==Title:==
==Title:==
SAFETY INJECTION TANK DidCHARGE CHECK VALVES TEST 4
SAFETY INJECTION TANK DidCHARGE CHECK VALVES TEST 4
                                                                                                                  .(
.(
Setpoint/ Procedure Forn Number (FC-68):             38552 Reason for Change:               To improve the safety injection tank discharge check values test by revising the initial conditions and by providing individual acceptance criteria for each tank.
Setpoint/ Procedure Forn Number (FC-68):
Contact Person:                   Ron Lippy 9209140171 920903 1qDR ADOCK 05000285 PDR ISSUED:   06-12-92       4:00 pm                                                                           R5-
38552 Reason for Change:
To improve the safety injection tank discharge check values test by revising the initial conditions and by providing individual acceptance criteria for each tank.
Contact Person:
Ron Lippy 9209140171 920903 1qDR ADOCK 05000285 PDR ISSUED:
06-12-92 4:00 pm R5-


FORT CALHOUN STATION                                   SS-ST-SI-3015 SURVElLLdNCE TEST                                       PAGE 1 OF 53 SAFETY INJECTION TANK DISCHARGE CHECK VALVES TEST SAFETY RELATED 1.0 PURPOSE 1.1   To satisfy in part, each refueling outage, the requirements of Technical Specifications 3.3 (1) a for the following check valves:
FORT CALHOUN STATION SS-ST-SI-3015 SURVElLLdNCE TEST PAGE 1 OF 53 SAFETY INJECTION TANK DISCHARGE CHECK VALVES TEST SAFETY RELATED 1.0 PURPOSE 1.1 To satisfy in part, each refueling outage, the requirements of Technical Specifications 3.3 (1) a for the following check valves:
SI-207         SI-211       SI-215         SI-219 SI-208         SI-212       SI-216         SI-220 2.0 BFFERENCES 2.1   Technical Specifications:
SI-207 SI-211 SI-215 SI-219 SI-208 SI-212 SI-216 SI-220 2.0 BFFERENCES 2.1 Technical Specifications:
* 2.1.1:     Reactor Coolant System
2.1.1:
* 2.8: Refueling Operations
Reactor Coolant System 2.8: Refueling Operations 3.3: Reactor Coolant System and Other Components Subject to ASME XI Boiler and Pressure Vessel Code Inspection and Testing Surveillance 3.6(4):
* 3.3: Reactor Coolant System and Other Components Subject to ASME XI Boiler and Pressure Vessel Code Inspection and Testing Surveillance
Safety Injection and Containment Spray
              =
=
3.6(4):   Safety Injection and Containment Spray Systems Tests 2.2   Fort Calhoun Station Inservice Inspection (ISI)
Systems Tests 2.2 Fort Calhoun Station Inservice Inspection (ISI)
Program Plan 2.3   Standing Order G-23, Surveillance Test Program 2.4   Operating Instructions:
Program Plan 2.3 Standing Order G-23, Surveillance Test Program 2.4 Operating Instructions:
* OI-NG-1:    Nitrogen System - Normal Operation
(
(
* OI-SI-1:   Safety Injection System - Normal Operation 2.5   P&ID:
OI-NG-1:
Nitrogen System - Normal Operation OI-SI-1:
Safety Injection System - Normal Operation 2.5 P&ID:
(
(
* E-23866-210-130 (Sh 2): Safety Injection and l               Containment Spray System (File No. 10480) l l
E-23866-210-130 (Sh 2):
* E-23866-210-110:   Reactor Coolant System (File No. 10475) l
Safety Injection and l
* 11405-M-42:   Nitrogen Flow Diagram (File No. 10450) l
Containment Spray System (File No. 10480) l l
* 11405-A-13:   Primary Plant Diagram (File No. 12170)
E-23866-210-110:
FC/SS-ST                                                           R5 9
Reactor Coolant System (File No. 10475) l 11405-M-42:
Nitrogen Flow Diagram (File No. 10450) l 11405-A-13:
Primary Plant Diagram (File No. 12170)
FC/SS-ST R5 9


  - ..      .                          ~   . _                                    _
~
FORT CALHOUN STATION                                           SS-ST-SI-3015 SURVEILLANCE TEST                                                 PAGE 2 OF 53 2.6   Instrumentation and Control Interconnect Diagrams
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 2 OF 53 2.6 Instrumentation and Control Interconnect Diagrams 161F561 SHT. 83 File No. 9581 161F561 SHT. 84 File No. 9582 e
                    . 161F561 SHT. 83 File No. 9581 161F561 SHT. 84 File No. 9582 e   161F561 SHT. 85 File No. 9583 e   161F561 SHT. 86 File No. 9584 e   161F561 SHT. 99 File No. 9597 e 161F561 SHT. 100 File No. 9598 161F561 SHT. 101 File No. 9599
161F561 SHT. 85 File No. 9583 e
                    . 161F561 SHT. 102 File No. 9600 2.7 Instrument Loop Drawings
e 161F561 SHT. 86 File No. 9584 e
                    . EM-2901 File No. 20574
161F561 SHT. 99 File No. 9597 e
                    . EM-2904 File No. 20592
161F561 SHT. 100 File No. 9598 161F561 SHT. 101 File No. 9599 161F561 SHT. 102 File No. 9600 2.7 Instrument Loop Drawings EM-2901 File No. 20574 EM-2904 File No. 20592 EM-2921 File No. 20575 EM-2924 File No. 20555 EM-2941 File No. 20576 EM-2944 File No. 20594 EM-2S61 File No. 20577 EM-2964 File No..20595 2.8 USAR:
                    . EM-2921 File No. 20575
6.2:
* EM-2924 File No. 20555
Safety Injection System
                  . EM-2941 File No. 20576 EM-2944 File No. 20594 EM-2S61 File No. 20577 EM-2964 File No. .20595 2.8 USAR:
* 6.2:   Safety Injection System


===2.9 Calculation===
===2.9 Calculation===
* FC-05280 FC-05428, Rev. 1 l
FC-05280 FC-05428, Rev. 1 l
2.10 Surveillance and Calibration-Procedures
e 2.10 Surveillance and Calibration-Procedures CP-106, Pressurizer Level-IC-ST-RC-0004, Channel Calibration of Pressurizer Level Instrument Channel L-101X.
* CP-106, Pressurizer Level-
(If LIC-101X is used) acs FC/SS-ST R5 l
* IC-ST-RC-0004, Channel Calibration of Pressurizer Level Instrument Channel L-101X.           (If LIC-101X is used)                                                                 acs FC/SS-ST                                                                         R5 l
\\
\                                 _ -,    ,  ,  ,    . , , , ,      , - - - - , -    - - ~~     - - ~ ~ -
~~
- - ~ ~ -


  -FORT CALHOUN STATION                                               SS-ST-SI-3015 SURVEILLANCE TEST                                                     PAGE 3 OF.53 2.10       e IC-ST-RC-0005, Channel Calibration of-Pressurizer level Instrument Channel L-101Y. (If LIC-101Y is used)
-FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 3 OF.53 2.10 e
* IC-ST-SI-0005, Channel Calibration of SI-Tank SI-6A Nitrogen Pressure, Loop P-2901
IC-ST-RC-0005, Channel Calibration of-Pressurizer level Instrument Channel L-101Y.
* IC-ST-SI-0008, Channel Calibration of SI Tank SI-6A Wide Range Level, Loop P-2904X e IC-ST-SI-0011, Channel Calibration of SI Tank SI-6B Nitrogen Pressure, Loop P-2921
(If LIC-101Y is used)
                  . IC-ST-SI-0014, Channel Calibration of SI Tank SI-6B Wide Range Level, Loop P-2924X IC-ST-SI-0017, Channel Calibration of SI Tank SI-6C Nitrogen Pressure, Loop P-2941' IC-ST-SI-0020, Channel Calibration of SI Tank SI-6C Wide Range Level, Loop P-2944X e
IC-ST-SI-0005, Channel Calibration of SI-Tank SI-6A Nitrogen Pressure, Loop P-2901 IC-ST-SI-0008, Channel Calibration of SI Tank SI-6A Wide Range Level, Loop P-2904X IC-ST-SI-0011, Channel Calibration of SI Tank SI-6B e
IC-ST-SI-0023, Channel Calibration of SI Tank'SI-6D Nitrogen Pressure, Loop P-2961
Nitrogen Pressure, Loop P-2921 IC-ST-SI-0014, Channel Calibration of SI Tank SI-6B Wide Range Level, Loop P-2924X IC-ST-SI-0017, Channel Calibration of SI Tank SI-6C e
* IC-ST-SI-0026, Channel-Calibration of SI Tank SI-6D Wide Range Level, Loop P-2964X 2.11       Technical Data Book
Nitrogen Pressure, Loop P-2941' IC-ST-SI-0020, Channel Calibration of SI Tank SI-6C Wide Range Level, Loop P-2944X IC-ST-SI-0023, Channel Calibration of SI Tank'SI-6D e
                  . TDB-III.20 Page 1 FC/SS-ST                                                                         R5
Nitrogen Pressure, Loop P-2961 IC-ST-SI-0026, Channel-Calibration of SI Tank SI-6D Wide Range Level, Loop P-2964X 2.11 Technical Data Book TDB-III.20 Page 1 FC/SS-ST R5


FORT CALHOUN STATION                                                       SS-ST-SI-3015 SURVEILLANCE TEST                                                             PAGE 4 OF 53 3.0       DEFINITIONS SIT - Safety Injection Tank PT-1 and PT Points on SIT level trace where SIT Isolation valve is >90% (as determined by valve stroke time). PT-1 and PT-2 represent a period of time when the valve is fully open and fluid is flowing through the check-valve at approximately its maximum velocity with the SIT Isolation Valve fully open.         PT-1 represents an arbitrary beginning time and PT-2 is an arbitrary end time (usually 1 - 10 secs after PT-1).         The time interval between PT-1 and PT-2 is used for calculation for fluid flowrate.
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 4 OF 53 3.0 DEFINITIONS SIT - Safety Injection Tank PT-1 and PT Points on SIT level trace where SIT Isolation valve is >90% (as determined by valve stroke time).
PT-5     -
PT-1 and PT-2 represent a period of time when the valve is fully open and fluid is flowing through the check-valve at approximately its maximum velocity with the SIT Isolation Valve fully open.
Point midway between PT-1 and PT-2 La        -
PT-1 represents an arbitrary beginning time and PT-2 is an arbitrary end time (usually 1 - 10 secs after PT-1).
The time interval between PT-1 and PT-2 is used for calculation for fluid flowrate.
PT-5 Point midway between PT-1 and PT-2 L
Level in Reactor Refueling-Cavity (in %)
Level in Reactor Refueling-Cavity (in %)
Lp7_1     -
a Lp7_1 Level of SIT at PT-1 (in feet)
Level of SIT at PT-1 (in feet)
LPT-2 Level of SIT at PT-2 (in feet)
L PT-2   -
L Level of SIT at PT-1 (in volts) y2 172 Level of SIT at PT-2 (in volts) e L
Level of SIT at PT-2 (in feet)
Level of SIT at PT-5 (in volts) v5 AL SIT Level change during the time period between PT-1 and PT-2 (in feet)
Ly2      -
D Distance between PT-1 and PT-2 (in mm-on the strip chart) i S
Level of SIT at PT-1 (in volts) 172       -
Level of SIT at PT-2 (in volts)                               e Lv5      -
Level of SIT at PT-5 (in volts)
AL       -
SIT Level change during the time period between PT-1 and PT-2 (in feet)
D         -
Distance between PT-1 and PT-2 (in mm-on the strip chart) i         S         -
Strip Chart Speed (in mm/sec)
Strip Chart Speed (in mm/sec)
R         -
R
                          -Rate of SIT level change-(in ft/sec)
-Rate of SIT level change-(in ft/sec)
Q         -
Q Calculated flow rate (in gpm)
Calculated flow rate (in gpm)
PPT-5 Total pressure in-SIT at time PT-5 (in psig)
P PT-5   -
Py5 Gas pressure in SIT at PT-5 (in volts)
Total pressure in-SIT at time PT-5 (in psig)
'Pg Gas pressure in SIT at.PT-5 (in psig)
P y5      -
Pg Head pressure due to-level in SIT plus.the i
Gas pressure in SIT at PT-5 (in volts)
        'P g        -
Gas pressure in SIT at.PT-5 (in psig)
!        Pg       -
Head pressure due to-level in SIT plus.the i
difference in elevation from the lower SIT level tap to the-top of reactor vessel flange (in psig)
difference in elevation from the lower SIT level tap to the-top of reactor vessel flange (in psig)
Pp        -
P Head pressure due to reactor vessel cavity level p
Head pressure due to reactor vessel cavity level (in psig) s FC/SS-ST                                                                                   - RS
(in psig) s FC/SS-ST
- RS


  - .        -      .        -~           .    .        .    -            -- -                                            -        -
-~
FORT'CALHOUN STATION                                                                   SS-ST-SI-3015-SURVEILLANCE TEST                                                                         PAGE 5 OF 53 3.0 DEFINITIONS (Continued)
FORT'CALHOUN STATION SS-ST-SI-3015-SURVEILLANCE TEST PAGE 5 OF 53 3.0 DEFINITIONS (Continued)
          .AP     -
.AP Difference in pressure between P and P PT-5 g
Difference in pressure between P PT-5 and P g (in psid) cy      - Flow Coefficient 4.0 EOUIPMENT LIST 4.1     TEST EQUIPMENT REQUIRED /USED:
(in psid) c
NOTE:   During the course of this procedure, some portable or temporary test equipment may be used to prove operability of a plant component.                                   All such equipment must be entered into the appropriate I&C Instrument Log.
- Flow Coefficient y
CALIBRATION E_OUIPMENT               OPPD NO./ DUE DATE                           INITIALS /DATE LI-106                   N/A               /                                     /
4.0 EOUIPMENT LIST 4.1 TEST EQUIPMENT REQUIRED /USED:
PT-2901                   N/A               /                                     /
NOTE:
LT-2904X                 N/A               /                                     /
During the course of this procedure, some portable or temporary test equipment may be used to prove operability of a plant component.
PT-2921                   N/A               /                                     /
All such equipment must be entered into the appropriate I&C Instrument Log.
LT-2924X                 N/A               /                                     /
CALIBRATION E_OUIPMENT OPPD NO./
PT-2941                   N/A               /                                     /
DUE DATE INITIALS /DATE LI-106 N/A
LT-2944X                 N/A               /                                     /
/
PT-2961                   N/A               /                                     /
/
LT-2964X                 N/A               /                                     /
PT-2901 N/A
Strip Chart Recorder                                     /                                     /
/
                                                                /                                     /
/
L.                                   /
LT-2904X N/A
5.0 ERECAUTIONS AND LIMITATIONS 5.1   All ancmalies and deficiencies shall--be reported immediately to the Shift Supervisor and noted in the Remarks Section.           An immediate check shall.be made to verify Limiting Conditions for Operation per Technical Specifications, have' not been exceeded.
/
5.2   A Maintenance Work Request (MWR) shall be initiated to correct _any reported deficiency and.the-MWR number shall be referenced on the Comment Sheet /
/
PT-2921 N/A
/
/
LT-2924X N/A
/
/
PT-2941 N/A
/
/
LT-2944X N/A
/
/
PT-2961 N/A
/
/
LT-2964X N/A
/
/
Strip Chart Recorder
/
/
/
/
L.
/
5.0 ERECAUTIONS AND LIMITATIONS 5.1 All ancmalies and deficiencies shall--be reported immediately to the Shift Supervisor and noted in the Remarks Section.
An immediate check shall.be made to verify Limiting Conditions for Operation per Technical Specifications, have' not been exceeded.
5.2 A Maintenance Work Request (MWR) shall be initiated to correct _any reported deficiency and.the-MWR number shall be referenced on the Comment Sheet /
Chronological Log.
Chronological Log.
FC/SS-ST                                                                                                 R5 l
FC/SS-ST R5 l
l               _,      _
l


FORT CALHOUN STATIO"                                   SS-ST-SI-3015 SURVEILLANCE TEST                                       PAGE 6 OF 53 5.3   Test data shall be evaluated by the Special Services Engineer (SS) AND reviewed by the Shift Supervisor for acceptability within 24 hours following completion of this test.
FORT CALHOUN STATIO" SS-ST-SI-3015 SURVEILLANCE TEST PAGE 6 OF 53 5.3 Test data shall be evaluated by the Special Services Engineer (SS) AND reviewed by the Shift Supervisor for acceptability within 24 hours following completion of this test.
5.4   The System Engineer shall be notified within 24 hours of the completion of this test of any marginal, unexpected, or unacceptable results.
5.4 The System Engineer shall be notified within 24 hours of the completion of this test of any marginal, unexpected, or unacceptable results.
5.5   The use of N/A (not applicable) in this procedure shall be in accordance with the requirements listed in Standing Order G-23.
5.5 The use of N/A (not applicable) in this procedure shall be in accordance with the requirements listed in Standing Order G-23.
5.6   The completed Surveillance Test procedure and all applicable attachments shall be signed and dated by the person (s) who actually performed the test.
5.6 The completed Surveillance Test procedure and all applicable attachments shall be signed and dated by the person (s) who actually performed the test.
5.7   To prevent overflow of the Reactor Refueling Cavity and to provide adequate Radiological Shielding in the         l event of a crud burst, the Reactor Refueling Cavity level must be between 40% and 50% as indicated on LI-106 at the beginning of this test. If LI-106 is unavailable, the Reactor Refueling Cavity must be between 1032 ft and 1034 ft as indicated on LI-199 at the beginning of this test.
5.7 To prevent overflow of the Reactor Refueling Cavity l
5.8   All steps in this procedure shall be conducted in sequence written unless otherwise noted.
and to provide adequate Radiological Shielding in the event of a crud burst, the Reactor Refueling Cavity level must be between 40% and 50% as indicated on LI-106 at the beginning of this test.
5.9   If the procedure becomes contaminated or damaged, the
If LI-106 is unavailable, the Reactor Refueling Cavity must be between 1032 ft and 1034 ft as indicated on LI-199 at the beginning of this test.
                      " Lead Person" or designee shall ensure that all data, Verifications, or other pertinent information is         l transcribed to another copy of the procedure, which will become the official copy.
5.8 All steps in this procedure shall be conducted in sequence written unless otherwise noted.
5.10   An Incident Report shall be initiated, in accordance with SO-R-4, to report any anomalies or deficiencies.
5.9 If the procedure becomes contaminated or damaged, the
" Lead Person" or designee shall ensure that all data, l
Verifications, or other pertinent information is transcribed to another copy of the procedure, which will become the official copy.
5.10 An Incident Report shall be initiated, in accordance with SO-R-4, to report any anomalies or deficiencies.
The Incident Report number shall be recorded on the Comment sheet / Chronological Log.
The Incident Report number shall be recorded on the Comment sheet / Chronological Log.
5.11 No maintenance shall be conducted within this Surveillance Test other than that specifically directed by this procedure.
5.11 No maintenance shall be conducted within this Surveillance Test other than that specifically directed by this procedure.
6.0 INITIAL CONDITIONS                               INITIALS /DATE NOTE:   The Initial Conditions may be performed in any sequence.
6.0 INITIAL CONDITIONS INITIALS /DATE NOTE:
6.1   Procedure revision verification Master Revision No.                                 /
The Initial Conditions may be performed in any sequence.
FC/SS-ST                                                           R5
6.1 Procedure revision verification Master Revision No.
_ _ ~ . .
/
FC/SS-ST R5
_ _ ~..


i FORT CALHOUN STATION                                                             SS-ST-SI-3015 SURVEILLANCE. TEST                                                                 PAGE 7 OF 53 l
i FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE. TEST PAGE 7 OF 53 l
INITIALS /DATE 6.2       No other test is in-progress which could potentially affect this test, or if this test were performed, could have an effect on that test.                                                             /
INITIALS /DATE 6.2 No other test is in-progress which could potentially affect this test, or if this test were performed, could have an effect on that test.
6.3       Calibration of test equipment has been verified and procedures listed below have been satisfactorily completed prior to test.                                                                     /
/
DATE PROCEDURE                   COMPLETED CP-106 (WP-005056)*                                                                             /
6.3 Calibration of test equipment has been verified and procedures listed below have been satisfactorily completed prior to test.
IC-ST-SI-0005                                                                                   /
/
;      IC-ST-SI-0008                                                                                   /
DATE PROCEDURE COMPLETED CP-106 (WP-005056)*
IC-ST-SI-0011                                                                                   /
/
IC-ST-SI-0014                                                                                   /
IC-ST-SI-0005
IC-ST-SI-OO17                                                                                   /
/
IC-ST-SI-0020                                                                                   /
IC-ST-SI-0008
IC-ST-SI-0023                                                                                   /
/
IC-ST-SI-0026                                                                                   /
IC-ST-SI-0011
* NOTE:         At the discretion of the Test Coordinator, LI-199 may be used as an alternate level indication.for LI-106. Note the
/
; Comment Sheet / Chronological Log if this is used.
IC-ST-SI-0014
t       6.4       A prejob briefing has been conducted j                   prior to the start of this_ test.-. ALL l                   persontzel participating in.the i                   performance of this test have read AND understand-the procedure AND have completed the surveillance Test Signature Sheet.                                                                 '/
/
6.5       Control power is available for valve
IC-ST-SI-OO17
,                  operation.                                                                         /
/
l 6.6       Safety Injection Tank levels are between 85% and 90%.                                                               /
IC-ST-SI-0020
6.7       Shutdown cooling is not in service.                                               /
/
t I       6.8       -The Reactor Vessel Head-has been removed and core off-loaded.                                                       /
IC-ST-SI-0023
6.9-       The pressurizer is vented or the manway removed (Pressurizer pressure is the same as Containment pressure).                                                     /
/
FC/SS-ST                                                                                                   R5 w             - - ,--  - v.-, e ,g,m v     ~ - < - e , ,     >w-+-.--n-r-- o.g- wy,     y
IC-ST-SI-0026
/
* NOTE:
At the discretion of the Test Coordinator, LI-199 may be used as an alternate level indication.for LI-106.
Note the Comment Sheet / Chronological Log if this is used.
t 6.4 A prejob briefing has been conducted j
prior to the start of this_ test.-.
ALL l
persontzel participating in.the i
performance of this test have read AND understand-the procedure AND have completed the surveillance Test Signature Sheet.
' /
6.5 Control power is available for valve operation.
/
l 6.6 Safety Injection Tank levels are between 85% and 90%.
/
6.7 Shutdown cooling is not in service.
/
t I
6.8
-The Reactor Vessel Head-has been removed and core off-loaded.
/
6.9-The pressurizer is vented or the manway removed (Pressurizer pressure is the same as Containment pressure).
/
FC/SS-ST R5 w
v.-,
e
,g,m v
~ - < -
e,,
>w-+-.--n-r--
o.g-wy, y


FORT CALHOUN STATION                                       SS-ST-SI-3015 SURVEILLANCE TEST                                           PAGE 8 OF 53 INITIALS /DATE 6.10   Notify Radiation Protection prior to the start of this test due to the possibility of increasing airborne radiation in containment.                                     /
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 8 OF 53 INITIALS /DATE 6.10 Notify Radiation Protection prior to the start of this test due to the possibility of increasing airborne radiation in containment.
6.11 The Reactor Refueling Cavity level is between 40% and 50% as indicated on LI-106. If LI-106 is unavailable the reactor refueling cavity level should be between 1032 ft and 1034 ft elevation on LI-199 sightglass.                               /
/
6.12   Ensure the Strip Chart Recorder is loaded with paper graduated in square centimeters.                                                 /
6.11 The Reactor Refueling Cavity level is between 40% and 50% as indicated on LI-106.
6.13   If test instrumentation or temporary equipment is expected to be installed for greater than 24 hours, ensure the requirements of SO-O-25 are met.                             /
If LI-106 is unavailable the reactor refueling cavity level should be between 1032 ft and 1034 ft elevation on LI-199 sightglass.
6.14 Complete the activities in Attachment 8 to fill and vent the Safety Injection Tanks, as required.
/
6.15 Notify Chemistry prior to start-to coordinate containment sampling as necded     support containment releases.                     /
6.12 Ensure the Strip Chart Recorder is loaded with paper graduated in square centimeters.
6.16 Ensura .nat the instrument lines to the level transmitter for each S.I. Tank have been flushed and filled-prior to the test.                                                   -/
/
I&C 6.17 Shift Supervisor authorizes performance of this test.
6.13 If test instrumentation or temporary equipment is expected to be installed for greater than 24 hours, ensure the requirements of SO-O-25 are met.
Shift Supervisor'                 Date/ Time                 /
/
7.0 PROCEDURE-l     NOTE:-   Step 7.1 through 7.4 may be-performed                                 I i     in any order at the dlscretion of the' Shift L     Supervisor. In order to decrease the time i
6.14 Complete the activities in Attachment 8 to fill and vent the Safety Injection Tanks, as required.
between each' test, the determination-of the flow coef ficient. (Cy ) for each tank need not be completed until all four safety injection tanks have been discharged. -(This                                             l calculation is located in Steps 18 through 25.1 in Attachments 1,     2, 3, and-4.
6.15 Notify Chemistry prior to start-to coordinate containment sampling as necded support containment releases.
7.1   Test SI-6A Discharge Check Valves SI-219 and SI-220 per Attachment'l.                                                 /
/
u FC/SS-ST                                                                     R5
6.16 Ensura.nat the instrument lines to the level transmitter for each S.I. Tank have been flushed and filled-prior to the test.
-/
I&C 6.17 Shift Supervisor authorizes performance of this test.
Shift Supervisor' Date/ Time
/
7.0 PROCEDURE-I l
NOTE:-
Step 7.1 through 7.4 may be-performed i
in any order at the dlscretion of the' Shift L
Supervisor.
In order to decrease the time i
between each' test, the determination-of the flow coef ficient. (C ) for each tank need not y
be completed until all four safety injection l
tanks have been discharged.
-(This calculation is located in Steps 18 through 25.1 in Attachments 1, 2,
3, and-4.
7.1 Test SI-6A Discharge Check Valves SI-219 and SI-220 per Attachment'l.
/
u FC/SS-ST R5


