Curates 11. Cnyst                                                                                                                                                           Baltimore Gas and Electric Company Plant GeneralManager                                                                                                                                                         Calvert Citifs Nuclear Power Plant 6 Calvert CIWs Parkway 150 Calvert Clifs Nuclear Power Plant uusby, Maryland 20657 410 586-2200 Ext. 4101 Local 410 260-4101 Baltimore October 14,1994
Curates 11. Cnyst Baltimore Gas and Electric Company Plant GeneralManager Calvert Citifs Nuclear Power Plant 150 Calvert CIWs Parkway 6
(:                             U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:                                                     Document Control Desk l
Calvert Clifs Nuclear Power Plant uusby, Maryland 20657 410 586-2200 Ext. 4101 Local 410 260-4101 Baltimore October 14,1994
(:
U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk l


==SUBJECT:==
==SUBJECT:==
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 September 1994 Orgia_ ling Data Repons The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 September 1994 Orgia_ ling Data Repons The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
Very truly yours,
Very truly yours, o
                                                                                                                                                                                                                    /     !
/
                                                                                                                                                                                                                            . o CHC/FP/bjd Attachments cc:         D. A. Brune, Esquire J. E. Silberg, Esquire L. B Marsh, NRC D. G. Mcdonald, Jr., NRC                                                                                                                                                                                                                           ,
CHC/FP/bjd Attachments cc:
I T. T. Manin, NRC P. R. Wilson, NRC R. A. Ilartfield, NRC R. I. McLean, DNR                                                                                                                                                                                                                                 l J. H. Walter, PSC                                                                                                                                                                                                                                 l P. Lewis, INPO                                                                                                                                                                                                                                     )
D. A. Brune, Esquire J. E. Silberg, Esquire L. B Marsh, NRC D. G. Mcdonald, Jr., NRC I
K. Larson, ANI m nac                                                                                                                                                                                                                   /
T. T. Manin, NRC P. R. Wilson, NRC R. A. Ilartfield, NRC R. I. McLean, DNR l
l t
J. H. Walter, PSC l
94101so227 DR                  94o93o                                                                                                                                                                                                               j ADOCK 05000317 PDR L_ _ _ _ _ _ _ _ _ . _ _ . _    _ _ _ _                  _ _ _ _ _ _ _ _ _ . . _ . _ _ _ _                _ _ _ _ _ _                                  _ _ . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
P. Lewis, INPO
)
K. Larson, ANI m nac l
94101so227 94o93o
/
t j DR ADOCK 05000317 PDR L_


m l
m
                                                                                                              \
\\
l I
l UNIT.1 OPERATING DATA REPORT Docket No. 50-317 October 14, 2394 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS 9
UNIT.1 OPERATING DATA REPORT Docket No. 50-317 October 14, 2394 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS 9
1.
: 1. UNIT NAME Calvert Cliffs Unit 1
UNIT NAME Calvert Cliffs Unit 1 2.
: 2. REPORTING PERIOD                             SEPTEMBER 1994
REPORTING PERIOD SEPTEMBER 1994 3.
: 3. LICENSED THERMAL POWER (MWT)                             2700
LICENSED THERMAL POWER (MWT) 2700 4.
: 4. NAMEPLATE RATING (GROSS MWe)                               918
NAMEPLATE RATING (GROSS MWe) 918 5.
: 5. DESIGN ELECTRICAL RATING (NET MWe)                         845
DESIGN ELECTRICAL RATING (NET MWe) 845
: 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe)                       865
: 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
: 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe)                         835
: 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.
: 8. CHANGE IN CAPACITY RATINGS                               NONE
CHANGE IN CAPACITY RATINGS NONE 9.
: 9. POWER LEVEL TO WHICH RESTRICTED                           N/A
POWER LEVEL TO WHICH RESTRICTED N/A
: 10. REASONS FOR RESTRICTIONS                                   N/A Cumulative .
: 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
This month           Year-to-Date       to Date   ,
: 11. HOURS IN REPORTING PERIOD 720 6,551 170,052
: 11. HOURS IN REPORTING PERIOD                                 720               6,551     170,052
: 12. NUMBER OF HOURS. REACTOR WAS CRITICAL 720.0 3,702.7 120,671.7
: 12. NUMBER OF HOURS. REACTOR WAS CRITICAL                   720.0             3,702.7     120,671.7
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
: 13. REACTOR RESERVE SHUTDOWN HOURS                             0.0                   0.0   3,019.4 ,
: 14. HOURS GENERATOR ON LINE 720.0 3,449.1 118,027.5
: 14. HOURS GENERATOR ON LINE                                 720.0             3,449.1     118,027.5
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
: 15. UNIT RESERVE SHUTDOWN HOURS                               0.0                   0.0       0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,935,671 8,912,249 299,227,068
: 16. GROSS THERMAL ENERGY GENERATED (MWH)             1,935,671           8,912,249 299,227,068
: 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH)
: 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH)               _634,729           2,919,774 99,393,320       r
_634,729 2,919,774 99,393,320 r
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)               608,832           2,791,447 94,595,729       ,
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 608,832 2,791,447 94,595,729
: 19. UNIT SERVICE FACTOR                                     100.0                 52.6       69.4
: 19. UNIT SERVICE FACTOR 100.0 52.6 69.4
: 20. UNIT-AVAILABILITY FACTOR                               100.0                 52.6       69.4
: 20. UNIT-AVAILABILITY FACTOR 100.0 52.6 69.4
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                   101.3                 51.2       67.4
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.3 51.2 67.4
: 22. UNIT CAPACITY FACTOR (USING DER NET)                     100.1                 50.4       65.8
: 22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 50.4 65.8
: 23. UNIT FORCED OUTAGE RATE                                     0.0                 17.2         9.0
: 23. UNIT FORCED OUTAGE RATE 0.0 17.2 9.0
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE.AND DURATION):
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE.AND DURATION):
N/A                                                                               ;
N/A
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:                                                               1 R
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A l
1 R
N/A


UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.           50-317 UNIT NAME           Calvert Cliffs-U1 DATE         October 14.1994 COMPLETED BY .       l Frank Piazza TELEPHONE           (410) 260-3821-REPORTMONTII September 1994 MET 110D OF SilUTTING             LICENSEE                                                     CAUSE & CORRECITVE DURAllON                         DOWN             EVENT               SYSTEM   COMPONENT                           ACllON TO NO.        DATE    TYPEI  (IlOURS)     REASON 2   REACIVR3             REPORT #               CODE 4     CODES                     PREVENTRECURRENCE There were no significant pmer reductions for this month.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
1 F: Forced                     2 Reason:                                                               3 Method:                         4 IEEE Standard 805-1984 S: Scheduled               A- Equipment Failure                                                     1 - Manual B - Maintenance or Test                                                 2 - Manual Scram.
50-317 UNIT NAME Calvert Cliffs-U1 DATE October 14.1994 COMPLETED BY.
C- Refueling                                                             3 - Automatic Scram.             5 IEEE Standard 803A-1983 D -Regulatory Restriction                                               4 - Continued E - Operator Training & License Examination                             5- Reduced Imad F- Administrative                                                       9 - Other O - Operational Error H - Other
l Frank Piazza TELEPHONE (410) 260-3821-REPORTMONTII September 1994 MET 110D OF SilUTTING LICENSEE CAUSE & CORRECITVE DURAllON DOWN EVENT SYSTEM COMPONENT ACllON TO (IlOURS)
REASON 2 REACIVR3 REPORT #
CODE 4 CODES PREVENTRECURRENCE NO.
DATE TYPEI There were no significant pmer reductions for this month.
1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A-Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C-Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D -Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5-Reduced Imad F-Administrative 9 - Other O - Operational Error H - Other


l AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************.                                           ;
AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************.
Docket No. 50-317                           i Calvert Cliffs Unit No. 1                   !
Docket No. 50-317 i
October 14, 1994                           ;
Calvert Cliffs Unit No. 1 October 14, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821' l
Prepared by Frank Piazza Telephone: (410) 260-3821'                 l SEPTEMBER 1994 Average Daily Power Level                                 Average Daily Power Level Day               (MWe-Net)                                       Day         .(MWe-Net)         ;
SEPTEMBER 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
1               844                                       17               842 2               846                                       18               841           !
Day
3              846                                       19               844           j 4               848                                       20               843 5               849                                       21               842 6               848                                       22               845         ~i 7               847                                       23               848           l 8               847                                       24               847           i i
.(MWe-Net) 1 844 17 842 2
844 9              846                                       25 10                     146                                       26               843
846 18 841 3
846 19 844 j
4 848 20 843 5
849 21 842 6
848 22 845
~i 7
847 23 848 l
8 847 24 847 i
i 9
846 25 844 10 146 26 843
(
(
11                   847                                       27               845           !
11 847 27 845 12 847 28 843 13 847 29 848 t
12                   847                                       28               843 13                   847                                       29               848           '
14 847 30 850 i
t 14                   847                                       30               850 i
15 845
15                   845
'l.
                                                                                                                        'l.
16 843
16                   843                                                                       >
)
                                                                                                                          )
f i
f i
I
I
Line 91: Line 116:
OF OPERATING EXPERIENCE September 1994 The unit operated the entire month at 100% power.
OF OPERATING EXPERIENCE September 1994 The unit operated the entire month at 100% power.


