ML20137G839: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.-.  .                          .            _    - -.  .
{{#Wiki_filter:.-.
Et.ition cupport Dep;rtment 4
Et.ition cupport Dep;rtment 4
                  +=
+=
PECO NUCLEAR                                                             ecco ~ c-e, 965 Chesterbrook Boulevard
PECO NUCLEAR ecco ~ c-e, 965 Chesterbrook Boulevard A Unit of PECO Energy Wayne, PA 19087 5691 March 20,1997 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
;                  A Unit of PECO Energy                                                     Wayne, PA 19087 5691 March 20,1997 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Limerick Generating Station, Units 1 and 2 Implementation Dates for NRC Approved Activities
Limerick Generating Station, Units 1 and 2 Implementation Dates for NRC Approved Activities Gentlemen; i
;        Gentlemen; i         The purpose of this letter is to notify the NRC of the implementation dates associated with recently approved activities for Limerick Generating Station.
The purpose of this letter is to notify the NRC of the implementation dates associated with recently approved activities for Limerick Generating Station.
BRIEF DESCRIPTION                     NRC APPROVAL DATE         PECO IMPLEMENTATION DATE Re-use of Fuel Channels                       December 9,1996               February 18,1997 l           Relief Request GVRR-1 (Rev. 2)               December 31,1996               January 24,1997
BRIEF DESCRIPTION NRC APPROVAL DATE PECO IMPLEMENTATION DATE Re-use of Fuel Channels December 9,1996 February 18,1997 l
:            Containment Isolation Valve
Relief Request GVRR-1 (Rev. 2)
;            Leak Rate Testing Relief Request 41-VRR-2 (Rev. 3)             January 1 6,1997               February 3,1997 Automatic Depressurization System Relief Valve Testing if you have any questions, please do not hesitate to contact us.
December 31,1996 January 24,1997 Containment Isolation Valve Leak Rate Testing Relief Request 41-VRR-2 (Rev. 3)
9704010541 970320 PDR       ADOCK 05000352 p                           PDR Very truly yours, Aa.%.), .
January 1 6,1997 February 3,1997 Automatic Depressurization System Relief Valve Testing if you have any questions, please do not hesitate to contact us.
G. A. Hunger, JrV Director Ucensing Awh cc:       H. J. Miller, Administrator, Region 1. USNRC N. S. Perry, USNRC Senior Resident inspector, LGS R. R. Janati, PA Bureau of Radiological Protection}}
9704010541 970320 PDR ADOCK 05000352 p
PDR Very truly yours, Awh Aa.%.),.
G. A. Hunger, JrV Director Ucensing cc:
H. J. Miller, Administrator, Region 1. USNRC N. S. Perry, USNRC Senior Resident inspector, LGS R. R. Janati, PA Bureau of Radiological Protection}}

Latest revision as of 23:25, 11 December 2024

Notifies NRC of Implementation Dates Associated W/Recently Approved Activities for Lgs,Units 1 & 2
ML20137G839
Person / Time
Site: Limerick  
Issue date: 03/20/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9704010541
Download: ML20137G839 (1)


Text

.-.

Et.ition cupport Dep;rtment 4

+=

PECO NUCLEAR ecco ~ c-e, 965 Chesterbrook Boulevard A Unit of PECO Energy Wayne, PA 19087 5691 March 20,1997 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Implementation Dates for NRC Approved Activities Gentlemen; i

The purpose of this letter is to notify the NRC of the implementation dates associated with recently approved activities for Limerick Generating Station.

BRIEF DESCRIPTION NRC APPROVAL DATE PECO IMPLEMENTATION DATE Re-use of Fuel Channels December 9,1996 February 18,1997 l

Relief Request GVRR-1 (Rev. 2)

December 31,1996 January 24,1997 Containment Isolation Valve Leak Rate Testing Relief Request 41-VRR-2 (Rev. 3)

January 1 6,1997 February 3,1997 Automatic Depressurization System Relief Valve Testing if you have any questions, please do not hesitate to contact us.

9704010541 970320 PDR ADOCK 05000352 p

PDR Very truly yours, Awh Aa.%.),.

G. A. Hunger, JrV Director Ucensing cc:

H. J. Miller, Administrator, Region 1. USNRC N. S. Perry, USNRC Senior Resident inspector, LGS R. R. Janati, PA Bureau of Radiological Protection