FORT CALHOUN STATION ~                                                                         SS-ST-51-3015 SURVEILLANCE TEST                                                                               PAGE 9 OF 53 INITIALS /DATE 7.2   Test.SI-6B Discharge Check Valves SI-215 and SI-216 per.
FORT CALHOUN STATION ~
Attachment 2.                                                                                /   _ _ _ _ _
SS-ST-51-3015 SURVEILLANCE TEST PAGE 9 OF 53 INITIALS /DATE 7.2 Test.SI-6B Discharge Check Valves SI-215 and SI-216 per..
7.3   Test SI-6C Discharge Check Valves SI-207 and SI-208-per 1 -.
/
Attachment 3.                                                                                /
7.3 Test SI-6C Discharge Check Valves SI-207 and SI-208-per.
7.4   Test SI-6D Discharge Check Valves SI-211 and SI-212 per Attachment 4.                                                                                 /
/
7.5   Position FH-11 as directed by Shift Supervisor.                                                                                   /
1 -.
OPS REMARKS Completed by                                             Date/ Time                               /
7.4 Test SI-6D Discharge Check Valves SI-211 and SI-212 per.
8.0   RESTORATION 8.1   Shift Supervisor notified this test is completed.
/
Shift Supervisor                                       Date/ Time                               /
7.5 Position FH-11 as directed by Shift Supervisor.
9.0   ACCEPTANCE CRITERIA 9.1 The Flow Coefficients (Cy ) calculated in Attachments 1 through below:
/
4 are greater than or. equal to the values-Tank               . Minimum Cy SI-6A                   1189 SI-6B                   1164 SI-SC                   1132 SI-6D                   1159 This satisfies the ISI requirement that the discharge check valves were full-stroked open. Acceptance criteria based on Reference 2.9.
OPS REMARKS Completed by Date/ Time
10.0 TEST RECORD 10.1 This entire procedure.
/
10.2 Attach Strip Charts to this procedure.
8.0 RESTORATION 8.1 Shift Supervisor notified this test is completed.
FC/SS-ST                                                                                                       RS
Shift Supervisor Date/ Time
/
9.0 ACCEPTANCE CRITERIA 9.1 The Flow Coefficients (C ) calculated in Attachments 1 y
through 4 are greater than or. equal to the values-below:
Tank
. Minimum Cy SI-6A 1189 SI-6B 1164 SI-SC 1132 SI-6D 1159 This satisfies the ISI requirement that the discharge check valves were full-stroked open.
Acceptance criteria based on Reference 2.9.
10.0 TEST RECORD 10.1 This entire procedure.
10.2 Attach Strip Charts to this procedure.
FC/SS-ST RS


I FORT CALHOUN STATION                                                                         SS-ST-SI-3015 SURVEII&ANCE TEST                                                                           PAGE 10 OF 53 11.0 REVIEW 11.1 The Supervisor-Special Services is responsible for ensuring this completed surveillance.is reviewed in a timely manner and forwarded in accordance with S0-G-23.
I FORT CALHOUN STATION SS-ST-SI-3015 SURVEII&ANCE TEST PAGE 10 OF 53 11.0 REVIEW 11.1 The Supervisor-Special Services is responsible for ensuring this completed surveillance.is reviewed in a timely manner and forwarded in accordance with S0-G-23.
Test data shall be evaluated by-the Special Services Engineer and reviewed by the Shift Supervisor for acceptability within 24 hours of the completion'of this test.
Test data shall be evaluated by-the Special Services Engineer and reviewed by the Shift Supervisor for acceptability within 24 hours of the completion'of this test.
Evaluated by                       Date/ Time                                           -/
Evaluated by Date/ Time
SS Engr Shift Supervisor 11.2 The Supervisor-Special Services is responsible for ensuring this test is evaluated and reviewed in a timely manner then forwarded in accordance with SO-G-23.
-/
11.2.1   Th. ISI Coordinator is responsible for reviewing this test to ensure compliance.with the FCS ISI Program Plan. This test has been reviewed and found acceptable or the deficiencies Section.
SS Engr Shift Supervisor 11.2 The Supervisor-Special Services is responsible for ensuring this test is evaluated and reviewed in a timely manner then forwarded in accordance with SO-G-23.
have been noted in the Remarks REMARKS ISI Coordinator                             Date/ Time                           /
11.2.1 Th. ISI Coordinator is responsible for reviewing this test to ensure compliance.with the FCS ISI Program Plan.
P FC/SS-iT                                                                                                 R5     !
This test has been reviewed and found acceptable or the deficiencies have been noted in the Remarks Section.
i l
REMARKS ISI Coordinator Date/ Time
/
P FC/SS-iT R5 i
l


FORT CALHOUN STATION                                                                                           SS-ST-SZ-3015 SURVEILLANCE TEST                                                                                               PAGE 11'OF.53-11.3   The Supervisor-System Engineering is responsible for ensuring this Surveillance-Test is evaluated by the System                           Eraineer in a timely manner and forwarded in accordan,                             ith So-G-23.
FORT CALHOUN STATION SS-ST-SZ-3015 SURVEILLANCE TEST PAGE 11'OF.53-11.3 The Supervisor-System Engineering is responsible for ensuring this Surveillance-Test is evaluated by the System Eraineer in a timely manner and forwarded in
11.3.1 The System Engineer is responsible for reviewing the test. data'and the identified deficiencies noted within the test.                                       This test has been reviewed and found acceptable or deficiencies and actions taken have been noted in the Remarks Section.
: accordan, ith So-G-23.
11.3.1 The System Engineer is responsible for reviewing the test. data'and the identified deficiencies noted within the test.
This test has been reviewed and found acceptable or deficiencies and actions taken have been noted in the Remarks Section.
REMARKS _.
REMARKS _.
System Engineer                       Date/ Time                                           /
System Engineer Date/ Time
FC/SS-ST-                                                                                                                                     RS-
/
__.._m- . _ , . . . . . . . . . . .
FC/SS-ST-RS-
                                                                                    " " ' ' ' ' - " ~ ~ ~ ~ - - ^ ^ ^ ^ '     ' ~ ~ ~ ~ ~ ' ~ ~
__.._m-
" " ' ' ' ' - " ~ ~ ~ ~ - - ^ ^ ^ ^ '
' ~ ~ ~ ~ ~ ' ~ ~


FORT CALHOUF STATION                                                             SS-ST-SI-3015 SURVEILLANCE TEST                                                               PAGE-12'OF 53 ATTACHMENT 1                                 Page 1 of 7 (SI-219 AND SI-220)
FORT CALHOUF STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE-12'OF 53 ATTACHMENT 1 Page 1 of 7 (SI-219 AND SI-220)
SAFETY RELATED PROCEQUEE                                                                       IHJTIALS/DATE NOTE:       Steps 1 through 10 can be performed in any sequence, but prior to Step 11.
SAFETY RELATED PROCEQUEE IHJTIALS/DATE NOTE:
NOTE:       This attachment will raise the reactor refueling cavity level by approximately 2%
Steps 1 through 10 can be performed in any sequence, but prior to Step 11.
NOTE:
This attachment will raise the reactor refueling cavity level by approximately 2%
frrm a 90% initial SIT level.
frrm a 90% initial SIT level.
: 1. Record the "As Found" position of the following valves, THEN Close.
1.
Valve           .  - s Found                                                   /
Record the "As Found" position of the following valves, THEN Close.
OPS HCV-311 HCV-312 HCV-327 NOTE:       Control Room Indication of SI-6A level is to be used for Step 2.0,
Valve
: 2. Ensure that Safety Injection Tank SI-6A level is between 85% and 90% as. indicated on-LI-2904X and record.
- s Found
SI-6A Level                           4                                     /
/
(85% to 90%)                             OPS
OPS HCV-311 HCV-312 HCV-327 NOTE:
: 3. Record the. Reactor Refueling Cavity-level (La ) as indicated on LI-106.
Control Room Indication of SI-6A level is to be used for Step 2.0, 2.
Reactor Refueling Cavity Level (Lp)
Ensure that Safety Injection Tank SI-6A level is between 85% and 90% as. indicated on-LI-2904X and record.
                                                      %                                                /
SI-6A Level 4
/
(85% to 90%)
OPS 3.
Record the. Reactor Refueling Cavity-level (L ) as indicated on LI-106.
a Reactor Refueling Cavity Level (L )
p
/
OPS N/A this step if LI-199 is used.
OPS N/A this step if LI-199 is used.
: 4. If LI-106 is unavailable, ensure the Reactor l           Refueling Cavity is between 1032 and 1034 ft elevation sightglass.
4.
as-indicated on the LI-199 Reactor Refueling Cavity-Level ft                                           /
If LI-106 is unavailable, ensure the Reactor l
(1032 ft.to 1034 ft)                                           OPS
Refueling Cavity is between 1032 and 1034 ft elevation as-indicated on the LI-199 sightglass.
;            N/A this step if LI-106 is used.
Reactor Refueling Cavity-Level ft
/
(1032 ft.to 1034 ft)
OPS N/A this step if LI-106 is used.
l l
l l
l FC/SS-ST                                                                                           R5
l FC/SS-ST R5


FORT CALMOUN STATION                                                                                                       SS-ST-SI-3015 SURVEII. LANCE TEST                                                                                                         PAGE 13 OT 53
FORT CALMOUN STATION SS-ST-SI-3015 SURVEII. LANCE TEST
)
)
e
PAGE 13 OT 53 e
;                                                                          ATTACHMENT 1                                                           Page 2 of 7
ATTACHMENT 1 Page 2 of 7 (Continued) 2 INITIALS /DATE 5.
;                                                                            (Continued)                                                                                                       '
Use Table 1 in Attachment 5 to determine the test pressure for SI-6A based on the tank level recorded in Step 2.
2 INITIALS /DATE
Use the pressure j
: 5.       Use Table 1 in Attachment 5 to determine the test pressure for SI-6A based on the tank                                                                                                                               '
that corresponds to the tank level rounded down to the nearest wholo percent.
,                      level recorded in Step 2. Use the pressure                                                                                                                             ,
I SI-6A Test Pressure-Dsig
j                      that corresponds to the tank level rounded                                                                                                                             ;
/
;                      down to the nearest wholo percent.
l NOTE Control Room Indication of SI-6A pressure is to be used for Step 6.0.
I
6.
,                      SI-6A Test Pressure-                                                                 Dsig                                                           /
Set pressure of Safety Injection Tank SI-6A as indicated on PT-2901 to pressure recorded 3
l                       NOTE             Control Room Indication of SI-6A pressure is to be used for Step 6.0.
j in Step 8.
';            6.       Set pressure of Safety Injection Tank SI-6A 3                      as indicated on PT-2901 to pressure recorded j                       in Step 8.                       N/A jf not required.                                                                .
N/A jf not required.
                                                                                                                                                                            /                   ,
/
OPS i
OPS i
1             7.       Strip Chart Recorder hooked up as per j                       Attachment 6.                                                                                                                                       /
1 7.
4 1
Strip Chart Recorder hooked up as per j.
I&C l             8.       Connect the StriD Chart Recorder to the Safety Injection" Tank SI-6A ERP computer
/
,                      input terminals located in cabinet PC-15.
I&C 4
1 8.1         To record SI-6A pressure, connect one channel to terminals j                                                               TB402-35(-)
1 l
TB402-16(+)                                                             ___.
8.
                                                                                                                                                                            /
Connect the StriD Chart Recorder to the Safety Injection" Tank SI-6A ERP computer input terminals located in cabinet PC-15.
;                                                                                                                                        I&C Independent Verification                                                                           /
1 8.1 To record SI-6A pressure, connect one channel to terminals j
I&C                                                   '
TB402-35(-)
$                      S.2         To record SI-6A level, connect'one channel to terminals:
TB402-16(+)
l                                                               TB401-15(-)
/
4 TD401-16(+)                                                                                               /
I&C Independent Verification
ILC-l                                                                       Independent Verification                                                                           /
/
j                                                                                                                                       I&C
I&C S.2 To record SI-6A level, connect'one channel to terminals:
: 9.       Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or cz desired, and record.
l TB401-15(-)
(S) =
4 TD401-16(+)
                                                                                                            .nm/ sec                                                       /
/
I&C TC/SSwiT                                                                                                                                                             RS g v ~ ..n-, on       -~we-- m-w<     ,          ,,-ezm       g- .----nw-- u.-rs,               ,r-     ,    -w ~,   ----e.                 ,2-w-~eee-.           - --- a .
ILC-l Independent Verification
n-r a
/
j I&C 9.
Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or cz desired, and record.
(S)
/
=
.nm sec
/
I&C TC/SSwiT RS g
v
~
..n-,
on
-~we--
m-w<
,,-ezm g-
.----nw--
u.-rs,
,r-
-w
~,
----e.
,2-w-~eee-.
a n-r a


FORT CALilOUM STATION                                                     SS-ST-SI-3013 SURVEfLLANCE TEST                                                           PAGE 14 OF 53 NITAClIMENT 1                         Page 3 of 7 (Continued)
FORT CALilOUM STATION SS-ST-SI-3013 SURVEfLLANCE TEST PAGE 14 OF 53 NITAClIMENT 1 Page 3 of 7 (Continued)
INITIALS /DATE
INITIALS /DATE 10.
: 10. Ensure that TH-11 is closed.                                                         /
Ensure that TH-11 is closed.
OPS
/
: 11. Start the Strip Chart Recorder.                                       -              /
OPS 11.
I&C
Start the Strip Chart Recorder.
: 12. Open HCV-2914 AND Mark the Strip Chart to indicate the start of the test (T=0) when HCV-2914 begins to open.                                                             /
/
OPS NOTE:       HCV-2914 takes approximately 55 seconde to open. When HCV-2914                   is full open, pnly the red light will be on.
I&C 12.
: 13. WHEN HCV-2914 indicates full open, Wait approximately 10 seconds, IRIN close HCV-2914.                                                                           /
Open HCV-2914 AND Mark the Strip Chart to indicate the start of the test (T=0) when HCV-2914 begins to open.
OPS NOTE: ,hlten HCV-2924 is closed unlY the green light is on.
/
: 14. WHEN HCV-2914 Indicates closed, I)iEH stop the Strip Chart Recorder.                                                               /
OPS NOTE:
I&C
HCV-2914 takes approximately 55 seconde to open.
: 15. Return valves in Step 1 to "As Found" position or as directed by the Shift Supervisor.                                                                         /
When HCV-2914 is full open, pnly the red light will be on.
OPS
13.
: 16. Restore Safety Injection Tank SI-6A to service as directed by the Shift Supervisor.                                       /
WHEN HCV-2914 indicates full open, Wait approximately 10 seconds, IRIN close HCV-2914.
OPS
/
: 17. Remove Strip Chart Recorder from the following ERF Computer terminals:
OPS NOTE:,hlten HCV-2924 is closed unlY the green light is on.
14.
WHEN HCV-2914 Indicates closed, I)iEH stop the Strip Chart Recorder.
/
I&C 15.
Return valves in Step 1 to "As Found" position or as directed by the Shift Supervisor.
/
OPS 16.
Restore Safety Injection Tank SI-6A to service as directed by the Shift Supervisor.
/
OPS 17.
Remove Strip Chart Recorder from the following ERF Computer terminals:
TB401-15(-)
TB401-15(-)
TB401-16(+)
TB401-16(+)
TB402-15(-)
TB402-15(-)
TB402-16(+)                                           -/
TB402-16(+)
I&C Independent Verification                         /
-/
I&C FC/SS-ST                                                                                         R5 l
I&C Independent Verification
N- .
/
I&C FC/SS-ST R5 l
N-


_ ~ _ _        _ _ _ _                  __        __    _. _.        . . . _ _ . . _ .          . _        _      _ _ _ _ _ , _ _ _ , _ _ . _
_ ~ _ _
FORT CALHOUM STATION                                                                                     SS-ST-SE-3015 SURVEILLANCE TEST                                                                                         PAGE 15 OF 53 ATTACHMENT 1                                         Page 4 of 7                         ;
FORT CALHOUM STATION SS-ST-SE-3015 SURVEILLANCE TEST PAGE 15 OF 53 ATTACHMENT 1 Page 4 of 7 (Continued)
(Continued)
INITIALS /DATE 18.
INITIALS /DATE                         ,
Record the following information on the Strip Recorder Chart:
: 18. Record the following information on the Strip Recorder Chart:
18.1 Surveillance Test Number 18.2 Attachment Number 18.3 Safety Injection Tank-Number 18.4 Date 18.5 Chart Speed (mm/sec) 18.6 Pressure Trace 18.7 Pressure Scale (psig/ volt) 18.G Level Trace 18.9 Level Scale (ft/ volt) l 18.10 Start of test (Y=O) 18.11 Segment of pressure and level traces when HCV-2914 is >90% open:
18.1       Surveillance Test Number 18.2       Attachment Number 18.3       Safety Injection Tank-Number 18.4       Date                                                                                                                         '
First Point (PT-1), Second Point 18.12 Point (PT-5) on the pressure (PT-2) l and lovel traces halfway between PT-1 and PT-2.
18.5       Chart Speed (mm/sec) 18.6       Pressure Trace 18.7       Pressure Scale (psig/ volt) 18.G       Level Trace
/
;                  18.9       Level Scale (ft/ volt) l 18.10 Start of test (Y=O) 18.11 Segment of pressure and level traces when HCV-2914 is >90% open: First Point (PT-1), Second Point 18.12 Point (PT-5) on the pressure (PT-2)                                 and lovel                                                     l traces halfway between PT-1 and PT-2.                                                                     /
19.
: 19. Measure and record the chart run along the trace (D) between PT-1 and PT-2.
Measure and record the chart run along the trace (D) between PT-1 and PT-2.
l                                             D=                         _mm                                                           /
l D=
: 20. Record the level change (AL) in SI-6A between PT-1 and PT-2 when HCV-2914 was >90% open.-                                                                                               ,'
_mm
l                 20.1       Determine the-level (Lp7 1) of SI-6A at PT-1.
/
i L p7      3      = LV 3    (volts)-X 3. 842 ft/ volt L pr_3            =
20.
X 3.6042 ft/ volt Lp7 3 =         -
Record the level change (AL) in SI-6A between PT-1 and PT-2 when HCV-2914 was >90% open.-
ft                                                             -/
l 20.1 Determine the-level (Lp7 1) of SI-6A at PT-1.
20.2 Determine PT-2.
i L
the level (LPT-2) of SI-6A at L PT-2 " LY 2                (volts) X 3.6042 ft/ volt L PT-2           =
= LV (volts)-X 3.
X 3.6042'ft/ volt-L pr.       2
842 ft/ volt p7 3 3
                                                                      - ft                                                             /
Lpr_3 X 3.6042 ft/ volt
FC/SS-ST                                                                                                                             R5
=
Lp7 3 =
ft
-/
20.2 Determine the level (LPT-2) of SI-6A at PT-2.
L
" LY (volts) X 3.6042 ft/ volt PT-2 2
LPT-2 X 3.6042'ft/ volt-
=
Lpr. 2
- ft
/
FC/SS-ST R5


FORT CALHOUH STATION                                                                 SS-ST-SI-3015 SURVEILLANCE TEST                                                                     PAGE 16 OF 53 ATTACHMENT 1                                   Page 5 of 7 (Continued) f INITIALS /DATE 20.3     Calculate AL for SI-6A.
FORT CALHOUH STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 16 OF 53 ATTACHMENT 1 Page 5 of 7 (Continued) f INITIALS /DATE 20.3 Calculate AL for SI-6A.
AL=L   PT-1   ~L  PT-2 ft AL =                       _-                                ft AL =                             ft                                   _            /
AL=L
: 21. Determine the tank level Rate of Change (R) for SI-6A.
~L ft PT-1 PT-2 AL =
R=     (AL + D) x S ft/sec Rr (               +               )x                     ft/sec R=                                   ft/sec Where:         S = chart speed recorded in Step 9 (mm/sec)
ft AL =
D = chart run recorded in Stop 19 (mm)                                                               /
ft
: 22. Calculate the flowrate (Q) from SI-6A through check   valves SI-219 and SI-220 (based on a
/
                        ~10 second average when HCV-2914 is >90%
21.
open).                                                                                                                       ,
Determine the tank level Rate of Change (R) for SI-6A.
Q = R x 530.24 gal /ft X 60 sec/ min-                                                                               ,
R=
Q = R x 31,814.4 gal / min Q=                   x 31,814.4 gal / min                                                                           -
(AL + D) x S ft/sec Rr (
Q=                                     GPM                                       /         ,_
+
: 23. Determine the pressure (PPT-5) of SI-6A at PT-5~.
) x ft/sec R=
23.1     Determine the gas pressure (Pg ) in SI-6A at PT-5.
ft/sec Where:
Pg = PV 5 (volts) x 75 psig/ volt Pg =
S = chart speed recorded in Step 9 (mm/sec)
x 75 psig/ volt Pg =                                psig                                           /
D = chart run recorded in Stop 19 (mm)
e FC/SS-ST                                                                                                   R5
/
_  _.                  .      .    .. _    _    _ _ - - . . _ _ _ _ . . _ _ _ _ _ , _ ;_._.    ~     . _.,_        _      . . . . _ . __.
22.
Calculate the flowrate (Q) from SI-6A through check valves SI-219 and SI-220 (based on a
~10 second average when HCV-2914 is >90%
open).
Q = R x 530.24 gal /ft X 60 sec/ min-Q = R x 31,814.4 gal / min Q=
x 31,814.4 gal / min Q=
GPM
/
23.
Determine the pressure (PPT-5) of SI-6A at PT-5~.
23.1 Determine the gas pressure (P ) in SI-6A at PT-5.
g P = PV g
5 (volts) x 75 psig/ volt Pg x 75 psig/ volt
=
Pg psig
/
=
e FC/SS-ST R5
~


          -. ..    . - _ .          -              -- -                        - - _ -          . _ - _ . - -          .- ~                 _.
.- ~
FORT CALHOUM STATION                                                                           SS-ST-SI-3015 SURVEILLANCE TEST                                                                             PAGE 17 OF 53 ATTACHMENT 1                                                 Page 6 of 7 (Continued)
FORT CALHOUM STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 17 OF 53 ATTACHMENT 1 Page 6 of 7 (Continued)
INITIALS /DATE 23.2 Determine the head pressure (P g) due to the level in SI-6A at PT-5.
INITIALS /DATE 23.2 Determine the head pressure (P ) due to g
Pg =
the level in SI-6A at PT-5.
(LV5 (volts) x 3.6042 ft/ volt x .434 psig/ft) + 2.42 psig                                                                               I Pg= (LV5 (volts) x 1.56) + 2.42 psig Pg= (                           x 1.56) + 2.42 psig                                                                                 i Pg     "                        psi 9                                                                                               ;
Pg (LV5 (volts) x 3.6042 ft/ volt x.434 psig/ft) + 2.42 psig I
2.42 = head pressure from 0% level in SI-6A at the Reactor Vessel Flange level (psig)                                                                                       /
=
23.3 Calculate the total pressure (Ppr.5) of SI-6A at PT-5.                                                                                                                     e P p7 5      =P9+Pg psig                                                                                                           '
Pg= (LV5 (volts) x 1.56) + 2.42 psig Pg= (
Pp7 5 =                           +                           usig P pr.5       =
x 1.56) + 2.42 psig i
osig             __
Pg psi 9 2.42 = head pressure from 0% level in SI-6A at the Reactor Vessel Flange level (psig)
                                                                                                                  /
/
: 24. Determine the head pressure (P g                            due to the reactor refueling cavity level )                                                                                                           ,
23.3 Calculate the total pressure (Ppr.5) of SI-6A at PT-5.
Pg= [(La (%) x 20) + 11) x .434 psig/ft Pg= (La x 8.68) + 4.77 psig Pg= (_                 x 8.68) + 4.77 psig Pg=                                                         psig Where La = Reactor Cavity level recorded in Step 3 (%).
e P
20 = distance betueen LI-106 0% and 100% level tapa (ft). If LI-199 is uced, refer to Attachment 7 for cavity level.
=P9+Pg psig p7 5 Pp7 5 =
11 = height'of 0% level tap above Reactor Vessel Flange (ft)                                                           /
+
24.1   Determine AP for SI-6A at PT-5 AP =-P PT-5 -Pg psid' AP =                       --
usig Ppr.5 osig
                                                                                  'osid AP =                                             osid                           /
/
FC/SS-ST                                                                                                             RS.
=
t l                                       . _ - ,          ,_ ..,_.. , _ . . .        . . _ , _ ,                    _
Determine the head pressure (P due to the 24.
reactor refueling cavity level )
g Pg=
[(L (%) x 20) + 11) x.434 psig/ft a
Pg= (La x 8.68) + 4.77 psig Pg=
(_
x 8.68) + 4.77 psig Pg=
psig Where La = Reactor Cavity level recorded in Step 3 (%).
20 = distance betueen LI-106 0% and 100% level tapa (ft).
If LI-199 is uced, refer to Attachment 7 for cavity level.
11 = height'of 0% level tap above Reactor Vessel Flange (ft)
/
24.1 Determine AP for SI-6A at PT-5 AP =-P
-Pg psid' PT-5 AP =
'osid AP =
osid
/
FC/SS-ST RS.
t l


