ML20083D024: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-            -  .              -
{{#Wiki_filter:-
    &>-fz1) q'25-DW                                   Y/9 95                 I ik03 M ? E
&>-fz1) q'25-DW Y 9 95 I ik03 M ? E
                                                                                        @"7950,     ""
/
pap 1 of 1-q                                        TAPE #40                                                                       I
@"7950, pap 1 of 1-TAPE #40 q
                                                                                    % HM -3 P3128 SEGMENT #1                                                                                                   J Tr Pg.15 Date : 410 00                                                         0FFICE OF SECRETARY Location: Adminestration Building                                     00CKETiNG & SEfiVICE                     I 2nd floorlarge conference room                                           BitANCH Bockhold: We went thru diesel testing in all it's gory detail, uh, uh, and talked about                         1 each of the runs and each of the testings and items associated with it,                           l and we basically told them that the diesel was operable. They , uh, I believe                     I accepted that fact.                                                                                 '
% HM -3 P3128 SEGMENT #1 J
SEGMENT #2 Tr Pg.16-18 Date : 410-90 Location: Adminestration Building 2nd floorlarge conference room Mosbaugh: George , on item 4 here in the letter from Hairston, the one that talks about
Tr Pg.15 Date : 410 00 0FFICE OF SECRETARY Location: Adminestration Building 00CKETiNG & SEfiVICE 2nd floorlarge conference room BitANCH Bockhold: We went thru diesel testing in all it's gory detail, uh, uh, and talked about 1
  ,                    air quality.
each of the runs and each of the testings and items associated with it, l
and we basically told them that the diesel was operable. They, uh, I believe accepted that fact.
SEGMENT #2 Tr Pg.16-18 Date : 410-90 Location: Adminestration Building 2nd floorlarge conference room Mosbaugh: George, on item 4 here in the letter from Hairston, the one that talks about air quality.
Bockhold: Yes.
Bockhold: Yes.
Mosbaugh: I guess when that came up toward the end of last week I recalled a period of time, a substantial period of time where one of the compressors, the refrigeration compressors, in one of the diesels had been out of service for a long period of time.
Mosbaugh: I guess when that came up toward the end of last week I recalled a period of time, a substantial period of time where one of the compressors, the refrigeration compressors, in one of the diesels had been out of service for a long period of time.
And so I had ask some of the engineers to check into that and see if that was on unit 1's or 2's diesel and so forth. And some of that information has come back.
And so I had ask some of the engineers to check into that and see if that was on unit 1's or 2's diesel and so forth. And some of that information has come back.
And I know- I think also--I think the team, lli team, has asked for some specific requests in that area. But who has done - who has done this review that has drawn                 ,
And I know-I think also--I think the team, lli team, has asked for some specific requests in that area. But who has done - who has done this review that has drawn these conclusions?
these conclusions?
Bockhold. The 1 A diesel, the I&C information that we have for the past year, uh, basically shows that there have been only short periods of time where air quality was--
Bockhold. The 1 A diesel, the I&C information that we have for the past year, uh, basically shows that there have been only short periods of time where air quality was--
wasn't in.
wasn't in.
Kitchens: Again, yesterday we talked about what the results of the PM's were. I made one up, got it to Herb yesterday,1 A diesel for the past year, all the PM's. We missed two months in the earlier year. Starting last March passed all the times but two. One of the times was March 31st. (inaudible). The other one it was a httle too cold. We don 1 have- when we do the PM, we're very                           !
Kitchens: Again, yesterday we talked about what the results of the PM's were. I made one up, got it to Herb yesterday,1 A diesel for the past year, all the PM's. We missed two months in the earlier year. Starting last March passed all the times but two. One of the times was March 31st. (inaudible). The other one it was a httle too cold. We don 1 have-when we do the PM, we're very regular for the last year and have not had any pmblems. We had to replace one
regular for the last year and have not had any pmblems. We had to replace one                     )
)
air dryer on Unit 2, I think.
air dryer on Unit 2, I think.
Mosbaugh: Unit 1 A diesel refftgeration compressor was out of service for a year or so according to one of the-l Kitchens: I only went back for one year. I didn1 go back three or four or five years.' For -                   j the last year they have not been out of service and they have passod thoreon.                       l There has been some corrective maintenance which, that's been done to them.                       j
Mosbaugh: Unit 1 A diesel refftgeration compressor was out of service for a year or so according to one of the-Kitchens: I only went back for one year. I didn1 go back three or four or five years.' For -
                                                                                                                        'l l
j the last year they have not been out of service and they have passod thoreon.
9505230309 950419 gDR   ADOCK 05000424 PDR
There has been some corrective maintenance which, that's been done to them.
j
'l l
9505230309 950419 gDR ADOCK 05000424 PDR


