ML20094G719: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-601937, Annual Operating Rept for 1991 for Clinton Power Station]]
| number = ML20094G719
| issue date = 12/31/1991
| title = Annual Operating Rept for 1991 for Clinton Power Station
| author name = Spangenberg F
| author affiliation = ILLINOIS POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000461
| license number =
| contact person =
| document report number = U-601937, NUDOCS 9203030269
| document type = ANNUAL OPERATING REPORT, TEXT-SAFETY REPORT
| page count = 6
}}
 
=Text=
{{#Wiki_filter:. ._.          _.          -    ._    -m        _. ..                      .._    __ ..        _  . _ - . . - -  .    .      _ ___    .. _                _        -
j-                                                                                                                        lilinois Power Cgej Clinton Power Stat:on
      ,-      .,                                                                                                        P.O. Box 678                                          '
Clinton. IL 61727
        ..                                                                                                              Tel 217 935-8881
+
3-ILLIN915                                                                                              '
P4sWER                                                                                    $'O 92 2 -26 ) -LP l                                                                                                                      1A.120
+
a February 26, 1992 10CFR50.36 1
i
;                          Docket No. 50-461 l
,                          Nuclear Regulatory Commiision l                          Documenc Contrc,1 Desk k'a shington , D.C.                      20555 i
i                         
 
==Subject:==
Annual Operatinn Report j
 
==Dear Sir:==
 
In accordance with 10CFR50.36 and paragraph 6.9.1.4 of tho Clinton Power Station Technical Specifications, Illinois Power Company is i                          submitting the attached Clinton Power Station Annual Operating Report i                          for the period of January 1,1991 through December 31, 1991.
i                                                                                  Sincerely yours, N lYA: Ta              --
i                                                                                  F.-A. Spangenberg,III
[                                                                                  Manager - Licensing and Safety 3FE/alli f                          Attachments
;                          cc:    NRC Region-III, Regional Administrator i
NRC Clinton Licensing Project Manager
                                  -NRC Reside'nt Office
:                                  Director, Office of Nuclear Regulatory Research Illinois Department of Nuclear Safety i
s m.,
(          7'SDq1II' l                                                                                                                                                              ,
;                                                                      ,                                                                                              j 92o3030269 911231                                                                                                                                              1 PDR          ADOCK-OSOOgi R                              - . . , _ _ _ _ . _ . _ . . _ . . .                                                                      _ . , ~ . . . . - , ,
 
r
* b
                                                                                                                                                          .r Clinton Power Station Clinton, Illinois l-Annual Operating Report January 1, 1991 through December 31, 1991
                                                                    .USNRC Docket 50-461 s-f 4
d  -
                ---9 m                    .gr1                          en e        q= -      -  ,y,, ug ga          .e-r
                                                                                                                            *r      -
 
Attachments I. Personnel Man Rem by Work and Job Function                                                      '*
II, Performance Chsracteristics and Tests Safety Valve and Safety / Relief Valve Challengey Primary Coolant Specific Activity Analyses                                                '
f
 
Attachment I tillwols Powa CmeAwy                                                to U-601927
'.                                                                                                                    PO CLIN 10N PWit $1 Atl0N                                                          Of s                                                  RR3 BOX 678 CLIN 10w, ILLINols 61727 Reg. Guide 1.16 Ry ort
$epartIng iear 91
                                      # PERLon(L (e100 MREM)                                            total kAN RtM V:*K & JOB FUwCTION        tiAi!ON          UillllY      CONTRACT            $1All0N        VilllTY      CONTRACT Routirw Ope +ations ord f.urvelliance Maintenance and Const ruction          124                1          292                41 #08            0.260        94.469 Orei at ior:                            27                0              10              12.003            0.000          1.8 75 Health Fhysics arc Lt=b                38                0              47              16.8 M            0.000          14.083 Supervisory and Offlee staff              9                0              15                1.671          0.000          2.585 Engineering staff                        10                0              18                1.983          0.000          3.889 Routine Plant Maintenance Maintenance and construction              0                0                0                0.296            0.000          0.0'2 Operations                                0                0                0                0.049            0.000          0.000 health Physics ard Lab                    0                0                0                0.048            0.000          0.000 supenvisory and Office staff            0                0                0                0.003            0.000          0.000 Engineering Staff                        0                0                0                0.000            0.000          0.000 Inservice Inspection Maintenance and Construction            0                0                2                0.000            0.000          0.535 Operations                              0                0                0                0.000            0,000          0.000 Health Physics and Lab                  0                0                0                0.010            0.000          0.0&*
supervisory and Office Staff            0                0              0                0.000            0.000          0.000 Engineering Staff                        0                0              0                0.000            0.000          0.027 special Pla't Maintenance Maintenance ord Construction              7                0                2                1.805          0.000          2.645 Operatiens                                0                0                0                0.067          0.000          0.076 Health Physics and Lab                    0                0                0                0.426          0.000          0.439 Supervisory a d Of fice Staf f            0                0                0                0.022          0.000          0.061 (ngineer1.ig $taff                        0                0                                  0.085 1                                0.000          0.306 Waste Processing Maintenance and Construction              0                0                                  0.000          0.000 1                                                0.298 Operations                                0                0                0                0.000          0.000          0.000 Health Physics and Lab                    0                0                0                0.088            0.000          0.000 supervisory and Office Staff              0                0                0                0.000            0.000'        O.000 Ingineering staff                        0                0                0                0.000            0.000          0.000 Refueling Operations Maintenance and Construction              0                0              0                0.407            0.000          0.971 operatiens                                0                0                0                0.118            0.000          0.062 Health Physics and Lab                    0                0                1                0.063          -0.000            0.282 Supervisory and Office staff              0                0                0                0.070            3.000          0.216 Eng(neering Staff                        0                0                0                0.017            0.000          0.175-WORK & JOB FUNCTION TOTALS                215                                389 1                                77.328            0.260        123.134 eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
                                      # PERSONNEL (eiOO MREM)                                            TOTAL MAN REM STA110N        Uilltif        CONTRCT            STA110N        UilLITY        CONTRACT CRAND TOTALS                          210                          389 1                              77.328          0.260        123.134 1
 
          .,                                                                                          Attachment 1 i
to U 601927 Page 2 of 2 Per onnel Man Rem by Work and Job Function
+
The work job function tabulati n reflects tiie nwnber of personnel who received greater than 100 mrem in EDy of the six identified categories.
The totals section at the bottom of the report reflects all work and job functions where personnel received exposures greater than 100 mReta.
J                  Due to job rotations during the year, there is not a direct correlation between the individual dose tabulation and tho totals swnmary.
.!                                                                                                                                          t 4
3 4
J 1
I
_ . , _ _            ..r.1 - -              -.                      . - . _ . . . - _ _ _
 
                    *.                                                                                                                      Attachment 2      1
                      .                                                                                                                    to U.601927 Page 1 of 1 PFRFORMANCE CHARACTTRISTJCS AND T['g[3 Snfety Valve and Safetv/ Relief Valve Challenzt.g
(
 
==Reference:==
NUREG 0737, Action Item II.K.3.3)
There were no unplanned or planned challenges to Safety Relief Valves during 1991, i
l Primary Conlanf_Etucif_ic Aetivitv onniVPE
(
 
==Reference:==
CPS Technical Specifications. Section 6.9.1.5(c))
All analyses for specific activity of primary coolant were within the limits of Technical Specification 3.4.5 for 1991.
__ _}}

Latest revision as of 20:28, 24 September 2022