FORT CALHOUN STATION                                                                 SS-ST-SZ-3015 SURVEILLANCE TEST                                                                   PAGE 18 OF 53 ATTACliMENT 1                                     Page 7 of 7 (Continued)
FORT CALHOUN STATION SS-ST-SZ-3015 SURVEILLANCE TEST PAGE 18 OF 53 ATTACliMENT 1 Page 7 of 7 (Continued)
INITIALSlDATE
INITIALSlDATE 25.
: 25.     Determine the Flow Coefficient (Cy ) for SI-6A Discharge Piping.
Determine the Flow Coefficient (C ) for SI-6A y
25.1           Determine the Flow Coefficient (C y) .                                                                         '
Discharge Piping.
Cy =
25.1 Determine the Flow Coefficient (C ).
Q + ( AP)1/2 Cy =
y Q + ( AP)1/2 C
                                                          +(           )1/2 Cy =
=
Whore: Q = flowrate calculated in Step 22                                       /                               l REMARKS l
y
l Completed by                                                   Date/ Time                     /
=
I-1 1-FC/SS-ST                                                                                                       RS -
+ (
)1/2 Cy C
=
y Whore:
Q = flowrate calculated in Step 22
/
l REMARKS l
l Completed by Date/ Time
/
I-1 1-FC/SS-ST RS -


FORT CALHOUN STATION                                   SS-ST-SI-3015 SURVEILLANCE TEST                                     PAGE 19 OF 53 ATTACHMENT     2               Page 1 of 7 (SI-215 AND SI-216)
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 19 OF 53 ATTACHMENT 2
EROCEDURE                                               Ili'-ThbS/DATE NOTE:   Steps 1 through 10 can be performed in any sequence, but prior to Step 11.
Page 1 of 7 (SI-215 AND SI-216)
NOTE:   This attachment will raise the reactor refueling cavity level by approximately 2%
EROCEDURE Ili'-ThbS/DATE NOTE:
Steps 1 through 10 can be performed in any sequence, but prior to Step 11.
NOTE:
This attachment will raise the reactor refueling cavity level by approximately 2%
from a 90% initial SIT level.
from a 90% initial SIT level.
: 1. Record the "As Found" position of the following valves, THEN Close.
1.
Valve         As Found HCV-314 HCV-315 HCV-329                 _                            /
Record the "As Found" position of the following valves, THEN Close.
OPS NOTE:   Control Room indication of SI-6B level is to be used for Step 2.0.
Valve As Found HCV-314 HCV-315 HCV-329
: 2. Ensure that Safety Injection Tank SI-6B level is between 85% and 90% as indicated on LI-2924X and record.
/
SI-6B Level                   %                      /
OPS NOTE:
(85% to 90%)               OPS
Control Room indication of SI-6B level is to be used for Step 2.0.
: 3. Record the Reactor Refueling Cavity Level (L a ) as indicated on LI-106.
2.
Reactor Refueling Cavity Level (L a)
Ensure that Safety Injection Tank SI-6B level is between 85% and 90% as indicated on LI-2924X and record.
                                    %                                /
SI-6B Level
OPS N/A this step if LI<199 is used
/
: 4. Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass Reactor Refueling Cavity Level (L g) ft                             /
(85% to 90%)
OPS 3.
Record the Reactor Refueling Cavity Level (L ) as indicated on LI-106.
a Reactor Refueling Cavity Level (L )
a
/
OPS N/A this step if LI<199 is used 4.
Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass Reactor Refueling Cavity Level (L )
g ft
/
OPS N/A if LI-106 is used.
OPS N/A if LI-106 is used.
: 5. Use Table 1 in Attachment 5 to determine the test pressure for SI-6B based on the tank level recorded in Step 2.     Use the pressure that corresponds to the Tank Level rounded down to the nearest whole percent, t
5.
SI-6B Test Pressure                       psig   .
Use Table 1 in Attachment 5 to determine the test pressure for SI-6B based on the tank level recorded in Step 2.
                                                                    /     1 l
Use the pressure that corresponds to the Tank Level rounded down to the nearest whole percent, t
4 FC/SS-ST                                                             R5 1
SI-6B Test Pressure psig
/
1 l
4 FC/SS-ST R5 1


f FORT CALHOUN STATION                                                   SS-ST-SI-3015                           '
f FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 20 OF 53 ATTACHMENT 2 Page 2 of 7 (Continued) lHIIJALS/DATE i
SURVEILLANCE TEST                                                       PAGE 20 OF 53 ATTACHMENT 2                         Page 2 of 7 (Continued) lHIIJALS/DATE i
NOTE:
NOTE:     Control Room indication for SI-6B pressure is to be used for Step 6.0.
Control Room indication for SI-6B pressure is to be used for Step 6.0.
: 6. Set pressure of Safoty Injection Tank SI-6B as indicated on PT-2921 to pressure recorded in Step 5.             N/A if not required.                                           /
6.
OPS
Set pressure of Safoty Injection Tank SI-6B as indicated on PT-2921 to pressure recorded in Step 5.
: 7. Strip Chart Recorder hooked up as per Attachment 6.                                                                         /
N/A if not required.
I&C                                             l
/
,            8. Connect the Strip Chart Recorder to the Safety Injection Tank SI-6B ERF computer input terminalu located in cabinet PC-15.                                                                       -,
OPS 7.
8.1     To record SI-6B pressure, connect one channel to terminals:
Strip Chart Recorder hooked up as per.
/
I&C 8.
Connect the Strip Chart Recorder to the Safety Injection Tank SI-6B ERF computer input terminalu located in cabinet PC-15.
8.1 To record SI-6B pressure, connect one channel to terminals:
TB402-17(-)
TB402-17(-)
TB402-18(+)                                                   /
TB402-18(+)
I&C Independent Verification                             /
/
I&C 8.2     To record SI-6B level, connect one channel to terminals:
I&C Independent Verification
/
I&C 8.2 To record SI-6B level, connect one channel to terminals:
TB401-17(-)
TB401-17(-)
TB401-18(+)                                                   /
TB401-18(+)
I&C Independent verification                             /
/
I&C-
I&C Independent verification
: 9. Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or as desired, and record.
/
(S) =
I&C-9.
mm/sec                             /
Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or as desired, and record.
I&C
(S) mm/sec
: 10. Ensure that EH-11 is closed..                                                           /
/
OPS
=
: 11. Start the Strip Chart Recorder.                                                         /
I&C 10.
I&C
Ensure that EH-11 is closed..
: 12. Open HCV-2934'AND Mark the Strip Chart to indicate the start of the test (Omo) when HCV-2934 begins to- open.                                                               /
/
OPS FC/SS-ST                                                                                         R5
OPS 11.
Start the Strip Chart Recorder.
/
I&C 12.
Open HCV-2934'AND Mark the Strip Chart to indicate the start of the test (Omo) when HCV-2934 begins to-open.
/
OPS FC/SS-ST R5


I FORT CALHOUN STATION                                                       SS-ST-ST-3015 i
I FORT CALHOUN STATION SS-ST-ST-3015 i
SURVEILLANCE TEST                                                           PAGE 21 OF 53 ATTACHMENT 2                             Page 3 of 7 (Continued) 0 INITIALSIDATE NOTE:           HCV-2934 takes approximately 55 seconds to open.           When HCV-2934 is full open nnly the red light will be on.
SURVEILLANCE TEST PAGE 21 OF 53 ATTACHMENT 2 Page 3 of 7 (Continued) 0 INITIALSIDATE NOTE:
4
HCV-2934 takes approximately 55 seconds to open.
: 13. WHEN HCV-2934 indicates full open, Wait approximately lo seconds, IREE close HCV-2934.                                                                           /
When HCV-2934 is full open nnly the red light will be on.
OPS NOTEt           When HCV-2934 is closed only the green
13.
;        light will be on.
WHEN HCV-2934 indicates full open, Wait 4
: 14. WRU. HCV-2934 indicates closed, THEN stop the Strip Chart Recorder.                                                               /
approximately lo seconds, IREE close HCV-2934.
I&C
/
: 15. Return valves in Stop 1 to "As Found" position or as directed by the Shift Supervisor.                                                                       /
OPS NOTEt When HCV-2934 is closed only the green light will be on.
OPS
14.
: 16. Restore Safety Injection Tank SI-6B to service as directed by the Shift Supervisor.                                       /
WRU. HCV-2934 indicates closed, THEN stop the Strip Chart Recorder.
OPS
/
: 17. Remove Strip Chart Recorder from the following ERF Computer terminals:
I&C 15.
Return valves in Stop 1 to "As Found" position or as directed by the Shift Supervisor.
/
OPS 16.
Restore Safety Injection Tank SI-6B to service as directed by the Shift Supervisor.
/
OPS 17.
Remove Strip Chart Recorder from the following ERF Computer terminals:
TB401-17(-)
TB401-17(-)
TB401-18(+)
TB401-18(+)
TB402-17(-)
TB402-17(-)
TB402-18(+)                                               /
TB402-18(+)
I&C Independent Verification                             /
/
I&C
I&C Independent Verification
: 18. Record the following information on the Strip
/
!        Recorder Chart:
I&C 18.
18.1           Surveillance Test Number 18.2           Attachh.ont Number 18.3           Safety Injection Tank Number 18.4           Date 18.5           Chart Speed (mm/sec) 18.6           Pressure Trace                                                                             #
Record the following information on the Strip Recorder Chart:
18.7           Pressure Scale (psig/ volt) 18.8           Level Trace 18.9           Level Scale (ft/ volt) 18.10 Start of test (T=O) 18.11 Segment of pressure and level traces when HCV-2934 is >90% open: First Point (PT-1), Second Point (PT-2) 18.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2.                               /
18.1 Surveillance Test Number 18.2 Attachh.ont Number 18.3 Safety Injection Tank Number 18.4 Date 18.5 Chart Speed (mm/sec) 18.6 Pressure Trace 18.7 Pressure Scale (psig/ volt) 18.8 Level Trace 18.9 Level Scale (ft/ volt) 18.10 Start of test (T=O) 18.11 Segment of pressure and level traces when HCV-2934 is >90% open:
FC/SS-ST                                                                                         RS
First Point (PT-1), Second Point (PT-2) 18.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2.
/
FC/SS-ST RS


FORT CALHOUli STATIoll                                                                                         SS-ST-SI-3010 SURVEILLANCE TEST                                                                                               PAGE 22 OF 53                   !
FORT CALHOUli STATIoll SS-ST-SI-3010 SURVEILLANCE TEST PAGE 22 OF 53 ATTACIU4ENT 2 Page 4 of 7 (Continued)
ATTACIU4ENT 2                                           Page 4 of 7
INITIALS /DATI 19.
,                                                                                      (Continued)                                                                         ,
Measure and record the el art run along the trace (D) between PT-1 at.J PT-2.
INITIALS /DATI
D=
: 19.         Measure and record the el art run along the trace (D) between PT-1 at.J PT-2.
mm
D=                                         mm                                         /
/
: 20.         Record the level change (AL) in SI-6B between PT-1 and PT-2 when HCV-2934 was >90% open 20.1   Determine the level (Lp7 3) of SI-6B at PT-1.
20.
L py      1    = LV (volts) X 3.6042 ft/ volt L p7      3     =
Record the level change (AL) in SI-6B between PT-1 and PT-2 when HCV-2934 was >90% open 20.1 Determine the level (Lp7 3) of SI-6B at PT-1.
X 3.6042 ft/ volt L p7      3
L
                                                                  =                               ft                                                 /
= LV (volts) X 3.6042 ft/ volt py 1 3
20.2     Determine             the level (LPT-2) of SI-6B at PT-2.
Lp7 3 X 3.6042 ft/ volt
LPT-2 " LY2 (volts) X 3.6042 ft/' M ts LPT-2 =                                         X 3.6042 ft/ volts LPT-2 =                                         ft                                                 /
=
20.3     Calculate AL for SI-6B.
Lp7 3 ft
AL = Lp7 3 - LPT-2                       ft AL =                                           -
/
ft AL =                                           ft                                                   /
=
: 21.         Determine.the tank level Rate of Change (R) for SI-6B.
20.2 Determine the level (LPT-2) of SI-6B at PT-2.
R=             (AL + D)-x S ft/sec R= (                     +                                 )x     ft/sec R =-                                                       ft/sec-                                                         ,
LPT-2 " LY2 (volts) X 3.6042 ft/' M ts LPT-2 =
Where:                 S = chart speed recorded in Step.9 (mm/sec)
X 3.6042 ft/ volts LPT-2 =
D = chart run recorded'in Step 19 (mm)-                                                                           /
ft
FC/SS-ST                                                                                                                       R5
/
    = . -                 .    - . . . - - , , .      ..- - . - . - -                                . - . . - . - . . . - -                    ...=       ._          .-
20.3 Calculate AL for SI-6B.
AL = Lp7 3 - LPT-2 ft AL =
ft AL =
ft
/
21.
Determine.the tank level Rate of Change (R) for SI-6B.
R=
(AL + D)-x S ft/sec R= (
+
)x ft/sec R =-
ft/sec-Where:
S = chart speed recorded in Step.9 (mm/sec)
D = chart run recorded'in Step 19 (mm)-
/
FC/SS-ST R5
=. -
... =


FORT CALilOUN STATION                                                             SS-ST-SI-3015 SURVEILLANCE TEST                                                                 PAGE 23 OF 53 ATTACl! MENT 2                               Page 5 of 7 (Continued)
FORT CALilOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 23 OF 53 ATTACl! MENT 2 Page 5 of 7 (Continued)
INITIALS /DATE 1
INITIALS /DATE 1
!                22. Calculate the flowrate (Q) from SI-6B through check valves SI-215 and SI-216 (based on a
22.
                        '10 second average when HCV-2934 is >90%
Calculate the flowrate (Q) from SI-6B through check valves SI-215 and SI-216 (based on a
'10 second average when HCV-2934 is >90%
open).
open).
Q=RX 530.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q=                         x 31,814.4 gal / min                                                               I Q=                                             GPM                                   /
Q=RX 530.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q=
: 23. Determine the pressure (PPT-5) of SI-6B at PT-5.
x 31,814.4 gal / min I
I 23.1   Determine the gas pressure (P g ) in SI-6B at PT-5.
Q=
Pg = PV         5  (volts) x 75 psig/ volt Pg =                            x 75 psig/ volt                                                                 !
GPM
Pg =                                    psig                                         /
/
23.2   Determine the head pressure (P )g due to
23.
(                             the-level in SI-6B at PT-5.
Determine the pressure (PPT-5) of SI-6B at PT-5.
: j.             Pg    =
I 23.1 Determine the gas pressure (P ) in g
(LV 5 (volts) x 3.6042 ft/ volt x .434 psig/ft) + 2.42 psig l                             Pg   =
SI-6B at PT-5.
(LV5 (volts) x 1.56) + 2.42 psig Pa = (                             x 1.56) + 2.42 psig Pg=                               psig 2.42 = head pressure from-0% level in SI-6B at the Reactor Vessel Flange level (psig)                                                                         /
P = PV (volts) x 75 psig/ volt g
23.3   Calculate the total pressure (PPT-5)- Of SI-6B at PT-5.
5 g
l                             P PT-5          =Pg+Pg psig Ppr.5 =                               +                 osig.
x 75 psig/ volt P
P PT-5 =                                                osig                         /
=
1 FC/SS-ST                                                                                                 TRS -
Pg psig
/
=
23.2 Determine the head pressure (P )g due to
(
the-level in SI-6B at PT-5.
P j.
g (LV5 (volts) x 3.6042 ft/ volt x.434 psig/ft) + 2.42 psig
=
l Pg (LV5 (volts) x 1.56) + 2.42 psig
=
Pa = (
x 1.56) + 2.42 psig Pg=
psig 2.42 = head pressure from-0% level in SI-6B at the Reactor Vessel Flange level (psig)
/
23.3 Calculate the total pressure (PPT-5)- Of SI-6B at PT-5.
l P
=Pg+Pg psig PT-5 Ppr.5 =
+
osig.
PPT-5 osig
/
=
1 FC/SS-ST TRS -


FORT CALHOUN STATION                                                           SS-ST-SZ-3015 SURVEILLA!!CE TEST                                                             PAGE 24 OF 53 ATTACHMENT 2                       Page 6 of 7 (Continued)
FORT CALHOUN STATION SS-ST-SZ-3015 SURVEILLA!!CE TEST PAGE 24 OF 53 ATTACHMENT 2 Page 6 of 7 (Continued)
INITIALS /DATE
INITIALS /DATE 24.
: 24. Determine the head pressure (PR ) due to the reactor refueling cavity level Pa = [(La (%) x 20) + 11) x .434 psig/ft Pp =
Determine the head pressure (P ) due to the R
(Lg x 8.68) + 4 77 psig Pg= (                 x 8.68) + 4.77 psig Pg =                                       psig Where:
reactor refueling cavity level Pa = [(L (%) x 20) + 11) x.434 psig/ft a
Pp (L x 8.68) + 4 77 psig
=
g Pg= (
x 8.68) + 4.77 psig Pg psig
=
Where:
La = Reactor Cavity level recorded in Step 3-(%).
La = Reactor Cavity level recorded in Step 3-(%).
20 = distance between LI-106 0% and 100% lovel taps (ft).             If LI-199 is used, refer to Attachment 7 for Cavity Level.
20 = distance between LI-106 0% and 100% lovel taps (ft).
l' 11 = height of 0%. level tap above Reactor Vessel Flange (ft) 24.1         Determine AP for SI-6B at PT-5 AP = P PT-5 ~P          R Psid AP =                     -
If LI-199 is used, refer to Attachment 7 for Cavity Level.
osid AP =                                   nsid             /
l' 11 = height of 0%. level tap above Reactor Vessel Flange (ft) 24.1 Determine AP for SI-6B at PT-5 AP = P
t FC/SS-ST -                                                                                 R5
~P Psid PT-5 R
AP =
osid AP =
nsid
/
t FC/SS-ST -
R5


    -          .. .- ~ - ..-                         .--. -...- . - . - . - . . . . -                  - _ . . . . . . - .
...- ~ -..-
_                                          - -._ . ~ --.                          . . . - - - . - . .
- -._. ~ --.
FORT Ct.LHOUM STATION                                                                                                                           3S-ST-SI-3015 SURVEILLANCE TEST                                                                                                                           .PAGE 25 OF 53 ATTACHMENT 2                                                                   Page 7 of 7 (Continued)                                                                                                               ,
FORT Ct.LHOUM STATION 3S-ST-SI-3015 SURVEILLANCE TEST
JJIITIALS/DATE                                     l'
.PAGE 25 OF 53 ATTACHMENT 2 Page 7 of 7 (Continued)
: 25.                 Determine the Flow Coeff.Leient (C                                       y ) for SI-6B Discharge Piping.                                                                                                                                                             r 25.1 Determine the Flow Coefficient (C y) .
JJIITIALS/DATE l
Cy        =      Q + ( AP)1/2                                                                                                                                   ;
25.
Cy        =
Determine the Flow Coeff.Leient (C ) for SI-6B y
                                                                                              +(                     )1/2 C, =
Discharge Piping.
Where:               Q = flowrote calculated in Stop 22                                                                                           /
r 25.1 Determine the Flow Coefficient (C ).
REMARKS                                         ,
y Q + ( AP)1/2 C
Completed by                                                                                 Date/ Time                                               /
=
y
=
+ (
)1/2 Cy C, =
Where:
Q = flowrote calculated in Stop 22
/
REMARKS Completed by Date/ Time
/
i 2
i 2
a l               . FC/SS-ST                                                                                                                                                                       R5                   l' l.
a l
r   . . . . _            . _ _ . _ . .
. FC/SS-ST R5 l
l.
r


e FORT CALL!OUN STATION                                                                                 SS-ST-SI-3015 SURVEILLANCE TEST                                                                                     PAGE 26 OF S3 ATTACHMENT             3                               Page 1 of 7 (SI-207 AND SI-208)
e FORT CALL!OUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 26 OF S3 ATTACHMENT 3
PROCEDURE                                                                                             INITIALS /DATE NOTE:         Steps 1 through 10 can be performed in any sequence, but prior to Step 11.
Page 1 of 7 (SI-207 AND SI-208)
NOTE:         This attachment will raise the reactor refueling cavity level by approximately 2%
PROCEDURE INITIALS /DATE NOTE:
Steps 1 through 10 can be performed in any sequence, but prior to Step 11.
NOTE:
This attachment will raise the reactor refueling cavity level by approximately 2%
from a 90% initial SIT level.
from a 90% initial SIT level.
: 1. Record the "As Found" position of the following valves, THEN Close.
1.
Valve               _As Found HCV-317                             _ _ _ _
Record the "As Found" position of the following valves, THEN Close.
HCV-318 HCV-331             ___
Valve
                                                                                                                                  /
_As Found HCV-317 HCV-318 HCV-331
OPS NOTE:         Control Room indication of SI-6C level-is to be used for Step 2.0.
/
: 2. Ensure that Safety Injection Tank SI-6C level is between 85% and 90% as indicated on LI-2944X and record.
OPS NOTE:
SI-6C Level                                           %                                            /
Control Room indication of SI-6C level-is to be used for Step 2.0.
(85% to 90%)                                     OPS
2.
: 3. Record the Reactor Refueling Cavity Level (La) as indicated on LI-106.
Ensure that Safety Injection Tank SI-6C level is between 85% and 90% as indicated on LI-2944X and record.
Reactor Refueling Cavity Letel (L g)
SI-6C Level
                                                                    %                                                            /
/
(85% to 90%)
OPS 3.
Record the Reactor Refueling Cavity Level (L ) as indicated on LI-106.
a Reactor Refueling Cavity Letel (L )
g
/
OPS N/A this step if LI-199 is used.
OPS N/A this step if LI-199 is used.
: 4. Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass                                                                                   /
4.
OPS Reactor Refueling Cavity Level (L g) ft N/A if LI-106 is used.
Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass
: 5. Use Table 1 in Attachment 5 to determine the test pressure for SI-6C based _on the-tank level recorded in Step 2.                                 Use the pressure                                                             ,
/
that corresponds to the tankLlevel rounded down to the nearest whole percent..
OPS Reactor Refueling Cavity Level (L )
SI-6C Test Pressure                                                         osig                                 /
g ft N/A if LI-106 is used.
5.
Use Table 1 in Attachment 5 to determine the test pressure for SI-6C based _on the-tank level recorded in Step 2.
Use the pressure that corresponds to the tankLlevel rounded down to the nearest whole percent..
SI-6C Test Pressure osig
/
l
l
        .FC/SS-ST                                                                                                                   1R5
.FC/SS-ST 1R5


FORT CALHOUN STATION                                                                                         SS-ST-SI-3015 SURVEILLANCE TEST                                                                                             PAGE 27 OF "'
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 27 OF "'
ATTACHMENT 3                                                         Page 2 of 7 (Continued) 1RITIALS/DATE NOTE:       Control Room indication of SI-6C pressure is to be used for Stop 6.0.                                                                                                           '
ATTACHMENT 3 Page 2 of 7 (Continued) 1RITIALS/DATE NOTE:
: 6.       Set pressure of Safety Injection Tank SI-6C as indicated on PT-2941 to pressure recorded in Step 5.           N/A if not required.                                                                           /
Control Room indication of SI-6C pressure is to be used for Stop 6.0.
OPS
6.
: 7.       Strip Chart Recorder hooked up as per Attachment 6.                                                                                                         /
Set pressure of Safety Injection Tank SI-6C as indicated on PT-2941 to pressure recorded in Step 5.
I&C
N/A if not required.
: 8.       Connect the Strip Chart Recorder to the Safety Injection Tank SI-6C ERF computer input terminals located in-cabinet PC-15.
/
8.1       To record SI-6C pressure, connect one channel te terminals:
OPS 7.
TB402-19(-)                                                                                                           .
Strip Chart Recorder hooked up as per.
TB402-20(+)                                                                                 /
/
I&C Independent Verification                                                   /
I&C 8.
I&C 8.2       To record SI-6C level, connuct one channel to terminals:
Connect the Strip Chart Recorder to the Safety Injection Tank SI-6C ERF computer input terminals located in-cabinet PC-15.
8.1 To record SI-6C pressure, connect one channel te terminals:
TB402-19(-)
TB402-20(+)
/
I&C Independent Verification
/
I&C 8.2 To record SI-6C level, connuct one channel to terminals:
f TB401-19(-)
f TB401-19(-)
TB4 01-2 0 ( +)                                                                             /
TB4 01-2 0 ( +)
I&C Independent Verification                                                   /
/
I&C                                       ,
I&C Independent Verification
: 9.     Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or as d:' sired, and record..
/
(S)         =
I&C 9.
mm/sec                                       /
Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or as d:' sired, and record..
I&C
(S) mm/sec
: 10. Ensure FH-11 is closed.                                                                                               /
/
OPS
=
: 11. Start the Strip Chart Recorder.                                                                                       /-
I&C 10.
I&C
Ensure FH-11 is closed.
: 12. Open HCV-2954 AND Mark the Strip Chart to indicate the start of the test (T=O) when HCV-2954 begins to open.                                                                                               /
/
OPS i                  FC/SS-ST                                                                                                                         RS
OPS 11.
Start the Strip Chart Recorder.
/-
I&C 12.
Open HCV-2954 AND Mark the Strip Chart to indicate the start of the test (T=O) when HCV-2954 begins to open.
/
OPS FC/SS-ST RS i