x
x U _,.
                                                                  ',    U _,.
O O
O l
NUCLEAR REGULATORY COMMIS510N re.42 y-a.4 -)
l l
1* * ' 2 I Doc ket No. t* -v 2 f ** d-3 Official Exh. No.
I O
In t'ta Ntbr ef (foA4 (<
NUCLEAR REGULATORY COMMIS510N re.42 y-a .4 -)
LA a l + 5
Doc ket No. t* -v 2 f ** d-3   Official Exh. No.
(*2 Str.ft_
1* * ' 2 I In t'ta Ntbr ef     (foA4   (<       LA a l + 5     (*2 Str.ft_                       IETNilflED           v RECEl\ID             7 Await ___
IETNilflED v
le!.evt.cr       #            iLJECIED Cx.t0 0:'r Conta: tor                     DATE       o '/ - f 9 - "I 0;*:er                         vntaess       B u, t ko (cf Refuter           7. 7 : l ?- i k l}}
RECEl\\ID 7
Await ___
iLJECIED le!.evt.cr Cx.t0 0:'r Conta: tor DATE o '/ - f 9 - "I 0;*:er vntaess B u, t ko (cf Refuter
: 7. 7 : l ?- i k l}}

Latest revision as of 07:06, 14 December 2024

Intervenor Exhibit I-MOSBA-25,consisting of Segment 1,to Tape 40
ML20083D024
Person / Time
Site: Vogtle  
Issue date: 04/19/1995
From:
AFFILIATION NOT ASSIGNED
To:
References
OLA-3-I-MOS-025, OLA-3-I-MOS-25, NUDOCS 9505230309
Download: ML20083D024 (2)


Text

-

&>-fz1) q'25-DW Y 9 95 I ik03 M ? E

/

@"7950, pap 1 of 1-TAPE #40 q

% HM -3 P3128 SEGMENT #1 J

Tr Pg.15 Date : 410 00 0FFICE OF SECRETARY Location: Adminestration Building 00CKETiNG & SEfiVICE 2nd floorlarge conference room BitANCH Bockhold: We went thru diesel testing in all it's gory detail, uh, uh, and talked about 1

each of the runs and each of the testings and items associated with it, l

and we basically told them that the diesel was operable. They, uh, I believe accepted that fact.

SEGMENT #2 Tr Pg.16-18 Date : 410-90 Location: Adminestration Building 2nd floorlarge conference room Mosbaugh: George, on item 4 here in the letter from Hairston, the one that talks about air quality.

Bockhold: Yes.

Mosbaugh: I guess when that came up toward the end of last week I recalled a period of time, a substantial period of time where one of the compressors, the refrigeration compressors, in one of the diesels had been out of service for a long period of time.

And so I had ask some of the engineers to check into that and see if that was on unit 1's or 2's diesel and so forth. And some of that information has come back.

And I know-I think also--I think the team, lli team, has asked for some specific requests in that area. But who has done - who has done this review that has drawn these conclusions?

Bockhold. The 1 A diesel, the I&C information that we have for the past year, uh, basically shows that there have been only short periods of time where air quality was--

wasn't in.

Kitchens: Again, yesterday we talked about what the results of the PM's were. I made one up, got it to Herb yesterday,1 A diesel for the past year, all the PM's. We missed two months in the earlier year. Starting last March passed all the times but two. One of the times was March 31st. (inaudible). The other one it was a httle too cold. We don 1 have-when we do the PM, we're very regular for the last year and have not had any pmblems. We had to replace one

)

air dryer on Unit 2, I think.

Mosbaugh: Unit 1 A diesel refftgeration compressor was out of service for a year or so according to one of the-Kitchens: I only went back for one year. I didn1 go back three or four or five years.' For -

j the last year they have not been out of service and they have passod thoreon.

There has been some corrective maintenance which, that's been done to them.

j

'l l

9505230309 950419 gDR ADOCK 05000424 PDR

x U _,.

O O

NUCLEAR REGULATORY COMMIS510N re.42 y-a.4 -)

1* * ' 2 I Doc ket No. t* -v 2 f ** d-3 Official Exh. No.

In t'ta Ntbr ef (foA4 (<

LA a l + 5

(*2 Str.ft_

IETNilflED v

RECEl\\ID 7

Await ___

iLJECIED le!.evt.cr Cx.t0 0:'r Conta: tor DATE o '/ - f 9 - "I 0;*:er vntaess B u, t ko (cf Refuter

7. 7 : l ?- i k l