{{Adams
#REDIRECT [[SNRC-1018, Interim Deficiency Rept Re Failure of Turbocharger on Emergency Standby Diesel Generator.Temporary Bypass Valve Around Turbocharger Prelube Drip Line Orifice Installed. W/Certificate of Svc.Related Correspondence]]
| number = ML20087F487
| issue date = 03/09/1984
| title = Interim Deficiency Rept Re Failure of Turbocharger on Emergency Standby Diesel Generator.Temporary Bypass Valve Around Turbocharger Prelube Drip Line Orifice Installed. W/Certificate of Svc.Related Correspondence
| author name = Mccaffrey B
| author affiliation = LONG ISLAND LIGHTING CO.
| addressee name = Murley T
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000322
| license number =
| contact person =
| document report number = SNRC-1018, NUDOCS 8403190127
| document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| page count = 4
}}
 
=Text=
{{#Wiki_filter:,    i      =
REU TZD CUiEEbFCN vs gg mm LONG ISLAND LIGHTINECOMPANY SHOREHAM NUCLEAR POWER STATION p.o. SOX 618. NORTH COUNTRY R
* O      .Y.11792 March 9, 1984                                            U F(i i.i il ..
00CEigCg,      ,
SNRC-1018 Dr. Thomas E. Murley Regional Adminiatrator Office of Inspection & Enforcement - Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA          194J6 Long Island Lighting Company Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322
 
==Dear Dr. Murley:==
 
On February      4, in accordance with 10CFR50.55 (e) , we reported verbally to Region 1 a potential deficiency concerning the failure of the turbocharger on one of Shoreham's Emergency Standby Diesel Generators.        This letter serves as our 30-day follow-up written report regarding that potential deficiency.
Description of the Deficiency On February        1,  the turbocharger on Diesel                Generator 101 (lR43*ENG101) failed in service causing a premature shutdown of Diesel Generator 101. On February 4, the turbocharger was disas-sembled      for purposes of conducting a preliminary failure inves-tigation.
that              Based upon the results of that inspection, it appeared the turbocharger failure res',ited from inadequate lubrication of the turbine end thrust bearing.
Inadequate turbocharger thrust bearing lubrication was the subject of a previous reportable condition under 10CFR21 (ref: TDI memo Mathews      to NRC 12/16/80), which was corrected on applicable nuclear engines, including Shoreham.
As the Diesel Generator 101 turbocharger inspection results indicated, the design modification provided by Transamerica Delaval, Inc. (TDI), to correct this problem may not have been completely effective.
On February        5,    the  turbocharger on Diesel Generator 103 y
i=4        (lR43*ENG103) also exhibited indications of incipient failure which resulted      in termination of the Diesel Generator 103 test run.
Subsequent inspection of the turbocharger evidenced a failure mechanism similar to that of the Diesel Generator 101 turbocharger.
l      -
8403190127 840309 i      ==
rs=
PDR ADOCK 05000322
,                          0                  PDR
 
(              .
Mtarch 9, 1984 SNRC-1018 Page 2 Desigr. Review / Quality Revalidation inspections conducted on the Diesel Generator 102 (1R43*ENG 102) turbocharger have shown excessive thrust bearing wear, which appears consistent with the Diesel Generator 101 and 103 turbocharger failures.
As this eNdence strongly suggests the existence of a generic deficiency, we requested TDI to address reportability under 10CFR21. TDI has concluded that a reportable deficiency under 10CFR21 exists and has notified the NRC and all potentially affected owners (ref. memo Mathews to NRC, 2/15/84).
            ,              Corrective Action and Action to Prevcnt Recurrence In order to confirm the findings of the preliminary failure inves-tigation, the turbine end thrust bearings from Diesel Generators 101, 102 and 103 were sent to Failure Analysis Associates (FaAA) for inspection. A failure analysis by FaAA has determined that the damage to the bearings can be attributed to high wear while sta-ting, when the turbocharger is accelerated with limited l<;ricant present.
Based upon recommendations made                  by TDI and Elliott    (the turbocharger manufacturer) , LILCO has installed a temporary by-pass valve around the turbocharger prelube drip line orifice.                    By opening the by-pass valve prior to engine start and allowing it to remain open until the engine is running and normal oil pressure is achieved, the turbocharger will receive adequate lubrication such that failures of the type experienced will be precluded.                  TDI has indicated that the3- recommended permanent corrective action will be providad to all .ffected owners by March. 30, 1984. Upon receipt of this information, we will initiate the appropriate permanent modifications on all' engines.                The interim steps outlined above, however, will ensure that the diesel generators are available to perform their safety function until the permanent modifications are made. The schedule fsr completion of.all corrective actions will be developed consistent with material delivery commitments and engine testing schedule requirements.
If you have any questions relative to this matter, please do not hesitate to contact this office.
Very truly youn ,
                            /;,e i f - w<
B. R. McCaf                          e -
Manager, Nuclear Compliance & Safety Shoreham Nuclear Pcwer Station WMJ/cf    S4 cc:  Mr. Richard DeYoung, Director NRC Office of Inspection & Enforcement Division of Reactor Operating Inspection Washington, DC                    20555 Mr. R. Caruso, NRC NRR Mr.,C. Petrone, Site NRC
 