FORT CALHOUN STATION                                   SS-ST-SI-3015 SURVEILLANCE TEST                                     PAGE 28 OF 53 ATTACHMENT 3                   Pane 3 of 7 (Continued)
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 28 OF 53 ATTACHMENT 3 Pane 3 of 7 (Continued)
INITIALS /DATE NOTE:     HCV-2954 takes approximately 55 seconds to open. When HCV-2954 is full open only the red light will be on.
INITIALS /DATE NOTE:
: 13. WHEN HCV-2954 indicates full open, Wait approximately 10 seconds, IEEN close HCV-2954.                                                     /
HCV-2954 takes approximately 55 seconds to open.
OPS NOTE:     When HCV-2954 is closed only the green light will be on.
When HCV-2954 is full open only the red light will be on.
: 14. EREN HCV-2954 indicates closed, IfLEE stop the Strip Chart Recorder.                                         /
13.
I&C
WHEN HCV-2954 indicates full open, Wait approximately 10 seconds, IEEN close HCV-2954.
: 15. Return valves in Step i to "As Found" position or as directed by the Shift Supervisor.                                                   /
/
OPS
OPS NOTE:
: 16. Restore Safety Injection Tank SI-6C to service as directed by the Shift Supervisor.                   /
When HCV-2954 is closed only the green light will be on.
Ops
14.
: 17. Remove Strip Chart Recorder from the following ERF Computer terminale:
EREN HCV-2954 indicates closed, IfLEE stop the Strip Chart Recorder.
/
I&C 15.
Return valves in Step i to "As Found" position or as directed by the Shift Supervisor.
/
OPS 16.
Restore Safety Injection Tank SI-6C to service as directed by the Shift Supervisor.
/
Ops 17.
Remove Strip Chart Recorder from the following ERF Computer terminale:
TB401-19(-)
TB401-19(-)
TB401-20(+)                                             .
TB401-20(+)
l                                 TB4 02-19 (-)
l TB4 02-19 (-)
                                                                                          ^
l
l TB402-20(+)                         _
^
                                                                                /
TB402-20(+)
I&C Independent Verification           __!          1 I&C FC/SS-ST                                                               R5
/
I&C Independent Verification 1
I&C FC/SS-ST R5


FORT CALHOUN STATION                                                                               SS-ST-SI-3015 SURVE.*'LLANCE TEST                                                                               PAGE 29 OF 53 ATTACHMENT 3                                 Page 4 of 7 (Continued)
FORT CALHOUN STATION SS-ST-SI-3015 SURVE.*'LLANCE TEST PAGE 29 OF 53 ATTACHMENT 3 Page 4 of 7 (Continued)
INITIALS /DATE
INITIALS /DATE 18.
: 18.         Record the following information on the Strip Recorder Chart:
Record the following information on the Strip Recorder Chart:
18.1   Surveillance Test Number 18.2   Attachment Number 18.3   F3fety Injection Tank Number 18.4   Date 18.5   Chart Speed (mm/sec) 18.6   Pressure Trace 18.7   Pressure Scale (psig/ volt) 18.8   Level Trace 18.9   Level Scale (ft/ volt) 18.10 Start of test (T=O) 18.11 Segment of pressure and level traces when HCV-2954 is >90% 'nen: First Point (PT-1), Second 1 int (PT-2) 19.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2.                                       _            /
18.1 Surveillance Test Number 18.2 Attachment Number 18.3 F3fety Injection Tank Number 18.4 Date 18.5 Chart Speed (mm/sec) 18.6 Pressure Trace 18.7 Pressure Scale (psig/ volt) 18.8 Level Trace 18.9 Level Scale (ft/ volt) 18.10 Start of test (T=O) 18.11 Segment of pressure and level traces when HCV-2954 is >90% 'nen:
: 19.         Measure and record the chart run along the trace (D) between PT-1 and PT-2.
First Point (PT-1), Second 1 int (PT-2) 19.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2.
D=                                   mm                                   /   _
/
: 20.         Record the level change (AL) in SI-6C between PT-1 and PT-2 when HCV-2954 was >90% open.
19.
20.1   Determine the level (Lp7 1) of SI-6C at PT-1.
Measure and record the chart run along the trace (D) between PT-1 and PT-2.
L p7    1    = LV 1          (volts) X-3.6042 ft/voit L pr.1       =
D=
X 3.6042 ft/ volt L pr.1       =
mm
ft.                                       /
/
20.2 Determine PT-2..
20.
the level (LPT-2) of SI-6C at L PT-2       ' " LY2-(volts)-X 3.6042 ft/ volt L PT-2 =                                    X 3.6042 ft/ volt L PT-2       "
Record the level change (AL) in SI-6C between PT-1 and PT-2 when HCV-2954 was >90% open.
                                                -                            ft                                        /
20.1 Determine the level (Lp7 1) of SI-6C at PT-1.
FC/SS-ST                                                                                                         R5
L
= LV (volts) X-3.6042 ft/voit p7 1 1
Lpr.1 X 3.6042 ft/ volt
=
Lpr.1 ft.
/
=
20.2 Determine the level (LPT-2) of SI-6C at PT-2..
L
' " LY2-(volts)-X 3.6042 ft/ volt PT-2 LPT-2 X 3.6042 ft/ volt
=
LPT-2 ft
/
FC/SS-ST R5


FORT CALHOUN STATION                                                                         SS-ST-SI-3015 SURVEILLANCE TEST                                                                             PAGE 30 OF 53 ATTACHMENT 3                                     Page 5 of 7 (Continued)                                                                         '
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 30 OF 53 ATTACHMENT 3 Page 5 of 7 (Continued)
INITIALS /DATE 20.3   Calculate AL for SI-6C.                                                                                                 ,
INITIALS /DATE 20.3 Calculate AL for SI-6C.
AL=L           PT-1 -L PT-2 ft AL =                                   -
AL=L
ft                                                       ,
-L ft PT-1 PT-2 AL =
AL =                               .ft                                                   /
ft AL =
: 21. Determine the tank level Rate of Change (R) for SI-6C.
.ft
R=     (AL + D) x S ft/sec R=     (                     +           ) x __           ft/sec R=                                       ft/sec                                                                       ,
/
Where:           S = chart speed recorded in Step 9 (mm/sec)
21.
D = chart run recorded in Step 19 (mm)                                                                       /
Determine the tank level Rate of Change (R) for SI-6C.
: 22. Calculate the flowrate (Q) from S.-6C through check valves SI-207 and SI-208 (based on a
R=
              ~10 se.ond average when HCV-2954 is >90%
(AL + D) x S ft/sec R=
(
+
) x __
ft/sec R=
ft/sec Where:
S = chart speed recorded in Step 9 (mm/sec)
D = chart run recorded in Step 19 (mm)
/
22.
Calculate the flowrate (Q) from S.-6C through check valves SI-207 and SI-208 (based on a
~10 se.ond average when HCV-2954 is >90%
open).
open).
Q = R x S30.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q=                             x 31,814.4 gal / min i
Q = R x S30.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q=
Q=                                           GPM                                         /
x 31,814.4 gal / min i
l
Q=
: 23. Determine the pressure (PPT-5) of SI-6C at PT-5.
GPM
23.1       Determine the gas pressure (Pg ) in SI-6C at PT-5.
/
Pg =  PV 5 (volts) x 75 psig/ volt
l 23.
Determine the pressure (PPT-5) of SI-6C at PT-5.
23.1 Determine the gas pressure (P ) in SI-6C at PT-5.
g Pg 5 (volts) x 75 psig/ volt PV
=
[
[
Pg =                              x'75 psig/ volt l'
Pg x'75 psig/ volt
Pg =                                      psig                                           /
=
l' Pg psig
/
=
i l
i l
FC/SS-ST                                                                                                           R5
FC/SS-ST R5


FORT CAL 110UN STATION                                                                           SS-ST-SI-3015 SURVEILLANCE TEST                                                                                 PAGE 31 OF 53 ATTACIIMENT 3                             Page 6 of 7                                 ;
FORT CAL 110UN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 31 OF 53 ATTACIIMENT 3 Page 6 of 7 (Continued)
(Continued)                                                                           ;
INITIALS /DATE 23.2 Determine the head pressure (P ) due to g
INITIALS /DATE 23.2           Determine the head pressure (P g ) due to                                                                                   4 the level in SI-CC at PT-5.
4 the level in SI-CC at PT-5.
1 Pg =
1 Pg (LV5 (volts) x 3.6042 ft/ volt x.434 psig/ft) + 2.42 psig
(LV5 (volts) x 3.6042 ft/ volt x .434 psig/ft) + 2.42 psig PH" (LYS (volts) x 1.56) + 2.42 psig                                                                                       ,
=
Pg = (                                 x 1.56) + 2.42 psig                                                                 :
PH" (LYS (volts) x 1.56) + 2.42 psig Pg = (
Pg      = .-                         paig 2.42 = head pressure from 0% level in SI-6C at the Reactor Vessel Flange level (psig)                                                                                 /
x 1.56) + 2.42 psig P
23.3           Calculate the total pressure (PPT-5) Of SI-6C at PT-5.
=.-
P p7 5          =Pg+Pg psig P PT-5           "                            +                   D819 Ppr.5 =                                                           nsig                     /
paig g
: 24. Determine the head pressure (Pg ) due to the reactor refueling cavity level.
2.42 = head pressure from 0% level in SI-6C at the Reactor Vessel Flange level (psig)
Pa = [(La (%) x 20) + 11 ft) x .434-psig/ft Pg= (La (%) x 8.68) + 4.77 psig                                                                                                             '
/
Pg= (                                 x 8.68) + 4.77 paig Pg=           =                                                 __ psig Where:
23.3 Calculate the total pressure (PPT-5) Of SI-6C at PT-5.
La  e    Reactor Cavity level recorded in Step 3 (%).
P
=Pg+Pg psig p7 5 PPT-5
+
D819 Ppr.5 =
nsig
/
24.
Determine the head pressure (P ) due to the g
reactor refueling cavity level.
Pa = [(L (%) x 20) + 11 ft) x.434-psig/ft a
Pg= (La (%) x 8.68) + 4.77 psig Pg= (
x 8.68) + 4.77 paig Pg=
=
__ psig Where:
a Reactor Cavity level recorded in L
e Step 3 (%).
20 = distance between LI-106 0% and
20 = distance between LI-106 0% and
                            -100% level taps-(ft).                                 -If LI-199 is.
-100% level taps-(ft).
-If LI-199 is.
I used, refer to Attachment 7 for Cavity.
I used, refer to Attachment 7 for Cavity.
Level.
Level.
11 = height of 0% level tap above Reactor Vessel Flange (ft)                                                                       /
11 = height of 0% level tap above Reactor Vessel Flange (ft)
/
I l
I l
FC/SS-ST                                                                                                               RS
FC/SS-ST RS
                                                    -_-                                                                                      - . - - ~. ,
-. - - ~.,


FORT CALHOUN STATION                                                                                               SS-ST-SI-3015 SURVEILLAN''E TEST                                                                                                 PAGE 32 OP 53 4
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLAN''E TEST PAGE 32 OP 53 4
ATTACHMENT 3                                           Page 7 of 7 (Coritinued)
ATTACHMENT 3 Page 7 of 7 (Coritinued)
INITIAlal.DATE 24.1           Determino AP for 6I-6C at PT-5 AP ' P PT-5       ~
INITIAlal.DATE 24.1 Determino AP for 6I-6C at PT-5 AP ' P IR PSid
IR PSid AP =                               -
~
osid i                                             $P =                                                   osid                                             /
PT-5 AP =
osid i
$P =
osid
/
25.
25.
D6cnrmine the Flow Coefficient (Cy ) for SI-6C Discharge Piping.                                                                                                                                     I 25.1         Determine the Flow Coefficient (C y) .
D6cnrmine the Flow Coefficient (C ) for SI-6C y
Cy  =
Discharge Piping.
Q + ( AP)1/2 Cy =         __
25.1 Determine the Flow Coefficient (C ).
                                                                              +(                     )1/2 Cy  =>
y Q + ( AP)1/2 C
iihere:               Q = flowrato calculated in Stop 22                                           _                            /
=
y C =
+ (
)1/2 y
C
=>
y iihere:
Q = flowrato calculated in Stop 22
/
REMARKS ____
REMARKS ____
i 1
i a-Completed by
a-Completed by                                                                             'Date/ Time                             /
'Date/ Time
FC/SS-ST                                                                                                                                               R5 l
/
FC/SS-ST R5 l


I FORT CALHOUH STATION SURVEILLANCE TEST                                    SS-ST-SI-3015 PAGE 33 OF 51 ATTACHMENT   4     Page 1 of 7 (SI-211 AND SI-212)
I FORT CALHOUH STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 33 OF 51 ATTACHMENT 4
PROCEDURE IElIJALS/DATE NOTE:   Steps 1 through 10 can be performed in any sequence, but prior to Stop 11.
Page 1 of 7 (SI-211 AND SI-212)
NOTE:   This attachment will raise reactor refueling cavity level by approximately 2%
PROCEDURE IElIJALS/DATE NOTE:
Steps 1 through 10 can be performed in any sequence, but prior to Stop 11.
NOTE:
This attachment will raise reactor refueling cavity level by approximately 2%
from a 90% initial SIT level.
from a 90% initial SIT level.
: 1. Record the "As Found" position of the following valves; THEN Close.
1.
Valvo                 As Found HCV-320 HCV-321 HCV-333                                                       /
Record the "As Found" position of the following valves; THEN Close.
OPS NOTE:   Control Room indication of SI-6D level is to be used for Step 2.0.
Valvo As Found HCV-320 HCV-321 HCV-333
: 2. Ensure that Safety Injection Tank SI-6D level is beckcan 85% and 90% as indicated on LI-2964X and record.
/
                    -SI-6D Level                       %                        /
OPS NOTE:
(85% to 90%)       OPS 3.
Control Room indication of SI-6D level is to be used for Step 2.0.
Record the Reactor Refueling Cavity Level (L3 ) as indicated on LI-106.
2.
Reactor Refueling Cavity Level (Lg)
Ensure that Safety Injection Tank SI-6D level is beckcan 85% and 90% as indicated on LI-2964X and record.
                                                %                                /
-SI-6D Level
OPS                                       ,
/
M/A this step if LI-199 is vbed.
(85% to 90%)
: 4. Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass Reactor Refueling Cavity Level. (Lg) ft                             /
OPS 3.
Record the Reactor Refueling Cavity Level (L ) as indicated on LI-106.
3 Reactor Refueling Cavity Level (L )
g
/
OPS M/A this step if LI-199 is vbed.
4.
Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass Reactor Refueling Cavity Level. (L )
g ft
/
OPS N/A if-LI-106-is used.
OPS N/A if-LI-106-is used.
FC/SS-ST
FC/SS-ST
_ RS ~
_ RS ~


  . _    . . _ _ - _ . _ . ~ , . _ - . . - . . - _ . . _ -               - - _ - . . - - _ - - . . - . . - .
.. _ _ - _. _. ~,. _ -.. -.. - _.. _ -
FORT CALHOUN STAT 1oN                                                                               SS-ST-SI-3015 SURVEILLANCE TEST                                                                                   PAGE 34 OF 53 ATTACHMENT 4                           Page 2 of 7 (Continued)
FORT CALHOUN STAT 1oN SS-ST-SI-3015 SURVEILLANCE TEST PAGE 34 OF 53 ATTACHMENT 4 Page 2 of 7 (Continued)
INITIALS /DATE
INITIALS /DATE 5.
: 5.                 Use Table 1 in Attachment 5 to determine the test pressure for SI-6D based on the tank level recorded in Step 2. Use the pressure that corresponds to the Tank Level round9d down to the nearest whole percent.
Use Table 1 in Attachment 5 to determine the test pressure for SI-6D based on the tank level recorded in Step 2.
SI-6D Test Pressure                                               osig         __        /
Use the pressure that corresponds to the Tank Level round9d down to the nearest whole percent.
NOTE:                         Control Room indication of SI-6D pressure is to be used in Step 6.0.
SI-6D Test Pressure osig
: 6.                 Set pressure of Safety Injection Tank SI-6D as indicated on PT-2961 to pressure recorded in Step 5.                       N/A if not required.                                     /
/
OPS
NOTE:
: 7.               Strip Chart Reccrder hooked up as per Attachment 6.                                                                               /
Control Room indication of SI-6D pressure is to be used in Step 6.0.
I&C
6.
: 8.               Connect the Strip Chart Recorder to the Safety Injection Tank SI-6D ERP computer input terminals located in cabinet PC-15.
Set pressure of Safety Injection Tank SI-6D as indicated on PT-2961 to pressure recorded in Step 5.
8.1                       To record SI-6D pressure, connect one channel to terminals:
N/A if not required.
/
OPS 7.
Strip Chart Reccrder hooked up as per.
/
I&C 8.
Connect the Strip Chart Recorder to the Safety Injection Tank SI-6D ERP computer input terminals located in cabinet PC-15.
8.1 To record SI-6D pressure, connect one channel to terminals:
TB402-21(-)
TB402-21(-)
TB402-22(+)                                           /
TB402-22(+)
I&C Independent. Verification                     /
/
                                                                                                        .I&C 8.2                       To' record SI-6D-level, connect one channel to terminals:
I&C Independent. Verification
/
.I&C 8.2 To' record SI-6D-level, connect one channel to terminals:
Tb401-21(-)
Tb401-21(-)
TB401-22(+)                                           /
TB401-22(+)
I&C Independent Verification                       /
/
I&C 9.-           LAdjust Strip Chart Recorder-Speed (S) to 10 mm/sec, or as desired, and record.
I&C Independent Verification
(S) =
/
mm/sec                    /
I&C 9.-
I&C FC/SS-ST.                                                                                                         R5
LAdjust Strip Chart Recorder-Speed (S) to 10 mm/sec, or as desired, and record.
mm/sec
/
(S)
=
I&C FC/SS-ST.
R5


i FORT CALHOUN STATION                                                           SS-ST-SI-3015 SURVEILLANCE TEST                                                               PAGE 35 OF 53 ATTACHMENT 4                         Page 3 of 7 (Continued)
i FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 35 OF 53 ATTACHMENT 4 Page 3 of 7 (Continued)
INITIALS /DATE
INITIALS /DATE 10.
: 10. Ensure FH-11 is closed.                                                               /
Ensure FH-11 is closed.
OPS
/
: 11. otart the Strip Chart Recorder.                                                       /
OPS 11.
I&C
otart the Strip Chart Recorder.
: 12. Open HCV-2974 AND Mark the Strip Chart to indicate the start of the test (T=O) when HCV-2974 begins to open.                                                               /
/
CPS NOTE:       HCV-2974 takes approximately 55 seconds to open. When HCV-2974                       is full                                             3 open 2nly the red light will be on.
I&C 12.
: 13. WHEN HCV-2974 indicates full open, Wait approximately 10 seconds, THEH close HCV-2974.                                                                             /
Open HCV-2974 AND Mark the Strip Chart to indicate the start of the test (T=O) when HCV-2974 begins to open.
OPS-NOTE:       When HCV-2974 indicates closed only the green light is on.
/
: 14. EKEN HCV-2974 indicates closed, THEN stop the Strip Chart Recorder.                                                                 /
CPS NOTE:
I&C
HCV-2974 takes approximately 55 seconds to open.
: 15. Return valves in Step 1 to "As Found" position or as directed by the' Shift Supervisor.                                                                           /
When HCV-2974 is full 3
OPS
open 2nly the red light will be on.
: 16. Restore Safety Injection Tank SI-6D to i           service as directed by the Shift Supervisor.                                         /
13.
l OPS
WHEN HCV-2974 indicates full open, Wait approximately 10 seconds, THEH close HCV-2974.
: 17. Remove Strip Chart Recorder from_the following ERF Computer terminals:
/
OPS-NOTE:
When HCV-2974 indicates closed only the green light is on.
14.
EKEN HCV-2974 indicates closed, THEN stop the Strip Chart Recorder.
/
I&C 15.
Return valves in Step 1 to "As Found" position or as directed by the' Shift Supervisor.
/
OPS 16.
Restore Safety Injection Tank SI-6D to i
service as directed by the Shift Supervisor.
/
l OPS 17.
Remove Strip Chart Recorder from_the following ERF Computer terminals:
TB403-21(-)
TB403-21(-)
TB401-22(+)
TB401-22(+)
TB402-21(-)-
TB402-21(-)-
TB402-22(+)                                                   /
TB402-22(+)
I&C Independent Verification             _            /
/
I&C Independent Verification
/
I&C l
I&C l
FC/SS-ST                                                                                       R5
FC/SS-ST R5


FORT CALL!OUN STATION                                                                                                     SS-ST-SI-3015 SURVEILLANCE TEST                                                                                                         PAGE 36 OF 53 ATTACHNENT 4                                                             Page 4 of 7 (Continded)
FORT CALL!OUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 36 OF 53 ATTACHNENT 4 Page 4 of 7 (Continded)
INITIALS /DATE
INITIALS /DATE 18.
: 18.       Record the #c11owing information on the Strip Recorder Chart:
Record the #c11owing information on the Strip Recorder Chart:
18.1         Surveillance Test Number 18.2       Attachment Number 18.3         Safety Injection Tank Number 18.4         Date 18.5         Chart Speed (mm/sec) 18.6         Pressure Trace 18.7         Pressure Scale (psig/ volt) 18.8         Level Trace 18.9         Level Scale (ft/ volt)                                                                                                                           l 18.10 Start of test (T=0)                                                                                                                                     (
18.1 Surveillance Test Number 18.2 Attachment Number 18.3 Safety Injection Tank Number 18.4 Date 18.5 Chart Speed (mm/sec) 18.6 Pressure Trace 18.7 Pressure Scale (psig/ volt) 18.8 Level Trace 18.9 Level Scale (ft/ volt) 18.10 Start of test (T=0) 18.11 Segment of pressure and' level traces l
18.11 Segment of pressure and' level traces                                                                                                                   l When HCV-2974 is >90% open: First Point (PT-1), Second Point (PT-2)                                                                                                               -
When HCV-2974 is >90% open:
18.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2.                                                                                     /
First Point (PT-1), Second Point (PT-2) 18.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2.
: 19.       Measure and record the chart run along the trace (D) between.PT-1 and PT-2.
/
D=                                         mm                                                                     /
19.
: 20.       Record the level change (AL) in SI-6D between                                                                                                               .
Measure and record the chart run along the trace (D) between.PT-1 and PT-2.
PT-1 and PT-2 when HCV-2974 was >90% open.
D=
20.2       Determine                 the level (LPT-1) of SI-6D at PT-1.
mm
L PT-2       "    LV  1 (volts) X 3.6042 ft/ volt L py.1       =
/
_                          X 3.6042 ft/ volt LPT-1 =                                   ft                                                                             /.___                  ,
20.
20.2       Determine                 the level (LPT-2) of SI-60 at PT-2.
Record the level change (AL) in SI-6D between PT-1 and PT-2 when HCV-2974 was >90% open.
LPT-2 " LY2 (volts) X 3.6042 ft/ volt LPT-2 =                                     X 3.6042 ft/ volt LPT-2fa                                   'ft                                                                               /
20.2 Determine the level (LPT-1) of SI-6D at PT-1.
FC/SS-ST                                                                                                                                               RS
LPT-2 1 (volts) X 3.6042 ft/ volt LV Lpy.1 X 3.6042 ft/ volt
  - - . . ,      y-e-               ,,     -e           w k- -
=
v e     rr,w +           - #e             ,,ar , ,c-,y-e             -w-   e               -y   e-+   ,,-g,r,<wg---
LPT-1 =
ft
/. _ _ _
20.2 Determine the level (LPT-2) of SI-60 at PT-2.
LPT-2 " LY2 (volts) X 3.6042 ft/ volt LPT-2 =
X 3.6042 ft/ volt LPT-2fa
'ft
/
FC/SS-ST RS y-e-w
+,se,t---.
-e w
w k-v v
e rr,w
+
- #e
-9
,,ar
,c-,y-e
-w-e
-y e-+
,,-g,r,<wg---


