{{#Wiki_filter:I LOUISIANA /           ,42Oua m e meu                                           !
{{#Wiki_filter:I LOUISIANA
POWER & LIGHT / P O BOX 6008
/,42Oua m e meu POWER & LIGHT / P O BOX 6008
* NdW ORLEANS. LOUISIANA 70174 * (504) 366-2345
* NdW ORLEANS. LOUISIANA 70174 * (504) 366-2345
{
{
  $iEISNdYSSE                                                                                                     )
$iEISNdYSSE
)
July 29, 1983 i
July 29, 1983 i
W3183-0255
W3183-0255
)                                                                               Q-3-A35.07.77 3      [h [ h[M Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012                                                                         NE - 91983
)
Q-3-A35.07.77 Mr. John T. Collins, Regional Administrator, Region IV
' 3 [h [ h[M U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 NE - 91983


==SUBJECT:==
==SUBJECT:==
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 77
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 77
                                " Inadequate Containment Purge Valves Closure Time and Flow Rate" Fourth Interim Report
" Inadequate Containment Purge Valves Closure Time and Flow Rate" Fourth Interim Report


==REFERENCE:==
==REFERENCE:==
Line 33: Line 36:


==Dear Mr. Collins:==
==Dear Mr. Collins:==
The above referenced letter indicated submittal of a Final Report to the USNRC no later than July 29, 1983.
The above referenced letter indicated submittal of a Final Report to the USNRC no later than July 29, 1983.
The supporting documentation for this SCD is presently under review.                                 Completion of this review is expected in September 1983.
The supporting documentation for this SCD is presently under review.
Completion of this review is expected in September 1983.
A Final Report will therefore be submitted to the USNRC by October 14, 1983.
A Final Report will therefore be submitted to the USNRC by October 14, 1983.
Very truly yours,
Very truly yours,
      //
/
F. J. Drummond pn m Project Support Manager - Nuclear FJD/WAC/ MAL:keh cc:   1) Director                                                           3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
/
: 2) Director                                                           4) Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8308160212 830729                                                                   -
pn m F. J. Drummond Project Support Manager - Nuclear FJD/WAC/ MAL:keh cc:
gDRADOCK 05000382 PDR
: 1) Director 3)
[h" 2-7 >
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
                                                                                          //O}}
20555
: 2) Director 4)
Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8308160212 830729 gDRADOCK 05000382
[h" 2-7 PDR
//O}}

Latest revision as of 01:26, 15 December 2024

Fourth Interim Rept of Significant Const Deficiency 77 Re Inadequate Containment Purge Valve Closure Time & Flow Rate.Review Completion Expected in Sept 1983.Final Rept Will Be Submitted by 831014
ML20077J314
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/29/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, 77, W3I83-0255, W3I83-255, NUDOCS 8308160212
Download: ML20077J314 (1)


Text

I LOUISIANA

/,42Oua m e meu POWER & LIGHT / P O BOX 6008

  • NdW ORLEANS. LOUISIANA 70174 * (504) 366-2345

{

$iEISNdYSSE

)

July 29, 1983 i

W3183-0255

)

Q-3-A35.07.77 Mr. John T. Collins, Regional Administrator, Region IV

' 3 [h [ h[M U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 NE - 91983

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 77

" Inadequate Containment Purge Valves Closure Time and Flow Rate" Fourth Interim Report

REFERENCE:

LP&L letter W3I83-0230 dated July 5, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than July 29, 1983.

The supporting documentation for this SCD is presently under review.

Completion of this review is expected in September 1983.

A Final Report will therefore be submitted to the USNRC by October 14, 1983.

Very truly yours,

/

/

pn m F. J. Drummond Project Support Manager - Nuclear FJD/WAC/ MAL:keh cc:

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 8308160212 830729 gDRADOCK 05000382

[h" 2-7 PDR

//O