ML20087P367: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:--
{{#Wiki_filter:--
        ~
~
    .. . s U- 0704 0210-L L 3 4 ( 2 9 )-8 4 (03 - 30 )-L ILLINDIS POWER 00MPANY CLINTON POWER STATION, P.o. BOX 678, CLINTON ILLINOIS 61727 March 30, 1984 Docket No.-50-461 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555                                               o S
... s U- 0704 0210-L L 3 4 ( 2 9 )-8 4 (03 - 30 )-L ILLINDIS POWER 00MPANY CLINTON POWER STATION, P.o. BOX 678, CLINTON ILLINOIS 61727 March 30, 1984 Docket No.-50-461 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555 o
S


==Subject:==
==Subject:==
Line 25: Line 31:


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
Illinois Power Company hereby files Amendment No. 29 dated March, 1984, for the Clinton Final Safety Analysis Report (CPS-FSAR).
Illinois Power Company hereby files Amendment No. 29 dated March, 1984, for the Clinton Final Safety Analysis Report (CPS-FSAR). FSAR Amendment-No. 29 presents changes that update and clarify information. The major changes consist of:
FSAR Amendment-No. 29 presents changes that update and clarify information.
a)   Revisions to Chapter 13 to reflect the current organizational. structure,. training programs, plant procedures, and an updating of resumes in Appendix
The major changes consist of:
                            -13A; b)   Additional information in Section 3.9 on HVAC ductwork design; c) . Revisions to Section 3.9.on Fuel Assembly design; d)   Changes to Section 9.5.on Fire Protection; e)   Revisions to Chapter.17 on the Quality Assurance organization responsibilities.         These changes do not reduce any quality program commitments; f)' Revisions to Appendix D on the TMI action plan responses, including.HPCS logic modifications.
a)
Revisions to Chapter 13 to reflect the current organizational. structure,. training programs, plant procedures, and an updating of resumes in Appendix
-13A; b)
Additional information in Section 3.9 on HVAC ductwork design; c)
. Revisions to Section 3.9.on Fuel Assembly design; d)
Changes to Section 9.5.on Fire Protection; e)
Revisions to Chapter.17 on the Quality Assurance organization responsibilities.
These changes do not reduce any quality program commitments; f)'
Revisions to Appendix D on the TMI action plan responses, including.HPCS logic modifications.
i I
i I
d.
d.
            @*Mwann,               -
@*Mwann, PDR a-
a-                       PDR


m
m
  ,- .. . ' h'
,-... ' h'
                                                                            ' U- 0704 0210-L L34 (29)-84 (03 -30 )-L March 30, 1984 Three (3)Lsigned originals and eighty-five (85) copies are furnished for amending.the FSAR sets provided to NRC per
' U- 0704 0210-L L34 (29)-84 (03 -30 )-L March 30, 1984 Three (3)Lsigned originals and eighty-five (85) copies are furnished for amending.the FSAR sets provided to NRC per
                            .10CFR50.30.
.10CFR50.30.
                      -                                                      Sincerely yours,
Sincerely yours,
            'V
'V
[                                                           D. P. Hall Vice President
[
                        '''b1H: lam
D.
                          . enclosures
P.
                          ' S u b s c r'i b e d a n'd sworn to before me the Godh. day of March, 1984.
Hall Vice President
114x      $ Osw Notary Public My Commission E4 res.'./.b. . . /. . . .A..d..
'''b1H: lam
. enclosures
' S u b s c r'i b e d a n'd sworn to before me the Godh. day of March, 1984.
$ Osw 114x Notary Public My Commission E4 res.'./.b... /....A..d..
I V
I V
2 ud}}
2 ud}}

Latest revision as of 14:51, 13 December 2024

Forwards Amend 29 to Fsar.Changes Consist of Revs to Fuel Assembly Design,Fire Protection,Qa Organization Responsibilities & TMI Action Plan Responses,Including HPCS Logic Mods
ML20087P367
Person / Time
Site: Clinton 
Issue date: 03/30/1984
From: Hall D
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20087P368 List:
References
0210-L, 210-L, U-0704, U-704, NUDOCS 8404060342
Download: ML20087P367 (2)


Text

--

~

... s U- 0704 0210-L L 3 4 ( 2 9 )-8 4 (03 - 30 )-L ILLINDIS POWER 00MPANY CLINTON POWER STATION, P.o. BOX 678, CLINTON ILLINOIS 61727 March 30, 1984 Docket No.-50-461 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission Washington, D.

C.

20555 o

S

Subject:

Clinton Power Station Unit 1 FSAR Amendment No. 29

Dear Mr. Denton:

Illinois Power Company hereby files Amendment No. 29 dated March, 1984, for the Clinton Final Safety Analysis Report (CPS-FSAR).

FSAR Amendment-No. 29 presents changes that update and clarify information.

The major changes consist of:

a)

Revisions to Chapter 13 to reflect the current organizational. structure,. training programs, plant procedures, and an updating of resumes in Appendix

-13A; b)

Additional information in Section 3.9 on HVAC ductwork design; c)

. Revisions to Section 3.9.on Fuel Assembly design; d)

Changes to Section 9.5.on Fire Protection; e)

Revisions to Chapter.17 on the Quality Assurance organization responsibilities.

These changes do not reduce any quality program commitments; f)'

Revisions to Appendix D on the TMI action plan responses, including.HPCS logic modifications.

i I

d.

@*Mwann, PDR a-

m

,-... ' h'

' U- 0704 0210-L L34 (29)-84 (03 -30 )-L March 30, 1984 Three (3)Lsigned originals and eighty-five (85) copies are furnished for amending.the FSAR sets provided to NRC per

.10CFR50.30.

Sincerely yours,

'V

[

D.

P.

Hall Vice President

b1H: lam

. enclosures

' S u b s c r'i b e d a n'd sworn to before me the Godh. day of March, 1984.

$ Osw 114x Notary Public My Commission E4 res.'./.b... /....A..d..

I V

2 ud