~ _ . . - . - - - . . . -. .                           - . . . . . - -                                  . . -      .  . . - . .      .        --- . -. - -                                  .-
~ _.. -. - - -... -..
FORT CALilOUN STATION                                                                                                         SS-ST-SI-3015 SURVEILLANCE TEST                                                                                                             PAGE 37 OF 53' I
FORT CALilOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 37 OF 53' I
ATTACHMENT 4                                               Page 5 of 7 (Continued)
ATTACHMENT 4 Page 5 of 7 (Continued)
IjjITI ALS / DATI                         i 20.3       Calculate AL for SI-6D.
IjjITI ALS / DATI i
AL = Lp ; 3 -L PT-2 ft AL =                                                       -
20.3 Calculate AL for SI-6D.
ft AL =                                                       ft                                                           /
AL = L ; 3 -L ft p
: 21. Determine the tank level Rate of' Change (R) for SI-6D.
PT-2 AL =
R=           (AL + D) x S ft/sec R= (                               +                           )x                     ft/sec R=                                                             ft/sec Where:               S = chart speed recorded in Step 9 (mm/sec)
ft AL =
D = chart run recorded in Step 19 (mm)                                                                                             /   _,,
ft
: 22.     Calculate the flowrate (Q) from SI-6D through check valves SI-211 and SI-212 (based on a
/
                                        ~10 second average when HCV-2974 10 >90%
21.
Determine the tank level Rate of' Change (R) for SI-6D.
R=
(AL + D) x S ft/sec R= (
+
) x ft/sec R=
ft/sec Where:
S = chart speed recorded in Step 9 (mm/sec)
D = chart run recorded in Step 19 (mm)
/
22.
Calculate the flowrate (Q) from SI-6D through check valves SI-211 and SI-212 (based on a
~10 second average when HCV-2974 10 >90%
open).
open).
Q = R x 530.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q=                                     X 31,814.4 gal / min Q=                                                               GPM'                                                 /
Q = R x 530.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q=
: 23.     Determine the pressure (PPT-5) of SI-6D at
X 31,814.4 gal / min Q=
* PT-5.
GPM'
23.1       Determine the gas pressure (Pg ) in SI-6D at PT-54 P9 = PV5 (volts) x 75 psig/ volt' P g. =-                              __. x 75 psig/ volt Pg =                                                          psig                                                     / __,
/
FC/SS-ST                                                                                                                                       R5
23.
                            --,,'...-.,,,,.-N.,,w,,v,-             .,-,m,-v~-y - - , , , - , , . ,-                  ,-,5..--.-.c   .e, .,    v. ~. ,       -- wrv         v- - w- v r   -r v
Determine the pressure (PPT-5) of SI-6D at PT-5.
23.1 Determine the gas pressure (P ) in g
SI-6D at PT-54 P9 = PV5 (volts) x 75 psig/ volt' Pg.
__. x 75 psig/ volt
=-
Pg psig
/
=
FC/SS-ST R5
,er.r.-,,
.,,,,.-N.,,w,,v,-
.,-,m,-v~-y
,-,5..--.-.c
.e, v.
~.,
r
-- wrv e-t-+*-
v- -
w-v r
-r v


FORT CALHOUN STATION                                                               SS-ST-SI-3015 SURVEILLANCE TEST                                                                 PAGE 38 OF 53 ATTACHMENT 4                             Page 6 of 7 (Continued)
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 38 OF 53 ATTACHMENT 4 Page 6 of 7 (Continued)
INITIALS /DATE 23.2   Determine the head pressure (Pg) due to the level in SI-6D at PT-5.
INITIALS /DATE 23.2 Determine the head pressure (Pg) due to the level in SI-6D at PT-5.
Pg = (LV5 (volts) x 3.604? ft/ volt x .434 psig/ft) + 2.42 psig Pg= (LV 5 (volts) x 1.56) + 2.42 psig PH        =
Pg = (LV5 (volts) x 3.604? ft/ volt x.434 psig/ft) + 2.42 psig Pg= (LV (volts) x 1.56) + 2.42 psig 5
(             x 1.56) + 2.4       1;';
H
Pg=                         psig 2.42 = head pressure from 0% level in SI-6D at the Reactor vessel Flange level (psig)                                                               /   __
(
23.3   Calculate the total pressure (PPT-5) Of SI-6D at PT-5.
x 1.56) + 2.4 1;';
Pp7 3 = Pg+Pg psig PPT-5 =                                   +       nsig.
P
Pp7 5 =                                           nsig                     /
=
: 24.       Determine the head pressure (PR ) due to the reactor refueling cavity level.
Pg=
Pg= ((Lg (%) x 20) + 11) x .434 psig/ft Pg= (La (%) x 8.68) + 4.77 psig Pg =         (         x 8.68) + 4.77 psig                                                                   ,
psig 2.42 = head pressure from 0% level in SI-6D at the Reactor vessel Flange level (psig)
Pg =        (                                 psig Where:
/
23.3 Calculate the total pressure (PPT-5) Of SI-6D at PT-5.
Pp7 3 = Pg+Pg psig PPT-5 =
+
nsig.
Pp7 5 =
nsig
/
24.
Determine the head pressure (P ) due to the R
reactor refueling cavity level.
Pg=
((L (%) x 20) + 11) x.434 psig/ft g
Pg= (La (%) x 8.68) + 4.77 psig P =
g
(
x 8.68) + 4.77 psig P =
g
(
psig Where:
Lg = Reactor Cavity level recorded in Step 3 (%).
Lg = Reactor Cavity level recorded in Step 3 (%).
20 = distance between LI-106 0% and 100% level taps-.(ft)._ If LI-199 is used, refer to Attachment 7 for Cavity Lavel._
20 = distance between LI-106 0% and 100% level taps-.(ft)._ If LI-199 is used, refer to Attachment 7 for Cavity Lavel._
                                                                                                  /
/
11 = height of 0% level tap above Reactor Vessel Flange (ft)
11 = height of 0% level tap above Reactor Vessel Flange (ft)
FC/SS-ST                                                                                       R5
FC/SS-ST R5 a.-.
_                            _    _ a .-. _ __        __    _


  . _.. . .  .  .-      _      _ _    . . _ . - . _ . - . . _ . .                ... ._.- --_ ...=_- ..                   . - . .        ._._ .. _
...._.- --_...=_-..
FORT CAL 110UN STATION                                                                                   SS-ST-SI-3015 SURVEILLA!JCE TEST                                                                                       PAGE 39 OF 53 ATTACllMEliT 4                                             Page 7 of 7                 I (Continued)                                                                       ,
FORT CAL 110UN STATION SS-ST-SI-3015 SURVEILLA!JCE TEST PAGE 39 OF 53 I
IllITI ALS / DATE 24.1   Determine AP for SI-6D at PT-5.
ATTACllMEliT 4 Page 7 of 7 (Continued)
AP = Ppr.5 -Pg psid AP =                                     -
IllITI ALS / DATE 24.1 Determine AP for SI-6D at PT-5.
AP = Ppr.5 -Pg psid AP =
paid t
paid t
AP =                                                               osid                   /
AP =
: 25. Determine the Flow Coefficient-(Cy ) for SI-6D Discharge Piping.
osid
25.1   Determine the Flow Coefficient (C y) .
/
Cy  =
25.
Q + ( AP)1/2 Cy =                                     +(                     )1/2 Cy  =
Determine the Flow Coefficient-(C ) for y
Where:   Q = flowrate calculated in Step 22                                                                   /
SI-6D Discharge Piping.
25.1 Determine the Flow Coefficient (C ).
y Q + ( AP)1/2 C
=
y C =
+ (
)1/2 y
C
=
y Where:
Q = flowrate calculated in Step 22
/
REMARKS
REMARKS
                                                                                                                                                      ;i
;i
(
(
Completed b'y                                                                           Date/ Time               /
Completed b'y Date/ Time
1 FC/SS-ST                                                                                                                     R5
/
1 FC/SS-ST R5


i TORT CALHOUH STATION                                                                                             SS-ST-SI-3015 SURVEILLANCE TEST                                                                                                 PAGE 40 OF 53 ATTACHMENT 5                                     Page 1 of 1 (SAFETY INJECTION TANK TEST PRESSURES)
i TORT CALHOUH STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 40 OF 53 ATTACHMENT 5 Page 1 of 1 (SAFETY INJECTION TANK TEST PRESSURES)
SAFETY INJECTION                                                                     TEST PRESSURE TANK LEVEL                                                                             (PSIG) 84%                                                                             80.0 85%                                                                             82.5 86%                                                                             87.5 87%                                                                             90.0                   ,
SAFETY INJECTION TEST PRESSURE TANK LEVEL (PSIG) 84%
88%                                                                             95.0 89%                                                                           100.0                                             '
80.0 85%
90%                                                                           105.0 NOTE:     Test Pressures are based on Calculation FC-05280.
82.5 86%
NOTE       Set pressure at above_ test pressure'+0 -2.5 psig l
87.5 87%
i FC/SS-ST                                                                                                                           R5-
90.0 88%
    . . .                .        ,      . . - . _            , , . - . _ . . . . - _ - . - . - -                                    .~           _
95.0 89%
100.0 90%
105.0 NOTE:
Test Pressures are based on Calculation FC-05280.
NOTE Set pressure at above_ test pressure'+0 -2.5 psig l
%i FC/SS-ST R5-
.~


  ,                          - . .        -      -                      -                              . ~
. ~
a      FORT CALHOUN STATION                                                                     SS-ST-SI-3015
FORT CALHOUN STATION SS-ST-SI-3015 a
:      SURVEILLANCE TEST                                                                       PAGE 41 OF 53 p                                                 ATTACHMENT 6                                         Page 1 of 2 i                         CALIBRATION CONSTANTS AND 9EFERENCE VALUES 4
SURVEILLANCE TEST PAGE 41 OF 53 p
!      LOOP INSTRUMENT OUTPUTS - ERF Computer i,
ATTACHMENT 6 Page 1 of 2 i
a 1
CALIBRATION CONSTANTS AND 9EFERENCE VALUES 4
Tank 6A
LOOP INSTRUMENT OUTPUTS - ERF Computer i,
)                Pressure:                   1 - 5 volts                 0 - 300 psig
Tank 6A a
: j.               P2901 1
1
4                Level                       1 - 5 volts                 0-         100%   (173" - 0) l                 L2904X
)
{         Tank 6B Pressure:                   1-       volts             0 - 300 psig l                 P2931 Level                       1 - 5 volts                 0 - 100%           (173"         -
Pressure:
0)
1 - 5 volts 0 - 300 psig j.
;                L2924X f
P2901 1
;          ank 6C l               Pressure:                   1 - 5 volts
Level 1 - 5 volts 0-100%
                                                                                    ~
(173" - 0) 4 l
0 - 300 psig-P2941 J
L2904X
Level L2944X 1 - 5 volts                 0 - 100%           (173" - 0)
{
Tank 6D i
Tank 6B Pressure:
Pressure:                   1 - 5 volts                 0 - 300 psig i                 P2961 i
1-volts 0 - 300 psig l
Level                       1 - 5 volts                 0- 100%             (173" L2964X 0) i Strip Chart Set-Up Parameters l~             ' Speed                 10 mm/sec (suggested) 5 Channel 1               Pressure Set 1 - 3 Volts to correspond to 0                             ~J50 psig Channel 2               Level Set 1 - 5_ Volts-to correspond to-0                               173" (14.42 feet)-
P2931 Level 1 - 5 volts 0 - 100%
4 FC/SS-ST                                                                                                       R5
(173" 0)
    ,.,e.   ..          .-w-f       , ,          ,,y-..   . - . - - - -,  , , - -      + w,   .s---y gp -     g , . +
L2924X f
ank 6C l
Pressure:
1 - 5 volts 0 - 300 psig-
~
J P2941 Level 1 - 5 volts 0 - 100%
(173" - 0)
L2944X Tank 6D i
Pressure:
1 - 5 volts 0 - 300 psig i
P2961 i
Level 1 - 5 volts 0- 100%
(173" 0)
L2964X i
Strip Chart Set-Up Parameters l~
' Speed 10 mm/sec (suggested) 5 Channel 1 Pressure Set 1 - 3 Volts to correspond to 0
~J50 psig Channel 2 Level Set 1 - 5_ Volts-to correspond to-0 173" (14.42 feet)-
4 FC/SS-ST R5
,.,e.
.-w-f
,,y-..
+
w,
.s---y gp -
g
+


FORT CALHOUN STATION                                         SS-ST-SI-3015 SURVEILLANCE TEST PP3E 42 OF 53
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PP3E 42 OF 53
                              'ATTACRMENT 6                       Page 2 of'2 (CONTINUED)
'ATTACRMENT 6 Page 2 of'2 (CONTINUED)
CONVERSION FACTORS 1
CONVERSION FACTORS 1
Level 14.42 feet /4 Volts 1
Level 14.42 feet /4 Volts 1
                      = 3.6042 ft/ volt 7       Pressure
= 3.6042 ft/ volt 7
                        .a psig/2 volts
Pressure
                      = 75 psig/ volt Volume Tank ID = 9'-6" Volume   = nD2 h/4
.a psig/2 volts
                                = n(9.5 ft)2 (1 ft).
= 75 psig/ volt Volume Tank ID = 9'-6" 2
(4)
Volume
                                = 70.88218 ft 3 per foot of height Water volume = 7.48052 gal /ft       3 Tank volume   =      7.48052 gal /ft3 x 70.88218 ft 3
= nD h/4
                                      =
= n(9.5 ft)2 (1 ft).
530.24 gal /ft of height 4
(4) 3
e i
= 70.88218 ft per foot of height 3
k FC/SS-ST                                                                 R5
Water volume = 7.48052 gal /ft 3
3 Tank volume 7.48052 gal /ft x 70.88218 ft
=
530.24 gal /ft of height
=
4 e
i k
FC/SS-ST R5


_            -.      ~..         . .                                        ._                                    _                              .        _
~..
FORT CALHOUN STATION-                                                                                                                               SS-ST-SI-3015 SURVEILIANCE TEST                                                                                                                                   PAGE 43 OF 53 ATTACHMENT 7                                                                                       Page 1 of 1 1046' --
FORT CALHOUN STATION-SS-ST-SI-3015 SURVEILIANCE TEST PAGE 43 OF 53 ATTACHMENT 7 Page 1 of 1 1046' --4
*l...-..
1044* H,
~~ ico:
4
4
                                                                        *l...-.. ~~ ico:
-i 1042*--i
4 1044* H,      -
~^ 907
                                                                        -i
-1
                                                                        -1                    ~^ 907 1042*--i
)
                                                                        ) -
3-1040' M
3- "
~
1040' M                               ~   ~
~
                                                                        -4
-4
                                                                        -1 CEDW 100L ACCCSS FLANGC (1034 6') ~~-~-----                     i                   _.-~70';-----
-1 CEDW 100L ACCCSS FLANGC (1034 6') ~~-~----- i
                                              .. . . - ,0 3 8.'.- 4. v---- --
_.-~70';-----
1 07.
.... -,0 3 8.'.- 4. v---- --
RIAC10R Pit LCvCL C0a.1ROL BAND               1036'N.                              ~     .
1 RIAC10R Pit LCvCL C0a.1ROL BAND N.
1036'
~
07.
UPPER LivCL FOR CCOW ---*------+-- -
UPPER LivCL FOR CCOW ---*------+-- -
CCUPtiNG/LNCCUPLING (1C35.3') . ,P**"*** " ,                                              s, o,.,
CCUPtiNG/LNCCUPLING (1C35.3').
r-
,P**"***
                                                  .--- 034 g TOP Of CCDM AUTOCLAVC. s 4         1                                                              --
.--- 034 g s, o,.
HOV$1NG (1034.6')                           y W!N. CIL TO PRECLUDE " ~         1032,                                -- 40T.                _._
r-1 TOP Of CCDM AUTOCLAVC. s 4 HOV$1NG (1034.6')
DRV SCAM (1034 3-)                           y 4                                             -    -
y W!N. CIL TO PRECLUDE " ~
1030                                   -- 30%                 __
DRV SCAM (1034 3-)
i 3                                             -      .
: 1032,
1025.Qw                              -- 20%                 __
-- 40T.
4                                              --
y 4
H 10 2 6 ' --.                         -- 10% . _.
1030
TECH SPEC 2.3 ~                           -
-- 30%
(23' ABOVE TOP OF CORE)           ~~'"""~1                     " * "
i 3
                                                                                              *--- 07 10 2 4 ' -~~                                                 __-
1025.Q
4               Lt-106
-- 20%
:        PRESSURIZER
w4 H
                                                                                                                    ~~                           ~
10 2 6 ' --.
10 2 2 ' - -.-                   LEVEL                     --
-- 10%. _.
OutCA SC A; (1020.6') ~ ~ -                    -
TECH SPEC 2.3 ~
                                                          ~
(23' ABOVE TOP OF CORE) ~~'"""~1
              *STPUwCNY FLANGC (1020.1*) - .[_~2.'[020(                                                             --
*--- 07 10 2 4 ' -~~
4 Lt-106 PRESSURIZER
~~
~
10 2 2 ' - -.-
LEVEL OutCA SC A; (1020.6') ~ ~ -
~
*STPUwCNY FLANGC (1020.1*) -.[_~2.'[020(
RV VE NT ( (1019.5 ') ---- -- ~ ~ ~ ~--
RV VE NT ( (1019.5 ') ---- -- ~ ~ ~ ~--
                                                                      -- 6*                                         --                            --
-- 6*
TCP 1.D. RV HE AD ( 1016.$') --- -- * ---- ---
TCP 1.D. RV HE AD ( 1016.$') --- -- * ---- ---
1018'             -   S'                                   --
1018'
1 4                                   __                            _-
- S' 1
1016* -- *f- 3'                                             --
4 1016* -- *f-3' TECH SPEC 2.1.1(4)(b
TECH SPEC 2.1.1(4)(b                                 -4 (15' ABOVE TOP OF CORE           ~~""""%.                         2'                                   --                            --
-4 (15' ABOVE TOP OF CORE
1014' ~~d       t- I'                                       --
~~""""%.
REACT OR VCSSCL rLANCC (1013') ------------                       0        1 ' --------~~- -                 ------~~----- - - - - - - - - - -                  -
2' 1014' ~~d t-I' REACT OR VCSSCL rLANCC (1013') ------------ 1 ' --------~~- -
                                                                    -i 1012'         -
0
                                                                                                                                                                          ~~
------~~----- - - - - - - - - - -
OP-6 REDUCEO ~                 '        1                                              ~~
-i 1012'
                                                                                                                                                                          ~~
~~
INVENTORY OPERATIONS ""                                                                                                                                   ~~
OP-6 REDUCEO ~
                                                                    -]
~~
TOP l.0 NOTLEG (1007.8')                       .      ----- ME%. '
~~
                                                                                                                    ~~
1
~~
INVENTORY OPERATIONS ""
-]
TOP l.0 NOTLEG (1007.8') ----- ME%. '
~~
[
[
J                                                                                                           -                                        '
.J
( HOTLEG (1006.5') --------     1006' M                                                      ---:                                                  _-.
( HOTLEG (1006.5') -------- M 1006'
                                                                    -1 sor row to, soitt c (i OCs.2-) ------------
-1 sor row to, soitt c (i OCs.2-) ------------ g------------ LL-lE9 Lh 197 M d-1004' -
g------------
COLD SHUT 00WN SIGHTGLASS '
LL-lE9                     Lh 197 1004' -                                                  -              -
-i
M d-SIGHTGLASS '              COLD SHUT 00WN
- REACTOR COOLANT-(rutL ASStuSLY) (1002.2') TOP Of CCPC * ""'1002'h LgygL PHYSICAL FEATURES ELEVATIONS
                                                                    -i                                                             - REACTOR COOLANT-(rutL ASStuSLY) (1002.2') TOP Of CCPC * ""'1002'h                                                                           LgygL PHYSICAL FEATURES                     ELEVATIONS
-{AOP-19-D.WPG}
                                                                                                                                          -{AOP-19-D.WPG}
A FC/SS-ST R5 my w
A FC/SS-ST                                                                                                                                                                       R5 gr y -mig,ai--'-eg-         w
w gr y
                                                                                                                                -M"       9-W-'a     g   9-MF V   t.7 P'       whyW gW.'M''7 T'-'''7$*-W-r' Y***1"- f
-mig,ai--'-eg-w
-M" T
9-W-'a g
9-MF V
t.7 P'
whyW gW.'M''7 T'-'''7$*-W-r' Y***1"-
f


FORT CALHOUM STATION                                             'SS-ST-SI-3015 SURVEILLANCE TEST                                                 PAGE 44 OF 53 t
FORT CALHOUM STATION
ATTACHMENT 8.                   Page 1 of'8 Depressurizing and Filling SI Tank (s) Using containment spray Pumps.
'SS-ST-SI-3015 SURVEILLANCE TEST PAGE 44 OF 53 t
JJJITIALS/DATE NOTE:   This procedure prevents SDHX AC-41 from being used for Shutdown Cooling.
ATTACHMENT 8.
: 1. Ensure SI Tank level and pressure instrumentation is operable by completing applicable portions of OI-SI-1-CL-C.                                                             /-
Page 1 of'8 Depressurizing and Filling SI Tank (s) Using containment spray Pumps.
OPS
JJJITIALS/DATE NOTE:
: 2. Verify SIRWT is at Refueling Boron Concentration.                                                           /
This procedure prevents SDHX AC-41 from being used for Shutdown Cooling.
: 3. If on shutdown cooling ensure the following valves are CLOSED:
1.
Valve           DescriDtion                           (V)
Ensure SI Tank level and pressure instrumentation is operable by completing applicable portions of OI-SI-1-CL-C.
SI+306         SIRWT Fill Valve HCV-349         Cooled Water Suction to HPSI Pump SI-2B HCV-2914       SI Tank 6A Discharge Isolation Valve HCV-2934       SI Tarh 6B Discharge-Isolation Valve HCV-2954       SI Tank 6C Discharge Isolation Valve' HCV-2974         SI Tank 6D Discharge
/-
                          ' Isolation Valve SI-170           Crosstie from SDHX 4A to 4B SI-174           SD Cooling Discharge-Isolation Valve                                         /
OPS 2.
Verify SIRWT is at Refueling Boron Concentration.
/
3.
If on shutdown cooling ensure the following valves are CLOSED:
Valve DescriDtion (V)
SI+306 SIRWT Fill Valve HCV-349 Cooled Water Suction to HPSI Pump SI-2B HCV-2914 SI Tank 6A Discharge Isolation Valve HCV-2934 SI Tarh 6B Discharge-Isolation Valve HCV-2954 SI Tank 6C Discharge Isolation Valve' HCV-2974 SI Tank 6D Discharge
' Isolation Valve SI-170 Crosstie from SDHX 4A to 4B SI-174 SD Cooling Discharge-Isolation Valve
/
OPS L
OPS L
t FC/SS-ST                                                                                 ER5.
t FC/SS-ST ER5.
l l
l l


  . FORT CALHOUN STATION                                               SS-ST-SI-3015-SURVEILLANCE TEST                                                 PAGE 45 OF 53 ATTACHMENT 8                         Page 2 of 8 (Continued)
. FORT CALHOUN STATION SS-ST-SI-3015-SURVEILLANCE TEST PAGE 45 OF 53 ATTACHMENT 8 Page 2 of 8 (Continued)
INITIALS /DATE
INITIALS /DATE 4.
: 4. If not on shutdown cooling ensure the following valves are CLOSED:
If not on shutdown cooling ensure the following valves are CLOSED:
Valve             Descriotion                         (V)
Valve Descriotion (V)
SI-306           SIRWT Fill Valve SI-183           Containment Spray Flow Test Stop Valve HCV-349         Cooled Water Suction to HPSI Pump SI-2B HCV-350         HPSI Pumps SI-2A and C Alternate Suction valve HCV-2914         SI Tank 6A Discharge Isolation Valve HCV-2934         SI Tank 6B Discharge
SI-306 SIRWT Fill Valve SI-183 Containment Spray Flow Test Stop Valve HCV-349 Cooled Water Suction to HPSI Pump SI-2B HCV-350 HPSI Pumps SI-2A and C Alternate Suction valve HCV-2914 SI Tank 6A Discharge Isolation Valve HCV-2934 SI Tank 6B Discharge
                          ' solation Valve
' solation Valve HCV-2954 SI Tank 6C Discharge Isolation Valve HCV-2974 SI Tank 6D Discharge Isolation Valve HCV-335 Shutdown Cooling Heat Exchanger Inlet Header Isolation Valve HCV-2983 Safety Injection Leakage
,        HCV-2954         SI Tank 6C Discharge Isolation Valve HCV-2974         SI Tank 6D Discharge Isolation Valve                 __
~
HCV-335         Shutdown Cooling Heat Exchanger Inlet Header Isolation Valve HCV-2983         Safety Injection Leakage To CVCS Isolation Valve-
To CVCS Isolation Valve-HCV-341 Shutdown Cooling Heat Exchanger Outlet Temperature Control.
                                  ~
HCV-341         Shutdown Cooling Heat Exchanger Outlet Temperature Control.
Valve J
Valve J
: 5. Ensure the following SDC FDC _ AC-4A                                           !
5.
Isolation Valves are-open:
Ensure the following SDC FDC _ AC-4A Isolation Valves are-open:
i SI-171                                                     __
i SI-171
                                                                                  /     I OPS SI-172                                                                   /
/
OPS FC/SS-ST                                                                           R5
OPS SI-172
/
OPS FC/SS-ST R5


