{{Adams
#REDIRECT [[IR 05000820/2010031]]
| number = ML20136G131
| issue date = 11/15/1985
| title = Notice of Violation from Insp on 850820-1031
| author name = Chrissotimos N
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =
| addressee affiliation =
| docket = 05000010, 05000237, 05000249
| license number =
| contact person =
| document report number = 50-010-85-13, 50-10-85-13, 50-237-85-30, 50-249-85-26, NUDOCS 8511220262
| package number = ML20136G116
| document type = NOTICE OF VIOLATION OF A REGULATION, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
See also: [[see also::IR 05000820/2010031]]
 
=Text=
{{#Wiki_filter:[,                                                                                        l
l
>    -
I
I                                            Appendix
                                      NOTICE OF VIOLATION
      Comonwealth Edison Company                      Docket Nos. 50-10, 50-237, 50-249
<
l      As a result of the inspection conducted on August 20 through October 31, 1985,
      and in accordance with the " General Policy and Procedures for NRC Enforcement
      Actions," 10 CFR Part 2 Appendix C (1985), the following violation was
      identified:
!      10 CFR 50, Appendix B, Criterion VI, as implemented by CECO Quality Assurance
i    Manual, Section 6, states " Measures shall be established to control the issuance
      of documents, such as instructions, procedures, and drawings, including changes
      thereto, which prescribe all activities affecting quality. These measures shall
      assure that documents, including changes, are reviewed for adequacy and approved
,
'
      for release by authorized personnel and are distributed to and used at the location
  -
      where the prescribed activity is performed."
!      Contrary to the above, the licensee failed to revise the Technical Specifications
      for Unit 3, in that Section 3.5.A.7, was not updated to reflect that a section,
      3.5.G, referenced in 3.5.A.7 had been deleted per United States Atomic Energy
      Commission letter dated April 19, 1974.
      This is a Severity Level V violation (Supplement I).
f      Pursuant to the provisions of 10 CFR 2.201, you are required to submit
      to this office within thirty days of the date of this Notice a written
      statement or explanation in reply, including for each violation:
      (1) corrective action taken and the results achieved; (2) corrective action
'
      to be taken to avoid further violations; and (3) the date when full
      compliance will be achieved. Consideration may be given to extending your
;      response time for good cause shown.
      Dated
              }HS45                                          W
                                                      N. K CVissotimos, Chief
                                                      Pr ects Branch 2
j                            WSB58
                              a
                                            $$h
i
.
                                              h
}}

Latest revision as of 16:13, 25 September 2020