October 5,1994 NFM 94-288 Page 2 of 4,
October 5,1994 NFM 94-288 Page 2 of 4, REFUEL,ING INFORMATION REOUEST 1.
                      .                                                  REFUEL,ING INFORMATION REOUEST
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
: 1.     Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
: 2.     Scheduled date for next refueling shutdown: March,1996.
Scheduled date for next refueling shutdown: March,1996.
1
1 3.
: 3.     Scheduled date for restart following refueling: May,1996.
Scheduled date for restart following refueling: May,1996.
I
I 4.
: 4.     Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
None identified at this time.
None identified at this time.
l
l 5.
: 5.     Scheduled date(s) for submitting proposed licensing action and supporting information.             l 1
Scheduled date(s) for submitting proposed licensing action and supporting information.
1 N/A.                                                                                               I
l 1
: 6.     Important licensing considerations associated with the refueling.
1 N/A.
Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.a
I 6.
: 7.     The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.
Important licensing considerations associated with the refueling.
(a) 217                 (b) 1442 (Note 2)*
Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.a 7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1442 (Note 2)*
Spent fuel pools are common to Units I and 2.
Spent fuel pools are common to Units I and 2.
: 8.     (a) The present licensed spent fuel pool storagc capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
8.
(a) 4710(Note 1)                         (b) 0
(a) The present licensed spent fuel pool storagc capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
: 9.     The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
(a) 4710(Note 1)
March 2007 NOTE 1:                                 4710 total licensed site storage capacity.
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2007 NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
(1830 pool + 2880 ISFSI)
NOTE 2:                                 144 Spent Fuel Assemblies in the ISFSI.a a
NOTE 2:
Entry has changed since last reported.
144 Spent Fuel Assemblies in the ISFSI.a Entry has changed since last reported.
a


co*****************************************************w********************
co*****************************************************w********************
UNIT 2     .
UNIT 2 OPERATING DATA REPORT i
OPERATING DATA REPORT i
co**************************************************************************
co**************************************************************************
Docket No. 50-318                                         '
Docket No. 50-318 October 14, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS 1.
October 14, 1994                                           '
UNIT NAME Calvert Cliffs Unit 2 2.
Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS
REPORTING PERIOD SEPTEMBER 1994
: 1. UNIT NAME                                       Calvert Cliffs Unit 2
: 3. LICENSED THERMAL POWER (MWT) 2700
: 2. REPORTING PERIOD                                 SEPTEMBER 1994                                           ,
: 4. NAMEPLATE RATING (GROSS MWe) 911
: 3. LICENSED THERMAL POWER (MWT)                                     2700
: 5. DESIGN ELECTRICAL RATING (NET MWe) 845
: 4. NAMEPLATE RATING (GROSS MWe)                                       911
: 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
: 5. DESIGN ELECTRICAL RATING (NET MWe)                                 845                                       ;
: 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 1
: 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe)                               870
8.
: 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe)                                 840                                       1
CHANGE IN CAPACITY RATINGS NONE' 9.
: 8. CHANGE IN CAPACITY RATINGS                                     NONE'
POWER LEVEL TO WHICH RESTRICTED N/A
: 9. POWER LEVEL TO WHICH RESTRICTED                                   N/A
: 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
: 10. REASONS FOR RESTRICTIONS                                         N/A                                       ,
: 11. HOURS IN REPORTING PERIOD 720 6,551 153,407 7
Cumulative This month             Year-to-Date         to Date       ;
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 619.2 5,992.1 112,028.9
: 11. HOURS IN REPORTING PERIOD                                         720                 6,551     153,407     7
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                           619.2             5,992.1     112,028.9
: 14. HOURS GENERATOR ON LINE 598.6 5,936.1 110,459.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                                     0.0                   0.0   1,296.6
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
: 14. HOURS GENERATOR ON LINE                                       598.6             5,936.1     110,459.7
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,406,157 15,320,324 282,185,867
: 15. UNIT RESERVE SHUTDOWN HOURS                                       0.0                   0.0         0.0   ;
: 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 456,151 5,079,447 93,235,316
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                   1,406,157             15,320,324 282,185,867
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 434,510 4,868,106 89,111,240
: 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH)                       456,151             5,079,447 93,235,316         -
: 19. UNIT SERVICE FACTOR 83.1 90.6 72.0
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                     434,510             4,868,106 89,111,240         -
: 20. UNIT AVAILABILITY FACTOR 83.1 90.6 72.0 21.-UNIT CAPACITY FACTOR (USING MDC NET) 71.8 89.1 70.4
: 19. UNIT SERVICE FACTOR                                             83.1                   90.6       72.0   >
: 22. UNIT CAPACITY FACTOR (USING DER NET) 71.4 87.9 68.7
: 20. UNIT AVAILABILITY FACTOR                                         83.1                   90.6       72.0 21.-UNIT CAPACITY FACTOR (USING MDC NET)                             71.8                   89.1       70.4
: 23. UNIT FORCED OUTAGE RATE.
: 22. UNIT CAPACITY FACTOR (USING DER NET)                             71.4                   87.9       68.7
16.9 7.3 5.8
: 23. UNIT FORCED OUTAGE RATE.                                         16.9                     7.3         5.8   !
: 24.. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
: 24. . SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
February 18,1995
February 18,1995
: 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
: 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A-t
N/A-t y
                          - - ,                                                -          ,          -    , y