FORT CALHOUN STATION                                           SS-ST-SI-3015 SURVEILLANCE TEST                                               PAGE 46 OF 53 ATTACHMENT 8                   Page 3 of 8 (Continued)
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 46 OF 53 ATTACHMENT 8 Page 3 of 8 (Continued)
INITIALS /DATE
INITIALS /DATE 6.
: 6. Uncap SI Tank (s) Vent Line(s):
Uncap SI Tank (s) Vent Line(s):
Tank                                               h')
Tank h')
SI-6A SI-6B SI-6C SI-6D                                                                 /
SI-6A SI-6B SI-6C SI-6D
PE
/
: 7. Throttle SI Tank (s) Manual Vent Valves:
PE 7.
Tanh               Va1ve                         (Vi SI-6A               NG-171 SI-6B               NG-172 SI-6C               NG-173 SI-6D               NG-174                                             /
Throttle SI Tank (s) Manual Vent Valves:
OPS
Tanh Va1ve (Vi SI-6A NG-171 SI-6B NG-172 SI-6C NG-173 SI-6D NG-174
: 8. Open SI Tank Vent to atmosphere valves as required to lower tank pressure to no lower than 25 psig then close valve:
/
Tank                 Valve                         (v)
OPS 8.
SI-6A               HCV-2630 SI-6B               HCV-2632-SI-- 6 C             HCV-2634 SI-6D               HCV-2636                                           /
Open SI Tank Vent to atmosphere valves as required to lower tank pressure to no lower than 25 psig then close valve:
Tank Valve (v)
SI-6A HCV-2630 SI-6B HCV-2632-SI-- 6 C HCV-2634 SI-6D HCV-2636
/
OPS l-i
OPS l-i
{ FC/SS-ST                                                                         R5 i
{
          ,      ,_.          ,    , . _ , . ,,    . .      ,~       , -- -        - --- -
FC/SS-ST R5 i
,~


FORT CALHOUN STATION                                               SS-ST-SI-3015 SURVEILLANCE TEST                                                 PAGE 47 OF 53 ATTACHMENT 8                       Page 4 of 8 (Continued)
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 47 OF 53 ATTACHMENT 8 Page 4 of 8 (Continued)
INITIALS /DATE
INITIALS /DATE 9.
: 9.     Ensure the SIRWT. Suction to SI Pumps is OPEN for the desired Containment Spray Pump:
Ensure the SIRWT. Suction to SI Pumps is OPEN for the desired Containment Spray Pump:
Containment Spray Pump Pumo               Valve                           (V)
Containment Spray Pump Pumo Valve (V)
SI-3A               LCV-383-2 SI-3B               LCV-383-1 SI-3C               LCV-383-1                                         /
SI-3A LCV-383-2 SI-3B LCV-383-1 SI-3C LCV-383-1
OPS
/
: 10. Open the Suction Valve:for the desired Containment Spray Pump:
OPS 10.
Pump               VaIve                           (V)
Open the Suction Valve:for the desired Containment Spray Pump:
SI-3A               HCV-2957 SI-3B               HCV-2967 SI-3C               HCV-2977                                           /
Pump VaIve (V)
OPS
SI-3A HCV-2957 SI-3B HCV-2967 SI-3C HCV-2977
: 11. Open the Discharge Valve for the desired Containment Spray Pump:
/
Pump               Valve                             (v)
OPS 11.
SI-3A               HCV-2958 SI-3B               HCV-2968 SI-3C               HCV-2978                                           /
Open the Discharge Valve for the desired Containment Spray Pump:
OPS FC/SS-ST                                                                           -R5:       !
Pump Valve (v)
1 1
SI-3A HCV-2958 SI-3B HCV-2968 SI-3C HCV-2978
/
OPS FC/SS-ST
-R5:
1


l FORT CALHOUN STATION                                     SS-ST-SI-3015             l SURVEILLANCE TEST                                         PAGE.4G OF 53 ATTACIIMENT 8             Page 5 of 8         1 (Continued)                                   !
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE.4G OF 53 ATTACIIMENT 8 Page 5 of 8 1
INITIALS /DATE
(Continued)
: 12. Open the Recirculation Isolation Valve                                         ,
INITIALS /DATE 12.
to SIRWT for the desired Containment Spray Pump:
Open the Recirculation Isolation Valve to SIRWT for the desired Containment Spray Pump:
Pumo         Valve                             (V)
Pumo Valve (V)
SI-3A         SI-138 SI-3B         SI-146 SI-3C         SI-152                                           /
SI-3A SI-138 SI-3B SI-146 SI-3C SI-152
OPS
/
: 13. Ensure the Minimum Recirculation Stop                                 s Valve for the inservice LPSI Pump is closed:   (N/A if SOC not in service)
OPS 13.
Pumn         Valve                             (V)
Ensure the Minimum Recirculation Stop s
SI-1A         SI-132 SI-1B         SI-124                                           /
Valve for the inservice LPSI Pump is closed:
OPS
(N/A if SOC not in service)
: 14. Open both SI Minimum Recirculation to SIRWT Isolation Valves:
Pumn Valve (V)
HCV-385                                                         /
SI-1A SI-132 SI-1B SI-124
OPS HCV-386                                                         /
/
OPS
OPS 14.
: 15. Verify both Containment Spray Valve Test Switches are in TEST:
Open both SI Minimum Recirculation to SIRWT Isolation Valves:
HCV-344 Test Switch                                             /
HCV-385
OPS HCV-345 Test Switch                                             /
/
OPS FC/SS-ST                                                                 RS-
OPS HCV-386
/
OPS 15.
Verify both Containment Spray Valve Test Switches are in TEST:
HCV-344 Test Switch
/
OPS HCV-345 Test Switch
/
OPS FC/SS-ST RS-


FORT CALHOUN STATION                                   SS-ST-Sl-3015           R SURVEILLANCE TEST                                     PAGE 49 OF 53             !
FORT CALHOUN STATION SS-ST-Sl-3015 R
ATTACHMENT 8             Page 6 of 0             l (Continued)                                     ]
SURVEILLANCE TEST PAGE 49 OF 53 ATTACHMENT 8 Page 6 of 0 (Continued)
INITIALS /DATE           l l
]
: 16. Verify both HCV-344/345 SET SPRAY                                       -i PUMPS TEST PERMIT annunciators are IN ALARM:
INITIALS /DATE 16.
                                                                          /
Verify both HCV-344/345 SET SPRAY
A33-1, H-5                                       OPS A34-1, H-3                                                       /
- i PUMPS TEST PERMIT annunciators are IN ALARM:
/
A33-1, H-5 OPS A34-1, H-3
/
OPS 17.
Start the' desired Containment Spray Pump.
/
OPS 18.
Open the Fill and Drain Valve (s) for the Tank (s) to be filled:
lad.li Va1vt M
SI-6A HCV-2916 SI-6B HCV-2936 SI-6C HCV-2956 SI-6D HCV-2976
/
OPS
OPS
: 17. Start the' desired Containment Spray Pump.                                                           /
- 19.
Unlock and open SI Tank Fill Isolation Valve SI-185.
/
OPS 20.
-Unlock and throttle open Containment Spray to SI Check Valve Leakage Header-Valve SI-342.
/
OPS CAUTION As SI Tank level increases SI Tank pressure will also increase.
Do not allow tank pressure to exceed 260 psig.
21.
Fill and/or vent SI Tanks as necessary 1
to achieve a level and pressure as
)
indicated on Attachment 5 of this procedure.
/
OPS
OPS
: 18. Open the Fill and Drain Valve (s) for the Tank (s) to be filled:
.FC/SS-ST R5.
lad.li          Va1vt                        M SI-6A            HCV-2916 SI-6B            HCV-2936 SI-6C            HCV-2956 SI-6D            HCV-2976                                        /
i
OPS
  - 19 . Unlock and open SI Tank Fill Isolation Valve SI-185.                                                    /
OPS
: 20.  -Unlock and throttle open Containment Spray to SI Check Valve Leakage Header-Valve SI-342.                                                    /
OPS CAUTION As SI Tank level increases SI Tank pressure will also increase. Do not allow tank pressure to exceed 260 psig.
: 21. Fill and/or vent SI Tanks as necessary                                  1 to achieve a level and pressure as                                        )
indicated on Attachment 5 of this                                          !
procedure.                                                      /        !
OPS
  .FC/SS-ST                                                                 R5.     !
l i
I


FORT CALHOUM STATION                               SS-ST-SI-3015 SURVEILLANCE TEST                                 PAGE 50 OF 53 ATTACHMENT 8             Page 7 of 8 (Continued)
FORT CALHOUM STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 50 OF 53 ATTACHMENT 8 Page 7 of 8 (Continued)
INITIALS /DATE
INITIALS /DATE 22.
: 22. When'SI Tank (s) reach desired indicated-level, THEN close their respective Fill and Drain Valve.
When'SI Tank (s) reach desired indicated-level, THEN close their respective Fill and Drain Valve.
Repeat as necessary for subsequent tank fillings.
Repeat as necessary for subsequent tank fillings.
Tank           Valve                 (V)
Tank Valve (V)
SI-6A           HCV-2916 SI-6B           HCV-2936 SI-6C           HCV-2956 SI-6D           HCV-2976                               /
SI-6A HCV-2916 SI-6B HCV-2936 SI-6C HCV-2956 SI-6D HCV-2976
OPS
/
: 23. LOCK CLOSED SI-342.                                   /
OPS 23.
OPS
LOCK CLOSED SI-342.
: 24. Stop the Containment Spray Pump.                       /
/
OPS-
OPS 24.
: 25. LOCK CLOSED the Minimum Recirculation Isolation Valve for the containment Spray Pump used.
Stop the Containment Spray Pump.
Pump           Valve                 (V)
/
SI-3A         SI-138                                         '
OPS-25.
SI-3B-         SI-146 SI-3C         SI-152-                                 /   _
LOCK CLOSED the Minimum Recirculation Isolation Valve for the containment Spray Pump used.
OPS
Pump Valve (V)
: 26. Ensure SI Tank Vent to Atmosphere Valve (s) are closed:
SI-3A SI-138 SI-3B-SI-146 SI-3C SI-152-
Tank           Valve                 (V)
/
SI-6A         HCV-2630 SI-6B         HCV-2632 SI-6C         HCV-2634 SI-6D         HCV-2636                               /
OPS 26.
OPS
Ensure SI Tank Vent to Atmosphere Valve (s) are closed:
* j FC/SS-ST                                                       R5 l
Tank Valve (V)
I
SI-6A HCV-2630 SI-6B HCV-2632 SI-6C HCV-2634 SI-6D HCV-2636
/
OPS j
FC/SS-ST R5 l


FORT CALHOUN STATION                                                                                               SS-ST-SI-3015 SURVEILLANCE TEST                                                                                                   PAGE 51 OF 53 ATTACHMENT 8                                       Page 8 of 8 (Continued) 27.
FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 51 OF 53 ATTACHMENT 8 Page 8 of 8 (Continued)
LNITIALS/DATE Close SI Tank Manual Vent Valves (N/A if_ valves-arc desired to remain open-at Shift' Supervisor's discretion):
LNITIALS/DATE 27.
Ign};                                                   Valve                                       (V)
Close SI Tank Manual Vent Valves (N/A if_ valves-arc desired to remain open-at Shift' Supervisor's discretion):
SI-6A                                                   NG-171 SI-6B                                                   NG-172 SI-6C                                                   NG-173 SI-6D                                                   NG-174                                                         /
Ign};
OPS
Valve (V)
: 28. Replace caps on SI Tank Vent Lines-(N/A if Ocss are desired to remain oft at the discretion of the Shift-Supervisor):
SI-6A NG-171 SI-6B NG-172 SI-6C NG-173 SI-6D NG-174
Tank                                                                                                 (V)
/
SI-6A                                                                                                   __
OPS 28.
SI-6B SI-6C SI-6D                                                                                                                   /
Replace caps on SI Tank Vent Lines-(N/A if Ocss are desired to remain oft at the discretion of the Shift-Supervisor):
PE
Tank (V)
: 29. LOCK CLOSED SI-185.                                                                                                     /
SI-6A SI-6B SI-6C SI-6D
OPS
/
                                                                                                                                          -/  _,
PE 29.
IND VER
LOCK CLOSED SI-185.
: 30. Close the Discharge Valve opened in Step 10 (N/A-if-desired to remain open at Shift Supervisor's discretion).                                                                                      /
/
OPS-
: 31. Open SI-170.                                                                                                            /
OPS
OPS
: 32. Open SI-174.                                                                                                             /
-/
OPS FC/SS-ST                                                                                                                         RS
IND VER 30.
Close the Discharge Valve opened in Step 10 (N/A-if-desired to remain open at Shift Supervisor's discretion).
/
OPS-31.
Open SI-170.
/
OPS 32.
Open SI-174.
/
OPS FC/SS-ST RS


FORT CAIJiOUN STATION                                               SS-ST-SI-3015
FORT CAIJiOUN STATION SS-ST-SI-3015
  -SURVEILLANCE TEST                                                   PAGE 52 OF 53 SURVEILLANCE TEST SIGNATURE SHEET All persons participating in the performance of this test shall-enter their printed name, signature and initials below.
-SURVEILLANCE TEST PAGE 52 OF 53 SURVEILLANCE TEST SIGNATURE SHEET All persons participating in the performance of this test shall-enter their printed name, signature and initials below.
NAME (PRINT)                         SIGNATURE                     JJgg L
NAME (PRINT)
SIGNATURE JJgg L
i n
i n
N 9
N 9
I FC/SS-ST                                                                               R5
I FC/SS-ST R5
      - .  = .            - . - -          . _  . , _ .    . . .    - . . . . . .    . , . . . . .
=


f D
f D
FORT CALHOUN STATION                                   'SS-ST-SI-3015 SURVEILLANCE' TEST                                       PAGE.53 OF 53 COMMENT SHEET / CHRONOLOGICAL LOG.
FORT CALHOUN STATION
'SS-ST-SI-3015 SURVEILLANCE' TEST PAGE.53 OF 53 COMMENT SHEET / CHRONOLOGICAL LOG.
I r
I r
L I
L I
FC/SS-ST                                                             R5
FC/SS-ST R5


(Left Blank Intentionally) i I
(Left Blank Intentionally) i I
i l
i l
h}}
h}}

Latest revision as of 03:34, 13 December 2024

Rev 5 to Surveillance Test Procedure SS-ST-SI-3015, Safety Injection Tank Discharge Check Valves Test
ML20104A829
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/03/1992
From:
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20104A825 List:
References
SS-ST-SI-3015, NUDOCS 9209140171
Download: ML20104A829 (54)


Text

{{#Wiki_filter:__ - _ - - - Fort Calhoun Station Unit No. 1 SS-ST-SI-3015 SURVEILLANCE TEST

Title:

SAFETY INJECTION TANK DidCHARGE CHECK VALVES TEST 4 .( Setpoint/ Procedure Forn Number (FC-68): 38552 Reason for Change: To improve the safety injection tank discharge check values test by revising the initial conditions and by providing individual acceptance criteria for each tank. Contact Person: Ron Lippy 9209140171 920903 1qDR ADOCK 05000285 PDR ISSUED: 06-12-92 4:00 pm R5-

FORT CALHOUN STATION SS-ST-SI-3015 SURVElLLdNCE TEST PAGE 1 OF 53 SAFETY INJECTION TANK DISCHARGE CHECK VALVES TEST SAFETY RELATED 1.0 PURPOSE 1.1 To satisfy in part, each refueling outage, the requirements of Technical Specifications 3.3 (1) a for the following check valves: SI-207 SI-211 SI-215 SI-219 SI-208 SI-212 SI-216 SI-220 2.0 BFFERENCES 2.1 Technical Specifications: 2.1.1: Reactor Coolant System 2.8: Refueling Operations 3.3: Reactor Coolant System and Other Components Subject to ASME XI Boiler and Pressure Vessel Code Inspection and Testing Surveillance 3.6(4): Safety Injection and Containment Spray = Systems Tests 2.2 Fort Calhoun Station Inservice Inspection (ISI) Program Plan 2.3 Standing Order G-23, Surveillance Test Program 2.4 Operating Instructions: ( OI-NG-1: Nitrogen System - Normal Operation OI-SI-1: Safety Injection System - Normal Operation 2.5 P&ID: ( E-23866-210-130 (Sh 2): Safety Injection and l Containment Spray System (File No. 10480) l l E-23866-210-110: Reactor Coolant System (File No. 10475) l 11405-M-42: Nitrogen Flow Diagram (File No. 10450) l 11405-A-13: Primary Plant Diagram (File No. 12170) FC/SS-ST R5 9

~ FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 2 OF 53 2.6 Instrumentation and Control Interconnect Diagrams 161F561 SHT. 83 File No. 9581 161F561 SHT. 84 File No. 9582 e 161F561 SHT. 85 File No. 9583 e e 161F561 SHT. 86 File No. 9584 e 161F561 SHT. 99 File No. 9597 e 161F561 SHT. 100 File No. 9598 161F561 SHT. 101 File No. 9599 161F561 SHT. 102 File No. 9600 2.7 Instrument Loop Drawings EM-2901 File No. 20574 EM-2904 File No. 20592 EM-2921 File No. 20575 EM-2924 File No. 20555 EM-2941 File No. 20576 EM-2944 File No. 20594 EM-2S61 File No. 20577 EM-2964 File No..20595 2.8 USAR: 6.2: Safety Injection System

2.9 Calculation

FC-05280 FC-05428, Rev. 1 l e 2.10 Surveillance and Calibration-Procedures CP-106, Pressurizer Level-IC-ST-RC-0004, Channel Calibration of Pressurizer Level Instrument Channel L-101X. (If LIC-101X is used) acs FC/SS-ST R5 l \\ ~~ - - ~ ~ -

-FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 3 OF.53 2.10 e IC-ST-RC-0005, Channel Calibration of-Pressurizer level Instrument Channel L-101Y. (If LIC-101Y is used) IC-ST-SI-0005, Channel Calibration of SI-Tank SI-6A Nitrogen Pressure, Loop P-2901 IC-ST-SI-0008, Channel Calibration of SI Tank SI-6A Wide Range Level, Loop P-2904X IC-ST-SI-0011, Channel Calibration of SI Tank SI-6B e Nitrogen Pressure, Loop P-2921 IC-ST-SI-0014, Channel Calibration of SI Tank SI-6B Wide Range Level, Loop P-2924X IC-ST-SI-0017, Channel Calibration of SI Tank SI-6C e Nitrogen Pressure, Loop P-2941' IC-ST-SI-0020, Channel Calibration of SI Tank SI-6C Wide Range Level, Loop P-2944X IC-ST-SI-0023, Channel Calibration of SI Tank'SI-6D e Nitrogen Pressure, Loop P-2961 IC-ST-SI-0026, Channel-Calibration of SI Tank SI-6D Wide Range Level, Loop P-2964X 2.11 Technical Data Book TDB-III.20 Page 1 FC/SS-ST R5

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 4 OF 53 3.0 DEFINITIONS SIT - Safety Injection Tank PT-1 and PT Points on SIT level trace where SIT Isolation valve is >90% (as determined by valve stroke time). PT-1 and PT-2 represent a period of time when the valve is fully open and fluid is flowing through the check-valve at approximately its maximum velocity with the SIT Isolation Valve fully open. PT-1 represents an arbitrary beginning time and PT-2 is an arbitrary end time (usually 1 - 10 secs after PT-1). The time interval between PT-1 and PT-2 is used for calculation for fluid flowrate. PT-5 Point midway between PT-1 and PT-2 L Level in Reactor Refueling-Cavity (in %) a Lp7_1 Level of SIT at PT-1 (in feet) LPT-2 Level of SIT at PT-2 (in feet) L Level of SIT at PT-1 (in volts) y2 172 Level of SIT at PT-2 (in volts) e L Level of SIT at PT-5 (in volts) v5 AL SIT Level change during the time period between PT-1 and PT-2 (in feet) D Distance between PT-1 and PT-2 (in mm-on the strip chart) i S Strip Chart Speed (in mm/sec) R -Rate of SIT level change-(in ft/sec) Q Calculated flow rate (in gpm) PPT-5 Total pressure in-SIT at time PT-5 (in psig) Py5 Gas pressure in SIT at PT-5 (in volts) 'Pg Gas pressure in SIT at.PT-5 (in psig) Pg Head pressure due to-level in SIT plus.the i difference in elevation from the lower SIT level tap to the-top of reactor vessel flange (in psig) P Head pressure due to reactor vessel cavity level p (in psig) s FC/SS-ST - RS

-~ FORT'CALHOUN STATION SS-ST-SI-3015-SURVEILLANCE TEST PAGE 5 OF 53 3.0 DEFINITIONS (Continued) .AP Difference in pressure between P and P PT-5 g (in psid) c - Flow Coefficient y 4.0 EOUIPMENT LIST 4.1 TEST EQUIPMENT REQUIRED /USED: NOTE: During the course of this procedure, some portable or temporary test equipment may be used to prove operability of a plant component. All such equipment must be entered into the appropriate I&C Instrument Log. CALIBRATION E_OUIPMENT OPPD NO./ DUE DATE INITIALS /DATE LI-106 N/A / / PT-2901 N/A / / LT-2904X N/A / / PT-2921 N/A / / LT-2924X N/A / / PT-2941 N/A / / LT-2944X N/A / / PT-2961 N/A / / LT-2964X N/A / / Strip Chart Recorder / / / / L. / 5.0 ERECAUTIONS AND LIMITATIONS 5.1 All ancmalies and deficiencies shall--be reported immediately to the Shift Supervisor and noted in the Remarks Section. An immediate check shall.be made to verify Limiting Conditions for Operation per Technical Specifications, have' not been exceeded. 5.2 A Maintenance Work Request (MWR) shall be initiated to correct _any reported deficiency and.the-MWR number shall be referenced on the Comment Sheet / Chronological Log. FC/SS-ST R5 l l

FORT CALHOUN STATIO" SS-ST-SI-3015 SURVEILLANCE TEST PAGE 6 OF 53 5.3 Test data shall be evaluated by the Special Services Engineer (SS) AND reviewed by the Shift Supervisor for acceptability within 24 hours following completion of this test. 5.4 The System Engineer shall be notified within 24 hours of the completion of this test of any marginal, unexpected, or unacceptable results. 5.5 The use of N/A (not applicable) in this procedure shall be in accordance with the requirements listed in Standing Order G-23. 5.6 The completed Surveillance Test procedure and all applicable attachments shall be signed and dated by the person (s) who actually performed the test. 5.7 To prevent overflow of the Reactor Refueling Cavity l and to provide adequate Radiological Shielding in the event of a crud burst, the Reactor Refueling Cavity level must be between 40% and 50% as indicated on LI-106 at the beginning of this test. If LI-106 is unavailable, the Reactor Refueling Cavity must be between 1032 ft and 1034 ft as indicated on LI-199 at the beginning of this test. 5.8 All steps in this procedure shall be conducted in sequence written unless otherwise noted. 5.9 If the procedure becomes contaminated or damaged, the " Lead Person" or designee shall ensure that all data, l Verifications, or other pertinent information is transcribed to another copy of the procedure, which will become the official copy. 5.10 An Incident Report shall be initiated, in accordance with SO-R-4, to report any anomalies or deficiencies. The Incident Report number shall be recorded on the Comment sheet / Chronological Log. 5.11 No maintenance shall be conducted within this Surveillance Test other than that specifically directed by this procedure. 6.0 INITIAL CONDITIONS INITIALS /DATE NOTE: The Initial Conditions may be performed in any sequence. 6.1 Procedure revision verification Master Revision No. / FC/SS-ST R5 _ _ ~..

i FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE. TEST PAGE 7 OF 53 l INITIALS /DATE 6.2 No other test is in-progress which could potentially affect this test, or if this test were performed, could have an effect on that test. / 6.3 Calibration of test equipment has been verified and procedures listed below have been satisfactorily completed prior to test. / DATE PROCEDURE COMPLETED CP-106 (WP-005056)* / IC-ST-SI-0005 / IC-ST-SI-0008 / IC-ST-SI-0011 / IC-ST-SI-0014 / IC-ST-SI-OO17 / IC-ST-SI-0020 / IC-ST-SI-0023 / IC-ST-SI-0026 /

  • NOTE:

At the discretion of the Test Coordinator, LI-199 may be used as an alternate level indication.for LI-106. Note the Comment Sheet / Chronological Log if this is used. t 6.4 A prejob briefing has been conducted j prior to the start of this_ test.-. ALL l persontzel participating in.the i performance of this test have read AND understand-the procedure AND have completed the surveillance Test Signature Sheet. ' / 6.5 Control power is available for valve operation. / l 6.6 Safety Injection Tank levels are between 85% and 90%. / 6.7 Shutdown cooling is not in service. / t I 6.8 -The Reactor Vessel Head-has been removed and core off-loaded. / 6.9-The pressurizer is vented or the manway removed (Pressurizer pressure is the same as Containment pressure). / FC/SS-ST R5 w v.-, e ,g,m v ~ - < - e,, >w-+-.--n-r-- o.g-wy, y

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 8 OF 53 INITIALS /DATE 6.10 Notify Radiation Protection prior to the start of this test due to the possibility of increasing airborne radiation in containment. / 6.11 The Reactor Refueling Cavity level is between 40% and 50% as indicated on LI-106. If LI-106 is unavailable the reactor refueling cavity level should be between 1032 ft and 1034 ft elevation on LI-199 sightglass. / 6.12 Ensure the Strip Chart Recorder is loaded with paper graduated in square centimeters. / 6.13 If test instrumentation or temporary equipment is expected to be installed for greater than 24 hours, ensure the requirements of SO-O-25 are met. / 6.14 Complete the activities in Attachment 8 to fill and vent the Safety Injection Tanks, as required. 6.15 Notify Chemistry prior to start-to coordinate containment sampling as necded support containment releases. / 6.16 Ensura.nat the instrument lines to the level transmitter for each S.I. Tank have been flushed and filled-prior to the test. -/ I&C 6.17 Shift Supervisor authorizes performance of this test. Shift Supervisor' Date/ Time / 7.0 PROCEDURE-I l NOTE:- Step 7.1 through 7.4 may be-performed i in any order at the dlscretion of the' Shift L Supervisor. In order to decrease the time i between each' test, the determination-of the flow coef ficient. (C ) for each tank need not y be completed until all four safety injection l tanks have been discharged. -(This calculation is located in Steps 18 through 25.1 in Attachments 1, 2, 3, and-4. 7.1 Test SI-6A Discharge Check Valves SI-219 and SI-220 per Attachment'l. / u FC/SS-ST R5

FORT CALHOUN STATION ~ SS-ST-51-3015 SURVEILLANCE TEST PAGE 9 OF 53 INITIALS /DATE 7.2 Test.SI-6B Discharge Check Valves SI-215 and SI-216 per.. / 7.3 Test SI-6C Discharge Check Valves SI-207 and SI-208-per. / 1 -. 7.4 Test SI-6D Discharge Check Valves SI-211 and SI-212 per. / 7.5 Position FH-11 as directed by Shift Supervisor. / OPS REMARKS Completed by Date/ Time / 8.0 RESTORATION 8.1 Shift Supervisor notified this test is completed. Shift Supervisor Date/ Time / 9.0 ACCEPTANCE CRITERIA 9.1 The Flow Coefficients (C ) calculated in Attachments 1 y through 4 are greater than or. equal to the values-below: Tank . Minimum Cy SI-6A 1189 SI-6B 1164 SI-SC 1132 SI-6D 1159 This satisfies the ISI requirement that the discharge check valves were full-stroked open. Acceptance criteria based on Reference 2.9. 10.0 TEST RECORD 10.1 This entire procedure. 10.2 Attach Strip Charts to this procedure. FC/SS-ST RS

I FORT CALHOUN STATION SS-ST-SI-3015 SURVEII&ANCE TEST PAGE 10 OF 53 11.0 REVIEW 11.1 The Supervisor-Special Services is responsible for ensuring this completed surveillance.is reviewed in a timely manner and forwarded in accordance with S0-G-23. Test data shall be evaluated by-the Special Services Engineer and reviewed by the Shift Supervisor for acceptability within 24 hours of the completion'of this test. Evaluated by Date/ Time -/ SS Engr Shift Supervisor 11.2 The Supervisor-Special Services is responsible for ensuring this test is evaluated and reviewed in a timely manner then forwarded in accordance with SO-G-23. 11.2.1 Th. ISI Coordinator is responsible for reviewing this test to ensure compliance.with the FCS ISI Program Plan. This test has been reviewed and found acceptable or the deficiencies have been noted in the Remarks Section. REMARKS ISI Coordinator Date/ Time / P FC/SS-iT R5 i l

FORT CALHOUN STATION SS-ST-SZ-3015 SURVEILLANCE TEST PAGE 11'OF.53-11.3 The Supervisor-System Engineering is responsible for ensuring this Surveillance-Test is evaluated by the System Eraineer in a timely manner and forwarded in

accordan, ith So-G-23.

