ML20134B620: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 2: Line 2:
| number = ML20134B620
| number = ML20134B620
| issue date = 01/22/1997
| issue date = 01/22/1997
| title = Staff Requirements Memo Re SECY-96-231, Proposed NRC GL 96-XX, 'Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition.'
| title = Staff Requirements Memo Re SECY-96-231, Proposed NRC GL 96-XX, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition
| author name = Hoyle J
| author name = Hoyle J
| author affiliation = NRC OFFICE OF THE SECRETARY (SECY)
| author affiliation = NRC OFFICE OF THE SECRETARY (SECY)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-     .      .      ...              .-.-.
{{#Wiki_filter:-
d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G 0 0 00 0 0 0 00l h
d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G 0 0 00 0 0 0 00l h
3-
/
          /          t UNITED STATES-NUCLEAR REGULATORY COMMISSION RELEASED TOTHE PDR.                 y j             $
UNITED STATES-RELEASED TOTHE PDR.
W ASHIN GTON, D.C. 20566                 yh g                      }      [
y 3-t NUCLEAR REGULATORY COMMISSION j
t January 22, 1997 l.......................
yh g
date                 initials
}
          %,*****ck OFFCE OF THE SECRETARY.
[
t MEMORANDUM TO:         Hugh L. Thompson, Jr.                                                                   ,
W ASHIN GTON, D.C. 20566 l
Actin     xec tive Director for Operations
date initials t
                                    ~,            42--                                                                 .
%,*****ck January 22, 1997 OFFCE OF THE SECRETARY.
FROM:                   Jo     C. Hoyl , Secretary
t MEMORANDUM TO:
Hugh L. Thompson, Jr.
Actin xec tive Director for Operations 42--
FROM:
Jo
~,C. Hoyl, Secretary


==SUBJECT:==
==SUBJECT:==
STAFF REQUIREMENTS - SECY-96-231 - PROPOSED NRC GENERIC LETTER 96-XX, " LOSS OF REACTOR COOLANT INVENTORY AND ASSOCIATED POTENTIAL FOR LOSS OF EMERGENCY MITIGATION FUNCTIONS WHILE IN A       SHUTDOWN CONDITION"                                                   ;
STAFF REQUIREMENTS - SECY-96-231 - PROPOSED NRC GENERIC LETTER 96-XX, " LOSS OF REACTOR COOLANT INVENTORY AND ASSOCIATED POTENTIAL FOR LOSS OF EMERGENCY MITIGATION FUNCTIONS WHILE IN A SHUTDOWN CONDITION" The Commission has reviewed the subject paper and agrees that the proposed Generic Letter discusses an issue that has safety significance.
The Commission has reviewed the subject paper and agrees that the                                               ,
However, the public should be accorded a i
proposed Generic Letter discusses an issue that has safety                                                     ,
reasonable public comment period of no less thanR30 days prior to its issuance.
significance. However, the public should be accorded a                                                         i reasonable public comment period of no less thanR30 days prior to its issuance. Certain references to GDC 34 and 35 should be replaced with more general language concerning regulatory and licensing requirements.       Specifically, the following revisions                                           ;
Certain references to GDC 34 and 35 should be replaced with more general language concerning regulatory and licensing requirements.
should be made to the ,nroposed generic letter:
Specifically, the following revisions should be made to the,nroposed generic letter:
: 1.     In the Purpose section, add the following to the next to last sentence:   "and the requirements of their licenses."
1.
: 2.     In the Requested Action (s) section, change the last sentence so it ends as follows:     "to ensure compliance with NRC
In the Purpose section, add the following to the next to last sentence:
:                regulatory and license requirements."
"and the requirements of their licenses."
In the Requested Information section, change the last d
2.
3.
In the Requested Action (s) section, change the last sentence so it ends as follows:
sentence so it ends as follows:           "and any administrative                                     '
"to ensure compliance with NRC regulatory and license requirements."
controls that the licensee intends to use to control valve manipulations such that draindowns are precluded."
d 3.
: 4. In the Backfit Discussion section, delete "10 CFR Part 50, Appendix A, GDC 34" and "10 CFR Part 50, Appendix A, GDC 35."
In the Requested Information section, change the last sentence so it ends as follows:
;                (EDO)                         (SECY Suspense:                 3/7/97)
"and any administrative controls that the licensee intends to use to control valve manipulations such that draindowns are precluded."
D THIS SRM AND SECY-96-231 WILL BE MADE PUBLICLY SECY NOTE:                                                                                              3 AVAILABLE 5 WORKING DAYS FROM THE DATE OF THIS                               i SRM.                                                                                        .
4.
9701300239 970122 PDR    10CFR 8 Id'b $4/9 T
In the Backfit Discussion section, delete "10 CFR Part 50, Appendix A, GDC 34" and "10 CFR Part 50, Appendix A, GDC 35."
PT9.'7           PDR
(EDO)
(SECY Suspense:
3/7/97)
D SECY NOTE:
THIS SRM AND SECY-96-231 WILL BE MADE PUBLICLY 3
AVAILABLE 5 WORKING DAYS FROM THE DATE OF THIS i
SRM.
9701300239 970122 8 Id'b $4/9 T
PDR 10CFR PT9.'7 PDR