UNITSIIUTDOWNS AND POWER REDLCTIONS DOCKET NO.           50-318 UNIT NAME           Cahrrt Cliffs-U2                     -
UNITSIIUTDOWNS AND POWER REDLCTIONS DOCKET NO.
DATE         October 14.1994 COMPLETED BY             Frank Piarla TELEPHONE             (410) 260-3821 REPORT MONTII S_etitember 1994 METilOD OF SilUTTING   1.ICENSEE                                             CAUSE & CORRECITVE DURATION                       DOWN       EVENT       SYST11M COMPONENT                           ACTION TU NO. DAlli  TYPEI  (IIOURS)     REASONI     REACIOR3     REPORT #       CODE 4     CODES                     PREVENT RECURRENCE S
50-318 UNIT NAME Cahrrt Cliffs-U2 DATE October 14.1994 COMPLETED BY Frank Piarla TELEPHONE (410) 260-3821 REPORT MONTII S_etitember 1994 METilOD OF SilUTTING 1.ICENSEE CAUSE & CORRECITVE DURATION DOWN EVENT SYST11M COMPONENT ACTION TU (IIOURS)
94-10   940906   S       0           H             5         N/A           N/A         N/A       Power was increased from 52% to 100% in 10%
REASONI REACIOR3 REPORT #
CODE 4 CODES PREVENT RECURRENCE NO.
DAlli TYPEI S
94-10 940906 S
0 H
5 N/A N/A N/A Power was increased from 52% to 100% in 10%
increments per hour as requested by the dispatcher.
increments per hour as requested by the dispatcher.
The power was kept low since 8/23/94 at the request of the dispatcher due to low power demand on the grid. Power was stable at 100% at 1540 on 9W)4.
The power was kept low since 8/23/94 at the request of the dispatcher due to low power demand on the grid. Power was stable at 100% at 1540 on 9W)4.
94-11   940923   F       17.1         A             1         N/A           SG       COND       Commenced reducing power on 9/23/94 at 2200 to repair an air leak in the Main Steam drain collector box. The unit was removed from the grid at 0310 on 9/24!94. After completing the repairs the unit was paralleled to the grid at 2015.
94-11 940923 F
94-12   940924   F     1R3           A             3     Not Available     TA         FCV       Unit tripped from 16% reactor power on low steam generator pressure at 2016 on 9/24/94. The cause of the trip was a k>ose wire on #1 governor vahr, which is part of a feedback circuit that caused the valve to open fully. The wire was loose due to vibration. The wire was tightened and all the other wires on the vahr were checked for security. The unit was returned to power and paralleled to the grid at 0435 on 9/29S4.
17.1 A
1 F: Forced               2 Reason:                                                   3 Method:                         4 IEEE Standard 805-1984 S: Scheduled             A - Equipment Failure                                     1 - Manual B - Maintenance or Test                                   2 - Manual Scram.
1 N/A SG COND Commenced reducing power on 9/23/94 at 2200 to repair an air leak in the Main Steam drain collector box. The unit was removed from the grid at 0310 on 9/24!94. After completing the repairs the unit was paralleled to the grid at 2015.
C - Refueling                                             3 - Automatic Scram.             5 IEEE Standard 803A-1983 D - Regulatory Restriction                               4 - Continued E - Operator Training & License Examination               5 - Reduced Load F- Administrative                                         9 - Other G - Operational Error H - Other
94-12 940924 F
                ,  ,                    .    -    _.                    ,  m                                                                           _ _ _ _ _ _ _ _ _ _ _
1R3 A
3 Not Available TA FCV Unit tripped from 16% reactor power on low steam generator pressure at 2016 on 9/24/94. The cause of the trip was a k>ose wire on #1 governor vahr, which is part of a feedback circuit that caused the valve to open fully. The wire was loose due to vibration. The wire was tightened and all the other wires on the vahr were checked for security. The unit was returned to power and paralleled to the grid at 0435 on 9/29S4.
1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F-Administrative 9 - Other G - Operational Error H - Other m