11.3.1 The System Engineer is responsible for reviewing the test. data'and the identified deficiencies noted within the test. This test has been reviewed and found acceptable or deficiencies and actions taken have been noted in the Remarks Section. REMARKS _. System Engineer Date/ Time / FC/SS-ST-RS- __.._m- " " ' ' ' ' - " ~ ~ ~ ~ - - ^ ^ ^ ^ ' ' ~ ~ ~ ~ ~ ' ~ ~

FORT CALHOUF STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE-12'OF 53 ATTACHMENT 1 Page 1 of 7 (SI-219 AND SI-220) SAFETY RELATED PROCEQUEE IHJTIALS/DATE NOTE: Steps 1 through 10 can be performed in any sequence, but prior to Step 11. NOTE: This attachment will raise the reactor refueling cavity level by approximately 2% frrm a 90% initial SIT level. 1. Record the "As Found" position of the following valves, THEN Close. Valve - s Found / OPS HCV-311 HCV-312 HCV-327 NOTE: Control Room Indication of SI-6A level is to be used for Step 2.0, 2. Ensure that Safety Injection Tank SI-6A level is between 85% and 90% as. indicated on-LI-2904X and record. SI-6A Level 4 / (85% to 90%) OPS 3. Record the. Reactor Refueling Cavity-level (L ) as indicated on LI-106. a Reactor Refueling Cavity Level (L ) p / OPS N/A this step if LI-199 is used. 4. If LI-106 is unavailable, ensure the Reactor l Refueling Cavity is between 1032 and 1034 ft elevation as-indicated on the LI-199 sightglass. Reactor Refueling Cavity-Level ft / (1032 ft.to 1034 ft) OPS N/A this step if LI-106 is used. l l l FC/SS-ST R5

FORT CALMOUN STATION SS-ST-SI-3015 SURVEII. LANCE TEST ) PAGE 13 OT 53 e ATTACHMENT 1 Page 2 of 7 (Continued) 2 INITIALS /DATE 5. Use Table 1 in Attachment 5 to determine the test pressure for SI-6A based on the tank level recorded in Step 2. Use the pressure j that corresponds to the tank level rounded down to the nearest wholo percent. I SI-6A Test Pressure-Dsig / l NOTE Control Room Indication of SI-6A pressure is to be used for Step 6.0. 6. Set pressure of Safety Injection Tank SI-6A as indicated on PT-2901 to pressure recorded 3 j in Step 8. N/A jf not required. / OPS i 1 7. Strip Chart Recorder hooked up as per j. / I&C 4 1 l 8. Connect the StriD Chart Recorder to the Safety Injection" Tank SI-6A ERP computer input terminals located in cabinet PC-15. 1 8.1 To record SI-6A pressure, connect one channel to terminals j TB402-35(-) TB402-16(+) / I&C Independent Verification / I&C S.2 To record SI-6A level, connect'one channel to terminals: l TB401-15(-) 4 TD401-16(+) / ILC-l Independent Verification / j I&C 9. Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or cz desired, and record. (S) / = .nm sec / I&C TC/SSwiT RS g v ~ ..n-, on -~we-- m-w< ,,-ezm g- .----nw-- u.-rs, ,r- -w ~,


e.

,2-w-~eee-. a n-r a

FORT CALilOUM STATION SS-ST-SI-3013 SURVEfLLANCE TEST PAGE 14 OF 53 NITAClIMENT 1 Page 3 of 7 (Continued) INITIALS /DATE 10. Ensure that TH-11 is closed. / OPS 11. Start the Strip Chart Recorder. / I&C 12. Open HCV-2914 AND Mark the Strip Chart to indicate the start of the test (T=0) when HCV-2914 begins to open. / OPS NOTE: HCV-2914 takes approximately 55 seconde to open. When HCV-2914 is full open, pnly the red light will be on. 13. WHEN HCV-2914 indicates full open, Wait approximately 10 seconds, IRIN close HCV-2914. / OPS NOTE:,hlten HCV-2924 is closed unlY the green light is on. 14. WHEN HCV-2914 Indicates closed, I)iEH stop the Strip Chart Recorder. / I&C 15. Return valves in Step 1 to "As Found" position or as directed by the Shift Supervisor. / OPS 16. Restore Safety Injection Tank SI-6A to service as directed by the Shift Supervisor. / OPS 17. Remove Strip Chart Recorder from the following ERF Computer terminals: TB401-15(-) TB401-16(+) TB402-15(-) TB402-16(+) -/ I&C Independent Verification / I&C FC/SS-ST R5 l N-

_ ~ _ _ FORT CALHOUM STATION SS-ST-SE-3015 SURVEILLANCE TEST PAGE 15 OF 53 ATTACHMENT 1 Page 4 of 7 (Continued) INITIALS /DATE 18. Record the following information on the Strip Recorder Chart: 18.1 Surveillance Test Number 18.2 Attachment Number 18.3 Safety Injection Tank-Number 18.4 Date 18.5 Chart Speed (mm/sec) 18.6 Pressure Trace 18.7 Pressure Scale (psig/ volt) 18.G Level Trace 18.9 Level Scale (ft/ volt) l 18.10 Start of test (Y=O) 18.11 Segment of pressure and level traces when HCV-2914 is >90% open: First Point (PT-1), Second Point 18.12 Point (PT-5) on the pressure (PT-2) l and lovel traces halfway between PT-1 and PT-2. / 19. Measure and record the chart run along the trace (D) between PT-1 and PT-2. l D= _mm / 20. Record the level change (AL) in SI-6A between PT-1 and PT-2 when HCV-2914 was >90% open.- l 20.1 Determine the-level (Lp7 1) of SI-6A at PT-1. i L = LV (volts)-X 3. 842 ft/ volt p7 3 3 Lpr_3 X 3.6042 ft/ volt = Lp7 3 = ft -/ 20.2 Determine the level (LPT-2) of SI-6A at PT-2. L " LY (volts) X 3.6042 ft/ volt PT-2 2 LPT-2 X 3.6042'ft/ volt- = Lpr. 2 - ft / FC/SS-ST R5

FORT CALHOUH STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 16 OF 53 ATTACHMENT 1 Page 5 of 7 (Continued) f INITIALS /DATE 20.3 Calculate AL for SI-6A. AL=L ~L ft PT-1 PT-2 AL = ft AL = ft / 21. Determine the tank level Rate of Change (R) for SI-6A. R= (AL + D) x S ft/sec Rr ( + ) x ft/sec R= ft/sec Where: S = chart speed recorded in Step 9 (mm/sec) D = chart run recorded in Stop 19 (mm) / 22. Calculate the flowrate (Q) from SI-6A through check valves SI-219 and SI-220 (based on a ~10 second average when HCV-2914 is >90% open). Q = R x 530.24 gal /ft X 60 sec/ min-Q = R x 31,814.4 gal / min Q= x 31,814.4 gal / min Q= GPM / 23. Determine the pressure (PPT-5) of SI-6A at PT-5~. 23.1 Determine the gas pressure (P ) in SI-6A at PT-5. g P = PV g 5 (volts) x 75 psig/ volt Pg x 75 psig/ volt = Pg psig / = e FC/SS-ST R5 ~

.- ~ FORT CALHOUM STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 17 OF 53 ATTACHMENT 1 Page 6 of 7 (Continued) INITIALS /DATE 23.2 Determine the head pressure (P ) due to g the level in SI-6A at PT-5. Pg (LV5 (volts) x 3.6042 ft/ volt x.434 psig/ft) + 2.42 psig I = Pg= (LV5 (volts) x 1.56) + 2.42 psig Pg= ( x 1.56) + 2.42 psig i Pg psi 9 2.42 = head pressure from 0% level in SI-6A at the Reactor Vessel Flange level (psig) / 23.3 Calculate the total pressure (Ppr.5) of SI-6A at PT-5. e P

P9+Pg psig p7 5 Pp7 5

+ usig Ppr.5 osig / = Determine the head pressure (P due to the 24. reactor refueling cavity level ) g Pg= [(L (%) x 20) + 11) x.434 psig/ft a Pg= (La x 8.68) + 4.77 psig Pg= (_ x 8.68) + 4.77 psig Pg= psig Where La = Reactor Cavity level recorded in Step 3 (%). 20 = distance betueen LI-106 0% and 100% level tapa (ft). If LI-199 is uced, refer to Attachment 7 for cavity level. 11 = height'of 0% level tap above Reactor Vessel Flange (ft) / 24.1 Determine AP for SI-6A at PT-5 AP =-P -Pg psid' PT-5 AP = 'osid AP = osid / FC/SS-ST RS. t l

FORT CALHOUN STATION SS-ST-SZ-3015 SURVEILLANCE TEST PAGE 18 OF 53 ATTACliMENT 1 Page 7 of 7 (Continued) INITIALSlDATE 25. Determine the Flow Coefficient (C ) for SI-6A y Discharge Piping. 25.1 Determine the Flow Coefficient (C ). y Q + ( AP)1/2 C = y = + ( )1/2 Cy C = y Whore: Q = flowrate calculated in Step 22 / l REMARKS l l Completed by Date/ Time / I-1 1-FC/SS-ST RS -

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 19 OF 53 ATTACHMENT 2 Page 1 of 7 (SI-215 AND SI-216) EROCEDURE Ili'-ThbS/DATE NOTE: Steps 1 through 10 can be performed in any sequence, but prior to Step 11. NOTE: This attachment will raise the reactor refueling cavity level by approximately 2% from a 90% initial SIT level. 1. Record the "As Found" position of the following valves, THEN Close. Valve As Found HCV-314 HCV-315 HCV-329 / OPS NOTE: Control Room indication of SI-6B level is to be used for Step 2.0. 2. Ensure that Safety Injection Tank SI-6B level is between 85% and 90% as indicated on LI-2924X and record. SI-6B Level / (85% to 90%) OPS 3. Record the Reactor Refueling Cavity Level (L ) as indicated on LI-106. a Reactor Refueling Cavity Level (L ) a / OPS N/A this step if LI<199 is used 4. Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass Reactor Refueling Cavity Level (L ) g ft / OPS N/A if LI-106 is used. 5. Use Table 1 in Attachment 5 to determine the test pressure for SI-6B based on the tank level recorded in Step 2. Use the pressure that corresponds to the Tank Level rounded down to the nearest whole percent, t SI-6B Test Pressure psig / 1 l 4 FC/SS-ST R5 1

f FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 20 OF 53 ATTACHMENT 2 Page 2 of 7 (Continued) lHIIJALS/DATE i NOTE: Control Room indication for SI-6B pressure is to be used for Step 6.0. 6. Set pressure of Safoty Injection Tank SI-6B as indicated on PT-2921 to pressure recorded in Step 5. N/A if not required. / OPS 7. Strip Chart Recorder hooked up as per. / I&C 8. Connect the Strip Chart Recorder to the Safety Injection Tank SI-6B ERF computer input terminalu located in cabinet PC-15. 8.1 To record SI-6B pressure, connect one channel to terminals: TB402-17(-) TB402-18(+) / I&C Independent Verification / I&C 8.2 To record SI-6B level, connect one channel to terminals: TB401-17(-) TB401-18(+) / I&C Independent verification / I&C-9. Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or as desired, and record. (S) mm/sec / = I&C 10. Ensure that EH-11 is closed.. / OPS 11. Start the Strip Chart Recorder. / I&C 12. Open HCV-2934'AND Mark the Strip Chart to indicate the start of the test (Omo) when HCV-2934 begins to-open. / OPS FC/SS-ST R5

I FORT CALHOUN STATION SS-ST-ST-3015 i SURVEILLANCE TEST PAGE 21 OF 53 ATTACHMENT 2 Page 3 of 7 (Continued) 0 INITIALSIDATE NOTE: HCV-2934 takes approximately 55 seconds to open. When HCV-2934 is full open nnly the red light will be on. 13. WHEN HCV-2934 indicates full open, Wait 4 approximately lo seconds, IREE close HCV-2934. / OPS NOTEt When HCV-2934 is closed only the green light will be on. 14. WRU. HCV-2934 indicates closed, THEN stop the Strip Chart Recorder. / I&C 15. Return valves in Stop 1 to "As Found" position or as directed by the Shift Supervisor. / OPS 16. Restore Safety Injection Tank SI-6B to service as directed by the Shift Supervisor. / OPS 17. Remove Strip Chart Recorder from the following ERF Computer terminals: TB401-17(-) TB401-18(+) TB402-17(-) TB402-18(+) / I&C Independent Verification / I&C 18. Record the following information on the Strip Recorder Chart: 18.1 Surveillance Test Number 18.2 Attachh.ont Number 18.3 Safety Injection Tank Number 18.4 Date 18.5 Chart Speed (mm/sec) 18.6 Pressure Trace 18.7 Pressure Scale (psig/ volt) 18.8 Level Trace 18.9 Level Scale (ft/ volt) 18.10 Start of test (T=O) 18.11 Segment of pressure and level traces when HCV-2934 is >90% open: First Point (PT-1), Second Point (PT-2) 18.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2. / FC/SS-ST RS

FORT CALHOUli STATIoll SS-ST-SI-3010 SURVEILLANCE TEST PAGE 22 OF 53 ATTACIU4ENT 2 Page 4 of 7 (Continued) INITIALS /DATI 19. Measure and record the el art run along the trace (D) between PT-1 at.J PT-2. D= mm / 20. Record the level change (AL) in SI-6B between PT-1 and PT-2 when HCV-2934 was >90% open 20.1 Determine the level (Lp7 3) of SI-6B at PT-1. L = LV (volts) X 3.6042 ft/ volt py 1 3 Lp7 3 X 3.6042 ft/ volt = Lp7 3 ft / = 20.2 Determine the level (LPT-2) of SI-6B at PT-2. LPT-2 " LY2 (volts) X 3.6042 ft/' M ts LPT-2 = X 3.6042 ft/ volts LPT-2 = ft / 20.3 Calculate AL for SI-6B. AL = Lp7 3 - LPT-2 ft AL = ft AL = ft / 21. Determine.the tank level Rate of Change (R) for SI-6B. R= (AL + D)-x S ft/sec R= ( + )x ft/sec R =- ft/sec-Where: S = chart speed recorded in Step.9 (mm/sec) D = chart run recorded'in Step 19 (mm)- / FC/SS-ST R5 =. - ... =

FORT CALilOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 23 OF 53 ATTACl! MENT 2 Page 5 of 7 (Continued) INITIALS /DATE 1 22. Calculate the flowrate (Q) from SI-6B through check valves SI-215 and SI-216 (based on a '10 second average when HCV-2934 is >90% open). Q=RX 530.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q= x 31,814.4 gal / min I Q= GPM / 23. Determine the pressure (PPT-5) of SI-6B at PT-5. I 23.1 Determine the gas pressure (P ) in g SI-6B at PT-5. P = PV (volts) x 75 psig/ volt g 5 g x 75 psig/ volt P = Pg psig / = 23.2 Determine the head pressure (P )g due to ( the-level in SI-6B at PT-5. P j. g (LV5 (volts) x 3.6042 ft/ volt x.434 psig/ft) + 2.42 psig = l Pg (LV5 (volts) x 1.56) + 2.42 psig = Pa = ( x 1.56) + 2.42 psig Pg= psig 2.42 = head pressure from-0% level in SI-6B at the Reactor Vessel Flange level (psig) / 23.3 Calculate the total pressure (PPT-5)- Of SI-6B at PT-5. l P

Pg+Pg psig PT-5 Ppr.5

+ osig. PPT-5 osig / = 1 FC/SS-ST TRS -

FORT CALHOUN STATION SS-ST-SZ-3015 SURVEILLA!!CE TEST PAGE 24 OF 53 ATTACHMENT 2 Page 6 of 7 (Continued) INITIALS /DATE 24. Determine the head pressure (P ) due to the R reactor refueling cavity level Pa = [(L (%) x 20) + 11) x.434 psig/ft a Pp (L x 8.68) + 4 77 psig = g Pg= ( x 8.68) + 4.77 psig Pg psig = Where: La = Reactor Cavity level recorded in Step 3-(%). 20 = distance between LI-106 0% and 100% lovel taps (ft). If LI-199 is used, refer to Attachment 7 for Cavity Level. l' 11 = height of 0%. level tap above Reactor Vessel Flange (ft) 24.1 Determine AP for SI-6B at PT-5 AP = P ~P Psid PT-5 R AP = osid AP = nsid / t FC/SS-ST - R5

...- ~ -..- - -._. ~ --. FORT Ct.LHOUM STATION 3S-ST-SI-3015 SURVEILLANCE TEST .PAGE 25 OF 53 ATTACHMENT 2 Page 7 of 7 (Continued) JJIITIALS/DATE l 25. Determine the Flow Coeff.Leient (C ) for SI-6B y Discharge Piping. r 25.1 Determine the Flow Coefficient (C ). y Q + ( AP)1/2 C = y = + ( )1/2 Cy C, = Where: Q = flowrote calculated in Stop 22 / REMARKS Completed by Date/ Time / i 2 a l . FC/SS-ST R5 l l. r

e FORT CALL!OUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 26 OF S3 ATTACHMENT 3 Page 1 of 7 (SI-207 AND SI-208) PROCEDURE INITIALS /DATE NOTE: Steps 1 through 10 can be performed in any sequence, but prior to Step 11. NOTE: This attachment will raise the reactor refueling cavity level by approximately 2% from a 90% initial SIT level. 1. Record the "As Found" position of the following valves, THEN Close. Valve _As Found HCV-317 HCV-318 HCV-331 / OPS NOTE: Control Room indication of SI-6C level-is to be used for Step 2.0. 2. Ensure that Safety Injection Tank SI-6C level is between 85% and 90% as indicated on LI-2944X and record. SI-6C Level / (85% to 90%) OPS 3. Record the Reactor Refueling Cavity Level (L ) as indicated on LI-106. a Reactor Refueling Cavity Letel (L ) g / OPS N/A this step if LI-199 is used. 4. Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass / OPS Reactor Refueling Cavity Level (L ) g ft N/A if LI-106 is used. 5. Use Table 1 in Attachment 5 to determine the test pressure for SI-6C based _on the-tank level recorded in Step 2. Use the pressure that corresponds to the tankLlevel rounded down to the nearest whole percent.. SI-6C Test Pressure osig / l .FC/SS-ST 1R5

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 27 OF "' ATTACHMENT 3 Page 2 of 7 (Continued) 1RITIALS/DATE NOTE: Control Room indication of SI-6C pressure is to be used for Stop 6.0. 6. Set pressure of Safety Injection Tank SI-6C as indicated on PT-2941 to pressure recorded in Step 5. N/A if not required. / OPS 7. Strip Chart Recorder hooked up as per. / I&C 8. Connect the Strip Chart Recorder to the Safety Injection Tank SI-6C ERF computer input terminals located in-cabinet PC-15. 8.1 To record SI-6C pressure, connect one channel te terminals: TB402-19(-) TB402-20(+) / I&C Independent Verification / I&C 8.2 To record SI-6C level, connuct one channel to terminals: f TB401-19(-) TB4 01-2 0 ( +) / I&C Independent Verification / I&C 9. Adjust Strip Chart Recorder Speed (S) to 10 mm/sec, or as d:' sired, and record.. (S) mm/sec / = I&C 10. Ensure FH-11 is closed. / OPS 11. Start the Strip Chart Recorder. /- I&C 12. Open HCV-2954 AND Mark the Strip Chart to indicate the start of the test (T=O) when HCV-2954 begins to open. / OPS FC/SS-ST RS i

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 28 OF 53 ATTACHMENT 3 Pane 3 of 7 (Continued) INITIALS /DATE NOTE: HCV-2954 takes approximately 55 seconds to open. When HCV-2954 is full open only the red light will be on. 13. WHEN HCV-2954 indicates full open, Wait approximately 10 seconds, IEEN close HCV-2954. / OPS NOTE: When HCV-2954 is closed only the green light will be on. 14. EREN HCV-2954 indicates closed, IfLEE stop the Strip Chart Recorder. / I&C 15. Return valves in Step i to "As Found" position or as directed by the Shift Supervisor. / OPS 16. Restore Safety Injection Tank SI-6C to service as directed by the Shift Supervisor. / Ops 17. Remove Strip Chart Recorder from the following ERF Computer terminale: TB401-19(-) TB401-20(+) l TB4 02-19 (-) l ^ TB402-20(+) / I&C Independent Verification 1 I&C FC/SS-ST R5

FORT CALHOUN STATION SS-ST-SI-3015 SURVE.*'LLANCE TEST PAGE 29 OF 53 ATTACHMENT 3 Page 4 of 7 (Continued) INITIALS /DATE 18. Record the following information on the Strip Recorder Chart: 18.1 Surveillance Test Number 18.2 Attachment Number 18.3 F3fety Injection Tank Number 18.4 Date 18.5 Chart Speed (mm/sec) 18.6 Pressure Trace 18.7 Pressure Scale (psig/ volt) 18.8 Level Trace 18.9 Level Scale (ft/ volt) 18.10 Start of test (T=O) 18.11 Segment of pressure and level traces when HCV-2954 is >90% 'nen: First Point (PT-1), Second 1 int (PT-2) 19.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2. / 19. Measure and record the chart run along the trace (D) between PT-1 and PT-2. D= mm / 20. Record the level change (AL) in SI-6C between PT-1 and PT-2 when HCV-2954 was >90% open. 20.1 Determine the level (Lp7 1) of SI-6C at PT-1. L = LV (volts) X-3.6042 ft/voit p7 1 1 Lpr.1 X 3.6042 ft/ volt = Lpr.1 ft. / = 20.2 Determine the level (LPT-2) of SI-6C at PT-2.. L ' " LY2-(volts)-X 3.6042 ft/ volt PT-2 LPT-2 X 3.6042 ft/ volt = LPT-2 ft / FC/SS-ST R5

