE 10/26/15 10/26/15 10/28/15 OFFICIAL RECORD COPY | |||
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated | |||
October 28, 2015. | |||
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT | |||
ACKNOWLEDGMENT | |||
OF DISPUTED VIOLATION OF NRC INSPECTION | |||
REPORT 05000263/2015007 | |||
DISTRIBUTION | |||
: Janelle Jessie | |||
RidsNrrDorlLpl3 | |||
-1 Resource | |||
RidsNrrPMMonticello | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Darrell Roberts | |||
Richard Skokowski | |||
Allan Barker Carole Ariano | |||
Linda Linn | |||
DRPIII DRSIII Jim Clay Carmen Olteanu | |||
ROPreports.Resource@nrc.gov | |||
}} | }} |
Revision as of 16:47, 20 June 2019
ML15301A814 | |
Person / Time | |
---|---|
Site: | Monticello ![]() |
Issue date: | 10/28/2015 |
From: | Christine Lipa NRC/RGN-III/DRS/EB2 |
To: | Gardner P Northern States Power Co |
References | |
EA-15-206, IR 2015007 | |
Download: ML15301A814 (3) | |
See also: IR 05000263/2015007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
E 210 LISLE, IL 60532
-4352 October 28, 2015
EA-15-206 Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
ACKNOWLEDGMENT
OF DISPUTED VIOLATION OF NRC INSPECTION
REPORT 05000263/2015007
Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we
received contested a Non
-Cited Violation (NCV) documented in Monticello
Inspection
Report 2015007. The contested NCV is
"Failure to Review for Suitability of Application Safety
-Related Relays Installed Beyond Their Service Life."
We are currently reviewing your basis for contesting
the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.
Accordingly, we will inform you as soon as we complete our evaluation.
In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/ Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50
-263 License No. DPR
-22 cc: Distribution via LISTSERV
EA-15-206 Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
ACKNOWLEDGMENT
OF DISPUTED VIOLATION OF NRC INSPECTION
REPORT 05000263/2015007
Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we
received contested a Non
-Cited Violation (NCV) documented in Monticello
Inspection
Report 2015007. The contested NCV is
"Failure to Review for Suitability of Application Safety
-Related Relays Installed Beyond Their Service Life."
We are currently reviewing your basis for contesting
the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.
Accordingly, we will inform you as soon as we complete our evaluation.
In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/ Christine A. Lipa, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50
-263 License No. DPR
-22 cc: Distribution via LISTSERV
DISTRIBUTION:
See next page
ADAMS Accession Number ML15301A814
Publicly Available
Non-Publicly Available
Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/enc
l "N" = No copy
OFFICE RIII RIII RIII RIII NAME ADunlop RSkokowski
CLipa DATE 10/26/15 10/26/15 10/28/15 OFFICIAL RECORD COPY
Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated
October 28, 2015.
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
ACKNOWLEDGMENT
OF DISPUTED VIOLATION OF NRC INSPECTION
REPORT 05000263/2015007
DISTRIBUTION
RidsNrrDorlLpl3
-1 Resource
RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII DRSIII Jim Clay Carmen Olteanu
ROPreports.Resource@nrc.gov