AVERAGE DAILY UNIT POWER LEVEL
AVERAGE DAILY UNIT POWER LEVEL
  'o*******p***************************************************************
'o*******p***************************************************************
Docket No. 50-318 Calvert Cliffs Unit No. 2 October 14, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 SEPTEMBER 1994 Average Daily Power Level                             Average Daily Power Level Day                                   (MWe-Net)                   Day                                             (MWe-Net) 1                             411                               17                                         844 2                             416                               18                                         843     l 3                             419                               19                                         845 4                             421                             20                                         846     ,
Docket No. 50-318 Calvert Cliffs Unit No. 2 October 14, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 SEPTEMBER 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
l 5                             417                             21                                         845     )
Day (MWe-Net) 1 411 17 844 2
6                             679                             22                                         847     l 7                             846                             23                                         841 8                             846                             24                                           10     l 9                             828                             25                                             0 10                                     742                             26                                             0 1
416 18 843 l
11                                     738                             27                                             0     '
3 419 19 845 4
12                                     738                             28                                           0 13                                     802                             29                                         496 14                                     844                             30                                         850   '
421 20 846 l
15                                     844 16                                     845
5 417 21 845
)
6 679 22 847 l
7 846 23 841 l
8 846 24 10 9
828 25 0
10 742 26 0
1 11 738 27 0
12 738 28 0
13 802 29 496 14 844 30 850 15 844 16 845


l DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2                                                                             .
l DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 October 14,1994
October 14,1994                                                                                     l l
l


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE                                           l September 1994 At the request of the dispatcher the unit began the month in a reduced power condition due to a very low demand on the grid. The power was 53% reactor power. Commenced raising power at 0500 on September 6,1994 and established 100% reactor power at 1540.
OF OPERATING EXPERIENCE September 1994 At the request of the dispatcher the unit began the month in a reduced power condition due to a very low demand on the grid. The power was 53% reactor power. Commenced raising power at 0500 on September 6,1994 and established 100% reactor power at 1540.
Power was again reduced slightly on September 9,1994 at 1525 to repair the number 22 heater drain tank normal level control valve. The power was again returned to 100% at 1350 on September 13, 1994.
Power was again reduced slightly on September 9,1994 at 1525 to repair the number 22 heater drain tank normal level control valve. The power was again returned to 100% at 1350 on September 13, 1994.
On September 23 at 2200, commenced reducing power to repair an air leak on 21 condenser of the Main Steam drain collector box. The unit was removed from the grid at 0310 on September 24,1994 to affect these repairs; however, the unit remained at approximately 6% reactor power during the repairs. The unit was again paralleled to the grid on September 24,1994 at 2015.
On September 23 at 2200, commenced reducing power to repair an air leak on 21 condenser of the Main Steam drain collector box. The unit was removed from the grid at 0310 on September 24,1994 to affect these repairs; however, the unit remained at approximately 6% reactor power during the repairs. The unit was again paralleled to the grid on September 24,1994 at 2015.
On September 24,1994 at 2016, the unit automatically tripped from approximately 16% reactor power due to low steam generator pressure caused by the governor valves opening fully. The cause of the governor valve opening was a loose wire in the control circuitry of the valve. The wire was tightened and the unit was returned to power and paralleled to the grid at 0435 on September 29, 1994.
On September 24,1994 at 2016, the unit automatically tripped from approximately 16% reactor power due to low steam generator pressure caused by the governor valves opening fully. The cause of the governor valve opening was a loose wire in the control circuitry of the valve. The wire was tightened and the unit was returned to power and paralleled to the grid at 0435 on September 29, 1994.
The unit ended the month at 100';c reactor power.
The unit ended the month at 100';c reactor power.
1