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 30 OF 53 ATTACHMENT 3 Page 5 of 7 (Continued) INITIALS /DATE 20.3 Calculate AL for SI-6C. AL=L -L ft PT-1 PT-2 AL = ft AL = .ft / 21. Determine the tank level Rate of Change (R) for SI-6C. R= (AL + D) x S ft/sec R= ( + ) x __ ft/sec R= ft/sec Where: S = chart speed recorded in Step 9 (mm/sec) D = chart run recorded in Step 19 (mm) / 22. Calculate the flowrate (Q) from S.-6C through check valves SI-207 and SI-208 (based on a ~10 se.ond average when HCV-2954 is >90% open). Q = R x S30.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q= x 31,814.4 gal / min i Q= GPM / l 23. Determine the pressure (PPT-5) of SI-6C at PT-5. 23.1 Determine the gas pressure (P ) in SI-6C at PT-5. g Pg 5 (volts) x 75 psig/ volt PV = [ Pg x'75 psig/ volt = l' Pg psig / = i l FC/SS-ST R5

FORT CAL 110UN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 31 OF 53 ATTACIIMENT 3 Page 6 of 7 (Continued) INITIALS /DATE 23.2 Determine the head pressure (P ) due to g 4 the level in SI-CC at PT-5. 1 Pg (LV5 (volts) x 3.6042 ft/ volt x.434 psig/ft) + 2.42 psig = PH" (LYS (volts) x 1.56) + 2.42 psig Pg = ( x 1.56) + 2.42 psig P =.- paig g 2.42 = head pressure from 0% level in SI-6C at the Reactor Vessel Flange level (psig) / 23.3 Calculate the total pressure (PPT-5) Of SI-6C at PT-5. P =Pg+Pg psig p7 5 PPT-5 + D819 Ppr.5 = nsig / 24. Determine the head pressure (P ) due to the g reactor refueling cavity level. Pa = [(L (%) x 20) + 11 ft) x.434-psig/ft a Pg= (La (%) x 8.68) + 4.77 psig Pg= ( x 8.68) + 4.77 paig Pg= = __ psig Where: a Reactor Cavity level recorded in L e Step 3 (%). 20 = distance between LI-106 0% and -100% level taps-(ft). -If LI-199 is. I used, refer to Attachment 7 for Cavity. Level. 11 = height of 0% level tap above Reactor Vessel Flange (ft) / I l FC/SS-ST RS -. - - ~.,

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANE TEST PAGE 32 OP 53 4 ATTACHMENT 3 Page 7 of 7 (Coritinued) INITIAlal.DATE 24.1 Determino AP for 6I-6C at PT-5 AP ' P IR PSid ~ PT-5 AP = osid i $P = osid / 25. D6cnrmine the Flow Coefficient (C ) for SI-6C y Discharge Piping. 25.1 Determine the Flow Coefficient (C ). y Q + ( AP)1/2 C = y C = + ( )1/2 y C => y iihere: Q = flowrato calculated in Stop 22 / REMARKS ____ i a-Completed by 'Date/ Time / FC/SS-ST R5 l

I FORT CALHOUH STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 33 OF 51 ATTACHMENT 4 Page 1 of 7 (SI-211 AND SI-212) PROCEDURE IElIJALS/DATE NOTE: Steps 1 through 10 can be performed in any sequence, but prior to Stop 11. NOTE: This attachment will raise reactor refueling cavity level by approximately 2% from a 90% initial SIT level. 1. Record the "As Found" position of the following valves; THEN Close. Valvo As Found HCV-320 HCV-321 HCV-333 / OPS NOTE: Control Room indication of SI-6D level is to be used for Step 2.0. 2. Ensure that Safety Injection Tank SI-6D level is beckcan 85% and 90% as indicated on LI-2964X and record. -SI-6D Level / (85% to 90%) OPS 3. Record the Reactor Refueling Cavity Level (L ) as indicated on LI-106. 3 Reactor Refueling Cavity Level (L ) g / OPS M/A this step if LI-199 is vbed. 4. Record the Reactor Refueling Cavity Level as indicated on LI-199 Sightglass Reactor Refueling Cavity Level. (L ) g ft / OPS N/A if-LI-106-is used. FC/SS-ST _ RS ~

.. _ _ - _. _. ~,. _ -.. -.. - _.. _ - FORT CALHOUN STAT 1oN SS-ST-SI-3015 SURVEILLANCE TEST PAGE 34 OF 53 ATTACHMENT 4 Page 2 of 7 (Continued) INITIALS /DATE 5. Use Table 1 in Attachment 5 to determine the test pressure for SI-6D based on the tank level recorded in Step 2. Use the pressure that corresponds to the Tank Level round9d down to the nearest whole percent. SI-6D Test Pressure osig / NOTE: Control Room indication of SI-6D pressure is to be used in Step 6.0. 6. Set pressure of Safety Injection Tank SI-6D as indicated on PT-2961 to pressure recorded in Step 5. N/A if not required. / OPS 7. Strip Chart Reccrder hooked up as per. / I&C 8. Connect the Strip Chart Recorder to the Safety Injection Tank SI-6D ERP computer input terminals located in cabinet PC-15. 8.1 To record SI-6D pressure, connect one channel to terminals: TB402-21(-) TB402-22(+) / I&C Independent. Verification / .I&C 8.2 To' record SI-6D-level, connect one channel to terminals: Tb401-21(-) TB401-22(+) / I&C Independent Verification / I&C 9.- LAdjust Strip Chart Recorder-Speed (S) to 10 mm/sec, or as desired, and record. mm/sec / (S) = I&C FC/SS-ST. R5

i FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 35 OF 53 ATTACHMENT 4 Page 3 of 7 (Continued) INITIALS /DATE 10. Ensure FH-11 is closed. / OPS 11. otart the Strip Chart Recorder. / I&C 12. Open HCV-2974 AND Mark the Strip Chart to indicate the start of the test (T=O) when HCV-2974 begins to open. / CPS NOTE: HCV-2974 takes approximately 55 seconds to open. When HCV-2974 is full 3 open 2nly the red light will be on. 13. WHEN HCV-2974 indicates full open, Wait approximately 10 seconds, THEH close HCV-2974. / OPS-NOTE: When HCV-2974 indicates closed only the green light is on. 14. EKEN HCV-2974 indicates closed, THEN stop the Strip Chart Recorder. / I&C 15. Return valves in Step 1 to "As Found" position or as directed by the' Shift Supervisor. / OPS 16. Restore Safety Injection Tank SI-6D to i service as directed by the Shift Supervisor. / l OPS 17. Remove Strip Chart Recorder from_the following ERF Computer terminals: TB403-21(-) TB401-22(+) TB402-21(-)- TB402-22(+) / I&C Independent Verification / I&C l FC/SS-ST R5

FORT CALL!OUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 36 OF 53 ATTACHNENT 4 Page 4 of 7 (Continded) INITIALS /DATE 18. Record the #c11owing information on the Strip Recorder Chart: 18.1 Surveillance Test Number 18.2 Attachment Number 18.3 Safety Injection Tank Number 18.4 Date 18.5 Chart Speed (mm/sec) 18.6 Pressure Trace 18.7 Pressure Scale (psig/ volt) 18.8 Level Trace 18.9 Level Scale (ft/ volt) 18.10 Start of test (T=0) 18.11 Segment of pressure and' level traces l When HCV-2974 is >90% open: First Point (PT-1), Second Point (PT-2) 18.12 Point (PT-5) on the pressure and level traces halfway between PT-1 and PT-2. / 19. Measure and record the chart run along the trace (D) between.PT-1 and PT-2. D= mm / 20. Record the level change (AL) in SI-6D between PT-1 and PT-2 when HCV-2974 was >90% open. 20.2 Determine the level (LPT-1) of SI-6D at PT-1. LPT-2 1 (volts) X 3.6042 ft/ volt LV Lpy.1 X 3.6042 ft/ volt = LPT-1 = ft /. _ _ _ 20.2 Determine the level (LPT-2) of SI-60 at PT-2. LPT-2 " LY2 (volts) X 3.6042 ft/ volt LPT-2 = X 3.6042 ft/ volt LPT-2fa 'ft / FC/SS-ST RS y-e-w +,se,t---. -e w w k-v v e rr,w + - #e -9 ,,ar ,c-,y-e -w-e -y e-+ ,,-g,r,<wg---

~ _.. -. - - -... -.. FORT CALilOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 37 OF 53' I ATTACHMENT 4 Page 5 of 7 (Continued) IjjITI ALS / DATI i 20.3 Calculate AL for SI-6D. AL = L ; 3 -L ft p PT-2 AL = ft AL = ft / 21. Determine the tank level Rate of' Change (R) for SI-6D. R= (AL + D) x S ft/sec R= ( + ) x ft/sec R= ft/sec Where: S = chart speed recorded in Step 9 (mm/sec) D = chart run recorded in Step 19 (mm) / 22. Calculate the flowrate (Q) from SI-6D through check valves SI-211 and SI-212 (based on a ~10 second average when HCV-2974 10 >90% open). Q = R x 530.24 gal /ft X 60 sec/ min Q = R x 31,814.4 gal / min Q= X 31,814.4 gal / min Q= GPM' / 23. Determine the pressure (PPT-5) of SI-6D at PT-5. 23.1 Determine the gas pressure (P ) in g SI-6D at PT-54 P9 = PV5 (volts) x 75 psig/ volt' Pg. __. x 75 psig/ volt =- Pg psig / = FC/SS-ST R5 ,er.r.-,, .,,,,.-N.,,w,,v,- .,-,m,-v~-y ,-,5..--.-.c .e, v. ~., r -- wrv e-t-+*- v- - w-v r -r v

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 38 OF 53 ATTACHMENT 4 Page 6 of 7 (Continued) INITIALS /DATE 23.2 Determine the head pressure (Pg) due to the level in SI-6D at PT-5. Pg = (LV5 (volts) x 3.604? ft/ volt x.434 psig/ft) + 2.42 psig Pg= (LV (volts) x 1.56) + 2.42 psig 5 H ( x 1.56) + 2.4 1;'; P = Pg= psig 2.42 = head pressure from 0% level in SI-6D at the Reactor vessel Flange level (psig) / 23.3 Calculate the total pressure (PPT-5) Of SI-6D at PT-5. Pp7 3 = Pg+Pg psig PPT-5 = + nsig. Pp7 5 = nsig / 24. Determine the head pressure (P ) due to the R reactor refueling cavity level. Pg= ((L (%) x 20) + 11) x.434 psig/ft g Pg= (La (%) x 8.68) + 4.77 psig P = g ( x 8.68) + 4.77 psig P = g ( psig Where: Lg = Reactor Cavity level recorded in Step 3 (%). 20 = distance between LI-106 0% and 100% level taps-.(ft)._ If LI-199 is used, refer to Attachment 7 for Cavity Lavel._ / 11 = height of 0% level tap above Reactor Vessel Flange (ft) FC/SS-ST R5 a.-.

...._.- --_...=_-.. FORT CAL 110UN STATION SS-ST-SI-3015 SURVEILLA!JCE TEST PAGE 39 OF 53 I ATTACllMEliT 4 Page 7 of 7 (Continued) IllITI ALS / DATE 24.1 Determine AP for SI-6D at PT-5. AP = Ppr.5 -Pg psid AP = paid t AP = osid / 25. Determine the Flow Coefficient-(C ) for y SI-6D Discharge Piping. 25.1 Determine the Flow Coefficient (C ). y Q + ( AP)1/2 C = y C = + ( )1/2 y C = y Where: Q = flowrate calculated in Step 22 / REMARKS

i

( Completed b'y Date/ Time / 1 FC/SS-ST R5

i TORT CALHOUH STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 40 OF 53 ATTACHMENT 5 Page 1 of 1 (SAFETY INJECTION TANK TEST PRESSURES) SAFETY INJECTION TEST PRESSURE TANK LEVEL (PSIG) 84% 80.0 85% 82.5 86% 87.5 87% 90.0 88% 95.0 89% 100.0 90% 105.0 NOTE: Test Pressures are based on Calculation FC-05280. NOTE Set pressure at above_ test pressure'+0 -2.5 psig l %i FC/SS-ST R5- .~

. ~ FORT CALHOUN STATION SS-ST-SI-3015 a SURVEILLANCE TEST PAGE 41 OF 53 p ATTACHMENT 6 Page 1 of 2 i CALIBRATION CONSTANTS AND 9EFERENCE VALUES 4 LOOP INSTRUMENT OUTPUTS - ERF Computer i, Tank 6A a 1 ) Pressure: 1 - 5 volts 0 - 300 psig j. P2901 1 Level 1 - 5 volts 0-100% (173" - 0) 4 l L2904X { Tank 6B Pressure: 1-volts 0 - 300 psig l P2931 Level 1 - 5 volts 0 - 100% (173" 0) L2924X f ank 6C l Pressure: 1 - 5 volts 0 - 300 psig- ~ J P2941 Level 1 - 5 volts 0 - 100% (173" - 0) L2944X Tank 6D i Pressure: 1 - 5 volts 0 - 300 psig i P2961 i Level 1 - 5 volts 0- 100% (173" 0) L2964X i Strip Chart Set-Up Parameters l~ ' Speed 10 mm/sec (suggested) 5 Channel 1 Pressure Set 1 - 3 Volts to correspond to 0 ~J50 psig Channel 2 Level Set 1 - 5_ Volts-to correspond to-0 173" (14.42 feet)- 4 FC/SS-ST R5 ,.,e. .-w-f ,,y-.. + w, .s---y gp - g +

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PP3E 42 OF 53 'ATTACRMENT 6 Page 2 of'2 (CONTINUED) CONVERSION FACTORS 1 Level 14.42 feet /4 Volts 1 = 3.6042 ft/ volt 7 Pressure .a psig/2 volts = 75 psig/ volt Volume Tank ID = 9'-6" 2 Volume = nD h/4 = n(9.5 ft)2 (1 ft). (4) 3 = 70.88218 ft per foot of height 3 Water volume = 7.48052 gal /ft 3 3 Tank volume 7.48052 gal /ft x 70.88218 ft = 530.24 gal /ft of height = 4 e i k FC/SS-ST R5

~.. FORT CALHOUN STATION-SS-ST-SI-3015 SURVEILIANCE TEST PAGE 43 OF 53 ATTACHMENT 7 Page 1 of 1 1046' --4

  • l...-..

1044* H, ~~ ico: 4 -i 1042*--i ~^ 907 -1 ) 3-1040' M ~ ~ -4 -1 CEDW 100L ACCCSS FLANGC (1034 6') ~~-~----- i _.-~70';----- .... -,0 3 8.'.- 4. v---- -- 1 RIAC10R Pit LCvCL C0a.1ROL BAND N. 1036' ~ 07. UPPER LivCL FOR CCOW ---*------+-- - CCUPtiNG/LNCCUPLING (1C35.3'). ,P**"*** .--- 034 g s, o,. r-1 TOP Of CCDM AUTOCLAVC. s 4 HOV$1NG (1034.6') y W!N. CIL TO PRECLUDE " ~ DRV SCAM (1034 3-)

1032,

-- 40T. y 4 1030 -- 30% i 3 1025.Q -- 20% w4 H 10 2 6 ' --. -- 10%. _. TECH SPEC 2.3 ~ (23' ABOVE TOP OF CORE) ~~'"""~1

  • --- 07 10 2 4 ' -~~

4 Lt-106 PRESSURIZER ~~ ~ 10 2 2 ' - -.- LEVEL OutCA SC A; (1020.6') ~ ~ - ~

  • STPUwCNY FLANGC (1020.1*) -.[_~2.'[020(

RV VE NT ( (1019.5 ') ---- -- ~ ~ ~ ~-- -- 6* TCP 1.D. RV HE AD ( 1016.$') --- -- * ---- --- 1018' - S' 1 4 1016* -- *f-3' TECH SPEC 2.1.1(4)(b -4 (15' ABOVE TOP OF CORE ~~""""%. 2' 1014' ~~d t-I' REACT OR VCSSCL rLANCC (1013') ------------ 1 ' --------~~- - 0


~~----- - - - - - - - - - -

-i 1012' ~~ OP-6 REDUCEO ~ ~~ ~~ 1 ~~ INVENTORY OPERATIONS "" -] TOP l.0 NOTLEG (1007.8') ----- ME%. ' ~~ [ .J ( HOTLEG (1006.5') -------- M 1006' -1 sor row to, soitt c (i OCs.2-) ------------ g------------ LL-lE9 Lh 197 M d-1004' - COLD SHUT 00WN SIGHTGLASS ' -i - REACTOR COOLANT-(rutL ASStuSLY) (1002.2') TOP Of CCPC * ""'1002'h LgygL PHYSICAL FEATURES ELEVATIONS -{AOP-19-D.WPG} A FC/SS-ST R5 my w w gr y -mig,ai--'-eg-w -M" T 9-W-'a g 9-MF V t.7 P' whyW gW.'M7 T'-'7$*-W-r' Y***1"- f

FORT CALHOUM STATION 'SS-ST-SI-3015 SURVEILLANCE TEST PAGE 44 OF 53 t ATTACHMENT 8. Page 1 of'8 Depressurizing and Filling SI Tank (s) Using containment spray Pumps. JJJITIALS/DATE NOTE: This procedure prevents SDHX AC-41 from being used for Shutdown Cooling. 1. Ensure SI Tank level and pressure instrumentation is operable by completing applicable portions of OI-SI-1-CL-C. /- OPS 2. Verify SIRWT is at Refueling Boron Concentration. / 3. If on shutdown cooling ensure the following valves are CLOSED: Valve DescriDtion (V) SI+306 SIRWT Fill Valve HCV-349 Cooled Water Suction to HPSI Pump SI-2B HCV-2914 SI Tank 6A Discharge Isolation Valve HCV-2934 SI Tarh 6B Discharge-Isolation Valve HCV-2954 SI Tank 6C Discharge Isolation Valve' HCV-2974 SI Tank 6D Discharge ' Isolation Valve SI-170 Crosstie from SDHX 4A to 4B SI-174 SD Cooling Discharge-Isolation Valve / OPS L t FC/SS-ST ER5. l l

. FORT CALHOUN STATION SS-ST-SI-3015-SURVEILLANCE TEST PAGE 45 OF 53 ATTACHMENT 8 Page 2 of 8 (Continued) INITIALS /DATE 4. If not on shutdown cooling ensure the following valves are CLOSED: Valve Descriotion (V) SI-306 SIRWT Fill Valve SI-183 Containment Spray Flow Test Stop Valve HCV-349 Cooled Water Suction to HPSI Pump SI-2B HCV-350 HPSI Pumps SI-2A and C Alternate Suction valve HCV-2914 SI Tank 6A Discharge Isolation Valve HCV-2934 SI Tank 6B Discharge ' solation Valve HCV-2954 SI Tank 6C Discharge Isolation Valve HCV-2974 SI Tank 6D Discharge Isolation Valve HCV-335 Shutdown Cooling Heat Exchanger Inlet Header Isolation Valve HCV-2983 Safety Injection Leakage ~ To CVCS Isolation Valve-HCV-341 Shutdown Cooling Heat Exchanger Outlet Temperature Control. Valve J 5. Ensure the following SDC FDC _ AC-4A Isolation Valves are-open: i SI-171 / OPS SI-172 / OPS FC/SS-ST R5

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 46 OF 53 ATTACHMENT 8 Page 3 of 8 (Continued) INITIALS /DATE 6. Uncap SI Tank (s) Vent Line(s): Tank h') SI-6A SI-6B SI-6C SI-6D / PE 7. Throttle SI Tank (s) Manual Vent Valves: Tanh Va1ve (Vi SI-6A NG-171 SI-6B NG-172 SI-6C NG-173 SI-6D NG-174 / OPS 8. Open SI Tank Vent to atmosphere valves as required to lower tank pressure to no lower than 25 psig then close valve: Tank Valve (v) SI-6A HCV-2630 SI-6B HCV-2632-SI-- 6 C HCV-2634 SI-6D HCV-2636 / OPS l-i { FC/SS-ST R5 i ,~

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 47 OF 53 ATTACHMENT 8 Page 4 of 8 (Continued) INITIALS /DATE 9. Ensure the SIRWT. Suction to SI Pumps is OPEN for the desired Containment Spray Pump: Containment Spray Pump Pumo Valve (V) SI-3A LCV-383-2 SI-3B LCV-383-1 SI-3C LCV-383-1 / OPS 10. Open the Suction Valve:for the desired Containment Spray Pump: Pump VaIve (V) SI-3A HCV-2957 SI-3B HCV-2967 SI-3C HCV-2977 / OPS 11. Open the Discharge Valve for the desired Containment Spray Pump: Pump Valve (v) SI-3A HCV-2958 SI-3B HCV-2968 SI-3C HCV-2978 / OPS FC/SS-ST -R5: 1

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE.4G OF 53 ATTACIIMENT 8 Page 5 of 8 1 (Continued) INITIALS /DATE 12. Open the Recirculation Isolation Valve to SIRWT for the desired Containment Spray Pump: Pumo Valve (V) SI-3A SI-138 SI-3B SI-146 SI-3C SI-152 / OPS 13. Ensure the Minimum Recirculation Stop s Valve for the inservice LPSI Pump is closed: (N/A if SOC not in service) Pumn Valve (V) SI-1A SI-132 SI-1B SI-124 / OPS 14. Open both SI Minimum Recirculation to SIRWT Isolation Valves: HCV-385 / OPS HCV-386 / OPS 15. Verify both Containment Spray Valve Test Switches are in TEST: HCV-344 Test Switch / OPS HCV-345 Test Switch / OPS FC/SS-ST RS-

FORT CALHOUN STATION SS-ST-Sl-3015 R SURVEILLANCE TEST PAGE 49 OF 53 ATTACHMENT 8 Page 6 of 0 (Continued) ] INITIALS /DATE 16. Verify both HCV-344/345 SET SPRAY - i PUMPS TEST PERMIT annunciators are IN ALARM: / A33-1, H-5 OPS A34-1, H-3 / OPS 17. Start the' desired Containment Spray Pump. / OPS 18. Open the Fill and Drain Valve (s) for the Tank (s) to be filled: lad.li Va1vt M SI-6A HCV-2916 SI-6B HCV-2936 SI-6C HCV-2956 SI-6D HCV-2976 / OPS - 19. Unlock and open SI Tank Fill Isolation Valve SI-185. / OPS 20. -Unlock and throttle open Containment Spray to SI Check Valve Leakage Header-Valve SI-342. / OPS CAUTION As SI Tank level increases SI Tank pressure will also increase. Do not allow tank pressure to exceed 260 psig. 21. Fill and/or vent SI Tanks as necessary 1 to achieve a level and pressure as ) indicated on Attachment 5 of this procedure. / OPS .FC/SS-ST R5. i

FORT CALHOUM STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 50 OF 53 ATTACHMENT 8 Page 7 of 8 (Continued) INITIALS /DATE 22. When'SI Tank (s) reach desired indicated-level, THEN close their respective Fill and Drain Valve. Repeat as necessary for subsequent tank fillings. Tank Valve (V) SI-6A HCV-2916 SI-6B HCV-2936 SI-6C HCV-2956 SI-6D HCV-2976 / OPS 23. LOCK CLOSED SI-342. / OPS 24. Stop the Containment Spray Pump. / OPS-25. LOCK CLOSED the Minimum Recirculation Isolation Valve for the containment Spray Pump used. Pump Valve (V) SI-3A SI-138 SI-3B-SI-146 SI-3C SI-152- / OPS 26. Ensure SI Tank Vent to Atmosphere Valve (s) are closed: Tank Valve (V) SI-6A HCV-2630 SI-6B HCV-2632 SI-6C HCV-2634 SI-6D HCV-2636 / OPS j FC/SS-ST R5 l

FORT CALHOUN STATION SS-ST-SI-3015 SURVEILLANCE TEST PAGE 51 OF 53 ATTACHMENT 8 Page 8 of 8 (Continued) LNITIALS/DATE 27. Close SI Tank Manual Vent Valves (N/A if_ valves-arc desired to remain open-at Shift' Supervisor's discretion): Ign}; Valve (V) SI-6A NG-171 SI-6B NG-172 SI-6C NG-173 SI-6D NG-174 / OPS 28. Replace caps on SI Tank Vent Lines-(N/A if Ocss are desired to remain oft at the discretion of the Shift-Supervisor): Tank (V) SI-6A SI-6B SI-6C SI-6D / PE 29. LOCK CLOSED SI-185. / OPS -/ IND VER 30. Close the Discharge Valve opened in Step 10 (N/A-if-desired to remain open at Shift Supervisor's discretion). / OPS-31. Open SI-170. / OPS 32. Open SI-174. / OPS FC/SS-ST RS

FORT CAIJiOUN STATION SS-ST-SI-3015 -SURVEILLANCE TEST PAGE 52 OF 53 SURVEILLANCE TEST SIGNATURE SHEET All persons participating in the performance of this test shall-enter their printed name, signature and initials below. NAME (PRINT) SIGNATURE JJgg L i n N 9 I FC/SS-ST R5 =

f D FORT CALHOUN STATION 'SS-ST-SI-3015 SURVEILLANCE' TEST PAGE.53 OF 53 COMMENT SHEET / CHRONOLOGICAL LOG. I r L I FC/SS-ST R5

(Left Blank Intentionally) i I i l h}}