05000366/LER-1979-135, Updated LER 79-135/03X-1:on 791219,power Supply a for RCIC Steam Leak Detection Sys Failed.Caused by Excess Current on 125-volt Dc Input to Power Supplies Blowing Fuses 7A & 7B.Fuses Replaced: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000366/LER-1979-135, Forwards Updated LER 79-135/03X-1]]
| number = ML20064M271
| issue date = 02/08/1983
| title = Updated LER 79-135/03X-1:on 791219,power Supply a for RCIC Steam Leak Detection Sys Failed.Caused by Excess Current on 125-volt Dc Input to Power Supplies Blowing Fuses 7A & 7B.Fuses Replaced
| author name = Tipps S
| author affiliation = GEORGIA POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000366
| license number =
| contact person =
| document report number = LER-79-135-03X, LER-79-135-3X, NUDOCS 8302150517
| package number = ML20064M241
| document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| page count = 2
}}
{{LER
| Title = Updated LER 79-135/03X-1:on 791219,power Supply a for RCIC Steam Leak Detection Sys Failed.Caused by Excess Current on 125-volt Dc Input to Power Supplies Blowing Fuses 7A & 7B.Fuses Replaced
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000366
| LER year = 2079
| LER number = 135
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:
}}
 
{{LER-Nav}}

Latest revision as of 13:05, 6 January 2021