          .                  October 5,1994 NFM 94-288 Page 3 of 4 REFUEL,ING INFORM ATION REOUEST
October 5,1994 NFM 94-288 Page 3 of 4 REFUEL,ING INFORM ATION REOUEST 1.
: 1. Name of facility: Calvert Cliffs Nuclear Power Plant. Unit No. 2                                                           I
Name of facility: Calvert Cliffs Nuclear Power Plant. Unit No. 2 I
: 2.     Scheduled date for next refueling shutdown: February 18, 1995 *
2.
: 3.     Scheduled date for restart following refueling: May 22,- 1995.
Scheduled date for next refueling shutdown: February 18, 1995
: 4.     Will refueling or resumption of operation thereafter require a Technical Specification change or                           )
* 3.
Scheduled date for restart following refueling: May 22,- 1995.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or
)
other license amendment?
other license amendment?
Yes.*
Yes.*
: a.        Revision of the Design Features Section to adopt Improved S' tandard Technical Specifications format which allows insertion of four lead fuel assemblics.*
Revision of the Design Features Section to adopt Improved S' tandard Technical a.
I                                     b.       License amendment to support installation of a Variable LTOP system.*
Specifications format which allows insertion of four lead fuel assemblics.*
: e.       License amendment to extend allowed out of service times for control room IIVAC
I b.
                                                - and emergency diesel generator to support Station Blackout modifications.*
License amendment to support installation of a Variable LTOP system.*
: 5.     Scheduled date(s) for submitting proposed licensing action and supporting information.
e.
1 l'                                     a.       Submitted 12/08/93*                                                                                               ;
License amendment to extend allowed out of service times for control room IIVAC
l
- and emergency diesel generator to support Station Blackout modifications.*
: b.       Submitted 05/27/94*                                                                                               !
5.
l
Scheduled date(s) for submitting proposed licensing action and supporting information.
: c.       Submitted 09/23/94*
1 l'
: 6.     Important licensing considerations associated with the refueling.
a.
Submitted 12/08/93*
l b.
Submitted 05/27/94*
l c.
Submitted 09/23/94*
6.
Important licensing considerations associated with the refueling.
1 An exemption from 10 CFR 50.46,10 CFR 50.44, and Appendix K to 10 CFR 50 is required to load four lead fuel assemblies. The exemption is scheduled to be submitted in October, 1994,*
1 An exemption from 10 CFR 50.46,10 CFR 50.44, and Appendix K to 10 CFR 50 is required to load four lead fuel assemblies. The exemption is scheduled to be submitted in October, 1994,*
An exemption from General Design Criteria 2 of Appendix A to 10 CFR Part 50 is required to allow the removal of the missile door to Emergency Diesel Generator No. 21. The exemption is needed to upgrade the capacity of the generator. The exemption was submitted 08/04/94.*
An exemption from General Design Criteria 2 of Appendix A to 10 CFR Part 50 is required to allow the removal of the missile door to Emergency Diesel Generator No. 21. The exemption is needed to upgrade the capacity of the generator. The exemption was submitted 08/04/94.*
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
7.
(a) 217.                                                                           (b) .1442 (Note 2)*
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217.
(b).1442 (Note 2)*
Spent fuel pools are common to Units 1 and 2.
Spent fuel pools are common to Units 1 and 2.
1
1 8.
: 8.     (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase m licensed storage capacity that has been requested or is planned in number of fuel assemblies.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase m licensed storage capacity that has been requested or is planned in number of fuel assemblies.
(a) 4710 (Note 1)                                                                         (b) 0 I
(a) 4710 (Note 1)
(b) 0 I


          '
'
* October 5,1994 NFM 94-288 I
* October 5,1994 NFM 94-288 I
Page 4 of 4 1
Page 4 of 4 1
: 9. .               The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
: 9..
March 2007 l             NOTE 1:                     4710 total licensed site storage capacity.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2007 l
NOTE 1:
4710 total licensed site storage capacity.
l (1830 pool + 2880 ISFSI)
l (1830 pool + 2880 ISFSI)
NOTE 2:                     144 Spent Fuel Assemblies in the ISFSI.*
NOTE 2:
144 Spent Fuel Assemblies in the ISFSI.*
l l
l l
Entry has changed since last reported.
Entry has changed since last reported.
l l
l l
1
1
                                                                                      - - - - - - _ - - - - - - - - - - - _ - _}}
- - - - - - _ - - - - - - - - - - - _ - _}}

Latest revision as of 03:41, 15 December 2024

Monthly Operating Rept for Sept 1994 for Calvert Cliffs Nuclear Power Plant
ML20076F883
Person / Time
Site: Calvert Cliffs  
Issue date: 09/30/1994
From: Cruse C, Piazza F
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9410180227
Download: ML20076F883 (12)


Text

- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _

Curates 11. Cnyst Baltimore Gas and Electric Company Plant GeneralManager Calvert Citifs Nuclear Power Plant 150 Calvert CIWs Parkway 6

Calvert Clifs Nuclear Power Plant uusby, Maryland 20657 410 586-2200 Ext. 4101 Local 410 260-4101 Baltimore October 14,1994

(:

U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk l

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 September 1994 Orgia_ ling Data Repons The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.

Very truly yours, o

/

CHC/FP/bjd Attachments cc:

D. A. Brune, Esquire J. E. Silberg, Esquire L. B Marsh, NRC D. G. Mcdonald, Jr., NRC I

T. T. Manin, NRC P. R. Wilson, NRC R. A. Ilartfield, NRC R. I. McLean, DNR l

J. H. Walter, PSC l

P. Lewis, INPO

)

K. Larson, ANI m nac l

94101so227 94o93o

/

t j DR ADOCK 05000317 PDR L_

m

\\

l UNIT.1 OPERATING DATA REPORT Docket No. 50-317 October 14, 2394 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS 9

1.

UNIT NAME Calvert Cliffs Unit 1 2.

REPORTING PERIOD SEPTEMBER 1994 3.

LICENSED THERMAL POWER (MWT) 2700 4.

NAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATING (NET MWe) 845

6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.

CHANGE IN CAPACITY RATINGS NONE 9.