  . f        .
ATDOM!NT I Diesel Generators CCfMETET
                                                                            ;m:
Lawrence J. Brenner, Esq.
* Ralph Shapiro, Esq.
Ahninistrative Judge                                C mu.u=
Atmfc Safety and Licensing Board                              mi'T"9\10 :59 9 East Ot/IStreet U.S. Nuclear Regulatory Ommission                  New York, NY 10016
,        Washington, D.C. 20555                                  kFFia Howard  O fp,0F $M:,;" & g ,.
Dr. George A. Ferguson
* 217 Newbr          'd Abninistrative Judge                              Hicksville, NY 11801 Atanic Safqty and Licensing Board Sdiool of Engineering                      "
W. Taylor Reveley, III, Esq. **
Howard University                                  Hunton & Williams 2300 6th Street, N.W.                              P. O. Box 1535 washington, D.C. 20059                            707 East Main Street Riclinond, VA 23212 Dr. Peter A. N rris
* hininistrative Judge                              Mr. Jay Dunkleberger Atanic Safety and Licensing Board                  New York State Energy Office U.S. Nuclear Regulatory Ccmnission                Agancy Building 2 Washington, D.C. 20555                          Jhpire State Plaza Albany, NY 12223 Erlward M. Barrett, Esq.
General Counsel                                    James B. Dougherty Icng Island Lighting ocmpany                        3045 Porter Street, N.W.
250 Old Country Road                              Washington, D.C.      20008 Mineola, NY 11501 Stephen B. Latham, Esq.
Mr. Brian McCaffrey                                'IWaney, Iatham & Shea Iong Island Lighting Cmpany                        P.O. Box 398 P. O. Box 618                                      33 West Second Street North Country Pcad                                Riverhead, NY 11901 Wading River, NY 11792 Marc W. Goldsmith Jeff Smith                                        Energy Research Group, Inc.
Shoreham Nuclear Power Station                    400-1 Totten Pond Road P.O. Box 618                                      Waltham, Massachusetts 02154 North Country Road Wading River, NY 11792                            - MHB 'Ibchnical Associates 1723 Hamilton Avenue Joel Blau, Esq.                                      Suite K New York Public Service Ccmnission                  San Jose, CA 95125
      'Ihe Governor Nelson A. Rockefeller Building Dipire State Plaza Hon. Peter F. Cohalan Albany, NY 12223                                    Suffolk County Executive H. Iee Dennison Building Martin Bradley Ashare, Esq.                          Veterans Mernorial Highway Suffolk County Attorney                              Hauppauge, New York 11788 H. Iee Dennison Building                                                              l i
Veterans Menorial Higlway                            Ezra I. Bialik, Esq.            l Hauppauge, New York 11788                            Assistant Attorney General      !
Environnental Protection Bureau  !
Atanic Safety and Licensing Board Panel              New York State Department of Iaw U.S. Nuclear Regulatory Ccmnission                    2 World Trade Center            )
l Washington, D.C.      20555                              New York, NY 10047          '
i I
f
 
  .      6*
D.G. Att. 1 Page 2 Docketing and Service Section        Atcnnic Safety and Licensing Appeal Office of the Secretary                  Board U. S. Nuclear Regulatory Ca mission  U.S. Nuclear Regulatory Ccenission 1717 H Street, N.W.                  Washington, D.C. 20555 Washington, D.C.      20555 Jonathan D. Feinberg, Esq. #
Richard J. Coddard, Esq.
* Staff Counsel Ralph Caruso                          New York State Public Service U. S. Nuclear Regulatory Cm mission      Cm mission Washington,.D.C. 20555              ,
                                              .5 lbckefeller Plaza Albany, NY 12223 Stuart Diamond                        Stewart M. Glass, Esq.
Envirornent/ Energy Writer NEWSDAY Regional Counsel Federal Bnergency Managment Agency Img Island, NY 11747 26 Federal Plaza Gerald C. Crotty, Esq.
New York, NY 10278 Ccunsel to the Governor              Ibbert E. Snith, Esq.
Executive Chaber State Capitol                        Guggenheimer & Untermyer Albany, NY 12224                      80 Pine Street New York, NY 10005 Fabian Palcmino, Esq. #
Special Counsel to the Governor Executive Chanber Roca 229 State Capitol Albany, NY 12224 1
                                                                                  /
            # By Federal Express
* By Hand Delivery
            ** By 'nelecopier
_.}}