_q.
_q.
cc: Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan OGC OCA OIG Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail) l l
cc:
1 l
Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan OGC OCA OIG Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail) l}}
1 l}}

Latest revision as of 06:48, 12 December 2024

Staff Requirements Memo Re SECY-96-231, Proposed NRC GL 96-XX, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition
ML20134B620
Person / Time
Issue date: 01/22/1997
From: Hoyle J
NRC OFFICE OF THE SECRETARY (SECY)
To: Thompson H
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-10CFR9.7 SECY-96-231-C, NUDOCS 9701300239
Download: ML20134B620 (2)


Text

-

d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G 0 0 00 0 0 0 00l h

/

UNITED STATES-RELEASED TOTHE PDR.

y 3-t NUCLEAR REGULATORY COMMISSION j

yh g

}

[

W ASHIN GTON, D.C. 20566 l

date initials t

%,*****ck January 22, 1997 OFFCE OF THE SECRETARY.

t MEMORANDUM TO:

Hugh L. Thompson, Jr.

Actin xec tive Director for Operations 42--

FROM:

Jo

~,C. Hoyl, Secretary

SUBJECT:

STAFF REQUIREMENTS - SECY-96-231 - PROPOSED NRC GENERIC LETTER 96-XX, " LOSS OF REACTOR COOLANT INVENTORY AND ASSOCIATED POTENTIAL FOR LOSS OF EMERGENCY MITIGATION FUNCTIONS WHILE IN A SHUTDOWN CONDITION" The Commission has reviewed the subject paper and agrees that the proposed Generic Letter discusses an issue that has safety significance.

However, the public should be accorded a i

reasonable public comment period of no less thanR30 days prior to its issuance.

Certain references to GDC 34 and 35 should be replaced with more general language concerning regulatory and licensing requirements.

Specifically, the following revisions should be made to the,nroposed generic letter:

1.

In the Purpose section, add the following to the next to last sentence:

"and the requirements of their licenses."

2.

In the Requested Action (s) section, change the last sentence so it ends as follows:

"to ensure compliance with NRC regulatory and license requirements."

d 3.

In the Requested Information section, change the last sentence so it ends as follows:

"and any administrative controls that the licensee intends to use to control valve manipulations such that draindowns are precluded."

4.

In the Backfit Discussion section, delete "10 CFR Part 50, Appendix A, GDC 34" and "10 CFR Part 50, Appendix A, GDC 35."

(EDO)

(SECY Suspense:

3/7/97)

D SECY NOTE:

THIS SRM AND SECY-96-231 WILL BE MADE PUBLICLY 3

AVAILABLE 5 WORKING DAYS FROM THE DATE OF THIS i

SRM.

9701300239 970122 8 Id'b $4/9 T

PDR 10CFR PT9.'7 PDR

_q.

cc:

Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan OGC OCA OIG Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail) l