POWER LEVEL TO WHICH RESTRICTED N/A

10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 720 6,551 170,052
12. NUMBER OF HOURS. REACTOR WAS CRITICAL 720.0 3,702.7 120,671.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 720.0 3,449.1 118,027.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,935,671 8,912,249 299,227,068
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH)

_634,729 2,919,774 99,393,320 r

18. NET ELECTRICAL ENERGY GENERATED (MWH) 608,832 2,791,447 94,595,729
19. UNIT SERVICE FACTOR 100.0 52.6 69.4
20. UNIT-AVAILABILITY FACTOR 100.0 52.6 69.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 101.3 51.2 67.4
22. UNIT CAPACITY FACTOR (USING DER NET) 100.1 50.4 65.8
23. UNIT FORCED OUTAGE RATE 0.0 17.2 9.0
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE.AND DURATION):

N/A

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

1 R

N/A

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-317 UNIT NAME Calvert Cliffs-U1 DATE October 14.1994 COMPLETED BY.

l Frank Piazza TELEPHONE (410) 260-3821-REPORTMONTII September 1994 MET 110D OF SilUTTING LICENSEE CAUSE & CORRECITVE DURAllON DOWN EVENT SYSTEM COMPONENT ACllON TO (IlOURS)

REASON 2 REACIVR3 REPORT #

CODE 4 CODES PREVENTRECURRENCE NO.

DATE TYPEI There were no significant pmer reductions for this month.

1 F: Forced 2 Reason:

3 Method:

4 IEEE Standard 805-1984 S: Scheduled A-Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C-Refueling 3 - Automatic Scram.

5 IEEE Standard 803A-1983 D -Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5-Reduced Imad F-Administrative 9 - Other O - Operational Error H - Other

AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************.

Docket No. 50-317 i

Calvert Cliffs Unit No. 1 October 14, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821' l

SEPTEMBER 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day

.(MWe-Net) 1 844 17 842 2

846 18 841 3

846 19 844 j

4 848 20 843 5

849 21 842 6

848 22 845

~i 7

847 23 848 l

8 847 24 847 i

i 9

846 25 844 10 146 26 843

(

11 847 27 845 12 847 28 843 13 847 29 848 t

14 847 30 850 i

15 845

'l.

16 843

)

f i

I

DOCKETNO. 50-317 CALVERT CLIFFS - UNIT 1 October 14,1994

SUMMARY

OF OPERATING EXPERIENCE September 1994 The unit operated the entire month at 100% power.

October 5,1994 NFM 94-288 Page 2 of 4, REFUEL,ING INFORMATION REOUEST 1.

Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.

2.

Scheduled date for next refueling shutdown: March,1996.

1 3.

Scheduled date for restart following refueling: May,1996.

I 4.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

None identified at this time.

l 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

l 1

1 N/A.

I 6.

Important licensing considerations associated with the refueling.

Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.a 7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1442 (Note 2)*

Spent fuel pools are common to Units I and 2.

8.

(a) The present licensed spent fuel pool storagc capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710(Note 1)

(b) 0 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1:

4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2:

144 Spent Fuel Assemblies in the ISFSI.a Entry has changed since last reported.

a

co*****************************************************w********************

UNIT 2 OPERATING DATA REPORT i

co**************************************************************************

Docket No. 50-318 October 14, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS 1.

UNIT NAME Calvert Cliffs Unit 2 2.

REPORTING PERIOD SEPTEMBER 1994

3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 911
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 1

8.

CHANGE IN CAPACITY RATINGS NONE' 9.

POWER LEVEL TO WHICH RESTRICTED N/A

10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 720 6,551 153,407 7
12. NUMBER OF HOURS REACTOR WAS CRITICAL 619.2 5,992.1 112,028.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 598.6 5,936.1 110,459.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,406,157 15,320,324 282,185,867
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 456,151 5,079,447 93,235,316
18. NET ELECTRICAL ENERGY GENERATED (MWH) 434,510 4,868,106 89,111,240
19. UNIT SERVICE FACTOR 83.1 90.6 72.0
20. UNIT AVAILABILITY FACTOR 83.1 90.6 72.0 21.-UNIT CAPACITY FACTOR (USING MDC NET) 71.8 89.1 70.4
22. UNIT CAPACITY FACTOR (USING DER NET) 71.4 87.9 68.7
23. UNIT FORCED OUTAGE RATE.

16.9 7.3 5.8

24.. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

February 18,1995

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A-t y

UNITSIIUTDOWNS AND POWER REDLCTIONS DOCKET NO.

50-318 UNIT NAME Cahrrt Cliffs-U2 DATE October 14.1994 COMPLETED BY Frank Piarla TELEPHONE (410) 260-3821 REPORT MONTII S_etitember 1994 METilOD OF SilUTTING 1.ICENSEE CAUSE & CORRECITVE DURATION DOWN EVENT SYST11M COMPONENT ACTION TU (IIOURS)

REASONI REACIOR3 REPORT #

CODE 4 CODES PREVENT RECURRENCE NO.

