05000272/LER-1982-016, Corrected LER 82-016/04L-0:on 820326,during Gaseous Release from Waste Gas Sys,Containment/Plant Vent Monitors 1R11A, 1R12A & 1R12B Incorrectly Aligned.Caused by Operator Failure to Properly Perform Operating Instruction: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000272/LER-1982-016, Forwards LER 82-016/03L-0.Detailed Event Analysis Encl]]
| number = ML20065R446
| issue date = 04/13/1982
| title = Corrected LER 82-016/04L-0:on 820326,during Gaseous Release from Waste Gas Sys,Containment/Plant Vent Monitors 1R11A, 1R12A & 1R12B Incorrectly Aligned.Caused by Operator Failure to Properly Perform Operating Instruction
| author name = Frahm R
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000272
| license number =
| contact person =
| document report number = LER-82-016-04L, LER-82-16-4L, NUDOCS 8210290218
| package number = ML20065R440
| document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| page count = 1
}}
{{LER
| Title = Corrected LER 82-016/04L-0:on 820326,during Gaseous Release from Waste Gas Sys,Containment/Plant Vent Monitors 1R11A, 1R12A & 1R12B Incorrectly Aligned.Caused by Operator Failure to Properly Perform Operating Instruction
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000272
| LER year = 2082
| LER number = 16
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:
}}
 
{{LER-Nav}}

Latest revision as of 08:35, 23 May 2020