DAlli TYPEI S

94-10 940906 S

0 H

5 N/A N/A N/A Power was increased from 52% to 100% in 10%

increments per hour as requested by the dispatcher.

The power was kept low since 8/23/94 at the request of the dispatcher due to low power demand on the grid. Power was stable at 100% at 1540 on 9W)4.

94-11 940923 F

17.1 A

1 N/A SG COND Commenced reducing power on 9/23/94 at 2200 to repair an air leak in the Main Steam drain collector box. The unit was removed from the grid at 0310 on 9/24!94. After completing the repairs the unit was paralleled to the grid at 2015.

94-12 940924 F

1R3 A

3 Not Available TA FCV Unit tripped from 16% reactor power on low steam generator pressure at 2016 on 9/24/94. The cause of the trip was a k>ose wire on #1 governor vahr, which is part of a feedback circuit that caused the valve to open fully. The wire was loose due to vibration. The wire was tightened and all the other wires on the vahr were checked for security. The unit was returned to power and paralleled to the grid at 0435 on 9/29S4.

1 F: Forced 2 Reason:

3 Method:

4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram.

5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F-Administrative 9 - Other G - Operational Error H - Other m

AVERAGE DAILY UNIT POWER LEVEL

'o*******p***************************************************************

Docket No. 50-318 Calvert Cliffs Unit No. 2 October 14, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 SEPTEMBER 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) 1 411 17 844 2

416 18 843 l

3 419 19 845 4

421 20 846 l

5 417 21 845

)

6 679 22 847 l

7 846 23 841 l

8 846 24 10 9

828 25 0

10 742 26 0

1 11 738 27 0

12 738 28 0

13 802 29 496 14 844 30 850 15 844 16 845

l DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 October 14,1994

SUMMARY

OF OPERATING EXPERIENCE September 1994 At the request of the dispatcher the unit began the month in a reduced power condition due to a very low demand on the grid. The power was 53% reactor power. Commenced raising power at 0500 on September 6,1994 and established 100% reactor power at 1540.

Power was again reduced slightly on September 9,1994 at 1525 to repair the number 22 heater drain tank normal level control valve. The power was again returned to 100% at 1350 on September 13, 1994.

On September 23 at 2200, commenced reducing power to repair an air leak on 21 condenser of the Main Steam drain collector box. The unit was removed from the grid at 0310 on September 24,1994 to affect these repairs; however, the unit remained at approximately 6% reactor power during the repairs. The unit was again paralleled to the grid on September 24,1994 at 2015.

On September 24,1994 at 2016, the unit automatically tripped from approximately 16% reactor power due to low steam generator pressure caused by the governor valves opening fully. The cause of the governor valve opening was a loose wire in the control circuitry of the valve. The wire was tightened and the unit was returned to power and paralleled to the grid at 0435 on September 29, 1994.

The unit ended the month at 100';c reactor power.

October 5,1994 NFM 94-288 Page 3 of 4 REFUEL,ING INFORM ATION REOUEST 1.

Name of facility: Calvert Cliffs Nuclear Power Plant. Unit No. 2 I

2.

Scheduled date for next refueling shutdown: February 18, 1995

  • 3.

Scheduled date for restart following refueling: May 22,- 1995.

4.

Will refueling or resumption of operation thereafter require a Technical Specification change or

)

other license amendment?

Yes.*

Revision of the Design Features Section to adopt Improved S' tandard Technical a.

Specifications format which allows insertion of four lead fuel assemblics.*

I b.

License amendment to support installation of a Variable LTOP system.*

e.

License amendment to extend allowed out of service times for control room IIVAC

- and emergency diesel generator to support Station Blackout modifications.*

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

1 l'

a.

Submitted 12/08/93*

l b.

Submitted 05/27/94*

l c.

Submitted 09/23/94*

6.

Important licensing considerations associated with the refueling.

1 An exemption from 10 CFR 50.46,10 CFR 50.44, and Appendix K to 10 CFR 50 is required to load four lead fuel assemblies. The exemption is scheduled to be submitted in October, 1994,*

An exemption from General Design Criteria 2 of Appendix A to 10 CFR Part 50 is required to allow the removal of the missile door to Emergency Diesel Generator No. 21. The exemption is needed to upgrade the capacity of the generator. The exemption was submitted 08/04/94.*

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217.

(b).1442 (Note 2)*

Spent fuel pools are common to Units 1 and 2.

1 8.

(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase m licensed storage capacity that has been requested or is planned in number of fuel assemblies.

(a) 4710 (Note 1)

(b) 0 I

'

  • October 5,1994 NFM 94-288 I

Page 4 of 4 1

9..

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 l

NOTE 1:

4710 total licensed site storage capacity.

l (1830 pool + 2880 ISFSI)

NOTE 2:

144 Spent Fuel Assemblies in the ISFSI.*

l l

Entry has changed since last reported.

l l

1